HomeMy WebLinkAbout22-102751-SU-Technical Information Report-06-15-2022-V1
TECHNICAL
INFORMATION REPORT
FOR
PLANT 2 RELOCATION
JUNE 9, 2022
TABLE OF CONTENTS
Page
SECTION 1 – PROJECT OVERVIEW ..................................................................................................................................................... 1
FIGURE 1.1 – TIR WORKSHEET ................................................................................................................................................ 3
FIGURE 1.2 – SITE LOCATION .................................................................................................................................................. 9
FIGURE 1.3 - DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS ......................................................................... 11
FIGURE 1.4 - SOILS ................................................................................................................................................................. 14
SECTION 2 – CONDITIONS AND REQUIREMENTS SUMMARY ......................................................................................................... 18
SECTION 3 – OFFSITE ANALYSIS ...................................................................................................................................................... 21
FIGURE 3.1 – DOWNSTREAM ANALYSIS ................................................................................................................................ 24
FIGURE 3.2 – FEMA FIRM ...................................................................................................................................................... 27
FIGURE 3.3 – CRITICAL AREAS MAP ....................................................................................................................................... 29
FIGURE 3.4 – DRAINAGE COMPLAINTS ................................................................................................................................. 31
FIGURE 3.5 – ASSESSED WATER QUALITY AREAS .................................................................................................................. 34
SECTION 4 – FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID) AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ........ 41
Part A – EXISTING SITE HYDROLOGY .......................................................................................................................................... 41
FIGURE 4.A.1 – PRE-DEVELOPED BASIN MAP ........................................................................................................................ 42
Part B – DEVELOPED SITE HYDROLOGY ...................................................................................................................................... 44
FIGURE 4.B.1 – DEVELOPED BASIN MAP ............................................................................................................................... 45
Part C – PERFORMANCE STANDARDS ........................................................................................................................................ 47
FIGURE 4.C.1 - FEDERAL WAY FLOW CONTROL APPLICATION MAP ...................................................................................... 48
FIGURE 4.C.2 - FEDERAL WAY WATER QUALITY APPLICATION MAP ..................................................................................... 50
Part D – FLOW CONTROL SYSTEM .............................................................................................................................................. 52
FIGURE 4.D.1 – WATER QUANTITY BASIN ANALYSIS ............................................................................................................. 53
FIGURE 4.D.2 – FLOW CONTROL WWHM CALCULATIONS .................................................................................................... 55
Part E – WATER QUALITY SYSTEM .............................................................................................................................................. 68
FIGURE 4.E.1 - COALESCING PLATE OIL/WATER SEPARATOR SIZING .................................................................................... 69
FIGURE 4.E.2 - WESTERN KING COUNTY 2-YEAR 24-HOUR ISOPLUVIAL ............................................................................... 73
FIGURE 4.E.3 – KCSWDM TABLE 6.2.1.A ................................................................................................................................ 75
FIGURE 4.E.4 – ONSITE BIOPOD BIOFILTER DETAIL ............................................................................................................... 77
FIGURE 4.E.5 – 351ST STREET BIOPOD BIOFILTER DETAIL ...................................................................................................... 79
FIGURE 4.E.6 – WATER QUALITY WWHM CALCULATIONS .................................................................................................... 81
SECTION 5 – CONVEYANCE SYSTEM ANALYSIS AND DESIGN .......................................................................................................... 91
FIGURE 5.1 – CONVEYANCE BASIN MAP ............................................................................................................................... 92
FIGURE 5.2 – CONVEYANCE BASIN ANALYSIS ........................................................................................................................ 94
FIGURE 5.3 – STORMSHED 3G CALCULATIONS ..................................................................................................................... 96
SECTION 6 – SPECIAL REPORTS AND STUDIES ............................................................................................................................... 125
FIGURE 6.1 – GEOTECHNICAL ENGINEERING REPORT ......................................................................................................... 126
SECTION 7 – OTHER PERMITS ....................................................................................................................................................... 139
SECTION 8 – CSWPP ANALYSIS AND DESIGN ................................................................................................................................ 140
Part A – ESC PLAN ANALYSIS AND DESIGN ............................................................................................................................... 140
FIGURE 8.A.1 – TESC BASIN MAP ........................................................................................................................................ 142
FIGURE 8.A.2 – SEDIMENT POND ANALYSIS ........................................................................................................................ 144
FIGURE 8.A.3 – TEMPORARY SWALE ANALYSIS ................................................................................................................... 146
FIGURE 8.A.4 – TESC WWHM CALCULATIONS ..................................................................................................................... 148
Part B – STORMWATER POLLUTION PREVENTION AND SPILL CONTROL PLAN (SWPPS) DESIGN ............................................ 153
FIGURE 8.B.1 – CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN............................................................... 154
SECTION 9 – BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ..................................................... 180
SECTION 10 – OPERATIONS AND MAINTENANCE MANUAL ......................................................................................................... 181
FIGURE 10.1 – OPERATIONS AND MAINTENANCE MANUAL ............................................................................................... 182
35072_Fed Way Plant 2 Relocation_TIR_060922.doc
1
SECTION 1 – PROJECT OVERVIEW
This report contains the preliminary technical and background information in support of the
site development associated with parcels 202104-9043, 202104-9155, 202104-9162, and
202104-9163. A concrete batch plant is proposed on the project site. The analysis included in
this report summarizes the preliminary design of the stormwater facilities, pollution prevention,
and erosion and sediment control. Refer to the attached preliminary TIR worksheet, Figure 1.1,
and the Site Plan, Figure 1.5 for additional information.
The proposed project site is within a portion of the southeast quarter of the southeast quarter
of Section 20, Township 21 North, Range 4 East, W.M., City of Federal Way, Washington. Refer
to the attached Vicinity Map, Figure 1.2. The parcels, 202104-9043, 202104-9155, 202104-9162,
and 202104-9163, containing approximately 4.19 acres, are located at 35000 Pacific Highway
South and are currently being used as a truck storage facility. The project site is abutted by a
commercial shopping center to the north and east, Pacific Highway South (State Route 99) to
the west, and a King County fire protection facility to the south. Refer to Figure 1.3 for a map of
the drainage basins.
The existing parcels have three buildings and are covered predominantly with gravel and
asphalt paving with limited vegetation. The project site consists of a single Threshold Discharge
Area. Generally, runoff from the western half of the site flows to the west to the existing storm
conveyance system located within Pacific Hwy. S., and runoff from the eastern half of the site
flows to the south to the existing storm conveyance system located within S. 351st Street which
is then conveyed to the west to Pacific Hwy. S. Runoff from adjacent properties does not
appear to drain onto the project site. Refer to Section 4, Part A of this report for further details
regarding the existing site hydrology and topography.
A concrete batch plant is proposed on the project site. The majority of the site is proposing to
be paved for plant operation and parking areas and will also include a shop/storage building,
covered storage bins, concrete plant silos and equipment, and perimeter landscape buffer. Full
roadway improvements to S. 351st Street are proposed. The roadway is currently private but is
proposing to be built to public standards (Cross Section Type R) including 40 feet of pavement
with curb and gutter, 4 foot planter strip, and 6 foot sidewalk both sides. The coverages for the
developed project site are summarized in the following table.
Basin
Total Area
(acres)
Impervious Area
(acres)
Pervious Area - Till,
Forest Area (acres)
Pervious Area - Till,
Lawn Area (acres)
TOTAL 4.19 3.74 0 0.45
The majority of the project site is providing oil control and enhanced basic water quality
treatment through the use of a coalescing plate oil/water separator, presettling vault, and
Oldcastle BioPod Biofilter, which has a Washington State Department of Ecology (WSDOE)
General Use Level Designation (GULD) for enhanced treatment. Water quantity control is
2
proposed with an underground infiltration vault. The western portion of the 351st Street
improvements is unable to gravity flow to the onsite storm facilities. This basin is proposing an
Oldcastle Biopod Biofilter for water quality treatment and will discharge to the existing
conveyance system within Pacific Highway South. This discharge is proposing to meet the
Conservation Flow Control criteria. Refer to Section 4 of this report for additional details
regarding the proposed storm systems.
NRCS’ web soil survey information was referenced for the soil mapping of the site. The site
consists of Everett-Alderwood gravelly sandy loams for the northern portion of the site and
Urban land for the southern portion of the site per the mapping.
South Sound Geotechnical Consulting (SSGC) completed a geotechnical engineering report and
infiltration assessment, dated June 18, 2021. The soils were described as consisting of an upper
layer of fill with underlying native soils of silty sand with gravel and occasional cobbles.
Groundwater was not observed at the time of excavation. One small-scale Pilot Infiltration Test
(PIT) was completed in the area of the proposed stormwater facilities. Based on the field
results, SSGC recommended a design infiltration rate of 2 inches per hour. The report should be
referenced for additional information regarding the site soils.
The Hylebos Wetland is south of site but located greater than one-quarter mile downstream.
No critical conditions or difficult site parameters are known to exist at this time.
The project is not located within a known floodplain and/or floodway per FEMA mapping. Refer
to the FEMA FIRM included as Figure 3.2.
3
FIGURE 1.1 – TIR WORKSHEET
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner ___________________________
Phone _________________________________
Address _______________________________
_______________________________________
Project Engineer _________________________
Company ______________________________
Phone _________________________________
Project Name _________________________
DPER Permit # ________________________
Location Township ______________
Range ________________
Section ________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse (e.g.,Subdivision / Short Subd. / UPD)
Building (e.g.,M/F / Commercial / SFR)
Clearing and Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Experimental / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: ______________________
2016 Surface Water Design Manual 4/24/20161
35000 Pacific Hwy S LLC
(253)-826-5003
P.O. Box 94176
Seattle, WA 98124
Gabe L. Jellison, PE
Apex Engineering, PLLC
(253) 473-4494
Plant 2 Relocation
21N
4E
20
35050 Pacific Hwy S
Federal Way, WA
Site Development
N/A
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: KCSWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: ____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
Part 10 SOILS
Soil Type
_________________
_________________
_________________
_________________
Slopes
_________________
_________________
_________________
_________________
Erosion Potential
_________________
_________________
_________________
_________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
2016 Surface Water Design Manual 4/24/20162
Aquifer Recharge
Federal Way
N/A
Hylebos Creek
Enhanced Basic Water Quality and Oil Control
Everett-Alderwood gravelly sandy loams
Urban land
6 to 15
N/A
N/A
N/A
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Level: 1 / 2 / 3 or Exemption Number ____________
Flow Control BMPs _______________________________
Conveyance System Spill containment located at: _________________________
Erosion and Sediment Control /
Construction Stormwater
Pollution Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Liability
Provided: Yes / No
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. ______________________
Landscape Management Plan: Yes / No
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): ______________
Datum:
Flood Protection Facilities Describe:
2016 Surface Water Design Manual 4/24/20163
N/A
Aquifer Recharge
N/A
N/A
N/A
1
2/11/2022
To be determined
To be provided as required
N/A
Plant 2 Relocation TDA
Infiltration Vault
CPS/Presettling Vault
To be determined
To be determined
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-use Site: Yes / No
Treatment BMP: ________________________________
Maintenance Agreement: Yes / No
with whom? ____________________________________
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Protection of Flow Control BMP Facilities
(existing and proposed)
Maintain BMPs / Manage Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent Facilities, restore
operation of Flow Control BMP Facilities as
necessary
Flag limits of SAO and open space preservation
areas
Other ______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
Flow Control BMPs
Other
________________
________________
________________
________________
________________
________________
________________
2016 Surface Water Design Manual 4/24/20164
Infiltration Vault Presettling vault
BioPod Biofilter Vault
CPS Oil Water Sep.
Downturned Elbow
Concrete Batch Plant
CPS/Presettling Vault
CPS Oil Water Separator
Presettling Vault, Biopod Biofilter Vault, Infiltration Vault
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ___________________________
Cast in Place Vault
Retaining Wall
Rockery > 4’ High
Structural on Steep Slope
Other ______________________________
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Signed/Date
2016 Surface Water Design Manual 4/24/20165
Presettling and Infiltration vault
9
FIGURE 1.2 – SITE LOCATION
11
FIGURE 1.3 - DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
14
FIGURE 1.4 - SOILS
Soil Map—King County Area, Washington
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/15/2022
Page 1 of 3523725052372705237290523731052373305237350523737052373905237410523725052372705237290523731052373305237350523737052373905237410551420551440551460551480551500551520551540551560551580551600551620551640551660
551420 551440 551460 551480 551500 551520 551540 551560 551580 551600 551620 551640 551660
47° 17' 17'' N 122° 19' 12'' W47° 17' 17'' N122° 18' 59'' W47° 17' 11'' N
122° 19' 12'' W47° 17' 11'' N
122° 18' 59'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 50 100 200 300
Feet
0 15 30 60 90
Meters
Map Scale: 1:1,200 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 17, Aug 23, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 6, 2020—Jul 20,
2020
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—King County Area, Washington
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/15/2022
Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
EwC Everett-Alderwood gravelly
sandy loams, 6 to 15 percent
slopes
1.8 40.6%
Ur Urban land 2.7 59.4%
Totals for Area of Interest 4.5 100.0%
Soil Map—King County Area, Washington
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/15/2022
Page 3 of 3
18
SECTION 2 – CONDITIONS AND REQUIREMENTS SUMMARY
Enclosed is a brief review/discussion of Core Requirements #1 through #9 in Section 1.2 of the
2016 King County Surface Water Design Manual (KCSWDM), and Special Requirements #1
through #5 in Section 1.3 of the KCSWDM.
Core Requirements
1. Core Requirement #1 – Discharge at a Natural Location
The majority of the developed project site is proposing water quantity control through an
underground infiltration vault. The western portion of the 351st Street improvements is
unable to gravity flow to the onsite storm facilities. Runoff from this basin is proposing to
discharge to the existing conveyance system within Pacific Highway South, which is the
current/natural discharge location.
2. Core Requirement #2 – Off-Site Analysis
Refer to Section 3 of this report for the upstream and downstream analyses.
3. Minimum Requirement #3 – Flow Control
The project is required to meet the Level 2 (Conservation) Flow Control Standard per the
KCSWDM. The majority of the developed project site is proposing water quantity control
through an underground infiltration vault. The western portion of the 351st Street
improvements is unable to gravity flow to the onsite storm facilities. Runoff from this basin
is proposing to discharge to the existing conveyance system within Pacific Highway South,
and is proposing to meet the Conservation Flow Control criteria. Refer to Section 4 of this
report for additional information. See Figure 4.C.1 for the City of Federal Way Flow Control
Application Map.
4. Core Requirement #4 – Conveyance System
The proposed conveyance system is designed to adequately convey the 25-year and 100-
year peak flows per Section 1.2.4.1 of the KCSWDM. In addition, a backwater analysis was
completed and headwater elevations calculated for the proposed system to confirm if the
100-year runoff event is contained within the system without exceeding catch basin rims.
Per the results of the backwater calculations, the proposed conveyance system should be
adequate. Refer to Section 5 of this report for additional information.
5. Core Requirement #5 – Erosion and Sediment Control
19
Refer to Section 8 of this report for an Erosion and Sedimentation Control Plan (ESC) and
proposed ESC measures.
6. Core Requirement #6 – Maintenance and Operations
Refer to Section 10 of this report for an Operations and Maintenance Manual for the
proposed stormwater facilities.
7. Core Requirement #7 – Financial Guarantee and Liability
Financial guarantees will be provided as necessary prior to permit issuance. Refer to Section
9 of this report for additional information.
8. Core Requirement #8 – Water Quality
The project is required to meet Enhanced Basic Water Quality Treatment Standards per
Section 6 of the KCSWDM. The majority of the project site is providing oil control and
enhanced basic water quality treatment through the use of a coalescing plate oil/water
separator, presettling vault, and Oldcastle BioPod Biofilter, which has a Washington State
Department of Ecology (WSDOE) General Use Level Designation (GULD) for enhanced
treatment. The western portion of the 351st Street improvements is unable to gravity flow
to the onsite storm facilities. This basin is proposing an Oldcastle Biopod Biofitler for water
quality treatment. Refer to Section 4 of this report for additional information. See Figure
4.C.2 for the City of Federal Way Water Quality Application Map.
9. Core Requirement #9 – Flow Control BMPs
Per Section 1.2.9 of the KCSWDM and the City of Federal Way Addendum to the KCSWDM
(CFWA), the project shall demonstrate compliance with the Low Impact Development (LID)
Performance Standard. The majority of the developed project site is proposing water
quantity control through an underground infiltration vault. The western portion of the 351st
Street improvements is unable to gravity flow to the onsite storm facilities. Runoff from this
basin is proposing to discharge to the existing conveyance system within Pacific Highway
South, and is proposing to meet the LID Performance Standard. Additionally, the soil
moisture holding capacity of new pervious surfaces shall be protected per King County Code
16.82.100 (G), and the disturbed project soils are proposed to be amended to meet these
criteria. Refer to Section 4 of this report for additional information.
Special Requirements
1. Special Requirement #1 – Other Adopted Area-Specific Requirements
20
The project site is located within the Hylebos Creek and Lower Puget Sound Basin Plan area.
The requirements of the Basin Plan should not be more restrictive than the requirements of
the KCSMDM and COFA.
2. Special Requirement #2 – Floodplain/Floodway Delineation
The project is not located within a known floodplain and/or floodway per FEMA mapping.
Refer to the FEMA FIRM included as Figure 3.2.
3. Special Requirement #3 – Flood Protection Facilities
The project is not proposing any flood protection facilities.
4. Special Requirement #4 – Source Control
The project is classified as a commercial development and is proposing structural and
nonstructural source control measures. Refer to Section 10 of this report for additional
information.
5. Special Requirement #5 – Oil Control
The project is classified as a high-use site and is providing oil control using a coalescing plate
oil/water separator. Refer to Section 4 of this report for additional information.
21
SECTION 3 – OFFSITE ANALYSIS
Task 1. Study Area Definition and Maps
Federal Way as-built/record drawings and GIS maps were obtained for the off-site areas
and are referenced for the downstream drainage path. The site discharges to a catch
basin within Pacific Highway South to the west, which conveys the drainage to the south
where it discharges to a City regional storm facility located approximately one-quarter
mile downstream. These facilities discharge to Hylebos Creek where drainage would
flow generally to the south to a point one mile downstream. Refer to the Downstream
Drainage Path map and associated documentation in this section for additional
information.
The Federal Way Crossings commercial development is located upstream of the project
site and has separate stormwater facilities. Run-on from adjacent properties is assumed
to be negligible.
Task 2. Resource Review
The project site is located within the Hylebos Creek and Lower Puget Sound Basin Plan
area. The requirements of the Basin Plan should not be more restrictive than the
requirements of the KCSMDM and COFA.
The project is not located within a known floodplain and/or floodway per FEMA
mapping. Refer to the FEMA FIRM included as Figure 3.2.
There are no other known offsite analysis reports within the same subbasin.
There are no known erosion hazard or landslide hazard areas located on the project site
or within one mile downstream of the site per City of Federal Way critical area mapping.
There are no known wetlands on the project site, but the Hylebos wetland and creek is
located approximately one-half mile downstream of the site. Refer to Figure 3.3 for the
City of Federal Way Critical Areas Map.
Per King County GIS, there are no listed drainage complaints within one mile
downstream of the project site. One drainage complaint is listed for a parcel south of
the project site that is not within the downstream drainage path. The complaint was for
a water quality audit inspection and was closed in June 2013. Refer to Figure 3.4 for
further information.
There are no known road drainage problems within one mile downstream of the project
site.
22
NRCS’ web soil survey information was referenced for the soil mapping of the site. The
site consists of Everett-Alderwood gravelly sandy loams for the northern portion of the
site and Urban land for the southern portion of the site per the mapping.
Per King County GIS, there are no channel migration hazard areas within one mile
downstream of the project site.
The Washington State Department of Ecology’s (ECY) published Clean Water Act Section
303d list of polluted waters has identified an unnamed water body in the area of the
project site as a Category 5 water due to temperature and dissolved oxygen. The water
body is listed as unmappable and it is unclear from the available information if the
project site drains to this water body. Additionally, Hylebos Creek greater than a mile
downstream of the project is identified as a Category 5 water due to temperature,
dissolved oxygen, and bacteria. No additional requirements from these assessments
have been identified at this time. Refer to Figure 3.5 for reports of the assessed water
quality areas.
There are no known designated water quality problems, and no additional requirements
from adopted stormwater compliance plans downstream of the project site have been
identified at this time.
Task 3. Field Inspection
A Level 1 field inspection was performed on February 11, 2022. The weather was
overcast and approximately 45 degrees. The drainage path to a point more than one-
quarter mile downstream was observed. Refer to the Downstream Drainage Path Map
and associated Drainage System Table in this section for additional information.
From the field inspection, it was determined that run-on from adjacent properties can
be considered negligible. The Federal Way Crossings commercial development is located
upstream of the project site on the north and east sides and has separate stormwater
facilities that will collect runoff. Pacific Highway South to the west and South 351st
Street to the south is located downgrade of the project site.
Task 4. Drainage System Description and Problem Descriptions
The majority of the project site is proposing infiltration for water quantity control. The
western portion of the 351st Street improvements is unable to gravity flow to the onsite
storm facilities and will discharge to the existing conveyance system within Pacific
Highway South, which is the current discharge location for the existing site.
The field inspection was aided by King County GIS information and City of Federal Way
record drawings. Runoff from the site discharges to a catch basin within the
23
easternmost Pacific Highway South/State Route 99 (SR99) northbound travel lane.
Runoff would then continue generally south within 36-inch pipes for approximately 253
feet. Runoff would then continue generally south within 48-inch pipes for approximately
354 feet to a catch basin within the eastern sidewalk of SR99. Runoff would then
continue generally east within a 48-inch pipe for approximately 173 feet to a flow
splitter for a City regional stormwater facility. Runoff would then continue generally
south within 48-inch and 60-inch pipes for approximately 39 feet where it enters the
City regional stormwater facility. Runoff would continue generally south within the City
facility for approximately 650 feet to a point more than one-quarter mile downstream.
Refer to the Downstream Drainage Path Map and associated Drainage System Table in
this section for additional information.
Task 5. Mitigation of Existing or Potential Problems
No existing or potential problems within a mile downstream have been identified at this
time.
