23-103390Plumbing
City oFFederal y
Community DevelopmenlopmenFILE Permit #:23-103390-00-PLt Dep[.
33325 Sth Ave S
Federal Way, WA 99003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MULTI -SERVICE CENTER
Project Address: 1217 SW 308TH ST Parcel Number: 072104 9177
Project Description: Replace plumbing fixtures; 3 toilets, 1 lav, 2 sinks, 1 electric water heater
Owner
Applicant
Contractor
SOUTH KING COUNTY MULTI-SER
KEVIN SAASENRADIANT PLUMBING &
RADIANT PLUMBING & HEATING INC
1200 S 336TH ST
HEATING
(PLUMBING)
FEDERAL WAY WA 98003
4516 S 8TH ST
RADIAPH79INR (8/17/23)
TACOMA WA 98405
4516 S 8TH ST
TACOMA WA 98405
Plumbing Fixtures
Lavatories 1 Sinks 2 Water Closets 3
Water Heaters l
PERMIT EXPIRES Saturday, 30 December, 2023
Permit Issued on Monday, July 3, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
(yNi-T111Fera-
on `Fedl Way.
Owner or agent: Date:
FINALED
N is.
CITY or `- -
Federal Way
THIS CARD IS TO REAL -MN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections nlay be failed if this card is not on -site. DO NOT LOSE TBIS CARD, Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work nnrst not be covered until it is approved. Check with dour inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are loaQed on the back of this card.
ELECTRICAL
❑
Bv
UFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
Q
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Poorer (4275)
Service (4235)
Approved
Approved
Approved
Br
Date
By
Date
By
Date
❑
Feeders/Sub-panels (404)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165)
❑' Gas Piping (4125)
El Final -Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By Date
PLUMBING
t❑ Plumbing Groundwork (4190)
❑ Rough Plumbing (4230)
❑ Final - Plumbing (4075)
Approved to cover
Approved
Approved
By Date
By Date 213
/
By , ' Date � � �