Loading...
23-101915-Draft 2024 TIP-04-13-23Exhibit A Map ID**Location Description Previous Years 2023 2024 2025 2026 2027 2028 2029 Total 1a City Center Access Phase 1 - Environmental Update environmental documentation for modified access at S 320th St & S 324th St 4,422 300 4,722 1b City Center Access Phase 2 - SB Ramps Construct all SB I-5 ramps, extend S 324th Street from 23rd Ave S to I-5 6,000 24,000 10,490 20,000 22,560 22,560 105,610 2 SR 99 @ S 373rd St Install roundabout, median control 20 400 525 2,100 2,100 5,145 3 SW 320th St @ 47th Ave SW Install traffic signal 637 637 4 S 312th St @ 28th Ave S Add SB right-turn lane or construct roundabout 809 809 5 SW 340th St: 37th Ave SW - City Limits Widen to 5 lanes 310 420 525 2,308 3,563 6 21st Ave S @ S 320th St Install traffic signal 112 1,047 1,159 7 S 320th St & 1st Ave S Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316th St or Alternatlive Measure 569 10,376 10,945 8 S 348th St: 9th Ave S - SR 99 Overlay 15 95 1,076 1,186 9 16th Ave S: S 344th St - S 348th St Add SB auxiliary lane 420 1,678 4,306 6,404 10 Citywide Implement Adaptive Traffic Control System Phases I & II 2,693 300 2,993 11 Citywide Install variable lane use control signs 466 516 100 1,082 12 Military Rd S @ S Star Lake Rd Add EB right-turn lane, sidewalk 220 1,049 1,269 13 SR 509 @ SW 301st St Install compact roundabout 157 734 891 14 Citywide Implement Adaptive Traffic Control System Phase III 700 105 805 15 SR 509 @ 47th Ave SW Install compact roundabout 1,110 130 1,240 16 SW 340th St: 31st Ave SW - 37th Ave SW Widen to 5 lanes 525 1,570 4,200 6,295 17 Citywide Annual overlays 3,150 3,150 3,150 3,150 3,150 3,150 3,150 22,050 18 SR 509 @ 4th Ave S Install compact roundabout 210 840 1,050 19 City Center Adaptive Traffic Control System - City Center Stage 2 - Detection upgrades 875 875 20 Citywide Adaptive Traffic Control System Phase IV; 1st Ave S 787 787 21 Citywide Adaptive Traffic Control System Phase V; 21st Ave SW & SW Campus Dr 1259 1,259 22 Military Rd S: S 320th St - SR 18 Overlay 50 1260 1,310 23 S 356th St: 1st Ave S - SR 99 Widen to 5 lanes, bike lanes, sidewalks 315 315 3150 3150 14050 20,980 24 Citywide Street Vegetation Management 200 200 200 200 200 200 200 1,400 25 SW 344th St @ 27th Ave SW Construct compact roundabout 50 110 585 745 26 Citywide High Friction Surface Treatments 383 3640 4,023 27 S 320th St: 1st Ave S - SR 99 Overlay 50 3100 3,150 28 S 324th St: 11th Pl S - SR 99 Overlay 50 840 890 Subtotal Roadway Capital Projects 10,305 6,598 14,203 36,153 23,917 39,760 32,740 41,535 205,211 Map ID Location Description Previous Years 2023 2024 2025 2026 2027 2028 2029 Total 29 SW King County Regional Trail Plan Plan to connect trails to adjacent cities 100 200 300 30 1st Ave S: S 292nd St - S 312th St Shoulder improvements 3,950 3,950 31 Citywide ADA Retrofits 420 420 420 420 420 420 420 2,940 32 Citywide Pedestrian Safety Install mid-block crossing treatments or other pedestrian improvements 1,231 168 168 168 168 335 335 335 2,908 33 Citywide Pedestrian Safety System Improvements Install mid-block crossing treatments 160 1,080 1,240 34 Citywide RRFB Upgrades Replace median-mounted RRFB's with mast arm mountings 140 690 830 35 SR 509: SW 312th St - 21st Ave SW Install sidewalk and streetlights on south side 200 1,300 1,500 36 Federal Way Transit Center Pedestrian Access Improvements 100 900 1,000 37 S 312th St: Steel Lake Park - 28th Ave S Install sidewalk and streetlights on south side 100 650 750 38 City Center Access - BPA Trail Extension Construct multi-use path between Celebration Park and Federal Way Transit Center 630 1,049 1,049 4,300 7,028 39a Pacific Hwy S Trail - 16th Ave S (S 288th St to S 308th St) Construct multi-use path 200 262 944 2188 7,350 10,944 39b Pacific Hwy S Trail - 16th Ave S (SR 509 to S 308th St) Construct multi-use path 300 1,993 2,293 40 S 314th St: PVR Wy S - 23rd Ave S Add sidewalks and street lights 175 131 131 1,678 1,365 3,480 41a S 288th St: Military Rd S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 105 944 1,049 41b S 288th St: 16th Ave S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 100 104 104 2,308 2,616 42 FWHS - City Center Greenway: S 308th St / 20th Ave S Greenway improvements 104 420 524 43 Citywide Local Improvement District Non-Motorized Improvement Program 315 315 315 315 315 315 315 2,205 44 S 320th St Grade Separation Conceptual design and feasibility analysis to lower S 320 St in City Center 200 100 300 45 28th Ave S: S 312th St - S 308th Ln Install sidewalk and streetlights on east side of 28th Ave S and south side of S 308th Ln 20 300 500 200 1,020 Subtotal Non-Motorized Capital Projects 2,306 5,478 4,706 7,953 9,083 3,797 7,534 6,020 46,877 TOTAL CAPITAL PROJECT COSTS 12,611 12,076 18,909 44,106 33,000 43,557 40,274 47,555 252,088 CITY OF FEDERAL WAY NON-MOTORIZED CAPITAL PROJECTS Year 2023 Costs in $ thousands TRANSPORTATION IMPROVEMENT PROGRAM (TIP) - 2024 TO 2029 Year 2023 Costs in $ thousandsROADWAY CAPITAL PROJECTS