24
FIGURE 3.1 – DOWNSTREAM ANALYSIS
Hylebos Creek -- 45 degrees, overcast 9:30 AM 2/11/2022BasinSubbasin Name Subbasin Number Weather ConditionsDateDrainage Component Type, Name, and SizeDrainage Component Description Slope Existing Problems Potential Problems Observations of field inspector, resource reviewer, or residentType: sheet flow, swale, stream, channel, pipe, pond; Size: diameter, surface areaDrainage basin, vegetation, cover, depth, type of sensitive area, volume+/-, %Tributary area, likelihood of problem, overflow pathways, potential impactsCatchbasinExisting 10' +/- deep cb(1)(2)None observed Sedimentation Impacts not expected1 - 2 36-inch pipe0.70(1)0 - 29 None observed Under capacity Impacts not expectedCatchbasinExisting 10' +/- deep cb(1)(2)None observed Sedimentation Impacts not expected2 - 3 36-inch pipe0.64(1)29 - 203 None observed Under capacity Impacts not expectedStorm ManholeExisting 7' +/- deep sdmh(1)(2)None observed Sedimentation Impacts not expected3 - 4 36-inch pipe0.60(1)203 - 253 None observed Under capacity Impacts not expectedCatchbasinExisting 11' +/- deep cb(1)(2)None observed Sedimentation Impacts not expected4 - 5 48-inch pipe1.66(1)253 - 494 None observed Under capacity Impacts not expectedCatchbasin Existing 11' +/- deep cbNone observed Sedimentation Impacts not expected5 - 6 48-inch pipe1.15(1)494 - 607 None observed Under capacity Impacts not expectedCatchbasin Existing 12' +/- deep cbNone observed Sedimentation Impacts not expected6 - 7 48-inch pipe0.81(1)607 - 780 None observed Under capacity Impacts not expected7 Diversion ManholeExisting 10' +/- deep cb - Flow splitter prior to regional storm facility(1)(3)None observed Sedimentation Impacts not expected7 - 8 60-inch pipe4.62(1)780 - 793 None observed Under capacity Impacts not expected8 CatchbasinExisting 17' +/- deep cb(1)(3)None observed Sedimentation Impacts not expected8 - 9 48-inch pipe0.92(1)793 - 819 None observed Under capacity Impacts not expectedPond InletInlet to existing City of Federal Way regional storm facility(1)(3)None observed Erosion/scouring Impacts not expected9 - 10 Regional pondExisting City of Federal Way regional storm facilityN/A 819 - 1469 None observed Under capacity Impacts not expectedPond outlet structureControl structure for existing City of Federal Way regional storm facility(1)(3)None observed Sedimentation Impacts not expected10 - 11 48-inch pipe0.20(1)1469 - 1520 None observed Under capacity Impacts not expectedCatchbasinExisting 5' +/- deep cb with debris cage top(1)(3)None observed Sedimentation Impacts not expected11 - 12 48-inch pipe0.37(1)1520 - 1574 None observed Under capacity Impacts not expectedCatchbasinExisting 7.5' +/- deep cb(1)(3)None observed Sedimentation Impacts not expected12 - 13 48-inch pipe0.37(1)1574 - 1672 None observed Under capacity Impacts not expectedCatchbasin Existing 7.5' +/- deep cbNone observed Sedimentation Impacts not expected13 - 14 48-inch pipe0.46(1)1672 - 1803 None observed Under capacity Impacts not expectedCatchbasin Existing 7.5' +/- deep cbNone observed Sedimentation Impacts not expected14 - 15 48-inch pipe0.37(1)1803 - 1825 None observed Under capacity Impacts not expectedPipe end Outlet to unnamed stream w/ rip rapNone observed Erosion/scouring Impacts not expectedNotes:(1) Slope/inverts per City of Federal Way Record Drawings(2) Unable to access/open structure, located within SR99 travel lane(3) Unable to access/open structure, located within fenced/locked City facility111520121574OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLEKING COUNTY SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosionPlant 2 Relocation (Job #35072) - Downstream Analysis229SymbolDistance from Site Discharge (+/-, ft)See Map1/4 mi = 1,320 ft1010146932034253549466079819780793131672141803151825
27
FIGURE 3.2 – FEMA FIRM
PROJECT
SITE
29
FIGURE 3.3 – CRITICAL AREAS MAP
Critical Areas!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
SW 312th St
SW 320th St Interstate 5Port of Tacoma RdMa
ri
n
e
Vi
e
w
Dr
MarineViewDr
Northshore Pkw y Military
R
d
S
28th Av SE
n
c
h
a
n
t
e
d
P
k
wy Military Rd SPe
a
s
l
eyCanyonRdRedondoWySRedondoBeachDrSPacific Hwy SMarineViewDrInterstate 5StarLake
R
d
1stWySS 324th St
E 11th StInterstate5SW Dash Point RdS W D ashP ointR dNE 49th St10thAvSWSW Campus Dr
SWCampus Dr
S 336th St Pacific Hwy SSW 330th St
SW 356th St
NorpointWyNES 356th St
Pacific Hwy SS356thSt Hwy 18WeyerhaeuserWySSDashPointRd1st Av SS 304th St
Mi
l
i
t
ar
yRdS
S 288th St Military Rd SS 288th St
S 272nd St
Pacific Hwy SS 312th St
I
nt
er
st
at
e5Military Rd SS 272nd St
Pacific Hwy S16th Av SMarineView
Dr E
n
c
h
a
n
t
e
d
P
k
wy
MilitaryRd1st Av S9thAvS21st Av SW23rd Av S51st Av S16thAvSHwy 18S 348th St
S 308th St PacificHwySMilitaryRdSSW 340th StHoy
t
R
dS
W
SW 336th St 21st Av SWH
oytR
d
S
WSW 320th St
SW 308th St
SW Dash Point RdSWD
ash
P
oi
nt
R
d
35th Av SW47th Av SW12th Av SW21st Av SW11th Av SW8th Av SWS 3 2 8 thSt5th Av SS 336th St
7th Av6thAv8thAv6th Av SWSW 344th St 28th Av S20th Av SS 373rd St 34th Av SS 298th St
37th Av SS 304th St
31stAvSS 320th St20th Av SS 312th St
Pacific Hwy SS 320th St
11th Pl S1st Av S8th Av SPavillionsCenter
CelebrationCenter
SeaTacVillage
Pal-doWorldPlaza
The Commons atFederal Way
GatewayCenter
Twin LakesVillage
CampusSquare
Federal WayMarketplace
Federal WayCrossings
LakehavenTreatmentCenter(Redondo)
LakehavenTreatmentCenter (Lakota)LakeGroveElem.
LakeDolloffElem.
LakelandElem
ValhallaElem.
SilverLakeElem.
WildwoodElem.
BrigadoonElem.
Twin LakesElem.
AdelaideElem.
SherwoodForestElem.
PantherLakeElem.
CamelotElem.
NautilusElem.
Mark TwainElem.
Rainier ViewElem.
OlympicViewElem.GreenGablesElem.
EnterpriseElem.
MirrorLakeElem.
Star LakeElem.
WoodmontElem.
IllaheeMiddle School
LakotaMiddleSchool
SacajaweaMiddle School
KiloMiddleSchool
SaghalieMiddleSchool
SequoyahMiddleSchool
PublicAcademy
DecaturHigh School
Federal WayHigh School
ThomasJeffersonHigh School
Todd BeamerHigh School
TrumanH.S.
TotemMiddle School
Golf
Golf
Twin
Course
Course
Lakes
NorthshoreGolf Course
Star LakePark &Ride
Federal Way/S 320th StreetPark & Ride
Twin LakesPark &Ride
South FederalWay Park &Ride
RedondoHeightsPark & Ride
TransitCenter
Federal WayCommunityCenter
SteelLakeAnnex
CityHall
Dumas BayCentre
KnutzenTheatre
ParkLakota
SacajaweaPark
FrenchParkLakePark
AdelaidePark
CamelotPark
Dash PointState Park
SaghaliePark
LakeGenevaPark
GlenNelsonPark
WestHylebosWetlandsPark
FiveMileLakePark
BingamanPond Park
B.P.A. TrailB.P.A. TrailWestCampusTrailB.P.A.TrailSteel LakePark
CelebrationPark
Dumas Bay Sanctuary Park
LaurelwoodPark
TownSquarePark
Brooklake CommunityCenter South CountyBallfields
Alderbrook Park
Dash PointHighlands Park
Spring ValleyOpen Space
Fisher'sPond
Panther LakeOpen SpacePark
PovertyBayOpenSpace
Pacific RimBonsai Collection
Rhododendron SpeciesBotanical Garden
EnchantedPark
Pierce County
King County
Pierce County
King County
Pierce County King CountyPierce County
King County
FireStation 73(Kent)
FireStation65
FireStation 61
FireStation 64
FireStation 63
TrainingCenter
FireStation62
FireStation66
Federal WayRegional Library
320thStreetLibrary
Fife
Milton
Tacoma
DesMoines
Edgewood
Pacific
Kent
FederalWay
FederalWay
Hylebos Creek WaterwayBlair Waterway
P
uyallu
p
R
i
v
erPuget Sound
BayDumas
PovertyBay
Sitcu
m W
aterw
ay
CommencementBay
LakeSteel
Star
Lake
MirrorLake
GenevaLake
North
Lake
EasterLake
Dolloff
LakeLakeFenwi
ckTroutLake
FiveMileLakeLakeKillarneyLake Lorene
JeaneLake
!"#$5
!"#$5
509
18
509
509 161
509
509
161
99
99
!"#$5
99
!"#$5
WhiteRiver
Mill Creek
HylebosCreek
LowerPugetSound
Lower GreenRiver
HylebosCreek
LowerPugetSound
5
City of Federal Way Critical Areas Map Map Date: May 2016City of Federal Way,GIS Division33325 8th Ave SFederal Way, WA 98003(253) 835-7000www.cityoffederalway.com
´
This map is accompanied by NO warranties, and is simply a graphic representation.J:\standard\reference\sensitive.mxd
KingCounty
Vicinity MapHylebos Creek
Lower Green River
Lower Puget Sound
Mill Creek
White River
Erosion Hazard Area
Landslide Hazard Areas
Wetlands (1998 City Survey)
Lakes
Streams
Drainage Basins:Critical Areas:Water Features:
Legend:
Boundaries are approximate. Remember, ADDITIONAL SENSITIVE AREAS MAY EXIST. See Map Notes below for more information.Please Note:Map Notes: Wetlands and streams were identified in a1998 City of Federal Way survey. Data for the Landslide hazard and erosion hazard areas is provided by King County. Drainage basin boundaries within city limits havebeen verified by the City of Federal Way. Basin boundaries outside of city limits are provided by King County and have not been verified by the City of Federal Way. Critical area information is provided forillustrative purposes ONLY.
Actual boundaries are subject of field verification. ADDITIONAL CRITICAL AREAS MAY EXIST. Critical areas in Pierce County are not shown. The City of Federal Wayshall not be liable for any damages due to the use or misuse of the information represented on this map. Wetlands are onlyshown in Federal Way and its Potential Annexation Area.Contact the City for an explanation of these areas and theregulations that govern them.Source: City of Federal Way, King County
0 0.5 10.25
Miles
Scale:
50 Acres
5
20
47°15'5.46831"N122°25'3.78156"W47°21'46.42899"N
122°25'3.78156"W47°21'46.42899"N
122°16'19.25508"W47°15'5.46831"N 122°16'19.25508"WA B C D E F
A B C D E F
1
2
3
4
5
6
7
1
2
3
4
5
6
7
PROJECT
SITE
31
FIGURE 3.4 – DRAINAGE COMPLAINTS
K in g
Date : 3/18/20 22 Notes:
±The informati on included on this map has been c ompil ed by King County s taff from a variety of sources and issubject to change without notice. King County makes no repr esentations or warr anties, ex press or implied,as to accurac y, completeness, timel iness, or rights to the us e of such information. T hi s doc ument i s not intendedfor use as a s urvey product. Ki ng County shall not be l iable for any general , special, indirect, incidental, orconsequential damages i ncl uding, but not li mited to, lost revenues or los t profits resulting from the us e or mi sus eof the information contained on this map. Any sale of thi s map or informati on on this map is prohi bited exc ept bywritten permi ss i on of Ki ng County.
King C ou nty iMap
PROJECT
SITE
Figure 3.4: Downstream Drainage Complaints
PLANT 2 RELOCATION
Apex Job #35072
#Parcel Address Type Problem Date Closed Comments
2013-0132 2021049059 1393 S 351st St WQAL WQAI 6/11/2013 N/A
34
FIGURE 3.5 – ASSESSED WATER QUALITY AREAS
Fed Way
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS,FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, EsriJapan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and
March 17, 2022
0 0.5 10.25Miles
K
Assessed Water/SedimentWater
Category 5 - 303d
Category 4C
Category 4B
Category 4A
Category 2
Category 1
Sediment
Category 5 - 303d
Category 4C
Category 4B
Category 4A
Category 2
Category 1
PROJECT
SITE
41
SECTION 4 – FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID) AND WATER QUALITY
FACILITY ANALYSIS AND DESIGN
Part A – EXISTING SITE HYDROLOGY
The existing project site has three buildings and is covered predominantly with gravel and
asphalt paving with limited vegetation. Slopes onsite are generally one to two percent. The
existing site entrances near the southwest corner and southeast corner slope up to the site at
approximately 7 percent.
The project site consists of a single Threshold Discharge Area. Generally, runoff from the
western half of the site flows to the west to the existing storm conveyance system located
within Pacific Hwy. S., and runoff from the eastern half of the site flows to the south to the
existing storm conveyance system located within S. 351st Street which is then conveyed to the
west to Pacific Hwy. S. Runoff from adjacent properties does not appear to drain onto the
project site and run-on drainage is considered insignificant. Refer to Figure 4.A.1 in this section
for a Pre-Developed Basin Map.
The Western Washington Hydrology Model (WWHM) program was used to model pre-
developed conditions. Historic site conditions (forested) were assumed for the pre-developed
scenarios.
Table 4.A.1– Summary of Pre-developed Site Land Cover
Basin
Total Area
(acres)
Impervious Area
(acres)
Pervious Area - Till,
Forest Area (acres)
Pervious Area - Till,
Lawn Area (acres)
ONSITE 4.19 0 4.19 0
42
FIGURE 4.A.1 – PRE-DEVELOPED BASIN MAP
44
Part B – DEVELOPED SITE HYDROLOGY
A concrete batch plant is proposed on the project site. The majority of the site is proposing to
be paved for plant operation and parking areas and will also include a shop/storage building,
covered storage bins, concrete plant silos and equipment, and perimeter landscape buffer. Full
roadway improvements to S. 351st Street are proposed. The roadway is currently private but is
proposing to be built to public standards (Cross Section Type R) including 40 feet of pavement
with curb and gutter, 4 foot planter strip, and 6 foot sidewalk both sides.
The majority of the project site is providing oil control and enhanced basic water quality
treatment through the use of a coalescing plate oil/water separator, presettling vault, and
Oldcastle BioPod Biofilter, which has a Washington State Department of Ecology (WSDOE)
General Use Level Designation (GULD) for enhanced treatment. Water quantity control is
proposed with an underground infiltration vault. The western portion of the 351st Street
improvements is unable to gravity flow to the onsite storm facilities. This basin is proposing an
Oldcastle Biopod Biofilter for water quality treatment and will discharge to the existing
conveyance system within Pacific Highway South. This discharge is proposing to meet the
Conservation Flow Control criteria. Refer to Section 4, Part D and Part E of this report for
additional details regarding the proposed storm systems.
The Western Washington Hydrology Model (WWHM) program was used to model developed
conditions. Refer to Figure 4.B.1 in this section for a Developed Basin Map.
Table 4.B.1– Summary of Developed Site Land Cover
Basin
Total Area
(acres)
Impervious Area
(acres)
Pervious Area - Till,
Forest Area (acres)
Pervious Area - Till,
Lawn Area (acres)
ONSITE 3.80 3.42 0 0.38
BYPASS 0.39 0.32 0 0.07
OFFSITE* 0.25 0.22 0 0.03
*Offsite area from Pacific Highway South that will contribute to the Biopod water quality system
located within South 351st Street.
45
FIGURE 4.B.1 – DEVELOPED BASIN MAP
47
Part C – PERFORMANCE STANDARDS
Drainage facilities were designed to conform to the KCSWDM and CFWA.
The majority of the project site is directing runoff to an underground infiltration vault for water
quantity control. The western portion of the 351st Street improvements is unable to gravity flow
to the onsite storm facilities and will discharge to the existing conveyance system within Pacific
Highway South. The discharge is proposing to meet the Level 2 Conservation Flow Control
Standard, matching developed discharge durations to pre-developed durations for the range of
pre-developed discharge rates from 50% of the 2-year peak flow up to the full 50-year peak
flow, and match pre-developed 2- and 10-year peak flows. Historic (forested) site conditions
were assumed for the pre-developed condition. Refer to Section 4, Part D for further details.
Additionally, the discharge is proposing to meet the Low Impact Development (LID)
Performance Standard, matching developed discharge durations to pre-developed durations for
the range of pre-developed discharge rates from 8% of the 2-year peak flow to 50% of the 2-
year peak flow. Refer to Section 4, Part D of this report for further details.
The proposed water quality facilities are designed to meet the Enhanced Basic Water Quality
Treatment Standard. The project is proposing Oldcastle BioPod Biofilters, which have a
Washington State Department of Ecology (WSDOE) General Use Level Designation (GULD) for
enhanced treatment. Refer to Section 4, Part E of this report for further details.
The project site is considered high use and is providing oil control through the use of a
coalescing plate oil/water separator. Refer to Section 4, Part E of this report for further details.
The capacity standard for the proposed conveyance system is the 25-year event per Section
1.2.4.1 of the KCSWDM. Refer to Section 5 of this report for further information.
48
FIGURE 4.C.1 - FEDERAL WAY FLOW CONTROL APPLICATION MAP
Fife
Milton
Tacoma
DesMoines
Edgewood
Pacific
AuburnFederalWay
Kent
Hyl
e
b
o
s
C
r
e
e
k
W
a
t
e
r
w
a
y
Bla
i
r
W
a
t
e
r
w
a
y
P
uyallu
p
R
i
v
erPuget Sound
BayDumas
PovertyBay
Sit
c
u
m
W
a
t
e
r
w
a
y
CommencementBay
LakeSteel
Star
Lake
MirrorLake
GenevaLake
North
Lake
Lorene Lake JeaneLake
EasterLake
Dolloff
LakeTroutLake
FiveMileLakeLake KillarneyHOYT
RD SW
MILITARY RD SWEST VALLEY HWYS 288th ST
DASH POINT R D
DASH PT RDMILITARY RD S21st AVE SWPACIFIC HWYMARINE VIEW
DRSW 336th ST
NORTHSHORE PK W Y
INTERSTATE 5E 11th STHWY 18H W Y 18PACIFIC HWY S28TH AVE SENC
HAN
T
ED
P
KW
Y 51st AVE SINTERSTATE 51st AVE SPACIFIC HWY SS 320th ST
21st AVE SWS 336th ST1st AVE SS 312th ST
SW 320th ST
SW 356th ST
S 348th ST SR 99S 272nd ST
33rd ST NE
Lower PugetSound Basin HylebosCreekBasin MillCreekBasin
LowerGreenRiverBasin
0 0.5 10.25 Mile
This map is intended for use as a graphical representation only. The City of Federal Way makes no warranty as to its accuracy.
Legend
Drainage Basin Boundary
Streams
City Limits
Lakes and Wetlands
Scale:
City of Federal Way
Flow ControlApplications Map
Map Date: February, 2010SWM DivisionCity of Federal Way33325 8th Ave SPO Box 9718Federal Way, WA 98063(253) 835-2700www.cityoffederalway.com
R:\erike\swm\FlowControl\flowcontrol.mxd
Flow Control
Basic Flow Control Areas
Conservation Flow Control Areas
Flood Problem Flow Control Areas
Major Receiving Waters1. Puget Sound
PROJECT
SITE
50
FIGURE 4.C.2 - FEDERAL WAY WATER QUALITY APPLICATION MAP
!!7Ái
Hyl
e
b
o
s
C
r
e
e
k
W
a
t
e
r
w
a
y
Bla
i
r
W
a
t
e
r
w
a
y
P
uyallu
p
R
i
v
erPuget Sound
BayDumas
PovertyBay
Sit
c
u
m
W
a
t
e
r
w
a
y
CommencementBay HOYT
RD SW
MILITARY RD SWEST VALLEY HWYMILTON WAY
S 288th ST
DASH POINT R D
DASH PT RDMILITARY RD S21st AVE SWPACIFIC HWYMARINE VIEW
DRSW 336th ST
NORTHSHORE PK W Y
INTERSTATE 5E 11th STHWY 18H W Y 18PACIFIC HWY S28TH AVE SENC
HAN
T
ED
P
KW
Y 51st AVE SINTERSTATE 51st AVE SPACIFIC HWY SS 320th ST
21st AVE SWS 336th ST1st AVE SS 312th ST
SW 320th ST
SW 356th ST
S 348th ST SR 99S 272nd ST
33rd ST NE
Fife
Milton
Tacoma
DesMoines
Edgewood
Pacific
Auburn
Algona
FederalWay
Kent
Lower PugetSound Basin HylebosCreekBasin
LowerGreenRiverBasin
126286.04851 ft
MillCreekBasin
City ofFederal Way
Water QualityApplicationsMap
This map is intended for use as a graphical representation only. The City of Federal Way makes no warranty as to its accuracy.
Map Date: November 2013SWM DivisionCity of Federal Way33325 8th Ave S.Federal Way, WA. 98003(253) 835 - 2700www.cityoffederalway.com
\\users\erike\swm\watqual.mxd
* High density single family, multi-family, commercial, and industrial uses, as well as most roads, are subject to Enhanced Basic Water Quality Treatment Requirements.
Legend
Drainage Basin Boundary
Streams
City Limits
0 0.5 10.25 Mile´
Enhanced Basic Water QualityTreatment Menu Required*
Sensitive Lake
!!7Ái Identified Sphagnum Bog Wetlands
Water Quality Treatment Area Types
Scale:
PROJECT
SITE
52
Part D – FLOW CONTROL SYSTEM
The majority of the project site is directing runoff to an underground infiltration vault for water
quantity control. South Sound Geotechnical Consulting (SSGC) completed a geotechnical
engineering report and infiltration assessment, dated June 18, 2021. The soils were described
as consisting of an upper layer of fill with underlying native soils of silty sand with gravel and
occasional cobbles. Groundwater was not observed at the time of excavation. One small-scale
Pilot Infiltration Test (PIT) was completed in the area of the proposed infiltration vault. Based
on the field results, SSGC recommended a design infiltration rate of 2 inches per hour for
infiltration facilities. The report should be referenced for additional information regarding the
site soils.
The infiltration system was analyzed using the WWHM program. Per this analysis, a vault with 5
feet of head and a footprint of 54 feet by 148 feet should be adequate to infiltrate 100 percent
of the contributory runoff.
The western portion of the 351st Street improvements is unable to gravity flow to the onsite
storm facilities and will discharge to the existing conveyance system within Pacific Highway
South. The discharge is proposing to meet the Level 2 Conservation Flow Control Standard,
matching developed discharge durations to pre-developed durations for the range of pre-
developed discharge rates from 50% of the 2-year peak flow up to the full 50-year peak flow,
and match pre-developed 2- and 10-year peak flows. Additionally, the discharge is proposing to
meet the Low Impact Development (LID) Performance Standard, matching developed discharge
durations to pre-developed durations for the range of pre-developed discharge rates from 8%
of the 2-year peak flow to 50% of the 2-year peak flow. Historic (forested) site conditions were
assumed for the pre-developed condition. The WWHM program was used for the Conservation
Flow Control and LID Performance Standard analyses. Refer to the calculations included in this
section for additional information.
53
FIGURE 4.D.1 – WATER QUANTITY BASIN ANALYSIS
Plant 2 Relocation
Basin Analysis
Basin Total Area
(sf)
Total
Project
Area (ac)
Total
Impervious
Area (sf)
Total
Impervious
Area (ac)
Pervious
Area - Grass
(sf)
Pervious
Area - Grass
(ac)
ONSITE 166,271 3.82 149,653 3.44 16,618 0.38
BYPASS 16,451 0.38 13,372 0.31 3,079 0.07
OFFSITE 10,903 0.25 9,492 0.22 1,411 0.03
55
FIGURE 4.D.2 – FLOW CONTROL WWHM CALCULATIONS
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: 35072
Site Name: Plant 2
Site Address:
City : Federal Way
Report Date: 3/18/2022
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2018/10/10
Version : 4.2.16
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : ONSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Flat 4.19
Pervious Total 4.19
Impervious Land Use acre
Impervious Total 0
Basin Total 4.19
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : ONSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .38
Pervious Total 0.38
Impervious Land Use acre
DRIVEWAYS FLAT 3.44
Impervious Total 3.44
Basin Total 3.82
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Infiltration Vault Infiltration Vault
___________________________________________________________________
Name : Infiltration Vault
Width : 54 ft.
Length : 148 ft.
Depth: 6 ft.
Infiltration On
Infiltration rate: 4.5
Infiltration safety factor: 0.45
Total Volume Infiltrated (ac-ft.): 570.657
Total Volume Through Riser (ac-ft.): 0
Total Volume Through Facility (ac-ft.): 570.657
Percent Infiltrated: 100
Total Precip Applied to Facility: 0
Total Evap From Facility: 0
Discharge Structure
Riser Height: 5 ft.
Riser Diameter: 8 in.
