HomeMy WebLinkAbout15-102843 • S Llecthcal
City of Federal WayF k
Corot^unity&Econ.Dev.Services T Permit #: .15-102843-00-EL.
33325 8th Ave S
Federal Way,WA 98003. Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p Q
Project Name: XEROX
Project Address: 3600 S 344TH ST Parcel Number: 726120 0221
Project Description: Remove and replace 36 like for like 12v batteries in UPS cabinet.
Owner Applicant Contractor
LBA REALTY FUND III-CO I LL TERRENCE FLANAGAN ENERSYS
PO BOX 847 AVE S A-10 ENERSYS ENERSDI897O9(11/12/15)
CARLSBAD CA 92018 14323 32ND ST E 14323 32ND ST E
SUMNER WA 98390 SUMNER WA 98390
Additional Permit information
Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No
Service greater than 999 Amps? No
Electrical Fixtures
Low Voltage-Other(Commercial I
PERMIT EXPIRES Tuesday, December 8, 2015
Permit Issued on Thursday, June 11, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
0 nd Ci deral Way.
Owner or agent: N Date:
:FINALED
THIS CARD IS T MAIN ON-SITE 4A. •Federal Way Construction I ection Record '
y INSPECTION REQ TS: (253)835-3050
PERMIT#: 15-102843-00-EL Address: 3600 S 344TH ST
Project: LBA REALTY FUND III-CO I LL FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O LIFER Ground(4295) El Ditch cover(4030) "0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
. . .
O Pool Bonding(4195) 0 Temporary Power(4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
O Feeders/Sub-panels(4045) �0 Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
O FiJn al,- lectrical(4055)
Approved
Date — ( 7�S
O Rough Electrical ❑ Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date