HomeMy WebLinkAboutLUTC PKT 10-18-2010City of Federal Way
City Council
Land Use/Transportation Committee
October 18, 2010 City Hall
5:30 .m. Council Chambers
MEETING AGENDA
(Electronic Version)
1. CALL TO ORDER
2. PUBLIC COMMENT (3 minutes)
3. COMMITTEE BUSINESS
Topic Title/Description
A. Approval of Minutes: October 4, 2010
B. 20"' Way S Street Lighting Project - Final
Acceptance
C. 2010 Pedestrian Safety Projects - Bid Award
Presenter Page
LeMaster 2
Salloum 5
Zukowski 7
Action Council
or Info Date
Action N/A
Action 11/5/2010
Consent
Action ii/5/2010
Consent
Time
5 min.
5 min.
4. OTHER
5 min.
5. FUTURE MEETINGS/AGENDA ITEMS: The next LUTC meeting will be held Monday, November 1, 2010 at
5:30 PM in City Hall Council Chambers.
6. ADJOURN
Committee Members City Staff
Dini Duc%s, Chair Cary M. Roe, P.E., Director of Parks, Public Works and Emergency Management
Jim Fe�re/% Member Darlene LeMaster, Administrative Assistant II
Jack Dovey, Member Z53-835-2701
G. �LUTqLUTCAgendas and Summades 1010�10-18-10 LUTCAgenda.doc
City of Federal Way
City Council
Land �Use/Transportation Committee
October 4, 2010 City Hall
5:30 PM City Council Chambers
MEETING SUMMARY
Committee Members in Attendance: Committee Chair Dini Duclos, Committee Member Jack Dovey and Committee
Member Jim Ferrell.
Council Members in Attendance: Mayor Linda Kochmar and Council Member Burbidge
Staff Members in Attendance: Director of Community Development Services Greg Fewins, Director of Parks, Public
Works and Emergency Management Cary Roe, Deputy Public Warks Director Marwan Salloum, Senior Planner Janet Shull,
Street Systems Engineer Jeff Huynh, Planning Manager Isaac Conlen, Assistant City Attorney Peter Beckwith, and
Administrative Assistant II Darlene LeMaster.
1. CALL TO ORDER
Committee Chair Duclos called the meeting to order at 530 PM.
Z. PUBLIC COMMENT
There was no public comment.
3. BUSINESS ITEMS
Forward
Topic Title/Description to Council
A.
Approval of the September 20, 2010, LUTC Minutes
N/A
B.
Committee approved September 20, 2010, LUTC minutes as presented.
Moved: Ferrell Seconded: Dovey Passed: Unanimously, 3-0
Shoreline Master Program Update — Revisions (continued from 9/20/2010 LUTC meeting)
Senior Planner Janet Shull presented information on this item. Ms. Shull gave a quick review of
what the Committee requested to be discussed at tonight's meeting. Councilmember Burbidge
asked for clarification of the Table on page 2 of the staff report. Ms. Shull briefly reviewed the
Table on page 2, noting similarities and differences between the existing code, Shoreline Master
Plan updates and the Citizen proposed revision.
Committee Member povey asked if given today's code and you wanted to build closer than the
50 ft setback and no adjacent neighbors were closer, you would need to go through a shoreline
variance. Ms. Shull answered, yes. Committee Member povey stated reasons for keeping the
current process without change. Chair Duclos noted a benefit of keeping the stringline setback
being that it allows the property owner the rightloption to apply for a shoreline variance. Chair
Duclos also supports leaving the code as is.
Ms. Shull also shared information obtained from King County's Shoreline Master Plan Update
for lakefront and marine bluff (currently under review by WA State Dept. of Ecology (DOE)), as
requested by the Committee at the 9/20/10 LUTC meeting. In addition, Ms. Shull gave
additional information on proposed setbacks from marine bluffs in Federal Way and compared it
to Des Moines, Tacoma and Thurston County. Ms. Shull gave supporting arguments to justify a
50-foot proposed setback.
