Loading...
18-104360r a City of Federal Way Com—ty Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax (253) 835-2609 w r Electrical FILEPermit #:18 -104360 -00 -EL Inspection Request Line. (253) 835-3050 Project Name: GLEN PARK APARTMENTS BLDG 26 Project Address: 952 SW CAMPUS DR Project Description: Bldg 26-18 units change main breakers for each unit Parcel Number: 192104 9005 Owner Applicant Contractor PRIME WOODLEY CAMPUS DRIVE LLC MARK JENSENINNOVATIVE SYSTEMS INNOVATIVE SYSTEMS TECHNOLOGY PO BOX 360859 TECH, INC. INC (EL 01) LOS ANGELES CA 90036 1402 LAKE TAPPS PKWY SE SUITE 104-147 INNOVST881B4 (1/24/20) USA AUBURN WA 98092 402 LAKE TAPPS PKWY SE SUITE 104-14' AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Alt. Serv./Feeder: 0 to 200 amt 18 PERMIT EXPIRES Friday, 20 September, 2019 Permit Issued on Thursday, September 20, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0 Ni I I NJ FM Date: THIS CARD IS TO REMAIN ON-SITE cffy Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 18104360 00 Address: 952 SW CAMPUS DR Bldg 26 Project: PRIME WOODLEY CAMPUS DRM FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as posnbie (read left to right, top to bottom). Please schedule inspections as appropriate. Wok must not be covered until it is approved. Check with your inspector if you are unme about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Service (4235) 2 Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Appmved Approved Approved By _ Date By Date By Date ® Final - Electrical (4055) Q Approved By ,C,Date 3^� Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date I By Date By Date