Element Flows To:
Outlet 1 Outlet 2
___________________________________________________________________
Vault Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.183 0.000 0.000 0.000
0.0667 0.183 0.012 0.000 0.374
0.1333 0.183 0.024 0.000 0.374
0.2000 0.183 0.036 0.000 0.374
0.2667 0.183 0.048 0.000 0.374
0.3333 0.183 0.061 0.000 0.374
0.4000 0.183 0.073 0.000 0.374
0.4667 0.183 0.085 0.000 0.374
0.5333 0.183 0.097 0.000 0.374
0.6000 0.183 0.110 0.000 0.374
0.6667 0.183 0.122 0.000 0.374
0.7333 0.183 0.134 0.000 0.374
0.8000 0.183 0.146 0.000 0.374
0.8667 0.183 0.159 0.000 0.374
0.9333 0.183 0.171 0.000 0.374
1.0000 0.183 0.183 0.000 0.374
1.0667 0.183 0.195 0.000 0.374
1.1333 0.183 0.207 0.000 0.374
1.2000 0.183 0.220 0.000 0.374
1.2667 0.183 0.232 0.000 0.374
1.3333 0.183 0.244 0.000 0.374
1.4000 0.183 0.256 0.000 0.374
1.4667 0.183 0.269 0.000 0.374
1.5333 0.183 0.281 0.000 0.374
1.6000 0.183 0.293 0.000 0.374
1.6667 0.183 0.305 0.000 0.374
1.7333 0.183 0.318 0.000 0.374
1.8000 0.183 0.330 0.000 0.374
1.8667 0.183 0.342 0.000 0.374
1.9333 0.183 0.354 0.000 0.374
2.0000 0.183 0.366 0.000 0.374
2.0667 0.183 0.379 0.000 0.374
2.1333 0.183 0.391 0.000 0.374
2.2000 0.183 0.403 0.000 0.374
2.2667 0.183 0.415 0.000 0.374
2.3333 0.183 0.428 0.000 0.374
2.4000 0.183 0.440 0.000 0.374
2.4667 0.183 0.452 0.000 0.374
2.5333 0.183 0.464 0.000 0.374
2.6000 0.183 0.477 0.000 0.374
2.6667 0.183 0.489 0.000 0.374
2.7333 0.183 0.501 0.000 0.374
2.8000 0.183 0.513 0.000 0.374
2.8667 0.183 0.526 0.000 0.374
2.9333 0.183 0.538 0.000 0.374
3.0000 0.183 0.550 0.000 0.374
3.0667 0.183 0.562 0.000 0.374
3.1333 0.183 0.574 0.000 0.374
3.2000 0.183 0.587 0.000 0.374
3.2667 0.183 0.599 0.000 0.374
3.3333 0.183 0.611 0.000 0.374
3.4000 0.183 0.623 0.000 0.374
3.4667 0.183 0.636 0.000 0.374
3.5333 0.183 0.648 0.000 0.374
3.6000 0.183 0.660 0.000 0.374
3.6667 0.183 0.672 0.000 0.374
3.7333 0.183 0.685 0.000 0.374
3.8000 0.183 0.697 0.000 0.374
3.8667 0.183 0.709 0.000 0.374
3.9333 0.183 0.721 0.000 0.374
4.0000 0.183 0.733 0.000 0.374
4.0667 0.183 0.746 0.000 0.374
4.1333 0.183 0.758 0.000 0.374
4.2000 0.183 0.770 0.000 0.374
4.2667 0.183 0.782 0.000 0.374
4.3333 0.183 0.795 0.000 0.374
4.4000 0.183 0.807 0.000 0.374
4.4667 0.183 0.819 0.000 0.374
4.5333 0.183 0.831 0.000 0.374
4.6000 0.183 0.844 0.000 0.374
4.6667 0.183 0.856 0.000 0.374
4.7333 0.183 0.868 0.000 0.374
4.8000 0.183 0.880 0.000 0.374
4.8667 0.183 0.892 0.000 0.374
4.9333 0.183 0.905 0.000 0.374
5.0000 0.183 0.917 0.000 0.374
5.0667 0.183 0.929 0.121 0.374
5.1333 0.183 0.941 0.329 0.374
5.2000 0.183 0.954 0.547 0.374
5.2667 0.183 0.966 0.711 0.374
5.3333 0.183 0.978 0.808 0.374
5.4000 0.183 0.990 0.885 0.374
5.4667 0.183 1.003 0.956 0.374
5.5333 0.183 1.015 1.022 0.374
5.6000 0.183 1.027 1.084 0.374
5.6667 0.183 1.039 1.143 0.374
5.7333 0.183 1.051 1.198 0.374
5.8000 0.183 1.064 1.252 0.374
5.8667 0.183 1.076 1.303 0.374
5.9333 0.183 1.088 1.352 0.374
6.0000 0.183 1.100 1.399 0.374
6.0667 0.183 1.113 1.445 0.374
6.1333 0.000 0.000 1.490 0.000
___________________________________________________________________
Name : BYPASS
Bypass: Yes
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .07
Pervious Total 0.07
Impervious Land Use acre
ROADS FLAT 0.31
Impervious Total 0.31
Basin Total 0.38
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:4.19
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.45
Total Impervious Area:3.75
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.12319
5 year 0.193474
10 year 0.233305
25 year 0.275503
50 year 0.301615
100 year 0.323825
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.122662
5 year 0.156531
10 year 0.179725
25 year 0.209997
50 year 0.233293
100 year 0.257257
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.121 0.163
1950 0.151 0.167
1951 0.271 0.102
1952 0.085 0.086
1953 0.069 0.093
1954 0.106 0.100
1955 0.169 0.112
1956 0.135 0.111
1957 0.109 0.128
1958 0.122 0.101
1959 0.105 0.100
1960 0.183 0.105
1961 0.103 0.109
1962 0.064 0.092
1963 0.088 0.105
1964 0.116 0.099
1965 0.083 0.133
1966 0.080 0.086
1967 0.168 0.150
1968 0.104 0.170
1969 0.102 0.121
1970 0.084 0.114
1971 0.090 0.137
1972 0.202 0.147
1973 0.092 0.082
1974 0.100 0.126
1975 0.135 0.138
1976 0.098 0.098
1977 0.012 0.101
1978 0.086 0.124
1979 0.052 0.170
1980 0.191 0.165
1981 0.077 0.128
1982 0.147 0.183
1983 0.132 0.144
1984 0.081 0.093
1985 0.048 0.128
1986 0.214 0.109
1987 0.189 0.167
1988 0.075 0.100
1989 0.049 0.125
1990 0.395 0.237
1991 0.238 0.185
1992 0.092 0.092
1993 0.096 0.078
1994 0.032 0.083
1995 0.137 0.113
1996 0.289 0.125
1997 0.241 0.120
1998 0.055 0.117
1999 0.226 0.249
2000 0.095 0.122
2001 0.017 0.130
2002 0.104 0.160
2003 0.133 0.125
2004 0.172 0.232
2005 0.124 0.106
2006 0.146 0.095
2007 0.293 0.218
2008 0.378 0.181
2009 0.186 0.153
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3949 0.2486
2 0.3781 0.2369
3 0.2931 0.2316
4 0.2886 0.2175
5 0.2713 0.1847
6 0.2413 0.1829
7 0.2378 0.1814
8 0.2263 0.1702
9 0.2135 0.1696
10 0.2020 0.1670
11 0.1915 0.1670
12 0.1889 0.1650
13 0.1857 0.1632
14 0.1834 0.1603
15 0.1724 0.1530
16 0.1693 0.1495
17 0.1675 0.1468
18 0.1509 0.1443
19 0.1472 0.1381
20 0.1459 0.1366
21 0.1370 0.1329
22 0.1350 0.1297
23 0.1347 0.1283
24 0.1332 0.1276
25 0.1319 0.1275
26 0.1237 0.1260
27 0.1225 0.1250
28 0.1210 0.1250
29 0.1164 0.1246
30 0.1087 0.1236
31 0.1062 0.1219
32 0.1051 0.1209
33 0.1045 0.1200
34 0.1044 0.1170
35 0.1035 0.1145
36 0.1022 0.1127
37 0.0996 0.1122
38 0.0976 0.1107
39 0.0955 0.1088
40 0.0952 0.1087
41 0.0918 0.1061
42 0.0917 0.1053
43 0.0902 0.1050
44 0.0884 0.1018
45 0.0856 0.1006
46 0.0855 0.1006
47 0.0843 0.1002
48 0.0833 0.1000
49 0.0814 0.0999
50 0.0801 0.0994
51 0.0765 0.0975
52 0.0745 0.0947
53 0.0691 0.0927
54 0.0644 0.0927
55 0.0546 0.0920
56 0.0517 0.0918
57 0.0486 0.0863
58 0.0483 0.0858
59 0.0321 0.0834
60 0.0171 0.0821
61 0.0116 0.0782
___________________________________________________________________
Stream Protection Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs) Predev Mit Percentage Pass/Fail
0.0616 17552 1694 9 Pass
0.0640 16164 1498 9 Pass
0.0664 14964 1283 8 Pass
0.0689 13851 1112 8 Pass
0.0713 12810 982 7 Pass
0.0737 11811 872 7 Pass
0.0761 10898 770 7 Pass
0.0786 10119 682 6 Pass
0.0810 9381 616 6 Pass
0.0834 8729 558 6 Pass
0.0858 8145 500 6 Pass
0.0883 7593 439 5 Pass
0.0907 7060 398 5 Pass
0.0931 6588 361 5 Pass
0.0955 6147 330 5 Pass
0.0980 5775 301 5 Pass
0.1004 5443 266 4 Pass
0.1028 5097 244 4 Pass
0.1052 4808 222 4 Pass
0.1077 4530 203 4 Pass
0.1101 4261 184 4 Pass
0.1125 4017 165 4 Pass
0.1149 3784 151 3 Pass
0.1174 3551 141 3 Pass
0.1198 3341 128 3 Pass
0.1222 3138 116 3 Pass
0.1246 2954 110 3 Pass
0.1271 2789 100 3 Pass
0.1295 2603 89 3 Pass
0.1319 2447 82 3 Pass
0.1343 2306 79 3 Pass
0.1368 2162 75 3 Pass
0.1392 2029 69 3 Pass
0.1416 1898 62 3 Pass
0.1440 1790 61 3 Pass
0.1465 1689 56 3 Pass
0.1489 1590 51 3 Pass
0.1513 1484 48 3 Pass
0.1537 1381 44 3 Pass
0.1561 1293 40 3 Pass
0.1586 1222 38 3 Pass
0.1610 1156 34 2 Pass
0.1634 1098 30 2 Pass
0.1658 1048 27 2 Pass
0.1683 997 23 2 Pass
0.1707 930 20 2 Pass
0.1731 883 16 1 Pass
0.1755 838 16 1 Pass
0.1780 789 15 1 Pass
0.1804 743 12 1 Pass
0.1828 713 11 1 Pass
0.1852 669 8 1 Pass
0.1877 633 8 1 Pass
0.1901 596 8 1 Pass
0.1925 565 8 1 Pass
0.1949 539 8 1 Pass
0.1974 497 8 1 Pass
0.1998 473 8 1 Pass
0.2022 434 8 1 Pass
0.2046 399 8 2 Pass
0.2071 368 7 1 Pass
0.2095 348 7 2 Pass
0.2119 323 6 1 Pass
0.2143 296 6 2 Pass
0.2168 272 6 2 Pass
0.2192 256 5 1 Pass
0.2216 235 4 1 Pass
0.2240 217 4 1 Pass
0.2265 197 4 2 Pass
0.2289 180 3 1 Pass
0.2313 158 3 1 Pass
0.2337 145 2 1 Pass
0.2362 129 2 1 Pass
0.2386 119 1 0 Pass
0.2410 109 1 0 Pass
0.2434 97 1 1 Pass
0.2459 91 1 1 Pass
0.2483 82 1 1 Pass
0.2507 76 0 0 Pass
0.2531 69 0 0 Pass
0.2556 61 0 0 Pass
0.2580 54 0 0 Pass
0.2604 48 0 0 Pass
0.2628 41 0 0 Pass
0.2652 38 0 0 Pass
0.2677 33 0 0 Pass
0.2701 27 0 0 Pass
0.2725 22 0 0 Pass
0.2749 21 0 0 Pass
0.2774 20 0 0 Pass
0.2798 19 0 0 Pass
0.2822 17 0 0 Pass
0.2846 14 0 0 Pass
0.2871 12 0 0 Pass
0.2895 9 0 0 Pass
0.2919 4 0 0 Pass
0.2943 3 0 0 Pass
0.2968 3 0 0 Pass
0.2992 3 0 0 Pass
0.3016 3 0 0 Pass
_____________________________________________________
___________________________________________________________________
LID Duration
LID Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.121 0.163
1950 0.151 0.167
1951 0.271 0.102
1952 0.085 0.086
1953 0.069 0.093
1954 0.106 0.100
1955 0.169 0.112
1956 0.135 0.111
1957 0.109 0.128
1958 0.122 0.101
1959 0.105 0.100
1960 0.183 0.105
1961 0.103 0.109
1962 0.064 0.092
1963 0.088 0.105
1964 0.116 0.099
1965 0.083 0.133
1966 0.080 0.086
1967 0.168 0.150
1968 0.104 0.170
1969 0.102 0.121
1970 0.084 0.114
1971 0.090 0.137
1972 0.202 0.147
1973 0.092 0.082
1974 0.100 0.126
1975 0.135 0.138
1976 0.098 0.098
1977 0.012 0.101
1978 0.086 0.124
1979 0.052 0.170
1980 0.191 0.165
1981 0.077 0.128
1982 0.147 0.183
1983 0.132 0.144
1984 0.081 0.093
1985 0.048 0.128
1986 0.214 0.109
1987 0.189 0.167
1988 0.075 0.100
1989 0.049 0.125
1990 0.395 0.237
1991 0.238 0.185
1992 0.092 0.092
1993 0.096 0.078
1994 0.032 0.083
1995 0.137 0.113
1996 0.289 0.125
1997 0.241 0.120
1998 0.055 0.117
1999 0.226 0.249
2000 0.095 0.122
2001 0.017 0.130
2002 0.104 0.160
2003 0.133 0.125
2004 0.172 0.232
2005 0.124 0.106
2006 0.146 0.095
2007 0.293 0.218
2008 0.378 0.181
2009 0.186 0.153
___________________________________________________________________
LID Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3949 0.2486
2 0.3781 0.2369
3 0.2931 0.2316
4 0.2886 0.2175
5 0.2713 0.1847
6 0.2413 0.1829
7 0.2378 0.1814
8 0.2263 0.1702
9 0.2135 0.1696
10 0.2020 0.1670
11 0.1915 0.1670
12 0.1889 0.1650
13 0.1857 0.1632
14 0.1834 0.1603
15 0.1724 0.1530
16 0.1693 0.1495
17 0.1675 0.1468
18 0.1509 0.1443
19 0.1472 0.1381
20 0.1459 0.1366
21 0.1370 0.1329
22 0.1350 0.1297
23 0.1347 0.1283
24 0.1332 0.1276
25 0.1319 0.1275
26 0.1237 0.1260
27 0.1225 0.1250
28 0.1210 0.1250
29 0.1164 0.1246
30 0.1087 0.1236
31 0.1062 0.1219
32 0.1051 0.1209
33 0.1045 0.1200
34 0.1044 0.1170
35 0.1035 0.1145
36 0.1022 0.1127
37 0.0996 0.1122
38 0.0976 0.1107
39 0.0955 0.1088
40 0.0952 0.1087
41 0.0918 0.1061
42 0.0917 0.1053
43 0.0902 0.1050
44 0.0884 0.1018
45 0.0856 0.1006
46 0.0855 0.1006
47 0.0843 0.1002
48 0.0833 0.1000
49 0.0814 0.0999
50 0.0801 0.0994
51 0.0765 0.0975
52 0.0745 0.0947
53 0.0691 0.0927
54 0.0644 0.0927
55 0.0546 0.0920
56 0.0517 0.0918
57 0.0486 0.0863
58 0.0483 0.0858
59 0.0321 0.0834
60 0.0171 0.0821
61 0.0116 0.0782
___________________________________________________________________
LID Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs) Predev Mit Percentage Pass/Fail
0.0099 229502 77085 33 Pass
0.0104 221160 73214 33 Pass
0.0109 212947 69471 32 Pass
0.0114 205311 66091 32 Pass
0.0119 198060 62862 31 Pass
0.0125 191088 59846 31 Pass
0.0130 184478 56916 30 Pass
0.0135 178318 54114 30 Pass
0.0140 172458 51633 29 Pass
0.0146 166918 49237 29 Pass
0.0151 161571 46927 29 Pass
0.0156 156502 44767 28 Pass
0.0161 151754 42735 28 Pass
0.0166 147198 40810 27 Pass
0.0172 142706 38863 27 Pass
0.0177 138471 37088 26 Pass
0.0182 134300 35420 26 Pass
0.0187 130365 33837 25 Pass
0.0193 126365 32340 25 Pass
0.0198 122643 30950 25 Pass
0.0203 119029 29602 24 Pass
0.0208 115435 28297 24 Pass
0.0214 112035 27100 24 Pass
0.0219 108741 25923 23 Pass
0.0224 105490 24832 23 Pass
0.0229 102324 23720 23 Pass
0.0234 99372 22715 22 Pass
0.0240 96506 21774 22 Pass
0.0245 93704 20837 22 Pass
0.0250 90988 19956 21 Pass
0.0255 88421 19143 21 Pass
0.0261 85983 18424 21 Pass
0.0266 83630 17682 21 Pass
0.0271 81256 16966 20 Pass
0.0276 79010 16260 20 Pass
0.0281 76850 15599 20 Pass
0.0287 74775 14974 20 Pass
0.0292 72701 14388 19 Pass
0.0297 70818 13832 19 Pass
0.0302 69000 13312 19 Pass
0.0308 67075 12833 19 Pass
0.0313 65321 12384 18 Pass
0.0318 63653 11907 18 Pass
0.0323 62028 11452 18 Pass
0.0329 60466 10981 18 Pass
0.0334 59012 10545 17 Pass
0.0339 57579 10145 17 Pass
0.0344 56124 9792 17 Pass
0.0349 54713 9430 17 Pass
0.0355 53365 9105 17 Pass
0.0360 52082 8787 16 Pass
0.0365 50820 8453 16 Pass
0.0370 49579 8147 16 Pass
0.0376 48360 7882 16 Pass
0.0381 47226 7578 16 Pass
0.0386 46093 7266 15 Pass
0.0391 44938 7024 15 Pass
0.0396 43911 6748 15 Pass
0.0402 42906 6502 15 Pass
0.0407 41901 6288 15 Pass
0.0412 40938 6074 14 Pass
0.0417 40018 5854 14 Pass
0.0423 39035 5668 14 Pass
0.0428 38158 5452 14 Pass
0.0433 37238 5274 14 Pass
0.0438 36404 5091 13 Pass
0.0443 35548 4909 13 Pass
0.0449 34735 4733 13 Pass
0.0454 33923 4575 13 Pass
0.0459 33153 4419 13 Pass
0.0464 32404 4269 13 Pass
0.0470 31677 4128 13 Pass
0.0475 30950 3959 12 Pass
0.0480 30244 3837 12 Pass
0.0485 29538 3717 12 Pass
0.0491 28875 3600 12 Pass
0.0496 28233 3499 12 Pass
0.0501 27592 3384 12 Pass
0.0506 26971 3277 12 Pass
0.0511 26372 3176 12 Pass
0.0517 25816 3091 11 Pass
0.0522 25260 3001 11 Pass
0.0527 24704 2902 11 Pass
0.0532 24191 2804 11 Pass
0.0538 23699 2714 11 Pass
0.0543 23228 2629 11 Pass
0.0548 22758 2550 11 Pass
0.0553 22309 2473 11 Pass
0.0558 21902 2411 11 Pass
0.0564 21453 2342 10 Pass
0.0569 21021 2267 10 Pass
0.0574 20621 2201 10 Pass
0.0579 20225 2139 10 Pass
0.0585 19795 2084 10 Pass
0.0590 19374 2009 10 Pass
0.0595 18991 1939 10 Pass
0.0600 18610 1875 10 Pass
0.0605 18240 1818 9 Pass
0.0611 17879 1760 9 Pass
0.0616 17552 1694 9 Pass
___________________________________________________________________
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2022; All Rights Reserved.
68
Part E – WATER QUALITY SYSTEM
The proposed water quality facilities are designed to meet the Enhanced Basic Water Quality
Treatment Standard. The project is proposing Oldcastle BioPod Biofilters, which have a
Washington State Department of Ecology (WSDOE) General Use Level Designation (GULD) for
enhanced treatment. The Biopod systems have an internal bypass for higher flows and have
been sized based on the offline peak 15-minute water quality design flow rate as calculated by
the WWHM software.
The onsite area and eastern portion of the South 351st Street improvements basin has a water
quality flow rate of 0.3135 cubic feet per second (cfs) per WWHM. A Biopod Biofilter Model
BPU-816IB has a treatment flow capacity of 0.384 cfs, therefore it should be adequate. The
western portion of the South 351st Street improvements basin has a water quality flow rate of
0.0480 cfs per WWHM. A Biopod Biofilter Model BPU-46IB has a treatment flow capacity of
0.057 cfs, therefore it should be adequate. Refer to the calculations included in this section for
additional information.
The project site is considered high use and is providing oil control through the use of a
coalescing plate oil/water separator (CPS). Per the KCSWDM, oil/water separators should be
offline facilities therefore a flow splitter is proposed upstream of the CPS. The KCSWDM
requires sizing based on a modified offline water quality design flow that is established through
an adjustment factor, k. The modified flow rate is 1.154 cfs, which requires an effective plate
media surface area of 1,874 square feet. An Oldcastle oil/water separator Model 816-2-CPS has
a projected coalescing plate area of 2,368 square feet and should be adequate. Refer to the
calculations included in this section for additional information.
Although not required by Code, the project is proposing a pre-settling vault for additional water
quality treatment. The vault is proposing a dead storage volume equal to 0.25 times the water
quality volume of 0.4354 acre-feet per WWHM. A 15 foot by 63 foot by 5.1 foot deep vault
provides 4,820 cubic feet of volume which should be adequate. Refer to the calculations
included in this section for additional information.
69
FIGURE 4.E.1 - COALESCING PLATE OIL/WATER SEPARATOR SIZING
Plant 2 Relocation
Water Quality Analysis
Coalescing Plate Oil/Water Separator Sizing
Ah = Q/Vt = 60*Q/[0.00386*((Sw - So)/(µw))]
Where: Sw = specific gravity of water = 1.0
So = specific gravity of oil =0.85
µw = absolute viscosity of water (poises) =0.015674
Q = modified off-line water quality design flow rate per Section 6.2.1 (cfs) = 1.154
Where: 2-year 24-hour precipitation (in) = 2.07
6-month 24-hour precipitation (72% of the 2-yr) (in) = 1.5
k (ratio per Table 6.2.1.A KCSWDM) = 3.68
Off-line facility target flow per WWHM (cfs) = 0.3135
Vt = rise rate of the oil droplet
Ah = required effective (horizontal) surface area of plate media (sf)
The equation is based on an oil droplet diameter of 60 microns.
Ah = 1,874
Oil/Water Separator
Flow Splitter Sizing
dorifice = (36.88Q/h1/2)1/2
Where:Q = water quality flow rate (ft3/sec) =1.154
d = orifice diameter (inches)
h = hydraulic head (ft)0.44
dorifice = 8.0
oldcastleprecast.com/wilsonville
File Name:
PO Box 323, Wilsonville, Oregon 97070-0323
Tel: (503) 682-2844 Fax: (503) 682-2657
Issue Date:
816-2-CPS
2018
020-816CPS2
816-2-CPS
OIL / WATER SEPARATOR
COALESCING - 560 GPM
816-2-CPS
11.0
TOP
No. 816-T-CPS
BASE ASSEMBLY
No. 816-B-CPS
OPTIONAL TOP - HEAVY TRAFFIC
No. 816-T-CPS-HD
A
PLAN VIEW
SECTION AA
A
Issue Date:
File Name:
PO Box 323, Wilsonville, Oregon 97070-0323
Tel: (503) 682-2844 Fax: (503) 682-2657 oldcastleprecast.com/wilsonville
816-2-CPS
2018
020-816CPS2
816-2-CPS
OIL / WATER SEPARATOR
COALESCING - 560 GPM
816-2-CPS
11.1
73
FIGURE 4.E.2 - WESTERN KING COUNTY 2-YEAR 24-HOUR ISOPLUVIAL
SECTION 3.2 RUNOFF COMPUTATION AND ANALYSIS METHODS
FIGURE 3.2.1.A 2-YEAR 24-HOUR ISOPLUVIALS
6/15/2016 2016 Surface Water Design Manual 3-16
PROJECT
SITE
75
FIGURE 4.E.3 – KCSWDM TABLE 6.2.1.A
77
FIGURE 4.E.4 – ONSITE BIOPOD BIOFILTER DETAIL
16'-0"
17'-0"
ELEVATION VIEWLEFT END VIEW
PLAN VIEW
8'-0"9'-0"
2X Ø36" BOLTED & GASKETED ACCESS COVERS,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
DIVIDER WALL
RIM
4'-0"
6"
VARIES
2'-0"
2X Ø24" BOLTED & GASKETED ACCESS COVERS,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
ALTERNATE OUTLET LOCATION
OUTLET
4" MIN TO
5' MAX COVER
(SEE NOTE 1.B)
OPTIONAL DRAIN
DOWN DEVICE
INLET
Ø18" RCP MAX. OUTLET
Ø18" RCP MAX. INLET
2'-8"
BYPASS WEIR
3'-10"
DIVIDER WALL
2'-2" [26"] DROP
RECOMMENDED, 6" MIN.