Committee Member povey asked if there w�ce any jurisdictions whose marine bluff buffer is
10/19/2010
Consent
Resolution
Land Use/Transportation Committee Page 2 October 4, 2010
less than 50 feet. Ms. Shull was unsure but stated that ultimately the geotechnical engineers
determine if a buf�er can be less. Committee Member povey did not want to increase our
marine bluff setback to 50 feet just because DOE suggests it or because all of our neighboring
communities use a 50 foot setback and stated that science (geo techs) will tell developers where
it is safe to build, regardless of regulation. Committee Member povey suggested keeping the 25
foot marine bluff setback as it currently is.
Councilmember Burbidge spoke in favor of the 50 foot setback, explaining that erosion is a
process that occurs over time. Tides and storms are out of our control. Also noted, there are
many other buffers within our code that are at least 50 feet. Moving the setback to 50 feet would
seem logical.
There were two public comments:
Norm Kutscha, 33021 38` Ave S, Federal Way — Mr. Kutscha addressed the Committee, sharing
a handout with them, illustrating his additional proposal to the Shoreline Master Plan update
and how it compares to the existing requirements as well as the proposed updates recommended
by Planning Commission.
Committee Member povey asked Mr. Kutscha if he was opposed to any of the existing rules.
Did Mr. Kutscha oppose an individual's right to obtain a shoreline variance? Mr. Kutscha stated
he had no problem with the current requirements.
Sam Pace, 28939 154` Ave SE, Kent — Mr. Pace asked staff for clarification as to what was
meant by "worst case ". Ms. Shull responded that in her presentation, she referenced "worst
case" as the most that could be built in regard to the Kutscha's situation only.
Committee forwarded Option #2, recommending City Council pass a resolution approving
the revised SMP modified to leave the setback to lakefront properties in place as it exists
today, remove the requirements for a marine bluff setback, and authorize submittal to the
Department of Ecology for their formal review/approvaL
Moved: Dovey Seconded: Ferrell Passed: Unanimously, 3-0
C. 2011 Asphalt Overlay Program Preliminary Project List and Authorization to Bid 10/19/2010
Consent
Deputy Public Works Director Marwan Salloum presented information on this item. Mr.
Salloum reviewed the available funds as well as the estimated costs associated with construction.
The streets selected for the overlay were rated as part of the Pavement Management System
contract and have been listed by schedule in the order of priority. There was no public comment
or discussion.
Committee forwarded Option #1 as presented.
Moved: Dovey ' Seconded: Eerrell Passed: Unanimously, 3-0
4. OTHER
One public comment was received:
Sam Pace, 28939154` Ave SE, Kent — Mr. Pace, representing the Seattle-King County Association of Realtors,
highlighted the email he sent to staff last week regarding real estate signs in the City right of way. Mr. Pace
thanked Mr. Fewins for adding this topic to the 2011 Work Plan but also noted that 2011 is a very long time to
wait for both realtors who are trying to survive financially selling homes and the home owners, who are trying to
sell before having their homes foreclosed on them. Mr. Pace illustrated a specific example from the Twin Lakes
community and stated his concern is the only place to put signs in the right of way is where the signs probably
shouldn't be. Mr. Pace is requesting that FYVRC 19.140.060 (29)(� be modified to eliminate "on street side
planter strips " and is asking Council for assistance
G:\LUTC\LUTC Agendas and Summaries 2010U0-4-10 Minutes.doc
Land Use/Transportation Committee Page 3 October 4, 2010
Committee Member povey asked for clarification on the style of signs involved. Mr. Pace was referring to A-
boards or sandwich boards. Mr. Pace explained further that these signs aze used only to advertise open houses,
during the hours of the Open House and while either the seller of the real estate agent is physically on site at the
property being sold.
The Committee directed staff to make a code amendment as soon as possible. Committee Member povey
suggested granting an emergency code amendment on the spot and then going back and formally making the code
amendment as soon as possible.
Committee recommended placing this item on the City Council Business Agenda at tomorrow's regular
City Council meeting, October 5, 2010.
