Loading...
21-100063-Permit FinalCity of Federal way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 IPh: (253) 835-2607 Fax: (253) 835-2609 Project Name: PARKE Project Address: 2519 SW 322ND ST Building - Single Family Permit #:21-100063-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 932431 0040 Project Description: BLUEBEAM - Construct addition to existing garage. No plumbing or mechanical. Owner Applicant Contractor Lender ROY PARKE JAMES DOWD C S BUILT LLC OWNER IS CONTRACTOR OWNER 1S LENDER 2519 SW 322ND CT 2 AUBURN WAY N SUITE 205 FEDERAL WAY WA 98023-2518 AUBURN WA 98002 Census Category: 434 - Residential alt/add - no change in number of units Includes: 91 42 #3 #4 Occupancy Class: R-3 Construction T e: Type V - B Occupancy Load: Floor Area (sq. ft.) Additional Permit Information New / Additional Sq. Feet - Ist Floor ..................... 0 New / Additional Sq. Feet - 3rd Floor ..................... 0 Occupancy #I - Construction Type ......:.................. Type V - B New / Additional Sq. Feet - Garage.—, ................... 277 Plumbing Work Valuation?.... .............. 0 Number of Stories ................................................... I Is this an Online or O.T.C. application? .................. No New / Additional Sq. Feet - Total ........................... 277 Comprehensive Plan Designation,..... ..................... SF - High -Density Residential Total Valuation: 13,514.83 New / Additional Sq. Feet - 2nd Floor .................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? .............. No Mechanical Work Valuation? .................................. 0 New / Additional Sq. Feet - Other .......................... 0 Plumbing to be Included? ........................................ No Occupancy #1 - Use....,,............. Residence (I or 2 family) Zoning Designation ..................... ....... RS 7.2 No Fixtures Associated With This Permit l! PERMIT EXPIRES Sunday, 29 August, 2021 Permit Issued on Tuesday, March 2, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in acc ce with the laws, rules and regulations of the State of FtL= on a City of Federal Way. Owner or agent: _ Date: CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 100063 00 Address: 2519 SW 322ND ST Project: ROY PARKS FEDERAL WAY WA 98023-2518 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE TI11S CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) ❑ Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date ❑ Foundation Wall (4115) ❑ Drainage/Downspout (4040) ❑ Slab/Concrete Floor (4255) Approved to place concrete Approved to backfil I Approved to place concrete By Date By Date By Date Underfloor Framing (4285) ® Floor Sheathing (4105) ❑ Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date 'l Roof Sheathing (4220) El Fire/Draft Stops (4095) ❑ Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date Prior to scheduling a Framing inspection; ❑ Framing (4120) t Insulation (4150) and Electrical, Plumbing & Mechanical Rough -in Fire/Draft Stop inspections must be signed - Approved to insulate Approved to install wallboard off and approved. IBC 109.3.4 By Date By Date El Gypsum Wallboard Nailing (4130) Final Erosion Control (4375) ❑ Final - Building (4050) Approved to install mud & tape Approved Appu�cd By Date By Date By Date 1 ,� ❑ Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date