23-104800Mechanical
City of Federal Way
Community Development Dept
•
Permit #•23-104800-00-ME
33325 8th Ave S
Federal Way, WA 98003
.
Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: REUSSER
Project Address: 28705 14TH AVE S
Parcel Number: 720300 0620
Project Description: replace gas water heater in same location
Owner
Applicant
Contractor
PATTI A REUSSER
PERMIT DEPARTMENTDRF WATER
SMART WATER EXPERTS (PLUMBING)
28705 14TH AVE S
HEATING SOLUTIONS
SMARTWE782KP(8/2/24)
FEDERAL WAY, WA 98003
10242 S BODE ST
10242 BODE ST
PLAINFIELD IL 60585
PLAINFIELD IL 60585
Additional Permit Information
Mechanical Work Valuation? ............... I.................. 2687.65 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures I
Hot Water Tanks 1
PERMIT EXPIRES Tuesday, 26 March, 2024
Permit Issued on Thursday, September 28, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: UNH Date:
N Noun
■ ■ w...
FINALIEJ)
CITY or
Federal Way
THIS C ALRD IS TO REZI_AI\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-30-50
Scheduled inspections nLu. be failed if this card is not oti-site. DO NOT LOSE THIS CARD. Ltspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as. appropriate. Work uutst not be covered until it is approved. Check with your inspector if
you are unsure about am of the inspections or the inspection sequence. On -going inspections are loQL7ed on the back of this card.
ELECTRICAL
❑
LTFER Ground (4295)
El
Ditch cover (4030)
❑
Slab/Concrete Floor (42-5)
Approved
Approved
Approved to place concrete
By
Date
By
Date
Br
Date
Pool Bonding (4195)
❑
Temporar}• Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225}
ElCeiling
Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
]Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final -'Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
a Date