INLET WINDOW
ALTERNATE INLET LOCATION
SAUDFI1325-0510USAXXXXSAUDFI1325-0510USAXXXX5'-1-1/4" MIN
13'-10" MAX
3'-10"
4"
3'-10"
ENERGY DISSIPATION
STONEFIDSAUXXXXUSADFI11540010FIDSAUXXXXUSADFI11540010OUTLET
INLET
UNDERDRAIN PIPE
2"
MULCH
6" DRAIN ROCK
1'-6"
StormMix™ MEDIA
Bioretention/
Biofiltration
Ph: 800.579.8819 | www.oldcastleinfrastructure.com/stormwater
THI S DOC UMENT IS THE P ROPERTY OF OLD CASTLE INFRASTRU CTUR E, IN C.
IT I S CO N FI DEN T I A L, S UBM I T TED F O R R E F ER E N CE P U RPO SES O NLY AN D
S H ALL N OT BE U S E D I N AN Y W AY I N J UR I OU S T O T H E I N T E REST S O F , O R
WITHOUT THE WRITTEN PERMISSI ON OF OLDCASTLE INFRASTRUCTURE, INC.
COPYRIGHT © 2021 OLDCASTLE INFRASTRUCTURE, INC. ALL RIGHTS RESERVED.
SHEET NAME REVISION SHEET
REV DATE
-
BioPod™ Biofilter System
CUSTOMER
PROJECT NAME
-
-
-
(STANDARD)
1 OF 1Specifier Drawing
BPU-816IB
Underground Vault with Internal Bypass
NOTES:
1.DESIGN LOADINGS:
A.AASHTO HS-20-44 (WITH IMPACT)
B.DESIGN SOIL COVER: 5'-0" MAXIMUM
C.ASSUMED WATER TABLE: BELOW BASE OF
PRECAST
(ENGINEER-OF-RECORD TO CONFIRM SITE
WATER TABLE ELEVATION)
D.LATERAL EARTH PRESSURE: 45 PCF
(DRAINED)
E.LATERAL LIVE LOAD SURCHARGE: 80 PSF
(APPLIED TO 8'-0" BELOW GRADE)
F.NO LATERAL SURCHARGE FROM ADJACENT
BUILDINGS, WALLS, PIERS, OR FOUNDATIONS.
2.CONCRETE 28-DAY MINIMUM COMPRESSIVE
STRENGTH: 5,000 PSI MINIMUM.
3.REINFORCING: REBAR, ASTM A615/A706, GRADE 60
4.CEMENT: ASTM C150
5.REQUIRED ALLOWABLE SOIL BEARING CAPACITY:
2,500 PSF
6.REFERENCE STANDARD:
A.ASTM C890
B.ASTM C913
C.ACI 318-14
7.THIS STRUCTURE IS DESIGNED TO THE
PARAMETERS NOTED HEREIN.
ENGINEER-OF-RECORD SHALL VERIFY FY THAT
NOTED PARAMETERS MEET OR EXCEED PROJECT
REQUIREMENTS. IF DESIGN PARAMETERS ARE
INCORRECT, REVIEWING ENGINEER/AUTHORITY
SHALL NOTIFY OLDCASTLE INFRASTRUCTURE UPON
REVIEW.
8.INLET AND OUTLET HOLES WILL BE FACTORY
CORED/CAST PER PLANS AND CUSTOMER
REQUIREMENTS. INLET AND OUTLET LOCATIONS
CAN BE MIRRORED.
9.CONTRACTOR RESPONSIBLE TO VERIFY ALL SIZES,
LOCATIONS, AND ELEVATIONS OF OPENINGS.
10.CONTRACTOR RESPONSIBLE TO ENSURE
ADEQUATE BEARING SURFACE IS PROVIDED (I.E.
COMPACTED AND LEVEL PER PROJECT
SPECIFICATIONS).
11.SECTION HEIGHTS, SLAB/WALL THICKNESSES, AND
KEYWAYS ARE SUBJECT TO CHANGE AS REQUIRED
FOR SITE REQUIREMENTS AND/OR DUE TO
PRODUCT AVAILABILITY AND PRODUCTION FACILITY
CONSTRAINTS.
12.MAXIMUM PICK WEIGHTS":
A.TOP: XX,XXX LBS
B.BASE: XX,XXX LBS*
(* COMBINED WEIGHT OF BASE INCLUDES
BYPASS WEIR, DIVIDER WALL, ROCK & MEDIA)
13.INTERNALS SHALL CONSIST OF UNDERDRAIN
PIPE, ROCK, STORMMIX™ MEDIA, MULCH, DIVIDER
WALL, BYPASS WEIR AND OPTIONAL DRAIN DOWN.
PERFORMANCE SPECIFICATIONS
Treatment Flow Capacities:*
NJDEP 80% Removal, 75 micron 0.432 cfs
0.384 cfs
*Contact Oldcastle for alternative treatment flow capacities.
WA Ecology GULD - Basic,
Enhanced & Phosphorus
Bypass Capacity 6.5 cfs
SITE SPECIFIC DATA
Structure ID
Treatment Flow Rate (cfs)
Peak Flow Rate (cfs)
Rim Elevation
Pipe Data Pipe
Size
Pipe
Type
Invert
Elevation
Inlet
Outlet
Notes:
Pipe
Location
Top of Vault Elevation
ID
0.3117
2.7412
252.28
250.50
SIDE
SIDE
18"
18"
ADS-N12
ADS-N12
243.46
242.96
79
FIGURE 4.E.5 – 351ST STREET BIOPOD BIOFILTER DETAIL
6'-0"
7'-0"
ELEVATION VIEWLEFT END VIEW
PLAN VIEW
4'-0"5'-0"SAUDFI1325-0510USAXXXXØ36" BOLTED & GASKETED ACCESS COVER,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
DIVIDER WALL
RIM
4'-0"
6"
VARIES
1'-6"
2X Ø18" TRAFFIC RATED CAST IRON COVERS,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
ALTERNATE OUTLET LOCATION
OUTLET
4" MIN TO
5' MAX COVER
(SEE NOTE 1.B)
OPTIONAL DRAIN
DOWN DEVICE
INLET
Ø12" RCP MAX. OUTLET
Ø12" RCP MAX. INLET
2'-8"
BYPASS WEIR
3'-10"
DIVIDER WALL
2'-2" [26"] DROP
RECOMMENDED, 6" MIN.
INLET WINDOW
ALTERNATE INLET LOCATION
INLET
OUTLET
1'-10"4"1'-10"
5'-1-1/4" MIN
13'-10" MAX ENERGY DISSIPATION STONE
UNDERDRAIN PIPE
2"
MULCH
1'-6"
StormMix™ MEDIA
6" DRAIN ROCK
Bioretention/
Biofiltration
Ph: 800.579.8819 | www.oldcastleinfrastructure.com/stormwater
THI S DOCU MENT IS THE PR OPER TY OF O LDC ASTLE INFRASTRUC TURE, INC .
I T IS C O NFID EN TI AL, SU BMI TTED F OR R E FER E NC E P UR POSES O NLY AN D
S HALL NO T BE U S E D I N AN Y WAY I NJU R I O U S T O T HE I N T ER EST S O F , O R
WITHOUT THE WRITTEN PERMI SSION OF OLDCASTLE INFRASTRUCTURE, IN C.
COPYRIGHT © 2021 OLDCASTLE INFRASTRUCTURE, INC. ALL RIGHTS RESERVED.
SHEET NAME REVISION SHEET
REV DATE
-
BioPod™ Biofilter System
CUSTOMER
PROJECT NAME
-
-
-
(STANDARD)
1 OF 1Specifier Drawing
BPU-46IB
Underground Vault with Internal Bypass
PERFORMANCE SPECIFICATIONS
Treatment Flow Capacities:*
NJDEP 80% Removal, 75 micron 0.064 cfs
0.057 cfs
*Contact Oldcastle for alternative treatment flow capacities.
WA Ecology GULD - Basic,
Enhanced & Phosphorus
Bypass Capactiy 5.0 cfs
NOTES:
1.DESIGN LOADINGS:
A.AASHTO HS-20-44 (WITH IMPACT)
B.DESIGN SOIL COVER: 5'-0" MAXIMUM
C.ASSUMED WATER TABLE: BELOW BASE OF
PRECAST
(ENGINEER-OF-RECORD TO CONFIRM SITE
WATER TABLE ELEVATION)
D.LATERAL EARTH PRESSURE: 45 PCF
(DRAINED)
E.LATERAL LIVE LOAD SURCHARGE: 80 PSF
(APPLIED TO 8'-0" BELOW GRADE)
F.NO LATERAL SURCHARGE FROM ADJACENT
BUILDINGS, WALLS, PIERS, OR FOUNDATIONS.
2.CONCRETE 28-DAY MINIMUM COMPRESSIVE
STRENGTH: 5,000 PSI MINIMUM.
3.REINFORCING: REBAR, ASTM A615/A706, GRADE 60
4.CEMENT: ASTM C150
5.REQUIRED ALLOWABLE SOIL BEARING CAPACITY:
2,500 PSF
6.REFERENCE STANDARD:
A.ASTM C890
B.ASTM C913
C.ACI 318-14
7.THIS STRUCTURE IS DESIGNED TO THE
PARAMETERS NOTED HEREIN.
ENGINEER-OF-RECORD SHALL VERIFY FY THAT
NOTED PARAMETERS MEET OR EXCEED PROJECT
REQUIREMENTS. IF DESIGN PARAMETERS ARE
INCORRECT, REVIEWING ENGINEER/AUTHORITY
SHALL NOTIFY OLDCASTLE INFRASTRUCTURE UPON
REVIEW.
8.INLET AND OUTLET HOLES WILL BE FACTORY
CORED/CAST PER PLANS AND CUSTOMER
REQUIREMENTS. INLET AND OUTLET LOCATIONS
CAN BE MIRRORED.
9.CONTRACTOR RESPONSIBLE TO VERIFY ALL SIZES,
LOCATIONS, AND ELEVATIONS OF OPENINGS.
10.CONTRACTOR RESPONSIBLE TO ENSURE
ADEQUATE BEARING SURFACE IS PROVIDED (I.E.
COMPACTED AND LEVEL PER PROJECT
SPECIFICATIONS).
11.SECTION HEIGHTS, SLAB/WALL THICKNESSES, AND
KEYWAYS ARE SUBJECT TO CHANGE AS REQUIRED
FOR SITE REQUIREMENTS AND/OR DUE TO
PRODUCT AVAILABILITY AND PRODUCTION FACILITY
CONSTRAINTS.
12.MAXIMUM PICK WEIGHTS":
A.TOP: XX,XXX LBS
B.BASE: XX,XXX LBS*
(* COMBINED WEIGHT OF BASE INCLUDES
BYPASS WEIR, DIVIDER WALL, ROCK & MEDIA)
13.INTERNALS SHALL CONSIST OF UNDERDRAIN
PIPE, ROCK, STORMMIX™ MEDIA, MULCH, DIVIDER
WALL, BYPASS WEIR AND OPTIONAL DRAIN DOWN.
SITE SPECIFIC DATA
Structure ID
Treatment Flow Rate (cfs)
Peak Flow Rate (cfs)
Rim Elevation
Pipe Data Pipe
Size
Pipe
Type
Invert
Elevation
Inlet
Outlet
Notes:
Pipe
Location
Top of Vault Elevation
ID
0.0490
0.4426
242.46
241.46
SIDE
SIDE
12"
12"
ADS-N12
ADS-N12
237.50
237.00
81
FIGURE 4.E.6 – WATER QUALITY WWHM CALCULATIONS
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: 35072-WQ
Site Name: Plant 2
Site Address:
City : Federal Way
Report Date: 3/18/2022
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2018/10/10
Version : 4.2.16
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
Low Flow Threshold for POC 2 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 2: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : ONSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Flat 3.82
Pervious Total 3.82
Impervious Land Use acre
Impervious Total 0
Basin Total 3.82
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
Name : 351ST
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Flat .38
Pervious Total 0.38
Impervious Land Use acre
Impervious Total 0
Basin Total 0.38
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
Name : OFFSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Flat .25
Pervious Total 0.25
Impervious Land Use acre
Impervious Total 0
Basin Total 0.25
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : ONSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .38
Pervious Total 0.38
Impervious Land Use acre
DRIVEWAYS FLAT 3.44
Impervious Total 3.44
Basin Total 3.82
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
Name : 351ST
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .07
Pervious Total 0.07
Impervious Land Use acre
ROADS FLAT 0.31
Impervious Total 0.31
Basin Total 0.38
__________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
Name : OFFSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat .03
Pervious Total 0.03
Impervious Land Use acre
ROADS FLAT 0.22
Impervious Total 0.22
Basin Total 0.25
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:3.82
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.38
Total Impervious Area:3.44
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.112311
5 year 0.176389
10 year 0.212703
25 year 0.251175
50 year 0.274981
100 year 0.295229
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 1.335964
5 year 1.69574
10 year 1.941103
25 year 2.260316
50 year 2.505267
100 year 2.756676
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.110 1.754
1950 0.138 1.844
1951 0.247 1.094
1952 0.078 0.948
1953 0.063 1.024
1954 0.097 1.087
1955 0.154 1.227
1956 0.123 1.209
1957 0.099 1.386
1958 0.112 1.103
1959 0.096 1.111
1960 0.167 1.127
1961 0.094 1.180
1962 0.059 1.013
1963 0.081 1.142
1964 0.106 1.098
1965 0.076 1.432
1966 0.073 0.943
1967 0.153 1.630
1968 0.095 1.855
1969 0.093 1.303
1970 0.077 1.245
1971 0.082 1.486
1972 0.184 1.565
1973 0.084 0.911
1974 0.091 1.363
1975 0.123 1.532
1976 0.089 1.056
1977 0.011 1.116
1978 0.078 1.368
1979 0.047 1.875
1980 0.175 1.752
1981 0.070 1.392
1982 0.134 1.980
1983 0.120 1.587
1984 0.074 1.010
1985 0.044 1.391
1986 0.195 1.195
1987 0.172 1.841
1988 0.068 1.110
1989 0.044 1.388
1990 0.360 2.480
1991 0.217 1.956
1992 0.084 1.000
1993 0.087 0.859
1994 0.029 0.926
1995 0.125 1.232
1996 0.263 1.339
1997 0.220 1.293
1998 0.050 1.285
1999 0.206 2.680
2000 0.087 1.324
2001 0.016 1.432
2002 0.095 1.719
2003 0.121 1.336
2004 0.157 2.502
2005 0.113 1.145
2006 0.133 1.016
2007 0.267 2.344
2008 0.345 1.922
2009 0.169 1.696
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3600 2.6800
2 0.3447 2.5018
3 0.2672 2.4801
4 0.2632 2.3442
5 0.2473 1.9801
6 0.2200 1.9563
7 0.2168 1.9217
8 0.2063 1.8746
9 0.1947 1.8547
10 0.1842 1.8444
11 0.1745 1.8409
12 0.1722 1.7538
13 0.1693 1.7515
14 0.1672 1.7188
15 0.1572 1.6963
16 0.1543 1.6302
17 0.1527 1.5867
18 0.1376 1.5652
19 0.1342 1.5318
20 0.1330 1.4858
21 0.1249 1.4318
22 0.1230 1.4317
23 0.1228 1.3925
24 0.1214 1.3911
25 0.1203 1.3875
26 0.1128 1.3862
27 0.1117 1.3676
28 0.1103 1.3632
29 0.1061 1.3391
30 0.0991 1.3356
31 0.0968 1.3241
32 0.0958 1.3031
33 0.0953 1.2928
34 0.0952 1.2854
35 0.0943 1.2454
36 0.0932 1.2324
37 0.0908 1.2267
38 0.0889 1.2086
39 0.0871 1.1954
40 0.0868 1.1797
41 0.0837 1.1448
42 0.0836 1.1420
43 0.0822 1.1271
44 0.0806 1.1160
45 0.0780 1.1113
46 0.0779 1.1095
47 0.0769 1.1027
48 0.0760 1.0984
49 0.0743 1.0944
50 0.0730 1.0870
51 0.0698 1.0556
52 0.0679 1.0241
53 0.0630 1.0164
54 0.0587 1.0129
55 0.0498 1.0101
56 0.0472 1.0005
57 0.0443 0.9481
58 0.0441 0.9432
59 0.0293 0.9259
60 0.0156 0.9112
61 0.0106 0.8593
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.4355 acre-feet
On-line facility target flow: 0.5543 cfs.
Adjusted for 15 min: 0.5543 cfs.
Off-line facility target flow: 0.3135 cfs.
Adjusted for 15 min: 0.3135 cfs.
___________________________________________________________________
___________________________________________________________________
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #2
Total Pervious Area:0.63
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #2
Total Pervious Area:0.1
Total Impervious Area:0.53
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #2
Return Period Flow(cfs)
2 year 0.018523
5 year 0.02909
10 year 0.035079
25 year 0.041424
50 year 0.04535
100 year 0.04869
Flow Frequency Return Periods for Mitigated. POC #2
Return Period Flow(cfs)
2 year 0.208468
5 year 0.265565
10 year 0.304613
25 year 0.355525
50 year 0.394667
100 year 0.434902
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #2
Year Predeveloped Mitigated
1949 0.018 0.276
1950 0.023 0.285
1951 0.041 0.172
1952 0.013 0.147
1953 0.010 0.158
1954 0.016 0.170
1955 0.025 0.191
1956 0.020 0.188
1957 0.016 0.218
1958 0.018 0.171
1959 0.016 0.171
1960 0.028 0.178
1961 0.016 0.185
1962 0.010 0.157
1963 0.013 0.179
1964 0.017 0.170
1965 0.013 0.225
1966 0.012 0.147
1967 0.025 0.254
1968 0.016 0.289
1969 0.015 0.205
1970 0.013 0.194
1971 0.014 0.232
1972 0.030 0.248
1973 0.014 0.140
1974 0.015 0.214
1975 0.020 0.236
1976 0.015 0.165
1977 0.002 0.172
1978 0.013 0.211
1979 0.008 0.290
1980 0.029 0.278
1981 0.012 0.217
1982 0.022 0.310
1983 0.020 0.246
1984 0.012 0.158
1985 0.007 0.217
1986 0.032 0.185
1987 0.028 0.285
1988 0.011 0.171
1989 0.007 0.214
1990 0.059 0.398
1991 0.036 0.311
1992 0.014 0.156
1993 0.014 0.133
1994 0.005 0.143
1995 0.021 0.192
1996 0.043 0.211
1997 0.036 0.203
1998 0.008 0.199
1999 0.034 0.421
2000 0.014 0.207
2001 0.003 0.221
2002 0.016 0.271
2003 0.020 0.211
2004 0.026 0.393
2005 0.019 0.180
2006 0.022 0.160
2007 0.044 0.368
2008 0.057 0.306
2009 0.028 0.261
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #2
Rank Predeveloped Mitigated
1 0.0594 0.4212
2 0.0569 0.3977
3 0.0441 0.3925
4 0.0434 0.3684
5 0.0408 0.3111
6 0.0363 0.3102
7 0.0358 0.3056
8 0.0340 0.2896
9 0.0321 0.2893
10 0.0304 0.2851
11 0.0288 0.2850
12 0.0284 0.2782
13 0.0279 0.2762
14 0.0276 0.2711
15 0.0259 0.2615
16 0.0255 0.2542
17 0.0252 0.2478
18 0.0227 0.2460
19 0.0221 0.2360
20 0.0219 0.2320
21 0.0206 0.2251
22 0.0203 0.2214
23 0.0203 0.2175
24 0.0200 0.2169
25 0.0198 0.2169
26 0.0186 0.2138
27 0.0184 0.2137
28 0.0182 0.2113
29 0.0175 0.2111
30 0.0163 0.2106
31 0.0160 0.2070
32 0.0158 0.2048
33 0.0157 0.2032
34 0.0157 0.1994
35 0.0156 0.1945
36 0.0154 0.1917
37 0.0150 0.1909
38 0.0147 0.1882
39 0.0144 0.1853
40 0.0143 0.1847
41 0.0138 0.1798
42 0.0138 0.1788
43 0.0136 0.1777
44 0.0133 0.1722
45 0.0129 0.1720
46 0.0129 0.1714
47 0.0127 0.1712
48 0.0125 0.1709
49 0.0122 0.1697
50 0.0120 0.1696
51 0.0115 0.1654
52 0.0112 0.1602
53 0.0104 0.1583
54 0.0097 0.1576
55 0.0082 0.1569
56 0.0078 0.1561
57 0.0073 0.1468
58 0.0073 0.1465
59 0.0048 0.1427
60 0.0026 0.1404
61 0.0017 0.1333
___________________________________________________________________
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #2
On-line facility volume: 0.0683 acre-feet
On-line facility target flow: 0.0852 cfs.
Adjusted for 15 min: 0.0852 cfs.
Off-line facility target flow: 0.048 cfs.
Adjusted for 15 min: 0.048 cfs.
___________________________________________________________________
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2022; All Rights Reserved.
91
SECTION 5 – CONVEYANCE SYSTEM ANALYSIS AND DESIGN
New pipe systems are required to adequately convey and contain (at minimum) the 25-year
peak flows per Section 1.2.4.1 of the KCSWDM. The project’s proposed conveyance systems are
designed to adequately convey and contain the 100-year peak flows without overtopping any
catch basin rims.
The storm conveyance systems and contributory areas were analyzed using the “StormShed
3G” software, Manning’s equation, and the SBUH Method. The analysis assumed a Manning’s
roughness coefficient (n) of 0.014.
Backwater and hydraulic grade line analyses are calculated for the systems to ensure that the
100-year storms are contained within the systems without exceeding any catch basin grates.
For the on-site system, a tailwater equal to the design water surface elevation of the infiltration
facility is assumed. For the western portion of the South 351st Street conveyance system, a
tailwater equal to the crown of the proposed pipe at the connection point is assumed. The
results show that the proposed drainage systems should be adequate, and the 100-year storms
should be contained within the systems below the catch basin grates.
It should also be noted that the pipe numbering scheme used in the analysis corresponds to the
outlet pipe from the appropriate catch basin. For example, the pipe exiting CB05 is labeled P05.
The other pipes in the analysis are labeled in the same fashion.
Refer to the calculations included in this section for additional information.