Moved: Dovey Seconded: Ferrell Passed: Unanimously, 3-0
Mr. Pace concluded that he wanted to insure that this code amendment is enforceable by having it go through the
correct process. Director Roe stated that the time for code modifications to go into effect is five days. The
Committee directed Assistant City Attorney Beckwith to begin drafting language for this code amendment.
5. FUTURE MEETING
The next LUTC meeting will be held Monday, 10/18/10 at 5:30 PM in City Hall Council Chambers.
6. ADJOURN
The meeting adjourned at 635 PM.
Attest:
Darlene LeMaster, Administrative Assistant II
COMMITTEE APPROVAL:
Dini Duclos, Chair Jim Fenell, Member Jack Dovey, Member
G:\LUTC�[,UTC Agendas and Summaries 2010U 0-4-10 Minutes.doc
COUNCIL MEETING DATE: November 2, 2010
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
ITEM #:
SUB.TECT: Street Lighting Project 20�' Way S: S 324`�' St to S 330` St — Final Acceptance
POLICY QUESTION Should the City Council accept the Street Lighting Project 20`�' Way S: S 324"' St to S 330�' St
Project constructed by Marles Corp dba Amaya Electric, as complete?
COMMITTEE Land Use and Transportation Committee
CATEGORY:
� Consent
❑ City Council Business
❑ Ordinance
❑ Resolution
MEETING DATE: October 18, 2010
❑ Public Hearing
❑ Other
STAFF REPORT BY: Marwan Salloum P.E. De u Pubhc Works Director Public Works
� _ ._. _.._.__...__._._..._...._..-----------..._ __ __- --------.._......__ __ __...._.
_ .............................................._�...................... z......._...... ..
_ . ..........................._........._....._.....__...._............_.
.._._..._......._.....---- - .. .
Attachments: Memorandum to Land Use and Transportation Committee dated October 18, 2010.
Options Considered:
1. Authorize final acceptance of the Street Lighting Project 20�' Way S: S 324 St to S 330`� St Project
constructed by Marles Corp dba Amaya Electric, in the amount of $86,313.97.
2. Do not authorize final acceptance of the completed Street Lighting Project 20` Way S: S 324�' St to S
330` St Project constructed by Marles Corp dba Amaya Electric, as complete and provide direction to
staff.
STAFF RECOMMENDATION Staff recommends forwarding Option 1 to the October November 2 2010 City
Council Consent Agenda for approval.
CITY MANAGER APPROVAL: ,LJ►IM �� DIRECTOR APPROVAL: �� "'
Cammittee Council Committee Council
COMMITTEE RECOMMENDATION Committee recommends forwarding Option 1 to the November 2 2010 City
Council Consent Agenda for approval.
Dini Duclos, Chair Jim Ferrell, Member Jack Dovey, Member
PROPOSED COUNCIL MOTION "I move approval of final acceptance of the Street Lighting Project 20`" Way
S: S 324`" St to S 330`" St Project constructed by Marles Corp DBA Amaya Edectric, in the amount of
$86,313.97 as complete. "
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
❑ APPROVED COUNCIL BILL #
❑ DENIED 1sT reading
❑ TABLED/DEFERRED/PIO ACTION Enactment reading
❑ MOVED TO SECOND READING (ordinances only) ORDINANCE #
REVISED — 08/12/2010 RESOLUTION #
5
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
October 18, 2010
Land Use and Transportation Committee
Brian Wilson, City Manager/Police Chief
Cary M. Roe, P.E., Director of Parks, Public Works and ergency M agement
Marwan Salloum, P.E., Deputy Public Works Director
Street Lighting Project 2d" Way S: S 324�" St to S 330"` S-� Final Acceptance
BACKGROUND:
Prior to release of retainage on a Public Works construction project, the City Council must accept the
work as complete to meet State Department of Revenue and State Department of Labor and Industries
requirements. The Street Lighting Project 20` Way S: S 324`�' St to S 330` St Project constructed by
Marles Corp dba Amaya Electric, is complete. The final construction contract amount is $86,313.97.
