Permit #: 15- 105819 -00 -EL
Inspection Request Line: (253) 835 -3050
Project Name: LAKE EASTER ESTATES CONDOMINIUM BLDG 10 UNIT 39
Project Address: 1211 S 308TH ST Unit 39 Parcel Number. 401540 0390
Project Description: Change out Receptacles and switches in 44 condo units. Job 1159194.
Owner
Applicant
City of Federal Way
UN CHU SON
Community & Econ. ev. Services
PRIME ELECTRIC INC
33325 8th Ave S
FILE
Federal Way, WA 98003
FEDERAL WAY WA 98003
Ph. (253) 835 -2607 Fax: (253) 835 -2609
13301 SE 26TH ST
0
Bectrical
Permit #: 15- 105819 -00 -EL
Inspection Request Line: (253) 835 -3050
Project Name: LAKE EASTER ESTATES CONDOMINIUM BLDG 10 UNIT 39
Project Address: 1211 S 308TH ST Unit 39 Parcel Number. 401540 0390
Project Description: Change out Receptacles and switches in 44 condo units. Job 1159194.
Owner
Applicant
Contractor
UN CHU SON
JEREMY STEEB
PRIME ELECTRIC INC
1211 S 308TH ST UNIT 39
PRIME ELECTRIC INC
PRIMEEI134BT (1/30/17)
FEDERAL WAY WA 98003
13301 SE 26TH ST
13301 SE 26TH ST
BELLEVUE WA 98005
BELLEVUE WA 98005
Additional Permit Information
Is this an Online or O.T.C. application ? .................Yes
Electrical Fixtures
Circuits - Residential ...................... 12
Is Use Educational or Institutional ? .......................No
PERMIT EXPIRES Saturday, May 14, 2016
Permit Issued on Monday, November 16, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and1he itg of al Way.
Owner or agent: I I I iN Date:
'%moor Not
FI NpLEo
CITY OF -•
Federal Way
PERMIT #:
I THIS CARD IS TO H&MAIN ON -SITE
Construction In ection Record
INSPECTION REQU TS: (253) 835 -3050
15- 105819 -00 -EL Address: 1211 S 308TH ST Unit 39
Project: UN CHU SON FEDERAL WAY, WA 98003 -4700
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be-covered-until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Final - Electrical (4055)
Approved
By LM�p Date
UFER Ground (4295)
E]
Ditch cover (4030)
Temporary Power (4275)
Slab /Concrete Floor (4255)
F]
Approved
By
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By LM�p Date
Pool Bonding (4195)
E]
Temporary Power (4275)
F]
Service (4235)
By
Approved
By
Approved
By
Approved
By
Date
By
Date
By
Date
E]
E]
0
Feeders /Sub - panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By LM�p Date
Rough Electrical
Approved
EJ
- Final Electrical
Approved
F]
Right of Way
Approved
By
Date
By
Date
By
Date