92
FIGURE 5.1 – CONVEYANCE BASIN MAP
94
FIGURE 5.2 – CONVEYANCE BASIN ANALYSIS
Plant 2 Relocation
Conveyance Basin Analysis
Basin ID Total
Basin Area
Total
Basin Area
Impervious
Area
Impervious
Area
Pervious
Area - Lawn
Pervious
Area - Lawn
(ft2)(ac)(ft2)(ac)(ft2)(ac)
B05 32,162 0.74 32,162 0.74 0 0.00
B07 44,139 1.01 40,567 0.93 3,572 0.08
B08 11,531 0.26 7,939 0.18 3,592 0.08
B09 8,867 0.20 7,368 0.17 1,499 0.03
B11 33,772 0.78 33,772 0.78 0 0.00
B12 2,087 0.05 2,087 0.05 0 0.00
B13 7,205 0.17 6,589 0.15 616 0.01
B15 9,860 0.23 9,001 0.21 859 0.02
B16 9,598 0.22 8,737 0.20 861 0.02
B17 11,702 0.27 10,028 0.23 1,674 0.04
B18 20,051 0.46 14,422 0.33 5,629 0.13
96
FIGURE 5.3 – STORMSHED 3G CALCULATIONS
Appended on: Monday, March 21, 2022 11:27:13 AM
ROUTEHYD [] THRU [PLANT 2] USING [25 year] AND [TYPE1A.RAC] NOTZERO RELATIVE SCS/SBUH
Gravity Analysis using 24 hr duration storm
Reach
ID
Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft)
Depth
ratio Size nVel
(ft/s)
fVel
(ft/s)
Infil Vol
(cf)
CBasin /
Hyd
P05 0.74 0.5723 2.3538 0.2431 0.3355 0.3355 12 in
Diam 2.4756 2.997 0.00 B05
P04 0.74 0.5723 7.0968 0.0806 0.1917 0.1917 12 in
Diam 5.4393 9.0359 0.00
P09 0.20 0.146 2.3456 0.0622 0.1691 0.1691 12 in
Diam 1.6611 2.9865 0.00 B09
P08 0.46 0.3238 2.3789 0.1361 0.2492 0.2492 12 in
Diam 2.1187 3.029 0.00 B08
P07 1.01 0.7578 3.2694 0.2318 0.3271 0.3271 12 in
Diam 3.3943 4.1628 0.00 B07
P06 1.47 1.0816 2.098 0.5155 0.5094 0.5094 12 in
Diam 2.6899 2.6713 0.00 B06
P12 0.05 0.0387 4.7716 0.0081 0.0636 0.0636 12 in
Diam 1.8428 6.0754 0.00 B12
P11 0.78 0.6032 2.3456 0.2572 0.3458 0.3458 12 in
Diam 2.5031 2.9865 0.00 B11
P16 0.22 0.1643 2.3456 0.0701 0.1793 0.1793 12 in
Diam 1.7187 2.9865 0.00 B16
P15 0.45 0.3364 3.9952 0.0842 0.1959 0.1959 12 in
Diam 3.0979 5.0868 0.00 B15
P14 0.45 0.3364 6.5057 0.0517 0.1544 0.1544 12 in
Diam 4.3681 8.2832 0.00
P13 0.61 0.4572 4.9273 0.0928 0.2058 0.2058 12 in
Diam 3.9252 6.2736 0.00 B13
P10 2.22 1.7023 2.9293 0.5811 0.5474 0.5474 12 in
Diam 3.8685 3.7297 0.00 B11
P02 4.43 3.3562 9.7803 0.3432 0.6059 0.4039 18 in
Diam 5.0188 5.5345 0.00
P03 4.43 3.3562 30.9924 0.1083 0.3326 0.2217 18 in
Diam 11.5133 17.5381 0.00 B03
P-VLT-
PRE 4.43 3.3562 7.393 0.454 0.7091 0.4727 18 in
Diam 4.0817 4.1836 0.00
P-VLT-
BIO 4.43 3.3562 9.7803 0.3432 0.6059 0.4039 18 in
Diam 5.0188 5.5345 0.00
P01 4.43 3.3562 7.3189 0.4586 0.7133 0.4755 18 in
Diam 4.0506 4.1416 0.00
HGL Analysis
From Node To Node HG El (ft) App (ft) Bend (ft) Junct Loss (ft) Adjusted HG El (ft) Max El (ft)
247.00
CB01 VLT-INFILT 247.0774 0.0560 0.0615 ------ 247.0829 252.0400
VLT-BIOPOD CB01 247.1572 --na-- --na-- --na-- 247.1572 252.2800
VLT-PRESETT VLT-BIOPOD 247.2327 --na-- --na-- --na-- 247.2327 252.0000
CB03 VLT-PRESETT 247.3281 0.0560 0.0771 ------ 247.3492 251.8900
CB02 CB03 247.4553 0.0729 0.0357 0.0395 247.4575 252.3900
CB04 CB02 247.4752 0.0082 0.0100 ------ 247.4769 252.2300
CB05 CB04 247.5288 ------ ------ ------ 247.5288 249.9000
CB06 CB02 247.7214 0.0145 0.0018 0.0043 247.7130 250.0400
CB08 CB06 247.7195 0.0005 0.0001 ------ 247.7191 248.2100
CB09 CB08 247.7205 ------ ------ ------ 247.7205 248.2100
CB07 CB06 247.7487 ------ ------ ------ 247.7487 249.4000
CB10 CB02 247.9873 0.0092 0.0169 0.0044 247.9996 252.0000
CB12 CB10 250.0965 ------ ------ ------ 250.0965 253.2100
CB11 CB10 248.0363 ------ ------ ------ 248.0363 249.7600
CB13 CB10 248.0179 0.2963 0.6165 ------ 248.3380 251.1400
CB14 CB13 249.8058 ------ 0.0341 ------ 249.8399 252.9600
CB15 CB14 251.1378 ------ 0.0003 ------ 251.1381 254.4700
CB16 CB15 251.4844 ------ ------ ------ 251.4844 254.4700
Conduit Notes
Reach HW Depth (ft) HW/D ratio Q (cfs) TW Depth (ft) Dc (ft) Dn (ft) Comment
P01 4.2278 2.8185 3.36 4.1500 0.6982 0.7133 Outlet Control
P-VLT-BIO 4.2572 2.8381 3.36 4.1829 0.6982 0.6059 Outlet Control
P-VLT-PRE 3.7727 2.5151 3.36 3.6972 0.6982 0.7091 Outlet Control
P03 4.8281 3.2188 3.36 4.7327 0.6982 0.3326 Outlet Control
P02 2.5453 1.6969 3.36 2.4392 0.6982 0.6059 Outlet Control
P04 2.6752 2.6752 0.57 2.6575 0.3144 0.1917 Outlet Control
P05 1.5388 1.5388 0.57 1.4869 0.3144 0.3355 Outlet Control
P06 2.9214 2.9214 1.08 2.6575 0.4375 0.5094 Outlet Control
P08 2.0595 2.0595 0.32 2.0530 0.2345 0.2492 Outlet Control
P09 1.8805 1.8805 0.15 1.8791 0.1560 0.1691 Outlet Control
P07 2.0887 2.0887 0.76 2.0530 0.3636 0.3271 Outlet Control
P10 3.1874 3.1874 1.70 2.6575 0.5550 0.5474 Outlet Control
P12 0.0965 0.0965 0.04 1.8896 0.0795 0.0636 SuperCrit flow, Inlet end controls
P11 1.9263 1.9263 0.60 1.8896 0.3230 0.3458 Outlet Control
P13 1.9078 1.9078 0.46 1.8896 0.2801 0.2058 Outlet Control
P14 0.3058 0.3058 0.34 0.8380 0.2391 0.1544 SuperCrit flow, Inlet end controls
P15 0.3178 0.3178 0.34 0.3399 0.2391 0.1959 SuperCrit flow, Inlet end controls
P16 0.2344 0.2344 0.16 0.3181 0.1658 0.1793 Outlet Control M1 Backwater
Reach ID Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft)
Depth
ratio Size nVel
(ft/s)
fVel
(ft/s)
Infil Vol
(cf)
CBasin /
Hyd
P17 0.27 0.1972 2.3456 0.0841 0.1958 0.1958 12 in
Diam 1.8181 2.9865 0.00 B17
P18 0.73 0.5151 11.6481 0.0442 0.1433 0.1433 12 in
Diam 7.4544 14.8309 0.00 B18
P-VLT-BIO-
351ST 0.73 0.5151 10.49 0.0491 0.1505 0.1505 12 in
Diam 6.9392 13.3563 0.00
HGL Analysis
From Node To Node HG El (ft) App (ft) Bend (ft) Junct Loss (ft) Adjusted HG El (ft) Max El (ft)
237.60
VLT-BIO-351ST CB19 237.6090 --na-- --na-- --na-- 237.6090 242.4300
CB18 VLT-BIO-351ST 238.2166 ------ 0.0694 ------ 238.2859 242.3000
CB17 CB18 238.3698 ------ ------ ------ 238.3698 241.2800
Conduit Notes
Reach HW Depth (ft) HW/D ratio Q (cfs) TW Depth (ft) Dc (ft) Dn (ft) Comment
P-VLT-BIO-351ST 1.0090 1.0090 0.52 1.0000 0.2978 0.1505 Outlet Control
P18 0.3466 0.3466 0.52 0.2978 0.2978 0.1433 SuperCrit flow, Inlet end controls
P17 0.2698 0.2698 0.20 0.4159 0.1822 0.1958 Outlet Control M1 Backwater
Licensed to: Debug License
Appended on: Monday, March 21, 2022 11:07:07 AM
ROUTEHYD [] THRU [PLANT 2] USING [100 year] AND [TYPE1A.RAC] NOTZERO RELATIVE SCS/SBUH
Gravity Analysis using 24 hr duration storm
Reach
ID
Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft)
Depth
ratio Size nVel
(ft/s)
fVel
(ft/s)
Infil Vol
(cf)
CBasin /
Hyd
P05 0.74 0.6957 2.3538 0.2956 0.3727 0.3727 12 in
Diam 2.6081 2.997 0.00 B05
P04 0.74 0.6957 7.0968 0.098 0.2114 0.2114 12 in
Diam 5.7469 9.0359 0.00
P09 0.20 0.1793 2.3456 0.0765 0.1868 0.1868 12 in
Diam 1.7689 2.9865 0.00 B09
P08 0.46 0.4006 2.3789 0.1684 0.2771 0.2771 12 in
Diam 2.2574 3.029 0.00 B08
P07 1.01 0.9263 3.2694 0.2833 0.3642 0.3642 12 in
Diam 3.5817 4.1628 0.00 B07
P06 1.47 1.3269 2.098 0.6325 0.5771 0.5771 12 in
Diam 2.8263 2.6713 0.00 B06
P12 0.05 0.047 4.7716 0.0099 0.0697 0.0697 12 in
Diam 1.9585 6.0754 0.00 B12
P11 0.78 0.7333 2.3456 0.3126 0.383 0.383 12 in
Diam 2.6496 2.9865 0.00 B11
P16 0.22 0.201 2.3456 0.0857 0.1977 0.1977 12 in
Diam 1.8272 2.9865 0.00 B16
P15 0.45 0.4115 3.9952 0.103 0.2163 0.2163 12 in
Diam 3.2912 5.0868 0.00 B15
P14 0.45 0.4115 6.5057 0.0632 0.1705 0.1705 12 in
Diam 4.6289 8.2832 0.00
P13 0.61 0.559 4.9273 0.1134 0.2279 0.2279 12 in
Diam 4.1493 6.2736 0.00 B13
P10 2.22 2.0726 2.9293 0.7075 0.6212 0.6212 12 in
Diam 4.0426 3.7297 0.00 B11
P02 4.43 4.0952 9.7803 0.4187 0.6771 0.4514 18 in
Diam 5.288 5.5345 0.00
P03 4.43 4.0952 30.9924 0.1321 0.3681 0.2454 18 in
Diam 12.1679 17.5381 0.00 B03
P-VLT-
PRE 4.43 4.0952 7.393 0.5539 0.798 0.532 18 in
Diam 4.2856 4.1836 0.00
P-VLT-
BIO 4.43 4.0952 9.7803 0.4187 0.6771 0.4514 18 in
Diam 5.288 5.5345 0.00
P01 4.43 4.0952 7.3189 0.5595 0.8026 0.5351 18 in
Diam 4.255 4.1416 0.00
HGL Analysis
From Node To Node HG El (ft) App (ft) Bend (ft) Junct Loss (ft) Adjusted HG El (ft) Max El (ft)
247.00
CB01 VLT-INFILT 247.1154 0.0834 0.0916 ------ 247.1237 252.0400
VLT-BIOPOD CB01 247.2343 --na-- --na-- --na-- 247.2343 252.2800
VLT-PRESETT VLT-BIOPOD 247.3466 --na-- --na-- --na-- 247.3466 252.0000
CB03 VLT-PRESETT 247.4887 0.0834 0.1148 ------ 247.5201 251.8900
CB02 CB03 247.6781 0.1081 0.0529 0.0588 247.6816 252.3900
CB04 CB02 247.7076 0.0122 0.0148 ------ 247.7102 252.2300
CB05 CB04 247.7869 ------ ------ ------ 247.7869 249.9000
CB06 CB02 248.0787 0.0216 0.0027 0.0064 248.0663 250.0400
CB08 CB06 248.0762 0.0008 0.0002 ------ 248.0756 248.2100
CB09 CB08 248.0777 ------ ------ ------ 248.0777 248.2100
CB07 CB06 248.1195 ------ ------ ------ 248.1195 249.4000
CB10 CB02 248.4670 0.0135 0.0250 0.0066 248.4850 252.0000
CB12 CB10 250.1076 ------ ------ ------ 250.1076 253.2100
CB11 CB10 248.5394 ------ ------ ------ 248.5394 249.7600
CB13 CB10 248.5124 0.0043 0.0089 ------ 248.5170 251.1400
CB14 CB13 249.8426 ------ 0.0385 ------ 249.8810 252.9600
CB15 CB14 251.1745 ------ 0.0003 ------ 251.1749 254.4700
CB16 CB15 251.5100 ------ ------ ------ 251.5100 254.4700
Conduit Notes
Reach HW Depth (ft) HW/D ratio Q (cfs) TW Depth (ft) Dc (ft) Dn (ft) Comment
P01 4.2658 2.8439 4.10 4.1500 0.7752 0.8026 Outlet Control
P-VLT-BIO 4.3343 2.8895 4.10 4.2237 0.7752 0.6771 Outlet Control
P-VLT-PRE 3.8866 2.5911 4.10 3.7743 0.7752 0.7980 Outlet Control
P03 4.9888 3.3258 4.10 4.8466 0.7752 0.3681 Outlet Control
P02 2.7681 1.8454 4.10 2.6101 0.7752 0.6771 Outlet Control
P04 2.9076 2.9076 0.70 2.8816 0.3478 0.2114 Outlet Control
P05 1.7968 1.7968 0.70 1.7202 0.3478 0.3727 Outlet Control
P06 3.2787 3.2787 1.33 2.8816 0.4870 0.5771 Outlet Control
P08 2.4162 2.4162 0.40 2.4063 0.2616 0.2771 Outlet Control
P09 2.2377 2.2377 0.18 2.2356 0.1734 0.1868 Outlet Control
P07 2.4595 2.4595 0.93 2.4063 0.4037 0.3642 Outlet Control
P10 3.6670 3.6670 2.07 2.8816 0.6162 0.6212 Outlet Control
P12 0.1076 0.1076 0.05 2.3750 0.0877 0.0697 SuperCrit flow, Inlet end controls
P11 2.4294 2.4294 0.73 2.3750 0.3574 0.3830 Outlet Control
P13 2.4024 2.4024 0.56 2.3750 0.3106 0.2279 Outlet Control
P14 0.3426 0.3426 0.41 1.0170 0.2652 0.1705 SuperCrit flow, Inlet end controls
P15 0.3545 0.3545 0.41 0.3810 0.2652 0.2163 SuperCrit flow, Inlet end controls
P16 0.2600 0.2600 0.20 0.3549 0.1839 0.1977 Outlet Control M1 Backwater
Reach ID Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft)
Depth
ratio Size nVel
(ft/s)
fVel
(ft/s)
Infil Vol
(cf)
CBasin /
Hyd
P17 0.27 0.2422 2.3456 0.1033 0.2165 0.2165 12 in
Diam 1.9341 2.9865 0.00 B17
P18 0.73 0.637 11.6481 0.0547 0.1588 0.1588 12 in
Diam 7.9403 14.8309 0.00 B18
P-VLT-BIO-
351ST 0.73 0.637 10.49 0.0607 0.1671 0.1671 12 in
Diam 7.3774 13.3563 0.00
HGL Analysis
From Node To Node HG El (ft) App (ft) Bend (ft) Junct Loss (ft) Adjusted HG El (ft) Max El (ft)
237.60
VLT-BIO-351ST CB19 237.6137 --na-- --na-- --na-- 237.6137 242.4300
CB18 VLT-BIO-351ST 238.2668 ------ 0.0785 ------ 238.3453 242.3000
CB17 CB18 238.4273 ------ ------ ------ 238.4273 241.2800
Conduit Notes
Reach HW Depth (ft) HW/D ratio Q (cfs) TW Depth (ft) Dc (ft) Dn (ft) Comment
P-VLT-BIO-351ST 1.0137 1.0137 0.64 1.0000 0.3324 0.1671 Outlet Control
P18 0.3968 0.3968 0.64 0.3324 0.3324 0.1588 SuperCrit flow, Inlet end controls
P17 0.3273 0.3273 0.24 0.4753 0.2021 0.2165 Outlet Control M1 Backwater
Licensed to: Debug License
Appended on: Monday, March 21, 2022 11:29:18 AM
Layout Report: PLANT 2
Event Precip (in)
2 yr 24 hr 2.06
10 year 2.93
25 year 3.40
100 year 4.11
Reach Records
Record Id: P01
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode VLT-INFILT UpNode CB01
Material unspecified Size 18 in Diam
Ent Losses Groove End w/Headwall
Length 9.00 ft Slope 0.56%
Up Invert 242.90 ft Dn Invert 242.85 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P02
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB03 UpNode CB02
Material unspecified Size 18 in Diam
Ent Losses Groove End w/Headwall
Length 33.00 ft Slope 1.00%
Up Invert 245.24 ft Dn Invert 244.91 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P03
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode VLT-PRESETT UpNode CB03
Material unspecified Size 18 in Diam
Ent Losses Groove End w/Headwall
Length 24.00 ft Slope 10.04%
Up Invert 244.91 ft Dn Invert 242.50 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P04
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB02 UpNode CB04
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 26.00 ft Slope 4.58%
Up Invert 245.99 ft Dn Invert 244.80 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P05
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB04 UpNode CB05
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 141.00 ft Slope 0.50%
Up Invert 246.70 ft Dn Invert 245.99 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P06
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB02 UpNode CB06
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 215.00 ft Slope 0.40%
Up Invert 245.66 ft Dn Invert 244.80 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P07
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB06 UpNode CB07
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 35.00 ft Slope 0.97%
Up Invert 246.00 ft Dn Invert 245.66 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P08
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB06 UpNode CB08
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 35.00 ft Slope 0.51%
Up Invert 245.84 ft Dn Invert 245.66 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P09
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB08 UpNode CB09
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 38.00 ft Slope 0.50%
Up Invert 246.03 ft Dn Invert 245.84 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P10
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB02 UpNode CB10
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 168.00 ft Slope 0.78%
Up Invert 246.11 ft Dn Invert 244.80 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P11
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB10 UpNode CB11
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 78.00 ft Slope 0.50%
Up Invert 246.50 ft Dn Invert 246.11 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P12
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB10 UpNode CB12
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 188.00 ft Slope 2.07%
Up Invert 250.00 ft Dn Invert 246.11 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P13
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB10 UpNode CB13
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 63.00 ft Slope 2.21%
Up Invert 247.50 ft Dn Invert 246.11 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P14
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB13 UpNode CB14
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 52.00 ft Slope 3.85%
Up Invert 249.50 ft Dn Invert 247.50 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P15
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB14 UpNode CB15
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 91.00 ft Slope 1.45%
Up Invert 250.82 ft Dn Invert 249.50 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P16
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB15 UpNode CB16
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 86.00 ft Slope 0.50%
Up Invert 251.25 ft Dn Invert 250.82 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P17
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB18 UpNode CB17
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 46.00 ft Slope 0.50%
Up Invert 238.10 ft Dn Invert 237.87 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P18
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode VLT-BIO-351ST UpNode CB18
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 3.00 ft Slope 12.33%
Up Invert 237.87 ft Dn Invert 237.50 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P-VLT-BIO
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB01 UpNode VLT-BIOPOD
Material unspecified Size 18 in Diam
Ent Losses Groove End w/Headwall
Length 6.00 ft Slope 1.00%
Up Invert 242.96 ft Dn Invert 242.90 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P-VLT-BIO-351ST
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode CB19 UpNode VLT-BIO-351ST
Material unspecified Size 12 in Diam
Ent Losses Groove End w/Headwall
Length 4.00 ft Slope 10.00%
Up Invert 237.00 ft Dn Invert 236.60 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P-VLT-PRE
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.014
Routing Method: Travel Time Shift Contributing Hyd
DnNode VLT-BIOPOD UpNode VLT-PRESETT
Material unspecified Size 18 in Diam
Ent Losses Groove End w/Headwall
Length 7.00 ft Slope 0.57%
Up Invert 243.50 ft Dn Invert 243.46 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.00 ft Ex/Infil Rate 0.00 in/hr
Node Records
Record Id: CB01
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 242.90 ft Max El. 252.04 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-48
Channelization No Special Shape
Catch 0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: CB02
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 244.80 ft Max El. 252.39 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-60
Channelization No Special Shape
Catch 0.00 ft Bottom Area 19.634 sf
MH/CB Type Node
Record Id: CB03
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 244.91 ft Max El. 251.89 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-48
Channelization No Special Shape
Catch 0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: CB04
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 245.99 ft Max El. 252.23 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-48
Channelization No Special Shape
Catch 0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: CB05
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 246.70 ft Max El. 249.90 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB06
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 245.66 ft Max El. 250.04 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-48
Channelization No Special Shape
Catch 0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: CB07
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 246.00 ft Max El. 249.40 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB08
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 245.84 ft Max El. 248.21 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB09
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 246.03 ft Max El. 248.21 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB10
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 246.11 ft Max El. 252.00 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-48
Channelization No Special Shape
Catch 0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: CB11
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 246.50 ft Max El. 249.76 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB12
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 250.00 ft Max El. 253.21 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB13
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 247.50 ft Max El. 251.14 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB14
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 249.50 ft Max El. 252.96 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB15
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 250.82 ft Max El. 254.47 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB16
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 251.25 ft Max El. 254.47 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB17
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 238.10 ft Max El. 241.28 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB18
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 237.87 ft Max El. 242.30 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 1
Channelization No Special Shape
Catch 0.00 ft Bottom Area 3.97 sf
MH/CB Type Node
Record Id: CB19
Descrip: Proposed Catch Basin Increment 0.10 ft
Start El. 236.50 ft Max El. 242.64 ft
Void Ratio 100.00
Condition Proposed Structure Type CB-TYPE 2-48
Channelization No Special Shape
Catch 0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: VLT-BIO-351ST
Descrip: Proposed Vault Increment 0.10 ft
Start El. 237.00 ft Max El. 242.43
ft
Void Ratio 100.00
Dummy Type Node
Record Id: VLT-BIOPOD
Descrip: Proposed Vault Increment 0.10 ft
Start El. 242.96 ft Max El. 252.28
ft
Void Ratio 100.00
Dummy Type Node
Record Id: VLT-INFILT
Descrip: Proposed Vault Increment 0.10 ft
Start El. 242.85 ft Max El. 250.00
ft
Void Ratio 100.00
Dummy Type Node
Record Id: VLT-PRESETT
Descrip: Proposed Vault Increment 0.10 ft
Start El. 242.50 ft Max El. 252.00
ft
Void Ratio 100.00
Dummy Type Node
Contributing Drainage Areas
Record Id: B05
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.00 ac DCIA 0.74 ac
Pervious CN 0.00 DC CN 98.00
Pervious TC 0.00 min DC TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.74 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B06
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.00 ac DCIA 0.74 ac
Pervious CN 0.00 DC CN 98.00
Pervious TC 0.00 min DC TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.74 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B07
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.08 ac DCIA 0.93 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.08 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.93 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B08
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.08 ac DCIA 0.18 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.08 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.18 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B09
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.03 ac DCIA 0.17 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.03 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.17 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B11
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.00 ac DCIA 0.78 ac
Pervious CN 0.00 DC CN 98.00
Pervious TC 0.00 min DC TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.78 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B12
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.00 ac DCIA 0.05 ac
Pervious CN 0.00 DC CN 98.00
Pervious TC 0.00 min DC TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.05 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B13
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.01 ac DCIA 0.15 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.01 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.15 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B15
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.02 ac DCIA 0.21 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.02 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.21 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B16
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.02 ac DCIA 0.20 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.02 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.20 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B17
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.04 ac DCIA 0.23 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.04 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.23 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Record Id: B18
Design Method SBUH Rainfall type TYPE1A.RAC
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.13 ac DCIA 0.33 ac
Pervious CN 86.00 DC CN 98.00
Pervious TC 5.00 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass) 0.13 ac 86.00
Pervious Composited CN (AMC 2) 86.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc) 0.33 ac 98.00
DC Composited CN (AMC 2) 98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Assumed 0.00 ft 0.0% 5.0 0.00 in 5.00 min
Pervious TC 5.00 min
Licensed to: Debug License
125
SECTION 6 – SPECIAL REPORTS AND STUDIES
The Geotechnical Engineering Report by South Sound Geotechnical Consulting (SSGC) has been
included in this section.
