ORD 14-779ORDINANCE NO. 14 -779 AN ORDINANCE of the City of Federal Way, Washington, relating to the City Center Planned Action established pursuant to RCW 43.21C.440; and amending FWRC 14.15.130. (Amending Ordinance Nos. 10 -659, 07 -552, and 07 -547) WHEREAS, the City Council enacted Ordinance No 07 -547 on February 20, 2007, establishing the City Center Planned Action, pursuant to RCW 43.21C.031; and WHEREAS, maintaining and extending the SEPA Planned Action for the City Center Planned Action area with appropriate standards and procedures will help achieve permit processing efficiency and promote environmental quality; and WHEREAS, a short-term extension of the designated development timeframe for a period of nine (9) months is proposed. During that time the city plans on conducting a detailed transportation analysis, as part of a plan to subsequently extend the EIS for a longer period of time. WHEREAS, on November 17, 2014, the city issued Addendum #4 to the City Center Planned Action EIS to extend the end timeframe of development for which the Planned Action Ordinance applies, from 2014 to September 30, 2015; and WHEREAS, the city distributed copies of the Addendum to the recipients of the City Center Planned Action Final EIS; and WHEREAS, the timeline modification does not alter assumptions contained within the City Center Planned Action EIS with regard to traffic impacts or other environmental impacts; and WHEREAS, proposed development within the City Center Planned Action is subject to the mitigation measures identified by the Planned Action EIS; WHEREAS, the Finance /Economic Development/Regional Affairs Committee (FEDRAC) of the Federal Way City Council considered these code amendments on November 25, 2014 and recommended adoption of the text amendments as recommended by staff. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON, DO ORDAIN AS FOLLOWS: Ordinance No. 14 -779 Page 1 of 7 Rev 1/10 Section 1. Chapter 14.15.130 of the FWRC is hereby amended to read as follows: 14.15.130 City center planned action. (1) Purpose. The city of Federal Way declares that the purpose of this section is to: (a) Combine environmental analysis with land use planning; and (b) Set forth a procedure designating certain project actions in a portion of the city center subarea as "planned actions" consistent with state law RCW 43.21C.034-440; and (c) Streamline and expedite the land use permit review process by relying on completed and existing environmental analysis for the planned action area; and (d) Apply the Federal Way Revised Code together with the mitigation framework in subsection (3) of this section for the purpose of processing planned action development applications. (2) Findings. The city of Federal Way finds that: (a) The city of Federal Way is required to prepare and implement plans in accordance with the provisions of the Growth Management Act, Chapter 36.70A RCW; (b) The city of Federal Way has adopted a comprehensive plan and city center subarea plan in compliance with the GMA; (c) The city center planned action environmental impact statement identifies and addresses all significant environmental impacts associated with the proposed planned action as defined in subsection (3) of this section; (d) The mitigation measures contained in Exhibit B of Ordinance 07 -547, together with applicable city development standards, are adequate to mitigate the significant adverse environmental impacts of planned action development as defined in subsection (3)(c) of this section; (e) The expedited permit review procedures as set forth in this section are and will be a benefit to the public, protect the environment, and enhance economic development; and (f) Opportunities for public involvement and review have been provided, and comments considered as part of preparation of the draft and final planned action environmental impact statement. (3) Procedures and criteria for evaluating and determining projects as planned actions. (a) Planned action site. The planned action designation shall apply to the approximately 200 -acre site generally bounded by South 312th Street on the north, South 324th Street on the south, Pacific Highway South on the west and 23rd Avenue South on the east and shown in Exhibit A of Ordinance 07 -547. (b) Environmental document. A planned action designation for a site - specific application shall be based on the environmental analysis contained in the city center planned action environmental impact statement (EIS) completed by the city on September 8, 2006. "EIS" means the city center planned action environmental impact statement composed of the draft EIS (June 2006) and the final EIS (September 2006). The mitigation document (Exhibit B of Ordinance 07 -547) is based upon the analysis of the EIS. The mitigation document, together with applicable city codes, ordinances Ordinance No. 14 -779 Page 2 of 7 Rev ] /l0 and standards, shall provide the framework for the decision by the city to impose conditions on a planned action project. (c) Planned action qualifications. (i) Land uses. The following uses are the primary uses analyzed in the EIS. (A) Retail goods and services. (B) Office. (C) Lodging. (D) Residential. (E) Civic. (F) Structured parking. (ii) Development thresholds. The planned action designation applies to future development proposals that cumulatively do not exceed the development envelope established by the EIS, as shown in the city center summary development