Loading...
12-101749 wilding - Commercial City ofFederal Way - Permit #: 12-101749-00-CO Community&EcoEcon.Dev.Services 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax (253)835-2609 Inspection Request Line: (253)835-3050 Project Name: TAMU FOODS INC Project Address: 1112 S 344TH ST SUITE 304 Parcel Number: 926480 0080 Project Description: TI-Construction of new partition walls and suspended ceiling grid for new food preparation tenant,no plumbing or mechanical.****THIS PERMIT IS TO COMPLETE FINAL APPROVAL OF PREVIOUS PERMIT#07-105633-00 CO*** Owner Applicant Contractor Lender, HARSCH INVESTMENTS JAMES GITHUI 2805 SW 342ND ST JAMES GITHUI PROPERTIES LLC 2805 SW 342ND ST FEDERAL WAY WA 98023 2805 SW 342ND ST 13010 20TH ST NE SUITE 450 FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 BELLEVUE WA 98005 Census Category: 437 -Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: B Construction Type: Occupancy Load: Floor Area(sq.ft.) 1,339 0 0 0 Additional Permit Information Existing Sprinkler System in Building? No Mechanical to be Included No Number of Stories 1 Permit for Building Shell Only? No Plumbing to be Included? No New/Additional Sq.Feet-Total 0 Occupancy#1-Use Factory-Moderate Zoning Designation CE Hazard No Fixtures Associated With This Permit!! ,.; 4k4/1Z CONDITIONS: Subject to field inspection without plans. • PERMIT EXPIRES Tuesday, October 16, 2012 Permit Issued on Thursday,April 19, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and t e will be in accordance with the laws, rules and regulations of the State of Washington 7))�� ` and the City of Federal Way. / 1 1Owner or agent: . Date: �� � I Z CITY OF • THIS CARD IS T MAIN ON-SITE Construction I ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-101749-00-CO Address: 1112 S 344TH ST SUITE 304 Project: HARSCH INVESTMENTS PROPER' FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) El Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date El Re-steel(4215) ❑ Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) Approved to place concrete or grout Approved to place concrete Approved to sheath floor By Date By Date By Date , El Floor Sheathing(4105) Fire/Draft Stops(4095) Interim Erosion Control(4370) Approved to install flooring Approved Approved By Date By Date By Date . Prior to scheduling a Framing inspection; 0 Framing(4120) El Insulation(4150) Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Approved to install wallboard Fire/Draft Stop inspections must be signed-off and approved. IBC 109.3.4 By Date By Date 0 Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid(4265) 0 Final-Fire Department(4060) Approved to install mud&tape Approved to drop tile Approved By Date By Date By Date 0 Final Erosion Control(4375) El Final-Building(4050) Approved Approved By Date BYO, t Date ,,a ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date