This is $29,958.03 below the $116,272.00 (including contingency) budget that was approved by the City
Council on April 20, 2010.
cc: Project File
Central File
K:U,LTI'C12010\10-18-10 Street lighting Project 20th Way S project - Project Acceptance.doc
6
COUNCIL MEETING DATE: November 2, 2010
CITY OF FEDERAL WAY
CITY COUNCIL
ITEM #:
AGENDA BILL
SUB.rEC'r: 2010 Pedestrian Safety Projects — Bid Award
POLICY QUESTION: Should the Council award the 2010 Pedestrian Safety Project to the lowest responsive,
responsible bidder?
COMMITTEE Land Use and Transportation Committee
CATEGORY:
� Consent
❑ City Council Business
STAFF REPORT BY: Maryan
❑ Ordinance
❑ Resolution
P.E.. Senior Traffic
Attachments: Land Use and Transportation Committee memorandum
October 18 , 2010.
ions Considered:
_....... ...............................................................__.................__.._.................._....................._...................._................__....__........�....._..............._..........__..._......._......_........................_......................................_...............__..._..........._........._..._._.._....__........__........---.......---........._._............._......
1. Award all Schedules of the 2010 Pedestrian Safety Project to Construct Company, LLC., the lowest responsive,
responsible bidder, in the amount of $279,436.00 and approve a 10% contingency of $27,944 for a total of
$307,380.00, and approve the transfer of $110,000 from the Annual Transportation System Safety Improvement
fund to this project and authorize the City Manager to execute the contract.
2. Award Schedules A, B, C, D and G of the 2010 Pedestrian Safety Project to Construct Company, LLC., the lowest
responsive, responsible bidder, in the amount of $183,506.00 and approve a 10% contingency of $18,350 for a total
of $201,856.00, and authorize the City Manager to execute the contract.
3. Do not award the 2010 Asphalt Overlay Project to the lowest responsive, responsible bidder and provide direction to
staff.
STAFF RECOMMENDATION: Staff recommends forwarding Option 1 to the November 2, 2010 City Council Consent
Agenda for approval.
,�,���, �
CITY MANAGER APPROVAL: 0�I ��'� DIRECTOR APPROVAL:
Comm�ttee Council Committee Council
COMMITTEE RECOMMENDATION: Place Option 1 on the November 2 2010 Council Consent Agenda for approval.
Dini Duclos, Chair
Jim Ferrell, Member
Jack Dovey, Member
PROPOSED COUNCIL MOTION: "I move to award all schedules of the 2010 Pedestrian Safery Project to Construct
Company, LLC., the lowest responsive, responsible bidder, in the amount of $279,436.00 and approve a 10% contingency
of $27,944 for a total of $307,380.00, and approve the transfer of $110,000 from the Annual Transportation System Safety
Improvement fund to this project and authorize the City Manager to execute the contract. "
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
❑ APPROVED COUNCIL BILL #
❑ DENIED lsr reading
❑ TABLED/DEFERRED/NO ACTION Enactment reading
❑ MOVED TO SECOND READING (ordinances only) ORDINANCE #
REVISED - 02/06/2006 RESOLUTION #
MEETING DATE: October 18, 2010
❑ Public Hearing
❑ Other
DEPT Public Works
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
October 18, 2010
Land Use and Transportation Committee
Brian Wilson, City Manager/Police Chief
Cary M. Roe, P.E., Director of Parks, Public Works and Emergency Management
Maryanne Zukowski, P.E., Senior Traffic Engineer ��`
2010 Pedestrian Safety Projects — Bid Award �
BACKGROUND:
Two bids were received and opened on September 30, 2010 for the 2010 Pedestrian Safety Projects; please see
attached Bid Tabulation Summary. The lowest responsive, responsible bidder is Construct Company, LLC., with
a total bid of $279,121.00.