126
FIGURE 6.1 – GEOTECHNICAL ENGINEERING REPORT
South Sound Geotechnical Consulting
P.O. Box 39500, Lakewood, WA 98496 (253) 973-0515
June 18, 2021
35000 Pacific Hwy South, LLC
3106 Sumner Tapps Hwy East, Suite A
Lake Tapps, WA 98391
Attention: Mr. Eric Corliss
Subject: Geotechnical Engineering Report – Infiltration Assessment
Plant 2 Relocation
35000 and 35050 Pacific Hwy South
Federal Way, WA
SSGC Project No. 21041
Mr. Corliss,
South Sound Geotechnical Consulting (SSGC) has completed an infiltration assessment for the Plant 2
Relocation at the above addressed property in Federal Way, Washington in support of design of
stormwater facilities. Our services have been completed in general conformance with our proposal
P21052 (dated May 10, 2021) and authorized per signature of our agreement for services. Our scope of
services included completion of one pilot infiltration test and one test pit, laboratory testing, engineering
analyses, and preparation of this report.
PROJECT INFORMATION
The site is on the east side of Pacific Highway South and encompasses four parcels. A new concrete plant
is planned on the lots. Preliminary plans have stormwater control facilities in the southwest portion of the
site (on the 35050 lot). Infiltration facilities are planned to assist in stormwater control.
SITE CONDITIONS
The proposed stormwater facility area is currently used as an access drive into the property and parking
area for trailers. A short retaining wall (on the order of 2 to 3 feet) is along the sidewalk that borders the
western boundary and Pacific Highway South. The access drive rises from street level to the overall
generally level property elevation.
SUBSURFACE CONDITIONS
Subsurface conditions were characterized by completing one infiltration test and one test pit on May 27,
2021. Test holes were advanced to final depths between 7 and 11 feet below existing ground surface.
Approximate locations of the explorations are shown on Figure 1, Exploration Plan. A summary
description of observed subgrade conditions is provided below. Logs of t he test holes are provided in
Appendix A.
Infiltration Assessment SSGC
Plant 2 Relocation
Federal Way, Washington
SSGC Project No. 21041
June 18, 2021
2
Soil Conditions
Fill was observed below the surface in the test holes and extended to depths between 1.5 to 2.5
feet. Fill consisted of mixed silt, sand, and gravel with variable debris. Native soil below the fill
consisted of silty sand with gravel and occasional cobbles. This soil was in a dense condition
closer to the surface, grading to medium dense with depth. It extended to the base of the test
holes.
Groundwater Conditions
Groundwater was not observed in the test holes at the time of excavation. No visual evidence of
perched seasonal groundwater (such as mottling) was observed. Groundwater levels will vary
throughout the year based on seasonal precipitation and on- and off-site drainage patterns.
Geologic Setting
Native soils on the property are mapped as Vashon recessional outwash per the USGS “Geologic
Map of the Poverty Bay 7.5’ Quadrangle, King and Pierce Counties, Washington”. These soils
reportedly formed in recessional glacial outwash. However, native soils were not characteristic
of recessional outwash and appeared to represent sandy drift or till.
INFILTRATION CHARACTERISTICS
One small-scale Pilot Infiltration Test (PIT) were completed in general conformance with the 2016 King
County Surface Water Design Manual to assess infiltration potential in the native soils. Results of the
infiltration test is presented in Table 1.
Table 1. Infiltration Test Results
Infiltration
Test No.
Depth of
Test
from Surface
(feet)
Soil Type
Field
Infiltration Rate
(in/hr)
Corrected
Infiltration
Rate
(in/hr)
Correction
Factors*
(Fg/Ft/Fp)
PIT-1 8 Silty SAND with
gravel 4.5 2.0 (1.0/0.5/0.9)
*Correction Factors from the 2016 KCSWDM.
The infiltration test was completed at a depth of 8 feet as we are unaware of planned finish grades of the
proposed concrete plant, and to ensure the test was completed below the base of the retaining wall along
the Pacific Hwy South sidewalk. Based on field results, we recommend a design rate of 2 inches per hour
(in/hr) for the soil at the tested depth. Native soils in the test pit in the north side of the proposed
stormwater facility appeared similar.
Groundwater was not observed in the test holes to a depth of 11 feet below existing grades. Evidence of
seasonal perched groundwater (such as mottling) was not observed in the test holes. Groundwater is not
Infiltration Assessment SSGC
Plant 2 Relocation
Federal Way, Washington
SSGC Project No. 21041
June 18, 2021
3
anticipated to affect stormwater facilities in this area of the site. In addition, following completion of the
infiltration test, the test hole was advanced to a depth of 11 feet with no evidence of ponded water
introduced during the test.
Cation Exchange Capacity (CEC) and organic content tests were completed on a soil sample from the
base of the infiltration test elevation in the test holes. Test results are summarized in Table 2.
Table 2. CEC and Organic Content Results
Test Location CEC Results
(milliequivalents)
CEC Required*
(milliequivalents)
Organic Content
Results (%)
Organic
Content
Required* (%)
PIT-1 5.3 ≥ 5 1.02 ≥1.0
* Per the 2016 KCSWDM.
CEC and organic content of the tested sample satisfy county requirements.
REPORT CONDITIONS
This report has been prepared for the exclusive use of 3500 Pacific Hwy South, LLC and their agents for
specific application to the project discussed and has been prepared in accordance with generally accepted
geotechnical engineering practices in the area. No warranties, either express or i mplied, are intended or
made. The analysis and recommendations presented in this report are based on observed soil conditions
and test results at the indicated locations, and from other geologic information discussed. This report
does not reflect variations that may occur across the project limits, or due to the modifying effects of
drainage patterns or weather.
This report was prepared for the planned type of development of the site as discussed herein. It is not
valid for third party entities or alternate types of development on the site without the express wr itten
consent of SSGC. If development plans change, we should be notified to review those changes and
modify our recommendations, as necessary.
The scope of services for this project does not include any environmental or biological assessment of the
site including identification or prevention of pollutants, hazardous materials, or conditions. Other studies
should be completed if the owner is concerned about the potential for contamination or pollution.
N
South Sound Geotechnical Consulting
P.O. Box 39500
Lakewood, WA 98496
(253) 973-0515
Figure 1 – Exploration Plan
Plant 2 Relocation
Federal Way, WA
SSGC Project #21041
Approximate Test Pit Location
PIT - 1
TP - 1
PIT - 1
Approximate Infiltration Test Location
Scale: NTS
Base map from drawing titled “Site Plan – Plant
2 Relocation”, by Apex Engineering, dated
2-1-21.
Legend
PIT-1
TP-1
Infiltration Assessment SSGC
Plant 2 Relocation
Federal Way, Washington
SSGC Project No. 21041
June 18, 2021
5
Appendix A
Field Exploration Procedures
Infiltration Assessment SSGC
Plant 2 Relocation
Federal Way, Washington
SSGC Project No. 21041
June 18, 2021
6
Field Exploration Procedures
Our field exploration for this project included one small-scale Pilot Infiltration Test (PIT) and one test pit
completed on May 27, 2021. Approximate locations of the explorations are shown on Figure 1,
Exploration Plan. The exploration locations were determined by pacing from site features. Ground
surface elevations referenced on the logs were inferred from topography from Google Earth satellite
imagery. Exploration locations and elevations should be considered accurate only to the degree implied by
the means and methods used.
A private excavating contractor subcontracted to SSGC dug the infiltration test holes. Select soil samples
were collected and stored in moisture tight for further assessment and laboratory testing. Explorations
were backfilled with excavated soils and tamped when completed. Please note that backfill in the
explorations will likely settle with time. Backfill located in building or pavement areas should be re-
excavated and recompacted, or replaced with structural fill.
The following logs indicate the observed lithology of soils and other materials observed in the
explorations at the time of excavation. Where a soil contact was observed to be gradational, our log
indicates the average contact depth. Our logs also indicate the approximate depth to groundwater (where
observed at the time of excavation), along with sample numbers and approximate sample depths. Soil
descriptions on the logs are based on the Unified Soil Classification System.
Project: Plant 2 Relocation SSGC Job # 21041 EXPLORATION LOGS PAGE 1 OF 1
Location: 35050 Pacific Hwy S., Federal Way, WA
EXPLORATION LOGS FIGURE A-1
South Sound Geotechnical Consulting PIT-1, TP-1 Logged by: THR
Infiltration Test PIT-1
Depth (feet) Material Description
0 – 2.5
2.5 – 11
Fill: Silt, sand, gravel with some debris (asphalt, brick,
plastic sheeting): Loose to medium dense, moist, brown.
Silty SAND with gravel and occasional cobble: Dense
grading medium dense, moist, gray grading brown at 4 feet.
(SM) (Sample S-1 @ 8 feet)
Test hole completed at approximately 11 feet on 5/27/21.
Infiltration test run at 8 feet.
Groundwater not observed at time of excavation.
Piezometer set in test hole.
Approximate surface elevation: 252 feet
Test Pit TP-1
Depth (feet) Material Description
0 – 1.5
1.5 – 7
Fill: Silt, sand, and gravel: Loose to medium dense, moist,
brown.
Silty SAND with gravel and occasional cobble: Dense
grading medium dense, moist, gray grading brown at 3 feet.
(SM)
Test pit completed at approximately 7 feet on 5/27/21.
Groundwater not observed at time of excavation.
Approximate surface elevation: 252 feet
Infiltration Assessment SSGC
Plant 2 Relocation
Federal Way, Washington
SSGC Project No. 21041
June 18, 2021
7
Appendix B
Laboratory Testing and Results
Infiltration Assessment SSGC
Plant 2 Relocation
Federal Way, Washington
SSGC Project No. 21041
June 18, 2021
8
Laboratory Testing
Organic content and cation exchange capacity (CEC) testing on a sample from the base of the PIT test
hole was completed by Northwest Agricultural Consultants of Kennewick, Washington. Results of the
laboratory testing are included in this appendix.
2545 W Falls Avenue
Kennewick, WA 99336
509.783.7450
www.nwag.com
lab@nwag.com
Sample ID Organic Matter Cation Exchange Capacity
Pit-1, S-1 1.02% 5.3 meq/100g
Method ASTM D2974 EPA 9081
South Sound Geotechnical Consulting
PO Box 39500
Lakewood, WA 98496
Report: 55334-1-1
Date: June 3, 2021
Project No: 21041
Project Name: Corliss Plant
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve
Clean Gravels
Less than 5% finesC
Cu 4 and 1 Cc 3E GW Well-graded gravelF
Cu 4 and/or 1 Cc 3E GP Poorly graded gravelF
Gravels with Fines
More than 12% finesC
Fines classify as ML or MH GM Silty gravelF,G, H
Fines classify as CL or CH GC Clayey gravelF,G,H
Sands
50% or more of coarse
fraction passes
No. 4 sieve
Clean Sands
Less than 5% finesD
Cu 6 and 1 Cc 3E SW Well-graded sandI
Cu 6 and/or 1 Cc 3E SP Poorly graded sandI
Sands with Fines
More than 12% finesD
Fines classify as ML or MH SM Silty sandG,H,I
Fines Classify as CL or CH SC Clayey sandG,H,I
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Silts and Clays
Liquid limit less than 50
inorganic PI 7 and plots on or above “A” lineJ CL Lean clayK,L,M
PI 4 or plots below “A” lineJ ML SiltK,L,M
organic Liquid limit - oven dried 0.75 OL Organic clayK,L,M,N
Liquid limit - not dried Organic siltK,L,M,O
Silts and Clays
Liquid limit 50 or more
inorganic PI plots on or above “A” line CH Fat clayK,L,M
PI plots below “A” line MH Elastic SiltK,L,M
organic Liquid limit - oven dried 0.75 OH Organic clayK,L,M,P
Liquid limit - not dried Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW -GM well-graded
gravel with silt, GW -GC well-graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW -SM well-graded
sand with silt, SW -SC well-graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
6010
2
30
DxD
)(D
F If soil contains 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains 30% plus No. 200, predominantly gravel,
add “gravelly” to group name.
N PI 4 and plots on or above “A” line.
O PI 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
139
SECTION 7 – OTHER PERMITS
There are no other known permits with more restrictive drainage-related requirements.
A Construction Stormwater General Permit will be acquired from the Washington State
Department of Ecology prior to construction.
140
SECTION 8 – CSWPP ANALYSIS AND DESIGN
Part A – ESC PLAN ANALYSIS AND DESIGN
A TESC Plan is included in Figure 1.3.
The work within the site includes:
· Removing/demolishing the existing buildings and pavement.
· Clearing and grading.
· Installing the sanitary sewer, storm sewer, and water systems.
· Paving the onsite areas for the development
· Installing road improvements including asphalt, curb, gutter and sidewalk.
Therefore, the anticipated TESC BMPs have been selected to minimize sediment leaving the
site. The following BMPs are proposed from Appendix D of the KCSWDM:
· Clearing Limits (per Section D.2.1.1)
· Plastic or Metal Fence (per Section D.2.1.1.1)
· Mulching (per Section D.2.1.2.2)
· Plastic Covering (per Section D.2.1.2.4)
· Temporary and Permanent Seeding (per Section D.2.1.2.6)
· Silt Fence (per Section D.2.1.3.1)
· Stabilized Construction Entrance (per Section D.2.1.4.1)
· Wheel Wash (per Section D.2.1.4.3)
· Sediment Pond (per Section D.2.1.5.2)
· Storm Drain Inlet Protection (per Section D.2.1.5.3)
· Interceptor Dike and Swale (per Section D.2.1.6.1)
· Check Dams (per Figure D.2.1.6.E)
· Outlet Protection (per Section D.2.1.6.5)
· Dust Control (per Section D.2.1.8)
· Concrete Handling (per Section D.2.2.1)
· Concrete Washout Area (per Section D.2.2.2)
· Sawcutting and Surfacing Pollution Prevention (per Section D.2.2.3)
· Material Delivery, Storage and Containment (per Section D.2.2.4)
· High pH Neutralization Using CO2 (per Section D.2.2.7)
· pH Control for High pH Water (per Section D.2.2.8)
· Maintain Protective BMPs (per Section D.2.2.10)
· Manage the Project (per Section D.2.2.11)
There are no known areas onsite with a high susceptibility to erosion. During construction and
until the site is completely stabilized, runoff shall not discharge directly into the infiltration
system. The bottom of the infiltration system shall not become compacted and construction
141
vehicle access shall be limited at all times. After excavation, delineate the immediate area with
protection fencing to prevent vehicles/traffic traversing the infiltration system area.
Refer to the calculations in this section for temporary swale and sediment pond analyses.
142
FIGURE 8.A.1 – TESC BASIN MAP
144
FIGURE 8.A.2 – SEDIMENT POND ANALYSIS
Plant 2 Relocation
TESC Analysis
Sediment Pond Analysis
Surface Area
SA = (2*Q2)/0.00096
Where: SA = surface area at top of riser (sf)
Q2 = peak flow for the 2-year runoff event (cfs) = 1.14
(per WWHM analysis)
SA (sf) = 2,375
Proposed pond with 26' by 95' at 3.5' riser elev. SA = 2,470 sf which should be adequate
Dewatering Orifice
Ao = As(2h)0.5/(0.6*3600Tg0.5)
Where: Ao = orifice area (sf)
As = pond surface area (sf) =2,375
h = head of water above orifice (height of riser in feet) = 3.5
T = dewatering time (hrs) =24
g = acceleration of gravity (ft/sec) = 32.2
Ao (sf) = 0.021
D (in.) = 24*(Ao/pi)0.5
D (in.) = 2.0
Overflow Riser
Qriser = 9.739DH3/2
Where: Qriser = Q100 = peak flow for the 100-year runoff event (cfs) = 2.74
H = height of water over riser (ft) =1.00
D (ft) = 0.28
Therefore an 8-inch riser should be adequate
Emergency Overflow Spillway
L = length of weir (ft) = [Q100/(3.21H3/2)] - 2.4H
Where: Q100 = peak flow for the 100-year runoff event (cfs) = 2.74
H = height of water over weir (ft) =0.50
L (ft) = 1.2
Therefore utilize a 6 foot min. spillway
146
FIGURE 8.A.3 – TEMPORARY SWALE ANALYSIS
Plant 2 Relocation ESC Temporary Swale Design
Job #35072
CAPACITY ANALYSIS:
Haestad Method’s Flowmaster 1 (Version 3.16) Results:
Solve For......Depth
Lt Side Slope......2.00:1 (H:V) Velocity...................1.49 fps
Rt Side Slope......2.00:1 (H:V) Flow Area................0.77 sf
Manning's n.......0.030 Flow Top Width..…..2.48 ft
Channel Slope.....0.0050 ft/ft Wetted Perimeter…2.77 ft
Depth.................0.62 ft Critical Depth….…....0.46 ft
Discharge...........1.14 cfs Critical Slope...........0.0249 ft/ft
Froude Number.......0.47
148
FIGURE 8.A.4 – TESC WWHM CALCULATIONS
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: 35072-TESC
Site Name: Plant 2
Site Address:
City : Federal Way
Report Date: 3/18/2022
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2018/10/10
Version : 4.2.16
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : TESC
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Flat 3
Pervious Total 3
Impervious Land Use acre
Impervious Total 0
Basin Total 3
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : ONSITE
Bypass: No
GroundWater: No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
DRIVEWAYS FLAT 3
Impervious Total 3
Basin Total 3
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:3
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0
Total Impervious Area:3
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.111723
5 year 0.175466
10 year 0.211589
25 year 0.24986
50 year 0.273541
100 year 0.293684
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 1.143794
5 year 1.444744
10 year 1.649219
25 year 1.914453
50 year 2.117455
100 year 2.325388
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.110 1.481
1950 0.137 1.601
1951 0.246 0.925
1952 0.078 0.823
1953 0.063 0.889
1954 0.096 0.930
1955 0.154 1.055
1956 0.122 1.038
1957 0.099 1.177
1958 0.111 0.950
1959 0.095 0.969
1960 0.166 0.951
1961 0.094 1.006
1962 0.058 0.876
1963 0.080 0.973
1964 0.106 0.955
1965 0.076 1.213
1966 0.073 0.811
1967 0.152 1.397
1968 0.095 1.589
1969 0.093 1.104
1970 0.076 1.066
1971 0.082 1.271
1972 0.183 1.312
1973 0.083 0.794
1974 0.090 1.159
1975 0.122 1.336
1976 0.088 0.898
1977 0.011 0.973
1978 0.078 1.190
1979 0.047 1.629
1980 0.174 1.461
1981 0.069 1.195
1982 0.133 1.685
1983 0.120 1.372
1984 0.074 0.865
1985 0.044 1.193
1986 0.194 1.034
1987 0.171 1.595
1988 0.068 0.968
1989 0.044 1.210
1990 0.358 2.038
1991 0.216 1.628
1992 0.083 0.857
1993 0.087 0.742
1994 0.029 0.807
1995 0.124 1.060
1996 0.262 1.128
1997 0.219 1.095
1998 0.050 1.110
1999 0.205 2.271
2000 0.086 1.131
2001 0.015 1.242
2002 0.095 1.449
2003 0.121 1.126
2004 0.156 2.125
2005 0.112 0.971
2006 0.132 0.858
2007 0.266 1.986
2008 0.343 1.600
2009 0.168 1.478
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3581 2.2713
2 0.3429 2.1251
3 0.2658 2.0383
4 0.2618 1.9862
5 0.2460 1.6855
6 0.2188 1.6287
7 0.2156 1.6283
8 0.2052 1.6008
9 0.1936 1.5999
10 0.1832 1.5948
11 0.1736 1.5887
12 0.1713 1.4814
13 0.1684 1.4784
14 0.1664 1.4612
15 0.1564 1.4491
16 0.1535 1.3973
17 0.1519 1.3718
18 0.1368 1.3356
19 0.1335 1.3120
20 0.1323 1.2709
21 0.1242 1.2422
22 0.1224 1.2126
23 0.1222 1.2100
24 0.1208 1.1953
25 0.1197 1.1925
26 0.1122 1.1898
27 0.1111 1.1772
28 0.1097 1.1593
29 0.1055 1.1305
30 0.0986 1.1278
31 0.0963 1.1259
32 0.0953 1.1102
33 0.0948 1.1044
34 0.0947 1.0953
35 0.0939 1.0655
36 0.0927 1.0599
37 0.0903 1.0546
38 0.0885 1.0377
39 0.0866 1.0336
40 0.0864 1.0057
41 0.0832 0.9735
42 0.0832 0.9726
43 0.0818 0.9711
44 0.0802 0.9689
45 0.0776 0.9675
46 0.0775 0.9546
47 0.0764 0.9508
48 0.0756 0.9499
49 0.0739 0.9301
50 0.0726 0.9254
51 0.0694 0.8981
52 0.0676 0.8889
53 0.0627 0.8763
54 0.0584 0.8653
55 0.0495 0.8578
56 0.0469 0.8570
57 0.0441 0.8232
58 0.0438 0.8108
59 0.0291 0.8074
60 0.0155 0.7945
61 0.0105 0.7422
___________________________________________________________________
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2022; All Rights Reserved.
153
Part B – STORMWATER POLLUTION PREVENTION AND SPILL CONTROL PLAN (SWPPS) DESIGN
This SWPPS consists of an Activities Worksheet together with a series of information sheets
listing the best management practices (BMP’s) required for commercial activities. This
information was obtained from the KCSWDM.
The K.C. SWPPP manual limits the requirements to a number of minimal measures that
reasonably balance stormwater pollution reduction with feasibility and cost. The manual also
includes recommended BMP’s that should always be considered in the effort to control
pollution. The intent and goal is to reduce pollution through education and prevention efforts,
emphasizing source control BMP’s before treatment.
This property has unique characteristics and drainage systems. These sites have a constructed
storm drainage system with catch basin inlets. The pollution generating activities occurring on-
site; type of drainage system; as well as the slope and ground cover of a site will affect the
selection of BMP’s. The activity sheets offer flexibility in BMP selection and, as much as
possible, recognize the wide variety of site conditions that may be encountered.
154
FIGURE 8.B.1 – CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN
CONSTRUCTION STORMWATER
POLLUTION PREVENTION PLAN
FOR
PLANT 2 RELOCATION
JUNE 9, 2022
TABLE OF CONTENTS
Stormwater Pollution Prevention Plan
SECTION 1 – PROJECT DESCRIPTION: ............................................................................................. 1
SECTION 2 – POLLUTION PREVENTION TEAM: .............................................................................. 1
SECTION 3 – EXISTING CONDITIONS SUMMARY: .......................................................................... 1
SECTION 4 – REQUIRED ACTIVITY-SPECIFIC INFORMATION: ........................................................ 2
Appendices
Appendix A BMP Forms
Appendix B Miscellaneous Forms
1
SECTION 1 – PROJECT DESCRIPTION:
The on-site proposed project includes:
· Removing/demolishing the existing buildings and pavement.
· Clearing and grading.
· Installing the sanitary sewer, storm sewer, and water systems.
· Paving the onsite areas for the development.
· Installing road improvements including asphalt, curb, gutter, and sidewalk.
SECTION 2 – POLLUTION PREVENTION TEAM:
Names and contact information for those identified as members of the pollution prevention
team are provided in the following table:
Title Name(s) Phone Number
Certified Erosion and Sediment Control
Lead (CESCL)
To Be Assigned ~
Resident Engineer Gabe L. Jellison (253) 473-4494
Emergency Ecology Contact Northwest Regional Office (360) 407-6000
Emergency Owner Contact Sloan Clack (253) 826-5020
Non-Emergency Ecology Contact Northwest Regional Office (360) 407-6000
Monitoring Personnel To Be Assigned ~
SECTION 3 – EXISTING CONDITIONS SUMMARY:
The existing project site has three buildings and is covered predominantly with gravel and
asphalt paving with limited vegetation. Slopes onsite are generally one to two percent. The
existing site entrances near the southwest corner and southeast corner slope up to the site at
approximately 7 percent.
The project site consists of a single Threshold Discharge Area. Generally, runoff from the
western half of the site flows to the west to the existing storm conveyance system located
within Pacific Hwy. S., and runoff from the eastern half of the site flows to the south to the
existing storm conveyance system located within S. 351st Street which is then conveyed to the
west to Pacific Hwy. S. Runoff from adjacent properties does not appear to drain onto the
project site and run-on drainage is considered insignificant.