table below: City Center Summary Development Table Uses Development Envelope Retail 750,000 sf Office 350,000 sf Lodging 600 rooms Residential 750 units Civic 500,000 sf Structured Parking 750 stalls The planned action designation also applies to demolition of existing buildings and /or parking facilities. If proposed plans significantly change the location of uses in a manner that would alter the environmental determinations of the EIS, additional SEPA review may be required. Additional environmental review may be conducted as an addendum or supplement to the planned action EIS. Shifting the total build -out of development among uses may be permitted so long as the total build -out does not exceed the aggregate amount of development, trip generation and parking thresholds reviewed in the EIS and so long as the impacts of that development have been identified and mitigated in the EIS and mitigation document. Ordinance No. 14 -779 Page 3 of 7 Rev 1 /10 (iii) The project is located within the planned action area. (iv) Transportation. (A) Vehicle trip ranges. The ranges of vehicle trips reviewed in the EIS are as follows: Planned Action Trip Thresholds by 2009 Time Period Total Trips AM Peak Hour 1,220 Saturday Peak Hour 2,816 PM Peak Hour 2,727 Planned Action Trip Thresholds 2010 — 2014 Time Period Total Trips AM Peak Hour 919-1,073 Saturday Peak Hour 2,537 — 2,552 PM Peak Hour 2,360 — 2,370 The EIS conducted quantitative analysis on a per- intersection basis of impacts and mitigation through 2009 (or the equivalent time, based on the cumulative totals of projected vehicle trips). EIS analysis of 2010 — 2014 vehicle trips was performed more qualitatively and may require additional environmental review to quantitatively analyze potential transportation impacts and mitigation measures, as determined by the SEPA official, in consultation with the public works director. (B) Trip threshold. Proposed development that would result in a cumulative total of trips that exceeds the maximum trip levels shown above would not qualify as a planned action. (C) Public works discretion. The public works director shall have discretion to determine incremental and total trip generation, consistent with the Institute of Traffic Engineers (ITE) General Manual (latest ed.), for each planned action project permit application proposed under this planned action. (v) Elements of the environment analyzed in the EIS. A project that would result in a significant change in impacts to any of the elements of the environment identified in the EIS would not qualify as a planned action. (vi) Time horizon. The planned action designation is intended to be applicable until all development shown in the city center summary development table (subsection (3)(c)(ii) of this section) is constructed or until 2014 September 30, 2015, whichever occurs first. In addition, should environmental conditions significantly change from those analyzed in the EIS, the city's SEPA official may determine that the planned action designation is no longer applicable unless additional, supplementary environmental review is conducted, regardless of the date. Ordinance No. 14 -779 Page 4 of 7 Rev 1/10 (d) Planned action review criteria. (i) Uses and activities described in the EIS, subject to the qualifications described in subsection (3)(c) of this section and the mitigation measures in Exhibit B of Ordinance 07- 547, may be designated planned actions pursuant to RCW 43.21C.03-�440. (ii) The SEPA official or designee is authorized to designate a project application as a planned action pursuant to RCW 43.21C.031(2)(x)440, if the project meets all of the following conditions: (A) The project is not otherwise exempt from SEPA; and (B) The project is consistent with the city of Federal Way Comprehensive Plan adopted under Chapter 36.70A RCW; and (C) The project is subsequent to or is implementing a project which has had its significant adverse environmental impacts that have been adequately identified in the EIS; and (D) The project falls within the planned action qualifications identified in subsection (3)(c) of this section; and (E) The SEPA official has determined that the project's adverse impacts are able to be mitigated through the application and /or inclusion of mitigation measures detailed in the mitigation document in Exhibit B of Ordinance 07 -547, as well as other applicable city, county, state, and federal requirements and conditions, which together constitute sufficient mitigation for the significant environmental impacts associated with the . proposed project; and (F) The proposed project complies with all applicable local, county, state, and federal regulations, and, where appropriate, the proposed project complies with needed variances or modifications or other special permits have been identified; and (G) The proposed project is not an essential public facility. (e) Effect ofplanned action. (i) Upon designation by the SEPA official that the development proposal within the planned action area qualifies as a planned action pursuant to this section and WAC 197 -11 -172, the project shall not be subject to a SEPA threshold determination, an environmental impact statement (EIS), SEPA appeal or any other additional review under SEPA. (ii) Being designated as a planned action or planned action project means that a proposed project has been reviewed in accordance with this section and found to be consistent with the development