Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-101694 Mechanical
City of Federal Way Permit #: 15-101694-00-M E
Community&Econ.lvev.Services
33325 8th Ave SFILE
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p
Project Name: GROVES 7 (s(f
Project Address: 29857 MARINE VIEW DR SW Parcel Number: 515320 0061
Project Description: Gas water heater replacement
Owner Applicant Contractor
IRA W JR GROVES NORTHWEST PERMIT/WESCO WASHINGTON ENERGY SERVICES CO
SUSAN K GROVES 1345 W GULF RD (GENERAL)
29857 MARINE VIEW DR SW POINT ROBERTS WA 98281 WASHIES971OB(9/2/15)
FEDERAL WAY WA 2800 THORNDYKE AVE W
98023 SEATTLE WA 98199
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Hot Water Tanks 1
PERMIT EXPIRES Monday, October 5, 2015
Permit Issued on Wednesday,April 8, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
fkJLINE
•
JINALED .
THIS CARD IS TO IN ON-SITE
CITY0111
Construction Ins ection Record
Federal Way INSPECTION REQU TS:(253)835-3050
PERMIT#: 15-101694-00-ME Address: 29857 MARINE VIEW DR SW
Project: IRA W JR GROVES FEDERAL WAY, WA 98023-3422
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date \kyAc---- Date __,
El Rough ElectricalEl Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date