18-100103 Mechanical
City or Federal Way Permit #:18-100103-00-ME
community Development Dept. FILE
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: KINGS COURT APARTMENTS BLDG E
Project Address: 33312 22ND LN S Parcel Number:797820 0182
Project Description: Install ductless heat pump in each unit
Owner Applicant Contractor
K C HOUSING AUTHORITY GRACE GARLANDUCONS LLC UCONS LLC
600 ANDOVER PARK W 10612 NE 46TH ST UCONSL*962RZ(3/1/19)
TUKWILA WA 98188 KIRKLAND WA 98033
10612 NE 46TH ST
KIRKLAND WA 98033
Additional Permit Information
Mechanical Work Valuation9 10800 Is this an Online or O.T.C.application? Yes
Compressors/Heat Pumps 5
PERMIT EXPIRES Monday,9 July,2018
Permit Issued on Wednesday,January 10,2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: C Date:
w a r ,
'014
THIS CARD IS TO REMAIN ON-SITE
OF
Construction Inspection Record
Federal W� INSPECTION REQUESTS:(253)835-3050
PERMIT#: 18 100103 00 Address: 33312 22ND LN S Bldg E
Project: K C HOUSING AUTHORITY FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El Mechanical Rough-in(4165) E Gas Piping(4125) [] Final-Mechanical(4065)
Approved Approved to release test Approved
By Date `By Date By .„1 Date i-%4 tACX
•
0 Rough Electrical 0 Final ElectricalElRight of Way
Approved Approved Approved
By Date By Date By Date