AVAILABLE FUNDING:
The available budget for the 2010 Pedestrian Safety Projects is $200,000 and is comprised of the following:
2010 Proposed Pedestrian Safety Program Budget $324,000
2010 budget adiustments - completed proiects ($124,000)
TOTAL FUNDING AVAILABLE $200,000
ESTIMATED EXPENDITURES:
The following is a breakdown of the estimated total project construction costs based on the low bid
SCHEDULE
A
B
C
D
E
F
G
H
LOCATION
SW 320�' St @ 10`" Pl SW
S 348 St @ 6�' Ave S
SW 320` St @ 14`�' Wy SW
11�'P1S@S322"
SW 336` St @ 26 Pl SW
SW312thSt@8`
S 304` St @ 16` Ave S
S 312 St @ Steel Lake Park
IMPROVEMENTS
3 RRFB's and Pedestrian Refuge
Island
3 RRFB's and Pedestrian Refuge
Island
3 RRFB's and Pedestrian Refuge
Island
2 RRFB's
3 RRFB's and Pedestrian Refuge
Island
2 RRFB's and Small Pedestrian
Island
2 RRFB's
r �� :
AMOUNT
$45,948.00
$43,686.00
$46,371:00
$27,338.00
$44,041.00
$26,922.00
$20,162.00
$24,968.00
ESTIMATED SUBTOTAL CONSTRUCTION PROJECT COSTS $279,436
10% Construction Contingency $27,943.00
ESTIMATED TOTAL PROGRAM COST $307,379
BALANCE -$ 107 ,379.00
*Improvements — RRFB = Rectangular Rapid Flashing Beacon; Note: Cost varies depending on need for ADA wheelchair ramps and
pavement markings.
Based on the law bid for all eight proposed locations a budget shortfall of $107,379 exists. Staff is requesting
council approval to transfer of $110,000 from the Annual Transportation System Safety Improvement fund to this
project. 8
K:\LUTC�2010\IO-18-10 2010 Pedestian Safety Projects - bid awazd.doc
. �
J� :
PROPOSED PROJECT LOCATIONS VICINITY MAP
� , ._ �
�
�, '� , � ��.
� � =�.; � ��=x ,
k :
; _
�
.Ixit�nnu
9
K:\LUTC\2010\10-18-10 2010 Pedestian Safety Projects - bid award.doc
2010 PEDESTRIAN SAFETY PROJECTS
RFB 10-105
BID OPENING DATE SEPTEMBER 30, 2010
r
0
BID 2
WEST WATER
Schedule A: SW 32pth St @ 10th PI SW BID 1 CONSTRUCTION
CONSTRUCTCO CO
_ __ _ __. __ _ _ _- _ , _ _ i .
LCC SUMNER WA AUBURN WA ENGINEERS ESTIMATE
ITEM ITEM DESCRIPTION I i j
NO. AMOUNTIUNIT PR�CE TOTAL PRICE TOTAL PRICE TOTAL
-- -- - - --- - --
� SP 1-07 17 (5) Utilrty Potholing �
_ 1 _ � FA .___ $1,000.00 __ $1 000.00 __ _$1,000.00 _ $1,000.00 $1,00O.00I __$1,000,00
. ___.._ _ _ _ . �
SP 1-09.7 Mobilization
2 1 i LS 5 000.00 $5 000.00 3,000.00 $3,000.00 1 406.10 $1 406.10
- - -- - -- -� ;
3 SPt-10 5 Traffic Control Labor
I 12Q_ � HR ____ _ $41.00 $4,920.00 _ ___$41.00 . $4,920.00 $41.00 __ ____$4,920.00
