HomeMy WebLinkAbout15-101122 • THIS CARD IS T MAIN ON-SITE
CITY OF
Construction I ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 15-101122-00-EL Address: 33915 1ST WAY S Unit 204
Project: CUNA MUTUAL INVESTMENT COF FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 UFER Ground(4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
•
❑ Pool Bonding(4195) ❑ Temporary Power(4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020)
Approved Approved Approved
By Date By Date •134 ----. ..., Date 4 e� S
❑ Final-Electrical(4055)
Approved
Date._ '
❑ Rough Electrical Final Electrical
Approved ID Right of Way
Approved
Approved
By Date By Date By Date
•
E1eectrical
Community
City
&Federal
�Dev Way
Permit #: 15-101122-00—EL
33325 8th Ave S
Federal way,WA 96003 Inspection Request Line: tt253t 835 -3050
Ph:(253)835-2607 Fax:(253)835-2609 p a t
Project Name: DR MEYERS-POWELL ADMIN OFFICE
Project Address: 33915 1ST WAY S Unit 204 Parcel Number: 926504 0150
Project Description: Relocate 2 thermostats
•
Owner Applicant Contractor
CUNA MUTUAL INVESTMENT CORP RICHARD SINNEMA HEATTRANSFER CO(ELECTRICAL)
5910 MINERAL POINT RD HEATTRANSFER CO HEATTC*009DA(5/30/16)
MADISON WI 53701 34405 NE 16TH ST PO BOX 1268
CARNATION WA 980 14- CARNATION WA 98014
•
Additional Permit Information
Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No
Service greater than 999 Amps? No
Electrical Fixtures
Thermostat. 2
PERMIT EXPIRES Saturday, September 5, 2015
Permit Issued on Monday, March 9, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent ONLIIVE
Date:
FIMALED