HomeMy WebLinkAbout15-104709 x
• .�... . y 0 Mechanic' al
Community
&Federal Way Permit#: 15-104709-00—ME
Community&Econ.Dev.Services
33325 8th Ave S
Federal Way,WA 98003 FILE
Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p q
Project Name: DOVEY
Project Address: 28904 8TH AVE S Parcel Number: 515292 0300
Project Description: Furnace replacement
Owner Applicant Contractor
JACK DOVEY SARAH TURNER GLENDALE HEATING&A/C(GENERAL)
JENNIFER DOVEY GLENDALE HEATING&A/C GLENDHA053Q2(11/2/15)
28904 8TH AVE S 32462 DES MOINES WAY S 12462 DES MOINES MEMORIAL DR
FEDERAL WAY WA 98003-3702 SEATTLE WA 98168-2266 SEATTLE WA 98168-2266
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Monday, March 14, 2016
Permit Issued on Wednesday, September 16, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: . Date:
1 ,
„. , ,
CITY OF Construction In. ection Record
Federal Way INSPECTION REQU TS: (253)835-3050
PERMIT#: 15-104709-00-ME Address: 28904 8TH AVE S
Project: JACK DOVEY FEDERAL WAY, WA 98003-3702
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Mechanical Rough-in(4165) El Gas Piping(4125) ❑ Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Q...\ ____ Date i.,o..,vb„1s
® Rough Electrical Final Electrical CI Right of Way
Approved Approved Approved
By Date By Date By Date