Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-102133a
,City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835 -2607 Fax: (253) 835 -2609
Project Name: D H P ENGINEERING
Project Address: 32008 32ND AVE S Unit G
!Building - Commercial
Permit #: 15- 102133 -00 -CO
Inspection Request Line: (253) 835 -3050
Parcel Number: 215480 0010
Project Description: TI - Interior tenant improvement work to include construction of (3) partition walls to
create office spaces. No plumbing or mechanical.
Owne
KOAM TV
ARRlican t
BRET BRASHER
Contractor
METIER CONSTRUCTION
LAC
32008 32ND AVE S SUITE A
D H P ENGINEERING
METIECIO55CG (2/7/16)
FEDERAL WAY WA 98003
25964 129TH PL SE
29727 49TH AVE S
Type V - B
KENT WA 98030
AUBURN WA 98001
Occupancy Load
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
B
Construction T
Type V - B
Occupancy Load
Floor Areas . ft.
917
0
0
0
Additional Permit Information
Building Pre -con. Meeting Required ? ....................No Existing Sprinkler System in Buildine ................. Yes
Mechanical to be Included9 ...... .............................No Number of Stories ................................................. 1
Permit for Building Shell Only ? ............................No Plumbing to be Included? ......... .............................No
Special Inspection(s) Required? .............................No New / Additional Sq. Feet - Total.......................... 0
Occupancy #I -Use ................ ............................... Professional Zoning Designation. ............................................... OP -1
Services(Offices
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Tuesday, November 10, 2015
Permit Issued on Thursday, May 14, 2015
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: � l ,� Date: 51 ` ���
r __ t
City of Federal Way W
Certificate of Occupancy
a
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed by CU staff.
Tenant Name: D H P ENGINEERING
Address: 32008 32ND AVE S UnitG
Permit #: 15- 102133 -00-CO
Includes:
#1
#2
#3
#4
Occupancy Class:
B
Construction T
Type V - B
Occupancy Load
Floor Area (sq. ft. )
917
0
0
1 0
Owner Name: KOAM TV
Owner Address: 32008 32ND AVE S SUITE A
FEDERAL WAY WA 98003
Building Official
-
�a -Is-
Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most seventy affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO MAIN ON -SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835 -3050
15- 102133 -00 -CO Address: 32008 32ND AVE S Unit G
KOAM N FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By P A,%, Date (0 _45-.1
Final - Planning
Approved
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final Erosion Control (4375)
Approved
By Date
13 Final - S K F& R (4060)
Approved
By Date
Final - Building (4050)
Approved
By A"-- Date (b . -( f,(.- I
SWM Precon Site Mtg 4400)
Initial Erosion Control (4365)
Final Electrical
Approved
Footings/Setback (4110)
Underfloor Framing (4285)
Approved
Approved to place concrete or grout
To be done prior to breaking ground
Approved to place concrete
Approved to place concrete
By
Date
By
Date
By
Date
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By P A,%, Date (0 _45-.1
Final - Planning
Approved
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final Erosion Control (4375)
Approved
By Date
13 Final - S K F& R (4060)
Approved
By Date
Final - Building (4050)
Approved
By A"-- Date (b . -( f,(.- I
Re -steel (4215)
Slab /Concrete Floor (4255)
Final Electrical
Approved
Underfloor Framing (4285)
Right of Way —^
Approved
Approved to place concrete or grout
Date
Approved to place concrete
By
Date
Approved to sheath floor
By
Date
By
Date
By
Date
Floor Sheathing (4105)
Fire/Draft Stops (4095)
Interim Erosion Control (4370)
Approved to install flooring
Approved
Approved
By
Date
By
Date
By
Date
Framing 4120
g ( )
Prior to scheduling a Framing inspection;
4150
Insulation ( )
lectrical, Plumbing & Mechanical Rough -in and
Approved to insulate
Approved to install wallboard
[Fire0raft Stop inspections must be signed -off and
IBC 109.3.4
By
Date V r c-
By
Date
approved.
{
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By P A,%, Date (0 _45-.1
Final - Planning
Approved
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final Erosion Control (4375)
Approved
By Date
13 Final - S K F& R (4060)
Approved
By Date
Final - Building (4050)
Approved
By A"-- Date (b . -( f,(.- I
Rough Electrical
Approved
o
Final Electrical
Approved
Right of Way —^
Approved
By
Date
By
Date
By
Date
' 0
' PER PPLICATION
Federal Way aga
34
MAY 0 5 2015
PERMIT NUaiEER 5 _ (� Z _ GTY OF FEDERJ6W qy
OTE ADDRESS 32008 32nd Ave So
SUITE /UNIT s
PROJECT VALUATION
ZONING
ASSESSOR'S TAR /PARCEL #
$ 3,000
2 1 5 4 8 0_ 0 0 1 0
TYPE OF PERMIT
XBUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
DHP Tenant Improvement
Interior tenant improvement. Construct (3) partition walls to create office space.