_ _ _ . . _ __ _ . � _
4 SP 2-01.5 Roadside Cleanup �
- --- -
_ � 1 FA $2 800.00 2 800.00 2 800.00 $2 800.00 3�_800.00 $2 800.00
5 SP 8-04.5 Pedestrian Refuge Isiand, Complete
_ � 1 _ � EA _ _ $3,200.00 ___$3,200.00 __ $3,50000 _ $3,500.00 $6,00O,OOr $6,000,00
6 SP 5-14.5 Wheel Chair Ramp, Complete '
---- --- - - - --- -
2 EA $1 200.00 $2 400.00 $2 800.00 $5,600.00 $3,_000_00 $6,000.00
� SP 8-2L5 Roadside Specialty Sign, Pole and Base, Complete � �
2 L EA $7,900 00 _ _ $5,000.00 __ $16,000.00 $8.050,00� _$16,10_0,00
_ _ _. _ __ _._._ � _
8 SP 5-21 5 Median Specialty Sign, Pole and Base, Complete i
__ _ _+_� EA _ $7.900 00 7,900.00 __ $7,400.00 $7 400.00 $8 050.00 $8,050.00
------ -
9 SP 8-21 5 R1-5 Sign and Post i -
' 2 _ I � .___ _$350.00 $70000 ____$ _. _ $500.00 $150.00 $300.00
�� ____ _„_ P � , __ �_�_ 2 � EA _�470.00 $940.00 $500.00 $1,000.00 $250.00� $500.00
SP 8-21 5 W11-2 and Wt6-9 S' ns and Post i
� � SP 8-22.5 Plastic Yieid Line
--
16 __ EA _ _$18 00 $288.00 $40.00 _ $640 $50.00 � $800 00
_ _. . _ � _ _ . _.
12 SP 8-22.5 Plastic Crosswalk Line � i �
200 � LF $5.00 $1 000.00 $7.00 $1 400 00 $2.00 $400.00
SUBTOTAL Schedule A: SW 3201fi St @ tOtfi PI SW $45,948.00 $48,060.00 $48,276.10
Schedule B: S 346th St @ 6th Ave S ID 1 B D 2
CONSTRUCT CO WEST WATER ENGINEERS ESTIMATE
ITEM ITEM DESCRIPTION i
NO. I AMOUNT UNIT PRICE � TOTAL PRICE TOTAL PRICE I TOTAL
- - ---. --- - -- --
� SP 1-07 17 (5) Utdity Potholing � i
� 1 1 FA, _____ $1 U00.00 . . $1 U00.00 _. _$1,000.00 ___ $1,00000 $1 OOO,OOI $1 000,00,
_ _ � -
Z SP 1-09J Mobilization I
� 1 LS 4,000.00 $4,OOU.00 3 000.00 $ 3,000.00 1 411.20 1,411.20
---- -- - - --
3 SP1-10 5 Traffic CoMrol Labor
. _. . _ __ _ _ _ _ � 1 _ � HR __ $41.00 _____$ $41 00 _ . $4,920.00 $41,00� . $4 920.00
4 SP 2-01�5 Roadside Cleanup -"-- 120 '' FA 300.00 $300.00 _ $300.00 300.00 300.00 $300.00
SP 8-04.5 Cement Concrete Curb and Gutter Removal and Replacement
5 __. __ _ __._ , 20_ _ � �F $3500 .._._ $700,00 _ _ ___ $3,300.00 $80.00� $1,600_ 00
__ _
SP B-04.5 Pedestrian Refuge Island, Complete I
6 ! 1 ' EA $2,500.00 $2,500.00 3,500.00 $3,500.00 $6,000.00 $6000.00
- -- -- -- -
7 SP 8-14 5 Cement Concrete Sidewalk Removal and Replacement � '
_. _ ___ 12_ SY --- $66.00 __ $79200 - $290.00 __ $85,00� _81�02000
__ 1
8 SP 8-14.5 Wheel Chair Ramp, Complete i i
2 EA $7,200. $2 400.00 $2 800.00 $5,800.00 $3 000.00 6 000.00
