Loading...
23-105388-UP-Approved Modification of ROW-12-05-23jSËäårerat way CITY HALL 33325 8th Avenue South . PO Box 9718 Federal Way, WA 98063-971 I (253) 835-7000 www. ci tyotre d e ra Ìway. co m March 8,202} Barghausen Consulting Engineers Attn: Ivana Halvorsen 18215 72d Ave S. Kent, WA 98032 RE: Permit 22-105976-00-SM, Creekwood Plat Dear Ms. Halvorsen The City of Federal Way Public Works Department has considered your request for modification to the right-of- way cross sections for a portion of Road A of the proposed 20-lot subdivision as described in FWRC 19.135.070 Modifications, Deferments and Waivers. After evaluating your proposals and the existing conditions along the proposed street, review of the Federal Way Revised Code (FWRC) provisions (19.135.070) and direction provided by City Council. The Public Works Department hereby modiJîes your request as noted below: Approved Reduction of Road 664" for Ravine/Stream Crossing (Sta. 14+18 to 15+66) The total cross-section shall be 24-foot paved roadway consisting of two l2-foot lanes, 0.5-foot curb and 5-foot sidewalk on both sides; additional l-foot on the north side and additional 7-foot along south side to accommodate Jersey barrier and retaining wall (if approved). The utility strip will be allowed underneath the sidewalk. The cross section must also show a 2O-foot wide access tract to the base of the retaining wall. Total ROW width shall be 43-foot. 2. Reduction of Road'oA" betrryeen22d Ave SW and 21'tAve SW (Sta. 10+45 to 14+18) The cross-section shall be 28-foot paved consisting of two l4-foot lanes (parking allowed on the south side of the road); 4-foot planter strip on the south side of the road; O.5-foot curb and S-foot sidewalks on both sides; 3-foot utility strip on the south side and any utilities along north side located under sidewalk; an additional l-foot of ROW behind curb on north side and street lights provided. Total ROV/ width shall be 47-foot. 3. Road Section from Ravine west to Cul-de-Sac (Sta. 15+66 to 21+13) Replace submitted road cross section between Sta. 16+66 and Sta. 2l+13 with Standard Drawing 3-2W C:\Users\dwinkler\AppData\Local\Microsoft\Windows\INetCache\Content.OutlookWPJXJAK6\Barghausen Consulting Engineers 22 105976 Mod Ltr.doc 4. Road Monumentation Required roadway monumentation shall include right-of-way centerline in addition to all road PC, PT, PI for roadway intersections points. A record of all plat monumentation shall be submitted on Standard Drawing 3-37 sealed by a PLS The approval and conditions of this letter will be applicable for a period of one year. If a permit is not issued within the one-year time period, this waiver will be void, and a new request for modification, must be submitted. If you have any questions, please contact Cole Elliott, P.E., Development Services Manager at, (253) 835-2730 or cole.elliott@cityoffederalway. com. Sincerely s l,úà"" Cc Desiree Winkler, P.E. Deputy Public Works Director CE DWCE:ss Day File Evan Lewis, Associate Planner Cole Elliott, P.E. Development Services Manager C:\Users\dwinkler\AppData\Local\Microsoft\Windows\INetCache\Content.OutlookWPJXJAK6\Barghausen Consulting Engineers 22 105976 Mod Ltr.doc