16-103923. — 0.
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835 -2807 Fax: (253) 835 -2809
Project Name: BRENNAN
Project Address: 433 S 2891M ST
Mechanical
Permit #: 16- 103923 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number. 515298 0210
Project Description: Change out existing gas furnace and add 2 ton Air Conditioner. Electrical connection for
gas furnace replacement.
Owne
ARRlican t
Contractor
ADRIAN J BRENNAN
JAIMIE HOW
BRENNAN HEATING & A/C LLC (GENERAL
HILDEGARD BRENNAN
BRENNAN HEATING & A/C
01)
433 S 289TH ST
4601 S 134TH PL
BRENNHA971R9 (12/29/17)
FEDERAL WAY WA 98003
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation ? ..... ...........................8370 Is this an Online or O.T.C. application ?................. Yes
Mechanical Fixtures
Air Conditioners - Stand Alone Un 1 Furnaces .......... ............................... 1
PERMIT EXPIRES Tuesday, February 7, 2017
Permit Issued on Thursday, August 11, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy'and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the Cavity of Federal Way.
Owner or agent: C Date:
FMALED
1" �&
MY Feclera! Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835.3050
PERMIT #: 16- 103923 -00 -ME Address: 433 S 289TH ST
Project: ADRIAN J BRENNAN FEDERAL WAY, WA 98003 -3609
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
SATE
Mechanical oug 4n (
as Piping (41
Final - Mechanical
Approved
Right of Way
Approved
Approved to release test
Approved
By
Date
By
Date
Date (,.— 7--4
SATE
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date