9 SP 8-21.5 Roadside Specialty Sign, Pole and Base, Complete i
_ _ � 2__ � EA __,_ $7,96000 ,._$15,920.00 _ $8,00000,__ �16,000 $8050 $16100.00
__. _ _
� SP 8-21.5 Median Specialty Sign, Pole and Base, Complete I
- ----
_ _ _ _� 1 _ EA $7 855.00 �7 855.00 $7 400.00 $7 400.00 8 U50.00 $8,050.00
� � SP 8-21 5 R1-5 Sign and Post
_ _ _- . -___.. __ . . _ 1 2_.__ EA -- $380.00 ._. $76000 _- ------- $400.00_ _.._. $800_00 $150.00 __$300_ 00
12 SP 5-21.5 W11-2 and W169p Signs and Post �
_ _ 2 EA __ $468.00 _ $936.00 $500.00 1 000.00 250.00 ___,�500.00
- - -- ---- -
� 3 SP 8-21.5 Sign Removal and or Relocation I
_ _ _ _ __ . _ _ f 1 _ EA_ ___ $315.00 _..__ $315 _ _ _ __ $100.00 $50.001 __ $50 Q0
_. 7
14 SP 6-22.5 Plastic Yield Line I
I 16 EA $18.00 5288.00 $40.00 $840.00 �50.00�_ 800.00
� 5 SP 8-22.5 Plastic Crosswalk Line ��-
200 lF $5.00 $1,000.00 $7.00 $7 400.00 $2.00 $400.00
SUBTOTAL Schedule B: S 348th St @ 6th Ave S y43 886.00 $52 440.00 $48 451.20
10F4
Schedule C: SW 320th St @ 14th Wy SW BI 1 BID 2
CONSTRUCT CO WEST WATER ENGINEERS ESTIMATE
ITEM � ITEM DESCRIPTION
NO. AMOUNT UNIT PRICE TOTAL PRICE TOTAL PRICE I TOTAL
� SP 1 07.17 (5) Utility Potholing i
_ _ ___ __ _ __. � 1 1 LS 4 000.00 ... $4.000.00 . 3 000.00 .. 3 000.00 1 40970 � $1.000.00
Z SP 1-09.7 Mobilization
1 A 1, 00.00 t,
- - ----- -� � - �_ $1 40970
3 i SP1-10 5 Traffic Control Labor I
� 120 . I HR _ $41 00 _ _ $4 920.00 ____ $41.00 $4,920 00 $41.00� $4,920.00
_ _ _ _. _ _ _ . r _ _ __- -- --- .. _._. - _ _
a SP 2-OL5 Roadside Cleanup
_ _ �_ 1 �A __ �300.00 __ $300.00 $300.00 $300.00 300.00f _ $300_00
- -- --- - ---
5 SP 8 04.5 Cement Concrete Curb and Gutter Removal and Replacement �
+ 20 � LF _ $35 00 __ $700 00 _ $165 00 $3,300.00 $SO,OOf $_1,600 00
_.. _ _ - -- _
6 SP 8-04.5 Pedestnan Refuge Island, Comp�ete i �
1 EA $5,500_00 $5 500.00 3 500.00 $3 500.00 $6 000.0_� _ _$6 000.00
� SP 8-14.5 Cement Concrete Sdewalk Removal and Replacement � i I
_ __ ._ _ __. ; 12_ _ I SY_ __ $66.00 $792,00 __ _ _$290.00 .. $3,480 00 $85.00J ___. $1,020.00
8 SP 8-21 5 Roadside 5 ecial Si n, Pole and Base, Com lete '� -- � �� 200.00 4 �2,400.00 _ 2 800.00 $5 600.00 $3,000.00� $6 000.00
SP 8-14 5 Wheel Chair Ramp, Complete i
-- g -- - P b 9 ---- P I t I
. _ ___ __ _ _ __ _
} ___2__ t EA____ $7,96000 __$15,92000 _ $8.00000 $16,000,00 $S,O50 $16,100._00
�� SP 8-21.5 Median Specialty Sign, Pole and Base, Complete � �
_ I 1 EA _ 7 855.00 $7 855.00 $7.400.00 $7,400.00 $8 050.001 $8,050.00
