Completeness Letter COMMUNITY DEVELOPMENT DEPARTMENT
33325 8th Avenue South
Federal Way, WA 98003-6325 253-835-7000
www.cityoffederalway.com
Jim Ferrell, Mayor
Mazen Haidar January 10, 2024
Pacific Land Engineering
13617 SE 18th Street
Bellevue, WA 98005
mazen@pacificlandwa.com
RE: File #23-105817-00-SU; LETTER OF COMPLETE APPLICATION
Ohashi Short Plat, 1225 SW 296th Street, Parcel # 515320-0015, Federal Way
Dear Mazen Haidar:
The Community Development Department is in receipt of the December 14, 2023, application submittal for
the short subdivision of one single-family residential lot into two single-family residential lots. Pursuant to
Federal Way Revised Code (FWRC) 18.30.050(a), within 28 days of receiving a short subdivision application, the
department shall notify the applicant whether the application is complete, or whether additional information
is necessary.
NOTICE OF COMPLETE APPLICATION
Please consider this correspondence a formal Letter of Complete Application. Pursuant to FWRC 18.30.050,
the application is deemed complete as of January 10, 2024. The complete application determination is based
on a review of submittal documents relative to those requirements as set forth in FWRC 18.30.030. The
submittal requirements are not intended to determine if an application conforms to the City of Federal Way
codes; they are used only to determine if all required materials have been submitted.
NOTICE OF APPLICATION
A Notice of Application (NOA) will be posted on the city’s official notice boards and published in the Federal
Way Mirror within 14 days of this letter, pursuant to FWRC 18.30.080(2). The city will prepare two Public
Notice Boards that the applicant will be responsible for posting on site by Friday, January 19, 2024.
Further posting instructions and the notice boards will be available for pick-up at Will Call at the second floor
of City Hall on Friday, January 12, 2024.
PRELIMINARY TECHNICAL COMMENTS
A full technical review of the proposal has not been conducted. However, during a brief and cursory initial
review of the application the following technical issue have been found and needs to be addressed in order to
expedite the review process.
1. Add the Approval Block to all civil plan pages at the lower right side.
2. Vertical Datum must be “N.G.V.D.-29” or “DATUM: K.C.A.S.,” on all sheets where vertical
elevations are called out.
Mazen Haidar
Page 2
January 8, 2024
23-105817-00-SU Doc. I.D. 83585
3. Ingress/egress easement must be constructed per Dwg. No. 3-2CC from the City of Federal Way
Public Works Standards and added to civil plans.
4. For Short Plat Map, use new permit number 23-105817-00-SU.
CLOSING
Please provide the additional information noted above. When you are ready to resubmit your documents,
please request your document upload link using the following website:
https://www.cityoffederalway.com/node/4588. The resubmittal should be accompanied by a completed
Resubmittal Form (enclosed).
Formal processing and review of your application will now begin. Technical review comments, if any, may
result in a request for additional information and revisions in order to comply with applicable code
requirements.
Please note, the original plan review fee collected at submittal of your permit covers the initial review and one
resubmittal. The city charges applicants for any additional staff time necessary to complete each review
following the first resubmittal. You can contact the Permit Center at permitcenter@cityoffederalway.com or
253-835-2607, if you have questions about the resubmittal process.
If you have any questions regarding this project, please feel free to contact me at 253-835-2641, or
becky.chapin@cityoffederalway.com.
Sincerely,
Becky Chapin
Senior Planner
enc: Notice of Application
Resubmittal Information Form
c: Sam Basmeh, Development Services Reviewer
Kathy Davis, Senior Traffic Engineer
Scott Gerard, South King Fire & Rescue
Brian Asbury, Lakehaven Water & Sewer District