18-102084y
s,
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
FILE
f
Electrical
Permit #:18 -102084 -00 -EL
Inspection Request Line: (253) 835-3050
Project Name: EMERALD SMOOTHIE.
Project Address: 2150 SW 336TH ST
Project Description: Replacing existing 2 ton heatpump with new & new t -stat
Parcel Number: 132103 9097
Owner
Applicant
Contractor
TWIN LAKES MALL LLC
TRIGVE FELTUSDESTINY CITY
DESTINY CITY ELECTRIC LLC
2300 SW 336TH ST
ELECTRIC LLC
DESTICE886N2 (8/22/18)
FEDERAL WAY WA 98023
11012 CANYON RD E SUITE 8-164
11012 CANYON RD E SUITE 8-164
PUYALLUP WA 98373
PUYALLUP WA 98373
Additional Permit Informatidn
Is this an Online or O.T.C. application? .................. Yes
Alt. Srvc / Feeder 0 to 200 aml 1 Low Voltage - Other (Commel 1 Thermostat 1
PERMIT EXPIRES Wednesday, 15 May, 2019
Permit Issued on Tuesday, May 15, 2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
Federal Way
PERMIT #: 18102084 00
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 2150 SW 336TH ST
Project: TWIN LADS MALL LLC FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
®
UFER Ground (4295)
n
Ditch cover (4030)❑
®
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
®
Pool Bonding (4195)
®
Temporary Power (4275)
®
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
7❑
Feeders/Sub-panels (4045)
®
Rough Electrical (4225)
®
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By Date .�
Rough Electrical
El
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date