-- - --- --
� � SP 8-21.5 R1-5 Sign and Past ' �
, 2__. L � _$380.00 __. $76000 _ _ $400.00 __ $800 $150.00� _ _$300,D0
__ _ .__ _
t2 SP 8-21.5 W11-2 and Wt6-9p Signs and Post ; i
__ `� 2 � EA _ _ $468.00 _3936.00 $500.00 1 000.00 $250.00 $500.00
- -- - --- - - ---
13 SP 8-22 5 Plastic Yield Line �
_ 16, EA , . $18.00� __ $288.00 _ _ __$40 _ $640.00 $50_00� _
14 SP 8-22.5 Plastic Crosswalk Line , i �
200 LF $5.00 $1000.00 $7.00 $1,400.00 $2.00 $400.00
SUBTOTAL Schedule C: SW 320M St @ 14th Wy SW
$46,371.00 $52 340,00 $48,399.70
r
r
20F4
Schedule E: SW 336th St � 26th PI SW B 1 BID 2
CONSTRUCT CO WEST WATER ENGINEERS ESTIMATE
ITEM ITEM DESCRIPTION '
NO, � AMOUNTI UNITI PRICE TOTAL PRICE TOTAL PRICE i TOTAL
---- ----- -
-- -
� SP 1-07 17 (5) Utility Potholing I - j
� 1__ � FA ;_. $1 ___$1000,00 _ _$1000A0 __ $1,000.00 $1,0_00.00� . $_1,000.00
_ _ ___. __ __ . _ _
z SP 1-09 7 Mobilization � � � I
__ __ ____ _�__ 1 � LS i 4 500.00 $4 500.00 3,000.00 3 000.00 1 296.06 _ 1 296.06
�-.�_ T _
SP7-10.5 Traffic Control Labor �
a
3 � i $41.00
__ . _ _ _.__ $41.00 _ $4,920.00 a41.00� _$4,920.00
_
I
SP 2-01.5 Roadside C�anup t , 1 0 FA r .
_ ' $300.00 $300.00 $300.00 �00.00 $300.00� $300.00
- ---------- ---
5 SP 8-04 5 Pedestnan Refuge Island, Complete i
� 1 f EA $5,000.00 $5 000 00 _ $3,500.30 __ $3,500.30 $6,000.00� $6,000.00
_. __ .
6 SP 8-14.5 Wheel Chair Ramp, Complete � � i
__ �� 2 ( EA� $1 200.00 $2,400.00 _$2_800.00 _ $5,600.U0 $3,000.00 $6000.00
-- --- ---- --
� SP 8-21 5 Roadside Specialty Sign, Pole and Base, Complete i I i
__ _ __ __ _ _ _ _ __ 2__ 1 � __ $7,980.00 _ $8�000.00 $8,05Q.00 $16,100.00
e SP 8-21.5 Median Specialty Sign, Pole and Base, Complete � , I �, i
- - - -- -- -- -
�_ $7 855.00 $7,855.00 $7,400 00 $7 400.00 $8,050.00 � $8 050.00
9 SP 8-21.5 W11-2 and Wt6-9p Signs and Post -��- ,
_ _ � 2 { EA „_ . $468 00 _... $936.00 _ . $500.00 ___ $1,000.00 $250 001 _ $500,00
_ _ . __ _
� SP 8-21 5 Sign Removal and or Relocation i �
_ _ ______ EA _ $315.00 $630.00 _�10000 _ $200.00 $50_00+_ 100.00
SP 8-22.5 Plastic Crosswalk Line '
� � 116 ! LF I $5.00 $580.00 $7.00 $812.00 $2.00 $232.00
SUBTOTAL Schedule E: SW 336th St @ 26th PI SW $44,041.00 $43,732.30 $44 498.06
30F4
TOTAL $279,436.00 $299 095.30 $278 689.95
ACTUAL BiD SUBMI7TE,U NdiTH IVIH"TH ERRS7k $L79,1'29.00 -
BID SIGNATURE YES YES
BID BOND YES YES
ATTACHMENTS A THROUGH H YES YES
r
w
40F4