2
SECTION 4 – REQUIRED ACTIVITY-SPECIFIC INFORMATION:
Storage and Handling of Liquids
1. The following liquids could be handled or stored on-site, including but not limited to:
a. Petroleum products
b. Fuel
c. Solvents
d. Detergents
2. Refer to the Site Development Plans for the location, types and sizes of the liquid
containers to be held on-site, if any.
3. On-site fueling tanks and petroleum product storage containers, if any, shall include
secondary containment.
Storage and Stockpiling of Construction Materials and Wastes
1. No construction materials and wastes are proposed to be stored or stockpiled on-site at
this time.
2. In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will
be temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from
erosion, protected with sediment trapping measures, and where possible, be located
away from storm drain inlets, waterways, and drainage channels.
3. All pollutants, including waste materials and demolition debris, that occur on-site shall
be handled and disposed of in a manner that does not cause contamination of
stormwater. Good housekeeping and preventative measures will be taken to ensure
that the site will be kept clean, well-organized, and free of debris. Solid waste will be
stored in secure, clearly marked containers. Portable sanitation facilities will be firmly
secured, regularly maintained, and emptied when necessary.
Fueling
1. No on-site fueling for construction equipment (i.e. stationary tanks, truck mounted
tanks, wet hosing, etc.) is proposed at this time.
2. No propane tanks within the project site are proposed at this time.
3. The following containment methods for fuel spills will be performed on-site:
a. All vehicles, equipment, and petroleum product storage/dispensing areas will be
inspected regularly to detect any leaks or spills, and to identify maintenance
needs to prevent leaks or spills.
b. Contaminated surfaces shall be cleaned immediately following any discharge or
spill incident.
4. No fueling is proposed to occur during evening hours at this time.
3
Maintenance, Repairs, and Storage of Vehicles and Equipment
1. No maintenance and repair areas and locations are proposed on-site at this time.
However, spill prevention measures, such as drip pans, will be used when conducting
maintenance and repair of vehicles or equipment if necessary.
2. The following methods will be used for collection, storage, and disposal of vehicle fluids
as required:
a. All vehicles, equipment, and petroleum product storage/dispensing areas will be
inspected regularly to detect any leaks or spills, and to identify maintenance
needs to prevent leaks or spills.
b. On-site fueling tanks and petroleum product storage containers shall include
secondary containment.
c. Spill prevention measures, such as drip pans, will be used when conducting
maintenance and repair of vehicles or equipment.
d. In order to perform emergency repairs on-site, temporary plastic will be placed
beneath and, if raining, over the vehicle.
e. Contaminated surfaces shall be cleaned immediately following any discharge or
spill incident.
3. No areas are proposed for vehicle maintenance at this time. However, if an area is
designated for vehicle maintenance, signs will be posted that state no vehicle washing
may occur in the area.
Concrete Saw Cutting, Slurry, and Washwater Disposal
1. Hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels shall
be washed off only into formed areas awaiting installation of concrete or asphalt.
2. The following methods will be followed for collecting, treating, and disposal of waste
water from exposed aggregate processes, concrete grinding and saw cutting, and new
concrete washing and curing water:
a. Concrete truck chutes, pumps, and internals shall be washed out only into
formed areas awaiting installation of concrete or asphalt.
b. Unused concrete remaining in the truck and pump shall be returned to the
originating batch plant for recycling, as feasible.
c. Equipment that cannot be easily moved, such as concrete pavers, shall only be
washed in areas that do not directly drain to natural or constructed stormwater
conveyances.
d. Washdown from areas such as concrete aggregate driveways shall not drain
directly to natural or constructed stormwater conveyances.
e. When no formed areas are available, washwater and leftover product shall be
contained in a lined container or a hole dug on-site. Contained concrete shall be
disposed of in a manner that does not violate groundwater or surface water
quality standards.
4
Handling of pH Elevated Water
New concrete vaults/structures may cause collected water to have an elevated pH. This water
cannot be discharged to storm or surface water until neutralized.
The key benchmark pH value for stormwater is a maximum of 8.5. If a pH greater than 8.5 is
measured in the sedimentation trap/pond(s) that has the potential to discharge to surface
water, the following steps will be conducted to treat/neutralize and/or dispose water:
a. Sampling and monitoring for pH will occur during the phase of construction
when concrete pouring will be conducted until fully cured (3 weeks from last
pour) and discharges are documented to be below pH 8.5. Samples will be
collected weekly at the sedimentation pond prior to discharge to surface water.
Samples will be analyzed for pH using a calibrated pH meter.
b. Prevent (detain) all discharges from leaving the site and entering surface waters
or storm drains if the pH is greater than 8.5.
c. Implement CO2 sparging or dry ice treatment in accordance with Ecology BMP
C252.
d. Describe inspection results and remedial actions that are taken in the site log
book and in monthly discharge monitoring reports.
Application of Chemicals including Pesticides and Fertilizers
1. At this time, the chemicals that may be used on the project site and the application
rates have not been determined.
2. Refer to the Landscape Plans for locations of on-site landscaping. Application of
agricultural chemicals, including fertilizers and pesticides, shall be conducted in a
manner and at application rates that will not result in loss of chemical to stormwater
runoff. Manufacturers’ recommendations for application procedures and rates shall be
followed.
3. Any chemicals stored in the construction areas will conform to the appropriate source
control BMPs listed in Volume IV of the Ecology Stormwater Manual. In Western WA, all
chemicals shall have cover, containment, and protection provided on-site.
35072_Construction SWPPP_031822.doc
APPENDIX A
CSWPP WORKSHEET/BMP FORMS
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
E S C M A I N T E N A N C E R E P O R T
Performed By:___________________________
Date:___________________________
Project Name:___________________________
DPER Permit #:___________________________
Clearing Limits
Damage OK Problem
Visible OK Problem
Intrusions OK Problem
Other OK Problem
Mulch
Rills/Gullies OK Problem
Thickness OK Problem
Other OK Problem
Nets/Blankets
Rills/Gullies OK Problem
Ground Contact OK Problem
Other OK Problem
Plastic
Tears/Gaps OK Problem
Other OK Problem
Seeding
Percent Cover OK Problem
Rills/Gullies OK Problem
Mulch OK Problem
Other OK Problem
Sodding
Grass Health OK Problem
Rills/Gullies OK Problem
Other OK Problem
Perimeter Protection including Silt Fence
Damage OK Problem
Sediment Build-up OK Problem
Concentrated Flow OK Problem
Other OK Problem
Flow Control BMP protection
Damage OK Problem
Sedimentation OK Problem
Concentrated Flow OK Problem
Rills/Gullies OK Problem
Intrusions OK Problem
Other OK Problem
Brush Barrier
Damage OK Problem
Sediment Build-up OK Problem
Concentrated Flow OK Problem
Other OK Problem
Vegetated Strip
Damage OK Problem
Sediment Build-up OK Problem
Concentrated Flow OK Problem
Other OK Problem
Construction Entrance
Dimensions OK Problem
Sediment Tracking OK Problem
Vehicle Avoidance OK Problem
Other OK Problem
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Wheel Wash
Dimensions OK Problem
Sed build up or tracking OK……. Problem
Other OK Problem
Construction Road
Stable Driving Surf. OK Problem
Vehicle Avoidance OK Problem
Other OK Problem
Sediment Trap/Pond
Sed. Accumulation OK Problem
Overtopping OK Problem
Inlet/Outlet Erosion OK Problem
Other OK Problem
Catch Basin/Inlet Protection
Sed. Accumulation OK Problem
Damage OK Problem
Clogged Filter OK Problem
Other OK Problem
Interceptor Dike/Swale
Damage OK Problem
Sed. Accumulation OK Problem
Overtopping OK Problem
Other OK Problem
Pipe Slope Drain
Damage OK Problem
Inlet/Outlet OK Problem
Secure Fittings OK Problem
Other OK Problem
Ditches
Damage OK Problem
Sed. Accumulation OK Problem
Overtopping OK Problem
Other OK Problem
Outlet Protection
Scour OK Problem
Other OK Problem
Level Spreader
Damage OK Problem
Concentrated Flow OK Problem
Rills/Gullies OK Problem
Sed. Accumulation OK Problem
Other OK Problem
Dewatering Controls
Sediment OK.. Problem
Dust Control
Palliative applied OK Problem
Miscellaneous
Wet Season Stockpile OK Problem
Other OK Problem
Comments:
Actions Taken:
Problems Unresolved:
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
BMP Implementation
Completed by:
Title:
Date:
Develop a plan for implementing each BMP. Describe the steps necessary to implement the BMP (i.e., any
construction or design), the schedule for completing those steps (list dates), and the person(s) responsible for
implementation.
BMPs
Description of Action(s) Required for
Implementation
Scheduled Milestone and
Completion Date(s)
Person
Responsible for
Action
Good
Housekeeping
1.
2.
3
Preventive
Maintenance
1.
2.
3.
4.
Spill
Prevention
and
Emergency
Cleanup
1.
2.
3.
Inspections 1.
2.
3.
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
BMPs
Description of Action(s) Required for Implementation
Schedule Milestone and
Completion Date(s)
Person
Responsible for
Action
Source Control
BMPs
1.
2.
3
4.
5.
6.
7.
8.
Treatment BMPs 1.
2.
3.
4.
Emerging
technologies
1.
2.
Flow Control
BMPs
3.
4.
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Pollution Prevention Team
Completed by: ______________________
Title: ______________________________
Date: ______________________________
Responsible Official: Title:
Team Leader: Office Phone:
Cell Phone #:
Pager #:
Responsibilities:
(1) Title:
Office Phone:
Pager #:
Cell Phone:
Responsibilities:
(2) Title:
Office Phone:
Pager #:
Cell Phone #:
Responsibilities:
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Employee Training
Completed by:
Title:
Date:
Describe the annual training of employees on the SWPPP, addressing spill response, good housekeeping, and material management practices.
Training Topics
1.) LINE WORKERS
Brief Description of Training Program/Materials
(e.g., film, newsletter course)
Schedule for Training
(list dates)
Attendees
Spill Prevention and
Response
Good Housekeeping
Material Management
Practices
2.) P2 TEAM:
SWPPP Implementation
Monitoring Procedures
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
List of Significant Spills and Leaks
Completed by:
Title:
Date:
List all spills and leaks of toxic or hazardous pollutants that were significant but are not limited to, release of oil or hazardous substances in excess of reportable
quantities. Although not required, we suggest you list spills and leaks of non-hazardous materials.
Description Response Procedure
Date
(month/day/ye
ar)
Location
(as
indicated
on site
map)
Type of
Material
Quantit
y
Sourc
e, If
Known
Reason for
Spill/Leak
Amount of
Material
Recovered
Material No
longer
exposed to
Stormwater
(Yes/No)
Preventive Measure Taken
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Potential Pollutant Source Identification
Completed by:
Title:
Date:
List all potential stormwater pollutants from materials handled, treated, or stored on-site.
Potential Stormwater Pollutant
Stormwater Pollutant Source
Likelihood of pollutant being present in your
stormwater discharge. If yes, explain
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Material Inventory
Completed by:
Title:
Date:
List materials handled, treated, stored, or disposed of at the project site that may potentially be exposed to precipitation or runoff.
Quantity (Units) Likelihood of contact with stormwater Past Spill or
Used Produced Stored If Yes, describe reason Leak
Material Purpose/Location (indicate per/wk. or yr.) Yes No
2016 Surface Water Design Manual – Appendix D CSWPP Forms 4/24/2016
APPENDIX B
MISCELLANEOUS FORMS
Emergency Phone Numbers
Fire, Police, Ambulance 911
Owner: 35000 Pacific Hwy South LLC (253) 826-5020
General Contractor: To be determined Office: N/A
Mobile # N/A
Subcontractors
Sub #1: To be determined Office: N/A
Sub #2: To be determined Office: N/A
Sub #3: To be determined Office: N/A
Sub #4: To be determined Office: N/A
City Contact: To be determined N/A
State Ecology Dept.: Northwest Region (360) 407-6000
Emergency – Spill Procedures:
All discharges to the District or City sewer system (storm or sanitary) require District or City
approval. The approval may include a separate Special Approved Discharge (SAD) permit.
All pollutants, including waste materials and demolition debris, that occur on-site during
construction shall be handled and disposed of in a manner that does not cause contamination
of surface water.
Cover, containment, and protection from vandalism shall be provided for all chemicals, liquid
products, petroleum products, and non-inert wastes present on the site. See Chapter 173-304
WAC for the definition of inert waste.
Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic
system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and
removal, and other activities which may result in discharge or spillage of pollutants to the
ground or into surface water must be conducted using spill prevention measures, such as drip
pans. Contaminated surfaces shall be cleaned immediately following any discharge or spill
incident. Emergency repairs may be performed on-site using temporary plastic placed beneath
and, if raining, over the vehicle.
Wheel wash or tire bath wastewater shall be discharged to a separate on-site treatment system
or to the sanitary sewer (with the District approval noted above).
Application of agricultural chemicals including fertilizers and pesticides shall be conducted in a
manner and at application rates that will not result in loss of chemical to surface water runoff.
Manufacturers’ recommendations for application rates and procedures shall be followed.
A site representative shall notify the City of Federal Way and/or the Lakehaven Water and
Sewer District within 24-hours of any spillage or discharge of pollutants.
In the event of a spill, make the appropriate notification(s) consistent with the following
procedures:
· Call 911 for fire department, police, and ambulance if required.
· Any spill of oil which 1) violates water quality standards, 2) produces a “sheen” on a
surface water, or 3) causes a sludge or emulsion must be reported immediately by
telephone to the National Response Center Hotline at (800) 424-8802.
· Any oil, hazardous substance, or hazardous waste release which exceeds the
reportable quantity must be reported immediately by telephone to the National
Response Center Hotline at (800) 424-8802.
· Any spill of oil or hazardous substance to waters of the state must be reported
immediately by telephone to the Washington State Emergency Management Division
at (800) 258-5990.
· Any release of a hazardous substance that may be a threat to human health or the
environment must be reported to the Ecology Toxics Cleanup Program immediately,
but no longer than 90 days from discovery.
A site representative will be responsible for completing the spill reporting form and for
reporting the spill to the appropriate state or local agency. Facility personnel with primary
responsibility for spill response and cleanup will need to be trained as required to respond and
clean up spills. This training will include identifying the location of spill kits and other spill
response equipment and the use of spill response materials. Spill response equipment will be
inspected and maintained as necessary to replace any materials used in spill response activities.
Spill Report Form
Location:
Date:___________________ Time:
Regulatory agencies notified (date, time, person, agency, and how):
Material spilled:
Quantity spilled:
Source:
Cause:
Extent of injuries (if any):
Adverse environmental impact (if any):
Immediate remedial actions taken at time of spill:
Measures taken or planned to prevent recurrence:
Additional comments:
This report prepared by:
(Signature)
(Date) (Job title)
BMP Maintenance and Inspection Schedule
(Source Control BMPs)
BMP
Designation
BMP Name Recommended Maintenance Recommended Schedule of
Maintenance
D.2.1.4.1 Stabilized
Construction
Entrance
Inspect stabilized areas regularly, especially
after large storm events. Add rock (hog fuel),
gravel, etc. as needed to maintain a stable
surface which won’t erode.
Daily
D.2.1.2.6 Temporary &
Permanent
Seeding
Re-seed areas failing to establish 80% cover
within one month (during growing season). If
re-seeding is ineffective, use sodding or
nets/blankets. Eroded areas shall be
corrected, re-planted, and irrigated as
required.
Inspect to ensure growth
weekly
D.2.1.2.2 Mulching Maintain specified thickness of mulch cover.
Eroded areas must be corrected and re-
mulched. Drainage problems must be
corrected.
Weekly and following
storms
D.2.1.6.1 Interceptor
Swale
Immediately remove sediment from the flow
area. Repair damage caused by construction
traffic or other activity before the end of each
working day. Check outlets and make timely
repairs as needed to avoid gully formation.
When the area below the temporary diversion
dike is permanently stabilized, remove the
dike and fill and stabilize the channel to blend
with the natural surface.
Weekly and following
storms
D.2.1.8 Dust Control Use dust control practices in areas (including
roadways) subject to surface and air
movement of dust where on-site and off-site
impacts to roadways, drainage ways, or
surface waters are likely. Evaluate the
potential for dust generation frequently during
dry periods.
Daily
D.2.1.3.1 Silt Fence Repair any damage immediately. Check the
uphill side of the fence for signs of the fence
clogging, acting as a barrier to flow, and then
causing channelization of flows parallel to the
fence. If this occurs, replace the fence or
remove the trapped sediment. Remove
sediment deposits when the deposit reaches
approximately one-third the height of the silt
fence, or install a second silt fence. If the filter
fabric (geotextile) has deteriorated due to
ultraviolet breakdown, replace it.
Weekly and following
storms
D.2.1.5.2 Sediment
Pond
Sediment shall be removed from the pond
when it reaches 1 foot in depth. Any damage
to the pond embankments or slopes shall be
repaired.
Inspection daily
D.2.1.5.3 Storm Drain
Inlet
Protection
Sediment shall be removed from the catch
basin insert when it has filled one-third of the
available storage.
Inspection daily
Erosion and Sediment Control Inspection Form
Inspector(s):________________________________Date:________________
Site Name and Location:___________________________________________
Current Weather Conditions:_____________ Last 24 Hours:______________
BMP Designation Not O.K. BMP Condition, Corrective Action, General Notes
Construction Access
Trackout?
Street Clean?
Soil Stabilization
Signs of Erosion:
Gullies?
Slope Failures?
Rills?
Slope Protection
Plastic Condition?
Grass Growing?
Hydroseed Condition?
Matting?
Perimeter Control
Clearing Limits Marked?
Silt Fences?
Swales?
Conveyances Stable
Ditches?
Check Dams Intact?
Sand Bags?
Slope Drains?
TESC Management
Revisions Required?
Water Management
Infiltration System?
Clean and Dirty Water Separated?
Off-site Water Bypassing?
Outlet Protection
Stabilized?
Erosion and Sediment Control Inspection Form
BMP Designation t O.K. BMP Condition, Corrective Action, General Notes
Stormwater Detention
And Monitoring
BMP Maintenance
Inlet Protection
Dust Control
Spill Prevention
Condition of Discharge
Water
Comments:_______________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
____
180
SECTION 9 – BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
A Bond Quantity Worksheet, Stormwater Facility Summary Sheet, and/or Declaration of
Covenant shall be provided as required prior to project finalization.
181
SECTION 10 – OPERATIONS AND MAINTENANCE MANUAL
The Operation and Maintenance (O&M) Manual will be kept on-site and may be reviewed by
the City of Federal Way at its request.
The maintenance tasks for the site’s storm system and frequency of each task is included in the
the O&M Manual. A sample maintenance activity log indicating emergency and routine actions
taken is included as well.
182
FIGURE 10.1 – OPERATIONS AND MAINTENANCE MANUAL
OPERATIONS AND MAINTENANCE MANUAL
FOR
PLANT 2 RELOCATION
JUNE 9, 2022
TABLE OF CONTENTS
PROJECT DESCRIPTION .................................................................................................................... 1
PREVENTATIVE BMP’s ..................................................................................................................... 1
INSPECTION ............................................................................................................................ 2
MAINTENANCE TASKS AND FREQUENCY ........................................................................................ 2
MAINTENANCE RESPONSIBILITY ..................................................................................................... 2
INSTRUCTIONS FOR MAINTENANCE CHECKLISTS ........................................................................... 2
MAINTENANCE STANDARDS FOR DRAINAGE FACILITIES ............................................................... 3
35072_Fed Way Plant 2 Relocation O&M_060922.doc
1
The maintenance requirements for this storm system and frequencies of each task are included
in this Operations and Maintenance (O&M) Manual.
PROJECT DESCRIPTION
The proposed project site is within a portion of the southeast quarter of the southeast quarter
of Section 20, Township 21 North, Range 4 East, W.M., City of Federal Way, Washington. The
parcels, 202104-9043, 202104-9155, 202104-9162, and 202104-9163, containing approximately
4.19 acres, are located at 35000 Pacific Highway South and are currently being used as a truck
storage facility. The project site is abutted by a commercial shopping center to the north and
east, Pacific Highway South (State Route 99) to the west, and a King County fire protection
facility to the south.
The existing parcels have three buildings and are covered predominantly with gravel and
asphalt paving with limited vegetation. The project site consists of a single Threshold Discharge
Area. Generally, runoff from the western half of the site flows to the west to the existing storm
conveyance system located within Pacific Hwy. S., and runoff from the eastern half of the site
flows to the south to the existing storm conveyance system located within S. 351st Street which
is then conveyed to the west to Pacific Hwy. S. Runoff from adjacent properties does not
appear to drain onto the project site.
A concrete batch plant is proposed on the project site. The majority of the site is proposing to
be paved for plant operation and parking areas and will also include a shop/storage building,
covered storage bins, concrete plant silos and equipment, and perimeter landscape buffer. Full
roadway improvements to S. 351st Street are proposed. The roadway is currently private but is
proposing to be built to public standards (Cross Section Type R) including 40 feet of pavement
with curb and gutter, 4 foot planter strip, and 6 foot sidewalk both sides.
The majority of the project site is providing oil control and enhanced basic water quality
treatment through the use of a coalescing plate oil/water separator, presettling vault, and
Oldcastle BioPod Biofilter. Water quantity control is proposed with an underground infiltration
vault. The western portion of the 351st Street improvements is unable to gravity flow to the
onsite storm facilities. This basin is proposing an Oldcastle Biopod Biofilter for water quality
treatment and will discharge to the existing conveyance system within Pacific Highway South.
Refer to Section 4 of the Technical Information Report for additional information regarding the
proposed storm systems.
PREVENTATIVE BMP’s
Catch basins are to have sumps to allow large particulate to settle without being introduced to
the main conveyance line. Also, the sumps will facilitate in maintaining and cleaning the system.
2
INSPECTION
Facility maintenance checklist sheets are contained in this manual. Drainage facilities shall be
maintained per King County requirements.
Specific maintenance schedule is difficult to anticipate at this time but it is recommend that
inspection of the facilities be worked into the regular schedule of the proposed site and other
general maintenance, in addition to inspections being made following larger less frequent
storm events. Proper correction to observed problems shall be as outlined in the following
excerpts from the King County Surface Water Design Manual (KCSWDM).
MAINTENANCE TASKS AND FREQUENCY
See attached Maintenance checklists.
Sediment and objects should be removed from catch basins when a depth of six (6) inches or
more has accumulated. Sediment and objects should be removed from pipes when a depth of
twenty (20) percent of the diameter of the pipe or more has accumulated. This maintenance
activity should be performed by professionals familiar with the proper disposal of hazardous
wastes.
MAINTENANCE RESPONSIBILITY
The property owner will be responsible for the maintenance of the storm system within the
site.
INSTRUCTIONS FOR MAINTENANCE CHECKLISTS
The following pages contain maintenance needs for the components that are part of the
drainage system, as well as for some components that may not be included. Ignore the
requirements that do not apply. Plan to complete a checklist for all system components on the
following schedule:
1. Monthly from November through April
2. Once in late summer (preferably September)
3. After any major storm (Use 1 inch in 24 hours as a guideline)
Using photocopies of these pages, check off and date the conditions looked for each time an
inspection was completed. Add comments on problems found and actions taken.
3
This O&M Manual/Checklist is to be kept on-site. It is suggested that photocopies of the
checklist should be kept in a binder and the checklists updated as required.
MAINTENANCE STANDARDS FOR DRAINAGE FACILITIES
The following pages contain maintenance standards for typical stormwater facilities that may
be required for stormwater mitigation. If the proposed stormwater system contains facilities or
components that are not listed, the owner is responsible for developing additional maintenance
standards and checklists for the proposed facility or component. Stormwater facilities and
components should be inspected as specified in the applicable maintenance standards.
The maintenance standards can be used as inspection forms for the system and associated
components. Record the date each time an inspection is completed and note any problems
and actions taken. Keep completed forms with the Operations and Maintenance Manual. City
staff may request to review the maintenance forms as a part of their inspection process. Some
components or facilities do not need to be looked at every time an inspection is conducted.
