Loading...
10-105034 0 Mechanical City of Federal Way '�-L Permit #: 10-105034-00-ME Community Development Services P O.Box 9718 ell_ I Federal Way,WA 98063-9718 Inspection Request Line: 25 Ph (253)835-2607 Fax (253)835-2609 P q ( 3)835-3050 Project Name: BACKMAN 0 a D.76" Project Address: 29921 3RD AVE SW Parcel Number: 720533 0030 Project Description: INSTALL 20' GAS PIPING TO GENERATOR Owner Applicant Contractor CHRISTINA BACKMAN WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 29921 3RD AVE S NORTHWEST PERMIT/WESCO (GENERAL) FEDERAL WAY WA 98003 1345 W GULF RD WASHIES971OB(9/2/11) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 .,"tz; 4 ! .'' sd.,ac= s' '.:c'* ', 5. , .r .iiS.4,d aI# i. '. .a . ., .'3Fi 1..y:V1:: Again Mechanical Valuation 250 Is this an Online or O.T.C.application? Yes 4, , :; iv: } ,bL«. 1f 't»£ • 1' i' k nillialtiMaigial Gas Piping. 1 Gas Pipe Outlets 1 PERMIT EXPIRES Wednesday, June 1, 2011 Permit Issued an Friday, December 3, 2010 _ . I hereby certify that the above information is correct and that the construction on the above described,property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. _/ Owner or agent: itl Date: / `/ Y. / r I /(4t i TIIIS CARD IST EMAIN ON-SITE CITY°�' Construction In ection Record " Federal Way INSPECTION REQUI.STS: (253)835-3050 PERMIT#: 10-105034-00-ME Address: 29921 3RD AVE SW Project: CHRISTINA BACKMAN FEDERAL WAY, WA 98023-3511 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough-in(4165) El Gas Piping(4125) El Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date B Date. • ❑ Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date