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
PROPERTY OWNER
NAME KO -AM TV, Inc. (Contact Shelley Ko)
X253 -946 -5537
MAHJNG ADDRESS
32008 32nd Ave SE
E-MAIL
shelleyooko @gmail.com
CITY
Federal Way
STATE
WA
ZIP
98003
NAME Metier Construction
PHONE 253- 529 -0503
MAILING ADDRESS
E -MAIL
CONTRACTOR
29727 49th Ave S
TCMetier @netscape.net
CITY
STATE
ZIP
FAX
Auburn
WA
98001
WA STATE CONTRACTOR'S LICENSE #
EXPIRATION DATE
FEDERAL WAY NUUM 88 LICBMIX •
METIEC1055CG
2 06 2016
pending
'E DHP Engineering
253-220-0848
APPLICANT
MAII.wGwDDRESS
25964 129th PI SE
$
b e @dhpengineedng.com
CITY
STATE
ZIP
FAX
Kent
WA
98030
PROJECT CONTACT
NAME Bret Brasher
PRUL4" PHONE
253-220 -0848
MAH.INO ADDP"o
25964 129th PI SE
E-MAIL
bret @dhpengineering.com
('The individual to receive and
respond to all correspondence
crrY
Kent
I STATE
WA
ZIP
98030
gA�[�, i
Q 111 dl
concerning this application)
PROJECT FINANCING
NAME N/A - Value is $3,000
❑ OWIIER- FINANCED
Required value of $5,000 or more
(RCW 19.27.095)
MAnJNG ADDRESS, CITY, STATE, ZIP
PHONE
I cert(& under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best
of my knowledge, the in formation submitted in support of this permit application is true and correct I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I jierther agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim/, which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its qfflcers and employees, upon the accuracy of the
information supplied to the city as a art of this application.
%��4 —Q it' 5-15 -15
SIGNATURE: V �"^ DATE
PRINT NAME, Bret Brasher
Bulletin #100 — January 1, 2013 Page 1 of 3 k: liandoutAPemtit Application
r A
MECHANICAL PERMIT N/A
Indicate how many of each type of fixture to be installed or rel,
AIR HANDLING UNITS FANS
AIR CONDITIONER FIREPLACE INSERTS
BOILERS FURNACES
COMPRESSORS GAS LOG SETS
DUCTING GAS PIPING
VALUE OF MECHANICAL WORK
xs part of this project. Do, include existiM fixtures exist' to remain.
GAS PIPE OUTLETS OTHER (Describe)
HOODS (eommer w) ,
HOT WATER TANKS (amp
REFRIGERATION SYST
WOODSTOVES
PLUMBING PERMIT N/A
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
VALUE OF PLUMBING WORK
4
Indicate how man pf each type offlxture
to be installed or relocated as
part of this project. Do not include existi
ng fixtures to remain.
BATHTUBS (orlkb /shower Combo(
LAVS (Hand Sinks)
TOILETS
WATER PIPING
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
SHOWERS
VACUUM BREAKERS
XYes ❑ No
DRINKING FOUNTAINS
SINKS (wrchm /utniry)
WATER HEATERS (nectriq
HOSE BIBBS
SUMPS
WASHING MACHINES
TOTAL FEKTURE8
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
SEWER PURVEYOR
VALUE OF E$STINO nMMIbOVlKZM
NO
LUD
LUD
�"a" $`
$ 3000
E4IST[NO /PREVIOUS USE
LOT SIZE (In square Feet)
WaSTI NO FIRE SPRINKLER SYSTEM(?
PROPORZD FIRE SUPPRESSION SYSTEM?
Office
43,277 SF
XYes ❑ No
❑ Yes X No
RESIDENTIAL - NEW OR ADDITION
AREA DESCRIPTION (in square feet)
EXISTING
PROPOSED
TOTAL
FOR OFFICE USE
J ^
AREA DESCRIPTION
�"a" $`
is Square Feet
;�
,-:... ;m,�,,, o+' ,A4�.x e„ 5.,
Vii': t, a .':, � _Srt
5•,�".:� .s 3�'� �
4 v.'•„
j+1'
FIRST FLOOR (or Mobile Home)
u''+ -'+
ADDITION
L ,?''at"
COMMERCIAL - REMODEL/TENANT IMPROVEMENTS
Area
onstruction
# of
AREA DESCRIPTION
COVERED ENTRY
Occupancy
Percy tisoup)')
Additional Information
in Square Feet
Stories
�
.^,.. !T,„.t
��s"
GARAGE ❑ CARPORT ❑
s; "..'C".
VB
1
TENANT AREA ONLY
917 SF
Type B
_
k,
- `.�"�s,�x a '.
_
Area Totals
fit.„ r's" x Xy'
P"�
MAL
zg
ESTIMATED SELLING PRICE $ # OF BEDROOMS
COMMERCIAL - NEW/ADDITION
Area
Construction
# of
AREA DESCRIPTION
Occupancy Group(s)
Additional Information
is Square Feet
Stories
j+1'
u''+ -'+
ADDITION
COMMERCIAL - REMODEL/TENANT IMPROVEMENTS
Area
onstruction
# of
AREA DESCRIPTION
Occupancy
Percy tisoup)')
Additional Information
in Square Feet
Stories
�
.^,.. !T,„.t
��s"
s; "..'C".
VB
1
TENANT AREA ONLY
917 SF
Type B
�
k,
- `.�"�s,�x a '.
fit.„ r's" x Xy'
zg
Bulletin #100 - January 1, 2013 Page 2 of 3 k:\Iiandouts\Permit Application