Loading...
Technical Comments_HTH COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South Federal Way, WA 98003-6325 253-835-7000 www.cityoffederalway.com Megan Espinoza April 12, 2024 SMR Architects 114 South Main Street, Suite 400 Seattle, WA 98104 mespinoza@smrarchitects.com RE: File #24-100317-00-UP and 24-100318-SE; TECHNICAL COMMENT LETTER Health Through Housing, 1400 South 320th Street, Federal Way Dear Megan Espinoza: The Community Development Department is in receipt of your February 1, 2024, Process III and State Environmental Policy Act (SEPA) Master Land Use (MLU) application. City staff have the following preliminary comments in response to the Health Through Housing Process III application. The proposal is for a change of use of a former hotel to permanent supportive housing project containing 86 efficiency dwelling units. Minor improvements to the site, including outdoor area are proposed. Pursuant to Federal Way Revised Code (FWRC) 19.15.045, the application was deemed complete on February 22, 2024. TECHNICAL COMMENTS The following comments provided by staff reviewing your project must be addressed prior to issuance of a land use Process III application decision, or as otherwise noted. Questions regarding technical review comments should be addressed to the referenced staff representative. Community Development – Planning Division Becky Chapin, 253- 835-2641, becky.chapin@federalwaywa.gov 1. Burden of Proof –During the Notice of Application comment period, the city received one public comment letter and three additional written comments were received at the March 19, 2024, City Council Meeting, which are enclosed. Please review and address the comments to support your project. Per FWRC 19.65.080: 19.65.080, “Burden of Proof” “The applicant has the responsibility of convincing the director that, under the provisions of this chapter, the applicant is entitled to the requested decision.” Public Works – Development Services Division Rockey Hansen, 253-835-2751, rocky.hansen@federalwaywa.gov Development Services has reviewed the plans submitted 02/01/2024 and makes the following comments; Megan Espinoza Page 2 of 3 April 12, 2024 24-100317-00-UP Doc. I.D. 83901 The submittal to the identified issues comments appears to be nonresponsive. The FWRC 19.125.150 section quoted on the plans is incomplete. The following are also applicable parts of this code to this project. Be aware using the stated dimensions on plans the trash enclosures area call- outs do not match the dimensions on the plans. Refer to enclosed redlined Sheet GO11. 1. FWRC 19.125.150 Solid waste receptacles Sec 6 (d,ii) Storage areas larger than 175 square feet in size must have a roof covering the storage area. This roof shall provide adequate overhang surface to prevent the direct entry of precipitation to the enclosure area. Storage areas with a roof require adequate floor drainage connected and conveyed to sanitary sewer. Precipitation runoff from the roof shall not be discharged to the sanitary sewer. Roofed or covered storage areas must provide adequate clearances to allow access by haulers and collection equipment. 2. FWRC 19.125.150 Solid waste receptacles Sec 6 (d) Weather protection. All solid waste storage areas (enclosures) require a spill prevention plan for management of liquids generated on or discharged from the storage area. The storage area spill prevention plan must detail how all liquids either precipitated, sprayed, washed, spilled, leaked, dripped, or blown onto the storage area will be collected and managed in compliance with city surface water protection standards. The storage area spill prevention plan shall be provided to the city’s surface water management program, to be kept on file in order to inform periodic site monitoring. Please explain size discrepancy and show appropriate design features. Lakehaven Water & Sewer District Brian Asbury, 253-946-5407, BAsbury@lakehaven.org The applicant has completed and submitted to Lakehaven an application for Certificate(s) of Availability, and Lakehaven issued these Certificates on 12/19/23. No other application has been submitted to Lakehaven that is necessary to be able to determine the applicant’s specific requirements for connection to Lakehaven’s water and/or sewer systems to serve the subject property. The applicant will need to submit application to Lakehaven for a sewer service connection permit (installation of a pretreatment device for proposed new kitchen area). CLOSING Please be aware that this review does not preclude the city from requesting additional information related to any of the topics discussed above. Please submit the revised application materials as appropriate, by electronic submittal (https://www.federalwaywa.gov/page/electronic-document-submittal), a letter explaining how these comments have been addressed, and the completed “Resubmittal Information Form” (enclosed). Individual documents or materials may be submitted to me or the appropriate reviewer for further discussion purposes, but these email submittals are not considered resubmittals. Please note, the original plan review fee collected at submittal of your permit covers the initial review and one resubmittal. The city has begun charging applicants for any additional staff time necessary to complete each review following the first resubmittal. Megan Espinoza Page 3 of 3 April 12, 2024 24-100317-00-UP Doc. I.D. 83901 Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified that such information is requested, the application shall be deemed null and void and the city shall have no duty to process, review, or issue any decisions with respect to such an application. If you have any questions regarding this letter, please contact me at becky.chapin@cityoffederalway.com, or 253-835-2641. Sincerely, Becky Chapin Senior Planner enc: Public Comment Letters Resubmittal Information Form c: Andrew Norton, Plans Examiner Rocky Hansen, Development Services Reviewer Kathy Davis, Senior Traffic Engineer Brian Asbury, Lakehaven Water & Sewer District Scott Gerard, South King Fire Christa Wood, King County Capital Project Manager, cwood@kingcounty.gov