Loading...
15-103832Project Name: CHRISTMAS Project Address: 1725 SW 347TH PL Metrical Permit #: 15-103832-00-K Inspection Request Line: (253) 835-3050 Project Description: Work with t -stat wire during installation of air condtioner. Parcel Number: 742800 0160 Owner Anolicant City of Federal Way Community & Econ. Dev. Services FILE 33325 8th Ave S AUBURN SHEET METAL INC Federal Way, WA 98003 AUBURN SHEET METAL INC Ph: (253) 835-2807 Fax: (253) 835-2809 FEDERAL WAY WA 98023-7000 Project Name: CHRISTMAS Project Address: 1725 SW 347TH PL Metrical Permit #: 15-103832-00-K Inspection Request Line: (253) 835-3050 Project Description: Work with t -stat wire during installation of air condtioner. Parcel Number: 742800 0160 Owner Anolicant Contractor DEBORAH A CHRISTMAS DAVE TREAT AUBURN SHEET METAL INC 1725 SW 347TH PL AUBURN SHEET METAL INC (ELECTRICAL) FEDERAL WAY WA 98023-7000 844 S MT VILLA DR AUBURSMOOOMP (7/21/16) ENUMCLAW WA 98022 PO BOX 1354 ENUMCLAW WA 98022 Additional Permit information Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No Electrical Fixtures Thermostat ..................................... 7 M PERMIT EXPIRES Sunday, ary 31, 2 6 Permit Issued on Tuesda ugust 4, 2015 I hereby certify that the above information is correct a t the cons tion a the occupancy and the use will be in a r n e laws, rules a Ions of Federal Way. Owner or agent: bove described property and of the State of Washington Date: TIJIS CARD IS TO REMAIN ON-SITE' CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 15 -103832 -00 -EL Address: 1725 SW 347TH PL Project: DEBORAH A CHRISTMAS FEDERAL WAY, WA 98023-7000 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground (4295)Ditch cover (4030) Temporary Power (4275) Slab/Concrete Floor (4 55) 1:1Approved Approved Service (4235) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) Temporary Power (4275) 1:1Approved Right of Way Service (4235) Date Approved By Date Approved By Date Approved By Date By Date By Date Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date TO SCHEDULE OR CANCEL AN INSPECTION, OR TO OBTAIN INSPECTION RESULTS CALL: (253) 835-3050 Be prepared to provide: 10 -Digit Permit Number below) Preferred Date of Inspection reached between 7:00 and 4:00 4 -Digit Inspection Code (see Phone Number where you can be You will receive a confirmation number at the end of the call. Make a note of the number for reference if a problem occurs with scheduling. If you do not receive a confirmation number, the inspection was not successfully scheduled. The correct inspection code must be used to schedule, cancel or obtain inspection results. The system will only accept codes that are associated with your permit. Please verify that the inspection is included on the card attached to the permit before attempting to schedule. Every effort will be made to perform inspections on the requested day, but it may take up to 48 hours, depending on workload. INSPECTIONS WILL NOT BE PERFORMED (AND YOU MAY BE ASSESSED REINSPECTION FEES) IF: o The work is not complete and ready to be inspected o Approved site copy of permit/planshnspection card are not on site, available to inspector o Site address is not clearly posted o Inspector does not have access to the site or project. It is the responsibility of whoever is requesting an inspection to provide any special equipment—such as ladders—required to access any aspect of the project. BUILDING INSPECTIONS ELECTRICAL INSPECTIONS Dramage/Downspout/Footmg 4040 Ceiling Cover 4020 Fire Stopping/Draft Stops 4095 Ditch Cover 4030 Floor Sheathing 4105 Feeders/Sub-Panels 4045 Footing/Setbacks 4110 Final Electrical 4055 Foundation Wall 4115 Pool Bonding 4295 Framing 4120 Rough Electrical 4225 Gypsum Wallboard Nailing 4130 Service 4235 Insulation 4150 Temporary Power 4275 Reinforcing Steel 4215 Roof sheathing 4220 SIGN INSPECTIONS Shear Walls 4245 Attachment 4010 Slab/Concrete Floor 4255 Final Sign 4085 Suspended Ceiling Grid 4265 Final Electrical for Signage 4055 Under -floor Framing 4285 Footing/Setback 4110 Under -Slab Groundwork 4295 FINAL INSPECTIONS MANUFACTURED HOME INSPECTIONS Building 4050 Blocking /Tie Downs 4015 Final SWM 4375 Skirting/Final 4250 Fire Department call (153) 946-7318 to schedule Planning call project planner to schedule SURFACE WATER MANAGEMENT INSPECTIONS Public Works call project inspector to schedule Temp Erosion/Sediment Control 4365 Final SWM 4375 MECHANICAL INSPECTIONS PLUMBING INSPECTIONS Final Mechanical 4065 Final Plumbing 4075 Gas Piping 4125 Plumbing Groundwork 4190 Mechanical Rough -In 4165 Rough Plumbing 4230 Page 2 of 2 Federal Way CITY OF Building Division 33325 Eighth Avenue South Federal Way, WA 98003-6325 Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE ADDRESS: 1725 SW 347th PL PERMIT#: 15 -103832 -00 -EL WAC 296-4613-901 General—Electrical work permits and fees. Permit - Responsibility for. (3) Each person, firm, partnership, corporation, or other entity must furnish a valid electrical work permit for the installation, alteration, or other electrical work performed or to be performed solely by that entity. An electrical work permit is to be posted on site for installation of line voltage wiring by the contractor who did the actual wiring to the outdoor condensing unit. IF YOU HAVE QUESTIONS CALL Matt (253) 835 2623 WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. 8/26/15 Matt Date Inspector DO NOT REMOVE THIS NOTICE Page 1 of 2