Use the suggested frequency at the left of each item as a guideline for activities to be
completed with each inspection.
The facility-specific maintenance standards contained in this section are intended to be
conditions for determining if maintenance actions are required as identified through inspection.
They are not intended to be measures of the facility’s required condition at all times between
inspections. In other words, exceeding these conditions at any time between inspections
and/or maintenance does not automatically constitute a violation of these standards.
However, based upon inspection observations, the inspection and maintenance schedules shall
be adjusted to minimize the length of time that a facility is in condition that required a
maintenance action.
MAINTENANCE REQUIREMENTS FOR FLOW
CONTROL, CONVEYANCE, AND WQ FACILITIES
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 2 – INFILTRATION FACILITIES
Maintenance
Component
Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height.
Grass or groundcover mowed to a
height no greater than 6 inches.
Infiltration Pond,
Top or Side Slopes
of Dam, Berm or
Embankment
Rodent holes Any evidence of rodent holes if facility is acting
as a dam or berm, or any evidence of water
piping through dam or berm via rodent holes.
Rodents removed or destroyed and
dam or berm repaired.
Tree growth Tree growth threatens integrity of dams, berms
or slopes, does not allow maintenance access,
or interferes with maintenance activity. If trees
are not a threat to dam, berm, or embankment
integrity or not interfering with access or
maintenance, they do not need to be removed.
Trees do not hinder facility
performance or maintenance
activities.
Erosion Eroded damage over 2 inches deep where cause
of damage is still present or where there is
potential for continued erosion. Any erosion
observed on a compacted slope.
Slopes stabilized using appropriate
erosion control measures. If erosion
is occurring on compacted slope, a
licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam, berm or embankment that
has settled 4 inches lower than the design
elevation.
Top or side slope restored to design
dimensions. If settlement is
significant, a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Infiltration Pond,
Tank, Vault, Trench,
or Small Basin
Storage Area
Sediment
accumulation If two inches or more sediment is present or a
percolation test indicates facility is working at or
less than 90% of design.
Facility infiltrates as designed.
Liner damaged
(If Applicable)
Liner is visible or pond does not hold water as
designed.
Liner repaired or replaced.
Infiltration Tank
Structure
Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of
shape
Any part of tank/pipe is bent out of shape more
than 10% of its design shape.
Tank repaired or replaced to design.
Gaps between
sections, damaged
joints or cracks or
tears in wall
A gap wider than ½-inch at the joint of any tank
sections or any evidence of soil particles entering
the tank at a joint or through a wall.
No water or soil entering tank
through joints or walls.
Infiltration Vault
Structure
Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of soil
entering the structure through cracks or qualified
inspection personnel determines that the vault is
not structurally sound.
Vault is sealed and structurally
sound.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-3
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 2 – INFILTRATION FACILITIES
Maintenance
Component
Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Maintenance Is Performed
Inlet/Outlet Pipes Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place.
Any open manhole requires immediate
maintenance.
Manhole access covered.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access
doors/plate
Damaged or difficult
to open
Large access doors or plates cannot be
opened/removed using normal equipment.
Replace or repair access door so it
can opened as designed.
Gaps, doesn't cover
completely
Large access doors not flat and/or access
opening not completely covered.
Doors close flat; covers access
opening completely.
Lifting Rings missing,
rusted
Lifting rings not capable of lifting weight of door
or plate.
Lifting rings sufficient to lift or
remove door or plate.
Infiltration Pond,
Tank, Vault, Trench,
or Small Basin Filter
Bags
Plugged Filter bag more than 1/2 full. Replace filter bag or redesign
system.
Infiltration Pond,
Tank, Vault, Trench,
or Small Basin Pre-
settling Ponds and
Vaults
Sediment
accumulation
6" or more of sediment has accumulated. Pre-settling occurs as designed
Infiltration Pond,
Rock Filter
Plugged High water level on upstream side of filter
remains for extended period of time or little or no
water flows through filter during heavy rain
storms.
Rock filter replaced evaluate need
for filter and remove if not
necessary.
Infiltration Pond
Emergency
Overflow Spillway
Rock missing Only one layer of rock exists above native soil in
area five square feet or larger, or any exposure
of native soil at the top of out flow path of
spillway. Rip-rap on inside slopes need not be
replaced.
Spillway restored to design
standards.
Tree growth Tree growth impedes flow or threatens stability of
spillway.
Trees removed.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-4
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Structure Trash and debris Trash or debris of more than ½ cubic foot which
is located immediately in front of the structure
opening or is blocking capacity of the structure
by more than 10%.
No Trash or debris blocking or
potentially blocking entrance to
structure.
Trash or debris in the structure that exceeds 1/3
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic foot in
volume.
No condition present which would
attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60% of the depth from the
bottom of the structure to the invert of the lowest
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Sump of structure contains no
sediment.
Damage to frame
and/or top slab
Corner of frame extends more than ¾ inch past
curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches
or cracks wider than ¼ inch.
Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the frame from
the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom
Cracks wider than ½ inch and longer than 3 feet,
any evidence of soil particles entering structure
through cracks, or maintenance person judges
that structure is unsound.
Structure is sealed and structurally
sound.
Cracks wider than ½ inch and longer than 1 foot
at the joint of any inlet/outlet pipe or any
evidence of soil particles entering structure
through cracks.
No cracks more than 1/4 inch wide at
the joint of inlet/outlet pipe.
Settlement/
misalignment
Structure has settled more than 1 inch or has
rotated more than 2 inches out of alignment.
Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
the structure at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing
or unsafe
Ladder is unsafe due to missing rungs,
misalignment, rust, cracks, or sharp edges.
Ladder meets design standards and
allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to structure
wall and outlet pipe structure should support at
least 1,000 lbs of up or down pressure.
T section securely attached to wall
and outlet pipe.
Structure is not in upright position (allow up to
10% from plumb).
Structure in correct position.
Connections to outlet pipe are not watertight or
show signs of deteriorated grout.
Connections to outlet pipe are water
tight; structure repaired or replaced
and works as designed.
Any holes—other than designed holes—in the
structure.
Structure has no holes other than
designed holes.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-7
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one
maintenance person.
Gate moves up and down easily and
is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to
missing, out of place, or bent orifice plate.
Plate is in place and works as
designed.
Obstructions Any trash, debris, sediment, or vegetation
blocking the plate.
Plate is free of all obstructions and
works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the
potential of blocking) the overflow pipe.
Pipe is free of all obstructions and
works as designed.
Deformed or
damaged lip
Lip of overflow pipe is bent or deformed. Overflow pipe does not allow
overflow at an elevation lower than
design
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Metal Grates
(If Applicable)
Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design
standards.
Trash and debris Trash and debris that is blocking more than 20%
of grate surface.
Grate free of trash and debris.
footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.
Any open structure requires urgent
maintenance.
Cover/lid protects opening to
structure.
Locking mechanism
Not Working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-8
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the
bottom of the catch basin to the invert of the
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Sump of catch basin contains no
sediment.
Trash and debris Trash or debris of more than ½ cubic foot which
is located immediately in front of the catch basin
opening or is blocking capacity of the catch basin
by more than 10%.
No Trash or debris blocking or
potentially blocking entrance to
catch basin.
Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert
the lowest pipe into or out of the basin.
No trash or debris in the catch
basin.
Dead animals or vegetation that could generate
odors that could cause complaints or dangerous
gases (e.g., methane).
No dead animals or vegetation
present within catch basin.
Deposits of garbage exceeding 1 cubic foot in
volume.
No condition present which would
attract or support the breeding of
insects or rodents.
Damage to frame
and/or top slab
Corner of frame extends more than ¾ inch past
curb face into the street (If applicable).
Frame is even with curb.
Top slab has holes larger than 2 square inches
or cracks wider than ¼ inch.
Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the frame from
the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom
Cracks wider than ½ inch and longer than 3 feet,
any evidence of soil particles entering catch
basin through cracks, or maintenance person
judges that catch basin is unsound.
Catch basin is sealed and is
structurally sound.
Cracks wider than ½ inch and longer than 1 foot
at the joint of any inlet/outlet pipe or any
evidence of soil particles entering catch basin
through cracks.
No cracks more than 1/4 inch wide at
the joint of inlet/outlet pipe.
Settlement/
misalignment
Catch basin has settled more than 1 inch or has
rotated more than 2 inches out of alignment.
Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
the catch basin at the joint of the inlet/outlet
pipes.
No cracks more than ¼-inch wide at
the joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-9
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Metal Grates
(Catch Basins)
Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design
standards.
Trash and debris Trash and debris that is blocking more than 20%
of grate surface.
Grate free of trash and debris.
footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate.
Any open structure requires urgent
maintenance.
Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place.
Any open structure requires urgent
maintenance.
Cover/lid protects opening to
structure.
Locking mechanism
Not Working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-10
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 6 – CONVEYANCE PIPES AND DITCHES
Maintenance
Component
Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Pipes Sediment & debris
accumulation
Accumulated sediment or debris that exceeds
20% of the diameter of the pipe.
Water flows freely through pipes.
Vegetation/roots Vegetation/roots that reduce free movement of
water through pipes.
Water flows freely through pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective
coating or corrosion
Protective coating is damaged; rust or corrosion
is weakening the structural integrity of any part of
pipe.
Pipe repaired or replaced.
Damaged Any dent that decreases the cross section area
of pipe by more than 20% or is determined to
have weakened structural integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000
square feet of ditch and slopes.
Trash and debris cleared from
ditches.
Sediment
accumulation
Accumulated sediment that exceeds 20% of the
design depth.
Ditch cleaned/flushed of all
sediment and debris so that it
matches design.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the
public.
Noxious and nuisance vegetation
removed according to applicable
regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water
through ditches.
Water flows freely through ditches.
Erosion damage to
slopes
Any erosion observed on a ditch slope. Slopes are not eroding.
Rock lining out of
place or missing (If
Applicable)
One layer or less of rock exists above native soil
area 5 square feet or more, any exposed native
soil.
Replace rocks to design standards.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-11
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 17 – WETVAULT
Maintenance
Component
Defect or Problem Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Treatment Area
Trash and debris Any trash and debris accumulated in vault
(includes floatables and non-floatables).
No trash or debris in vault.
Sediment
accumulation
Sediment accumulation in vault bottom exceeds
the depth of the sediment zone plus 6 inches.
No sediment in vault.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vault Structure Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of soil
entering the structure through cracks, vault does
not retain water or qualified inspection personnel
determines that the vault is not structurally
sound.
Vault is sealed and structurally
sound.
Baffles damaged Baffles corroding, cracking, warping and/or
showing signs of failure or baffle cannot be
removed.
Repair or replace baffles or walls to
specifications.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won’t seal Valve does not seal completely. Valve completely seals closed.
Access Manhole Access cover/lid
damaged or difficult to
open
Access cover/lid cannot be easily opened by one
person. Corrosion/deformation of cover/lid.
Access cover/lid can be opened by
one person.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
Access doors/plate
has gaps, doesn't
cover completely
Large access doors not flat and/or access
opening not completely covered.
Doors close flat; covers access
opening completely.
Lifting Rings missing,
rusted
Lifting rings not capable of lifting weight of door
or plate.
Lifting rings sufficient to lift or
remove door or plate.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-23
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 23 – COALESCING PLATE OIL/WATER SEPARATOR
Maintenance
Component
Defect Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Any trash or debris which impairs the function of
the facility.
Trash and debris removed from
facility.
Contaminants and
pollution
Floating oil in excess of 1 inch in first chamber,
any oil in other chambers or other contaminants
of any type in any chamber.
No contaminants present other than
a surface oil film.
Vault Treatment
Area
Sediment
accumulation in the
forebay
Sediment accumulation of 6 inches or greater in
the forebay.
No sediment in the forebay.
Discharge water not
clear
Inspection of discharge water shows obvious
signs of poor water quality - effluent discharge
from vault shows thick visible sheen.
Repair function of plates so effluent
is clear.
Trash or debris
accumulation
Trash and debris accumulation in vault
(floatables and non-floatables).
Trash and debris removed from
vault.
Oil accumulation Oil accumulation that exceeds 1 inch at the water
surface in the in the coalescing plate chamber.
No visible oil depth on water and
coalescing plates clear of oil.
Coalescing Plates Damaged Plate media broken, deformed, cracked and/or
showing signs of failure.
Replace that portion of media pack
or entire plate pack depending on
severity of failure.
Sediment
accumulation
Any sediment accumulation which interferes with
the operation of the coalescing plates.
No sediment accumulation
interfering with the coalescing
plates.
Vault Structure Damage to Wall,
Frame, Bottom,
and/or Top Slab
Cracks wider than ½-inch and any evidence of
soil particles entering the structure through the
cracks, or maintenance inspection personnel
determines that the vault is not structurally
sound.
Vault replaced or repaired to design
specifications.
Baffles damaged Baffles corroding, cracking, warping and/or
showing signs of failure as determined by
maintenance/inspection person.
Repair or replace baffles to
specifications.
Ventilation Pipes Plugged Any obstruction to the ventilation pipes. Ventilation pipes are clear.
Shutoff Valve Damaged or
inoperable
Shutoff valve cannot be opened or closed. Shutoff valve operates normally.
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet
pipes (includes floatables and non-floatables).
No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at
the joint of the inlet/outlet pipe.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place.
Any open manhole requires immediate
maintenance.
Manhole access covered.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs of lift.
Cover/lid can be removed and
reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
2016 Surface Water Design Manual – Appendix A 4/24/2016
A-33
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 23 – COALESCING PLATE OIL/WATER SEPARATOR
Maintenance
Component
Defect Condition When Maintenance is Needed Results Expected When
Maintenance is Performed
Large access
doors/plate
Damaged or difficult
to open
Large access doors or plates cannot be
opened/removed using normal equipment.
Replace or repair access door so it
can opened as designed.
Gaps, doesn't cover
completely
Large access doors not flat and/or access
opening not completely covered.
Doors close flat and cover access
opening completely.
Lifting Rings missing,
rusted
Lifting rings not capable of lifting weight of door
or plate.
Lifting rings sufficient to lift or
remove door or plate.
NO. 24 – CATCH BASIN INSERT
Maintenance
Component
Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Media Insert Visible Oil Visible oil sheen passing through media Media inset replaced.
Insert does not fit
catch basin properly
Flow gets into catch basin without going through
media.
All flow goes through media.
Filter media plugged Filter media plugged. Flow through filter media is normal.
Oil absorbent media
saturated
Media oil saturated. Oil absorbent media replaced.
Water saturated Catch basin insert is saturated with water, which
no longer has the capacity to absorb.
Insert replaced.
Service life exceeded Regular interval replacement due to typical
average life of media insert product, typically one
month.
Media replaced at manufacturer’s
recommended interval.
Seasonal
maintenance
When storms occur and during the wet season. Remove, clean and replace or install
new insert after major storms,
monthly during the wet season or at
manufacturer’s recommended
interval.
4/24/2016 2016 Surface Water Design Manual – Appendix A
A-34
Inspection and Maintenance Guide
BIOPODTM SYSTEM
WITH STORMMIX™ MEDIA
BioPod™ Biofilter with StormMix™ Biofiltration Media
Description
The BioPod™ Biofilter System (BioPod) is a stormwater biofiltration treatment system used to remove pollutants
from stormwater runoff. Impervious surfaces and other urban and suburban landscapes generate a variety of
contaminants that can enter stormwater and pollute downstream receiving waters unless treatment is provided.
The BioPod system uses proprietary StormMix™ biofiltration media to capture and retain pollutants including
total suspended solids (TSS), metals, nutrients, gross solids, trash and debris as well as petroleum hydrocarbons.
Function
The BioPod system uses engineered, high-flow rate filter media to remove stormwater pollutants, allowing for a
smaller footprint than conventional bioretention systems. Contained within a compact precast concrete vault, the
BioPod system consists of a biofiltration chamber and an optional integrated high-flow bypass with a contoured
inlet rack to minimize scour. The biofiltration chamber is filled with horizontal layers of aggregate (which may or
may not include an underdrain), biofiltration media and mulch. Stormwater passes vertically down through the
mulch and biofiltration media for treatment. The mulch provides pretreatment by retaining most of the solids or
sediment. The biofiltration media provides further treatment by retaining finer sediment and dissolved pollutants.
The aggregate allows the media bed to drain evenly for discharge through an underdrain pipe or by infiltration.
Configuration
The BioPod system can be configured with either an internal or external bypass. The internal bypass allows both
water quality and bypass flows to enter the treatment vault. The water quality flows are directed to the biofiltration
chamber while the excess flows are diverted over the bypass weir without entering the biofiltration chamber. Both
the treatment and bypass flows are combined in the outlet area prior to discharge from the structure. BioPod
units without an internal bypass are designed such that only treatment flows enter the treatment structure. When
the system has exceeded its treatment capacity, ponding will force bypass flows to continue down the gutter to
the nearest standard catch basin or other external bypass structure.
The BioPod system can be configured as a tree box filter with tree and grated inlet, as a planter box filter with
shrubs, grasses and an open top, or as an underground filter with access risers, doors and a subsurface inlet
pipe. The optional internal bypass may be incorporated with any of these configurations. In addition, an open
bottom configuration may be used to promote infiltration and groundwater recharge. The configuration and size
of the BioPod system is designed to meet the requirements of a specific project.
Inspection & Maintenance Overview
State and local regulations require all stormwater management systems to be inspected on a regular basis and
maintained as necessary to ensure performance and protect downstream receiving waters. Without maintenance,
excessive pollutant buildup can limit system performance by reducing the operating capacity of the system and
increasing the potential for scouring of pollutants during periods of high flow.
Some configurations of the BioPod may require periodic irrigation to establish and maintain vegetation. Vegetation
will typically become established about two years after planting. Irrigation requirements are ultimately dependent
on climate, rainfall and the type of vegetation selected.
2
INSPECTION AND MAINTENANCE GUIDE
3
Maintenance Frequency
Periodic inspection is essential for consistent system performance and is easily completed. Inspection is
typically conducted a minimum of twice per year, but since pollutant transport and deposition varies from site to
site, a site-specific maintenance frequency should be established during the first two or three years of operation.
Inspection Equipment
The following equipment is helpful when conducting BioPod inspections:
• Recording device (pen and paper form, voice recorder, iPad, etc.)
• Suitable clothing (appropriate footwear, gloves, hardhat, safety glasses, etc.)
• Traffic control equipment (cones, barricades, signage, flagging, etc.)
• Manhole hook or pry bar
• Flashlight
• Tape measure
Inspection Procedures
BioPod inspections are visual and are conducted without entering the unit. To complete an inspection, safety
measures including traffic control should be deployed before the access covers or tree grates are removed. Once
the covers have been removed, the following items should be checked and recorded (see form provided on page 6)
to determine whether maintenance is required:
• If the BioPod unit is equipped with an internal bypass, inspect the contoured inlet rack and outlet chamber
and note whether there are any broken or missing parts. In the unlikely event that internal parts are broken
or missing, contact Oldcastle Stormwater at (800) 579-8819 to determine appropriate corrective action.
• Note whether the curb inlet, inlet pipe, or – if the unit is equipped with an internal bypass – the inlet rack is
blocked or obstructed.
• If the unit is equipped with an internal bypass, observe, quantify and record the accumulation of trash
and debris in the inlet rack. The significance of accumulated trash and debris is a matter of judgment.
Often, much of the trash and debris may be removed manually at the time of inspection if a separate
maintenance visit is not yet warranted.
• If it has not rained within the past 24 hours, note whether standing water is observed in the biofiltration
chamber.
• Finally, observe, quantify and record presence of invasive vegetation and the amount of trash and debris
and sediment load in the biofiltration chamber. Erosion of the mulch and biofiltration media bed should
also be recorded. Sediment load may be rated light, medium or heavy depending on the conditions.
Loading characteristics may be determined as follows:
o Light sediment load – sediment is difficult to distinguish among the mulch fibers at the top of the
mulch layer; the mulch appears almost new.
o Medium sediment load – sediment accumulation is apparent and may be concentrated in some areas;
probing the mulch layer reveals lighter sediment loads under the top 1” of mulch.
o Heavy sediment load – sediment is readily apparent across the entire top of the mulch layer; individual
mulch fibers are difficult to distinguish; probing the mulch layer reveals heavy sediment load under the
top 1” of mulch.
Often, much of the invasive vegetation and trash and debris may be removed manually at the time of inspection
if a separate maintenance visit is not yet warranted.
4
Maintenance Indicators
Maintenance should be scheduled if any of the following conditions are identified during inspection:
•The concrete structure is damaged or the tree grate or access cover is damaged or missing.
•The curb inlet or inlet rack is obstructed.
•Standing water is observed in the biofiltration chamber more than 24 hours after a rainfall event (use
discretion if the BioPod is located downstream of a storage system that attenuates flow).
•Trash and debris in the inlet rack cannot be easily removed at the time of inspection.
•Trash and debris, invasive vegetation or sediment load in the biofiltration chamber is heavy or excessive
erosion has occurred.
Maintenance Equipment
The following equipment is helpful when conducting BioPod maintenance:
•Suitable clothing (appropriate footwear, gloves, hardhat, safety glasses, etc.)
•Traffic control equipment (cones, barricades, signage, flagging, etc.)
•Manhole hook or pry bar
•Flashlight
•Tape measure
•Rake, hoe, shovel and broom
•Bucket
•Pruners
•Vacuum truck (optional)
Maintenance Procedures
Maintenance should be conducted during dry weather when no flows are entering the system. All maintenance
may be conducted without entering the BioPod structure. Once safety measures such as traffic control are
deployed, the access covers may be removed and the following activities may be conducted to complete
maintenance:
•Remove all trash and debris from the curb inlet and inlet rack manually or by using a vacuum truck as
required.
•Remove all trash and debris and invasive vegetation from the biofiltration chamber manually or by using a
vacuum truck as required.
•If the sediment load is medium or light but erosion of the biofiltration media bed is evident, redistribute
the mulch with a rake or replace missing mulch as appropriate. If erosion persists, rocks may be placed in
the eroded area to help dissipate energy and prevent recurring erosion.
•If the sediment load is heavy, remove the mulch layer using a hoe, rake, shovel and bucket, or by using a
vacuum truck as required. If the sediment load is particularly heavy, inspect the surface of the biofiltration
media once the mulch has been removed. If the media appears clogged with sediment, remove and
replace one or two inches of biofiltration media prior to replacing the mulch layer.
•Prune vegetation as appropriate and replace damaged or dead plants as required.
•Replace the tree grate and/or access covers and sweep the area around the BioPod to leave the site clean.
•All material removed from the BioPod during maintenance must be disposed of in accordance with local
environmental regulations. In most cases, the material may be handled in the same manner as disposal
of material removed from sumped catch basins or manholes.
Natural, shredded hardwood mulch should be used in the BioPod. Timely replacement of the mulch layer
according to the maintenance indicators described above should protect the biofiltration media below the
mulch layer from clogging due to sediment accumulation. However, whenever the mulch is replaced, the
BioPod should be visited 24 hours after the next major storm event to ensure that there is no standing water
in the biofiltration chamber. Standing water indicates that the biofiltration media below the mulch layer is
clogged and must be replaced. Please contact Oldcastle Infrastructure at (800) 579-8819 to purchase the
proprietary StormMix™ biofiltration media.
5
BioPod Tree Module BioPod Media Module
BioPod Planter Module BioPod Media Vault
6
Curb Inlet or Inlet Rack Blocked Notes:
Yes No
BioPod Inspection &
Maintenance Log
BioPod Model__________________________ Inspection Date________________________
Location______________________________________________________________________________
Condition of Internal Components Notes:
Good Damaged Missing
Standing Water in Biofiltration Chamber Notes:
Yes No
Trash and Debris in Inlet Rack Notes:
Yes No
Trash and Debris in Biofiltration Chamber Notes:
Yes No
Maintenance Requirements
Yes - Schedule Maintenance No - Schedule Re-Inspection
Invasive Vegetation in Biofiltration Chamber Notes:
Yes No
Sediment in Biofiltration Chamber Notes:
Light Medium Heavy
Erosion in Biofiltration Chamber Notes:
Yes No
BIOPODTM SYSTEM
WITH STORMMIX™ MEDIA
BUILDING
STRUCTURES
OUR MARKETS
TRANSPORTATION
WATER
ENERGYCOMMUNICATIONS
December 2018 v.1
www.oldcastleinfrastructure.com