Loading...
16-1029400 Mechanical City of ay Community & Econ.rDevServices Permit #: 16 -102940 -00 -ME 33325 8th Ave SFILE Federal Way, WA 98003 Inspection Ph: (253) 835-2607 Fax: (253) 835-2609 p Request Line: (253) 835-3050 Project Name: TORRES Project Address: 33438 11TH PL SW Parcel Number: 926496 0290 Project Description: Remove/replace gas water heater Owner nlicant Contractor GABRIEL TORRES SALINA THAPA FAST WATER HEATER CO (GENERAL).. 33438 11TH PL SW FAST WATER HEATER COMPANY FASTWWH948BC (1/4/18) FEDERAL WAY WA 98023 11715 NORTH CREEK PKWY S SUITE C-106 11715 NORTH CREEK PKWY S SUITE C-106 BOTHELL WA 98011 BOTHELL WA 98011 Additional Permit Information Mechanical Work Valuation?.................................1600 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Saturday, December 17, 2016 Permit Issued on Monday, June 20, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the Ci of Federal Way. Owner or agent:C) NJ 1-1 Date: 1%001 1 low 7- `'a r MY of THIS CARD IS TO 6HAIN 4N -SITE y Federal Way Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 16 -102940 -00 -ME Address: 33438 11 TH PL SW Project: GABRIEL TORRES FEDERAL WAY, WA 98023-6309 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARO. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (1 as Piping (4125)Final - Mechanical ) Approved Approved to release test Approved By Date rBy Date Date /— ( Z -- Rough Electrical Approved 0 Final Electrical Approved ❑ Right of Way Approved By Date By Date By Date