parameters and environmental analysis included in the EIS. (iii) Planned action projects will not be subject to further procedural review under SEPA. However, as stated under subsection (3)(d)(ii)(F) of this section, in order to qualify as planned actions, these projects will have incorporated mitigating measures identified in the city center planned action EIS, as outlined in this document and Exhibit B (attached to Ordinance 07- 547), which are designed to mitigate environmental impacts resulting from the project Ordinance No. 14 -779 Page 5 of 7 Rev 1 /10 proposal. Additionally, projects will be subject to applicable city, state and federal regulatory requirements. The planned action designation shall not exempt a project from meeting the city's code and ordinance requirements apart from the SEPA process. (f) Planned action permit process. The director of community development services or designee shall review projects and determine whether they meet the criteria as planned actions under applicable state, federal, and local laws, regulations, codes and ordinances. The review procedure shall consist, at a minimum, of the following: (i) Development applications will meet the requirements of FWRC Titles 4, 8, 11 (Division III), 13, 14, 15 and 19 and Chapter 1.35 FWRC. Applications shall be made on forms provided by the city and shall include a planned action checklist or such other project review forms provided by the community development, building, and public works departments. The checklist may be incorporated into the form of an application. (ii) The director of community development services will determine whether the application is complete as provided in FWRC 19.15.040. (iii) After the city receives and reviews a complete application, the SEPA official shall determine, utilizing the criteria and procedures contained in subsection (3)(d) of this section and WAC 197 -11 -172, whether the project qualifies as a planned action. If the project does qualify as a planned action, the director of community development services shall notify the applicant, and the project shall proceed in accordance with the appropriate permit procedures, except that no additional SEPA review, threshold determination or EIS will be required. (iv) For projects that qualify as planned actions, public notice shall be provided as specified in FWRC 14.15.060(3). (v) If a project is determined not to be a planned action, the director of community development services shall notify the applicant and prescribe a SEPA review procedure consistent with the city SEPA procedures and state laws. The notice to the applicant shall describe the elements of the application that result in disqualification as a planned action. (vi) Projects disqualified as a planned action may use or incorporate relevant elements of the environmental review analysis in the EIS prepared for the planned action, as well as other environmental review documents to assist in meeting SEPA requirements. The SEPA official may choose to limit the scope of the SEPA review to those issues and environmental impacts not previously addressed in the EIS. (4) Planned action area monitoring. The city center planned action section shall be reviewed periodically by the director of community development services to determine its continuing validity with respect to the environmental conditions of the project area and vicinity and applicability of planned action requirements, ineludin .., review p fie.. to the end „r2nnn to ensure continued applicability of the transportation analysis and impacts. Based upon this review, this section may be amended as needed, and another review period may be specified. (5) Conflict. In the event of a conflict between this section or any mitigation measures imposed pursuant thereto and any ordinance or regulation of the city, the provisions of this section shall control. Ordinance No. 14 -779 Page 6 of 7 Rev 1 /10 Section 2. Severability. Should any section, subsection, paragraph, sentence, clause, or phrase of this chapter, or its application to any person or situation, be declared unconstitutional or invalid for any reason, such decision shall not affect the validity of the remaining portions of this chapter or its application to any other person or situation. The City Council of the City of Federal Way hereby declares that it would have adopted this chapter and each section, subsection, sentence, clauses, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases, or portions be declared invalid or unconstitutional. Section 3. Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of scrivener /clerical errors, references, ordinance numbering, section /subsection numbers and any references thereto. Section 4. Ratification. Any act consistent with the authority and prior to the effective date of this ordinance is hereby ratified and affirmed. Section 5. Effective Date. This ordinance shall take effect and be in force five (5) days from and after its passage and publication, as provided by law. PASSED by the City Council of the City of Federal Way this 2nd day of December, 2014. CITY-OF FEDERAL WAY FERRELL ATTEST: hnh li AA / o ni -" r i —K / I V, A — / 0, IYA C Y C ERK, STEPHANIE CO T EY, CMC APP OVED AST ORM: CITY AT EY, AMY JO PEARSALL FILED WITH THE CITY CLERK: 11 -24 -2014 PASSED BY THE CITY COUNCIL: 12 -02 -2014 PUBLISHED: 12 -05 -2014 EFFECTIVE DATE: 12 -10 -2014 ORDINANCE NO.: 14 -779 Ordinance No. 14 -779 Page 7 of 7 Rev 1/10