23-101948City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: WATT
Building - Single Family
Permit #:23-101948-00-SF
FINALEDIns ection Re uest Line: (253) 835_
3050
Project Address: 1434 S 290TH PL
Parcel Number: 516210 0320
Project Description: BLUEBEAM - Complete rebuild of first floor, and second floor patios. Front porch
replacement. No plumbing or mechanical.
Owner
Applicant
Contractor
Lender
STEVEN & MARY WATT
TARA
MASTERDECKS LLC
OWNER IS LENDER
1434 S 290TH PL
KADDOURAMASTERDECKS LLC
16910 59TH AVE NE SUITE 215-216
FEDERAL WAY WA 98003
16910 59TH AVE NE SUITE 215
ARLINGTON WA 98223
ARLINGTON WA 98223
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
#1
#2
#3
#4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
0
New / Additional Sq. Feet - 3rd Floor .....................
0
Occupancy #1 - Construction Type .........................
Type V - B
New / Additional Sq. Feet - Garage ........................
0
Plumbing Work Valuation? .....................................
0
Number of Stories ............... ................... :................
2
Is this an Online or O.T.C. application? ..................
No
New / Additional Sq. Feet - Total ...........................
1180
Comprehensive Plan Designation ........................... SF - High -Density
Residential
Total Valuation: 24,968.80
New / Additional Sq. Feet - 2nd Floor ....................
0
New / Additional Sq. Feet - Basement ....................
0
New / Additional Sq. Feet - Deck ..........................-
1085
Mechanical to be Included? .....................................
No
Mechanical Work Valuation? ..................................
0
New / Additional Sq. Feet - Other ...........................
95
Plumbing to be Included? ........................................
No
Occupancy #1 - Use .......................
Residence (1 or 2
family)
Zoning Designation .................................................
RS 9.6
No Fixtures Associated With This Permit 1!
CONDITIONS:
CONDITIONS OF FIRE APPROVAL:
1. Installation of an automatic fire sprinkler system is NOT REQUIRED.
2. Demolition and construction shall conform to the requirements of International Fire Code (IFC)
Chapter 33.
PERMIT EXPIRES Saturday, 28 October, 2023
Permit Issued on Monday, May 1, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the. City of Federal Way.
Owner or agent: F I I E Date.
n
A��
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 23 101948 00 Address: 1434 S 290TH PL
Project: STEVEN & MARY WATT FEDERAL WAY WA 98003-3761
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
1❑ SWM Precon Site Mtg (4400) '0 Site Assessment (Erosion) (4365) Footings/Setback (4110) T i%
Approved To be done PRIOR to breaking ground Approved to place commnc
By Date By Date By ^V Date -g//TL_
❑4 Foundation Wall (4115) Drainage/Downspout (4040) 0 Slab/Concrete Floor (4255)
Approved to place concrete Approved to backfill Approved to place concrete
By Date By Date By Date
E]
Underfloor Framing (4285)
0
Floor Sheathing (4105)
❑9
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
s ^- Roof Sheathing (4220)
Approved to install roofing
By Date
El Fire/Draft Stops (4095)
Approved
By Date
t'-
By
Interim Erosion Control (4370)
Approved
Date
Prior to scheduling a Framing inspection;
3 Framing (4120)
t4
Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed-
Appro%cc to insulate
]�
Approved to install wallboard
off and approved. IBC 109.3.4
S �
By J"J Date
t
By
Date
i s Gypsum Wallboard Nailing (4130)
16 Final Erosion Control (4375)
l ]
Final - Building (4050)
Approved to install mud & tape
Approved
Approved
By Date
By Date
By
Date !1 j =j6 �`•i = y
Q O1 /�
F9 - r,C D ^` Ly d P-C, V,
Rough Electrical
❑
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date