Loading...
NOA for Mailing & Posting - APL Short Plat NOTICE OF LAND USE APPLICATION Project Name: APL 288th Short Plat (permit #23-101488-SU) Project Description: Proposed subdivision of one, appx. 0.9-acre parcel into 2 single-family residential lots with an access/utility tract and utilities, landscape tract, open space tract, and right of way dedication. The site is zoned RS 7.2 which requires a minimum lot area of 7,200 sq. ft. Project Applicant: Sikander Sekhon, PO Box 1226, Kent, WA 98035; Applicant’s Agent: Amy Donlan, 165 NE Juniper St., Suite 201, Issaquah, WA 98027 Project Location: Unaddressed parcel #332204-9023, appx. 400 ft west of the S 288th St. and Military Rd. S intersection. Date of Application: April 18, 2023 Date Application Determined Complete: May 16, 2023 Date of Notice of Application: May 26, 2023 Requested & Related Decisions, & Other Determinations Included with Application: Short Plat Application File #23-101488-SU pursuant to FWRC 18.30 and 18.55; Transportation Concurrency File #23-101615-CN; Street Modification Request #22-104775-SM; Pre-application file # 21-105241-PC. Submitted Environmental Documents & Studies: Geotechnical Evaluation report from Earth Solutions NW LLC (6/3/22); stormwater Preliminary Technical Information Report from Encompass Engineering & Surveying (3/17/23); Limited Phase II Environmental Site Assessment by Earth Solutions NW (5/16/22); Preliminary Clearing, Grading & Tree Retention Plan and Preliminary Drainage & Utility Plan by Encompass Engineering & Surveying (3/17/23). Development Regulations Used for Project Mitigation: Title 16, “Surface Water Management”; Title 18, “Subdivisions”; and Title 19, “Zoning and Development Code.” Consistency with Applicable Plans and Regulations: The project will be reviewed for consistency with all applicable policies and regulations, including but not limited to: The Federal Way Comprehensive Plan; King County Surface Water Design Manual; Public Works Development Standards; Lakehaven Water and Sewer System Design and Construction Standards; South King Fire and Rescue Administrative Policies; Federal Way Public Schools Safe Access Policies; and FWRC Titles 16, 18, and 19. Public Comment: Any person may submit written comments on the application to the Community Development Director by June 9, 2023. Only the applicant, persons who submit written comments to the director, or persons who specifically request a copy of the original decision may appeal the director’s decision. Comments can be submitted to the Community Development Department, 33325 8th Avenue South, Federal Way, WA, 98003 or planning@cityoffederalway.com. Availability of File and Environmental Documents: The official project file and environmental documents are available for public review on the City’s website https://www.cityoffederalway.com/node/1962 or at City Hall during normal business hours at the Community Development Department, 33325 8th Ave. S., 2nd Floor, Federal Way, WA 98003. City Staff Contact: Senior Planner Evan Lewis, 253-835-2646, or evan.lewis@cityoffederalway.com. Vicinity Map Existing Parcel Involved in APL 288th Short (shown in yellow, outlined in black) Proposed Site Plan