Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-102709 •
Demolition
City of Federal Way
Community&Econ.Dev.Services Permit #: 15-102709-00-DE
33325 8th Ave S FILE
Federal Way, 98003 Inspection Request Line: (253) 835-3050
Ph:(253)835-2607 Fax
ecues
:(253)835-2609 p q
Project Name: FEDERAL WAY BOYS & GIRLS CLUB .3-ct(gG
Project Address: 30835 8TH AVE S Parcel Number: 082104 9119
Project Description: Demolition of single family residence.
Owner Applicant Contractor
BOYS&GIRLS CLUB KING CNTY MARK HENDRICKS BAYLEY CONSTRUCTION
603 STEWART ST#300 BOYS&GIRLS CLUBS OF KING BAYLECG034JC(12/31/15)
SEATTLE WA COUNTY/FEDERAL WAY 8005 28TH ST
98101 PO BOX 3134 MERCER ISLAND WA 98040
FEDERAL WAY WA 98063
Additional Permit Information
Demolition Valuation 25000.00
PERMIT EXPIRES Saturday, June 3, 2017
Permit Issued on Thursday, June 4, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
44 /5//Owner or agent: k �.� Date: Il`
4 • THIS CARD IS TO AIN ON-SITE
"TM OF 4144*, Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT#: 15-102709-00-DE Address: 30835 8TH AVE S
Project: BOYS & GIRLS CLUB KING CNTY FEDERAL WAY, WA 98003-4701
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Final-Building(4050)
Approved
7 .
By4. Date G_ ((- 15
El Rough ElectricalCI Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
CITU OF 411111 PERMIT APPLICATION
Federal Way _-,gyp
7___
JUN 0 4 2015
PERMIT NUMBER 5 ....
! _ pu
TARGET DATE Cm OF FEDERAL WAY
CDS
SITE ADDRESS SUITE/UNIT#
30P3S RD-r floc= _�. FEOER-AL L :-Ayt L / 78003
PROJECT VALUATION ZONING ASSESSOR' T PARCEL#
$ 5; oCI 0 Z 04-
Y 9
,
TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING 0 MECHANICAL ISIDEMOLITION 0 ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT r 0 E ILA L Li p y G o yS £ 6 i �L-S C L Q
PROJECT DESCRIPTION C�t Li jj of.),A/
�/ 0 /Sfr1( LC" 64..r4/i2, h'� /(
Detailed description of work to (Aft yi j 70 67C 8137 A vt. -f y�-}i )i-2 6'0 Flo}
be included on this permit only q
"Y 4!A /Ic n?
r
, NAME r PRIMARY PHONE
PROPERTY OWNER �j i�S q Gl(SLS CIk�,i o ��/NG c0t,✓17. 2SY ""6Gi --�,$o/
I GADDRESSSy- b 7 E-MAIL MH CAJ,)21C f KJ
607 fIt=�..J{ �.-. , .1 OQ PG§lrlV e/ ts+_c ..0 fit. G
CITY STATE ZIP
SF�i nE kt `y 1 / o
. _. NAME e �. .�,�.. �>..m�..,.-�_. a. ...:.�=PHONE_
LIPS ey CO r-Li rittk.cii‘v r) /Lb -CoZ/- 2y,5/
MAILING O
ADbREsef
CONTRACTOR
100.C.- 6— 2-8 Ty, .f�r� L1�t-M (i) r,, , .
y I t Ne
CITY STATE y , � U.- ZIP ` r o y,) z 3'/-- 7 7 2.
FAX
e 14(ea- /1 IA rim {-..
WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE#
g l LC ' . [r /2, / 71 / i
PRIMARY PHONE
" 5: .t,4'i--6.S'c /
APPLICANTmAnatiG ADDRESS E-mAIL/Nicivil, ii.i c KJ J
POI Of-rvC-'1'i/Ntt=. 6IL6
C TY STATE ZIP FAX
A . 2si -3-2 - /50
PRIMARY PHONE
(The individual to receive and
E-MAILTh H Er oR i c rc.1
respond to all correspondence ..5. 4 t .../ *
concerning this application) FAX
i ,
NAME �
PROJECT FINANCING 0 OWNER-FINANCED
Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE
(RCW 19.27.095)
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in
the investigation and defense of such claim), which may be made by arty person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of this application.
SIGNATURE: /I j % a.. DATE /3 1 / I S'~
PRINT NAME: /14 A R)Z P. H E/ C) Q 1 C K$
R1111Pt;.,A 1(1(1-Tan,lary 1 '11111 Pana 1 of 2 4-VF3anrTn„tc\Pv,-.,,it d,,v-dir at7...,
• •
AMMER LIS
106 Frontage Rd N
Pacific,WA 98047
PO Box 1 150
Sumner,WA 98390
Phone:253-939-4375
Fax:253.939.5720
Date: 5/12/15
To:Bayley Construction
From: Rick Estes Ascendent LLC Project Manager
Subject:Federal Way Boys& Girls Club,30835 8th AVE S Federal Way
1 certify all asbestos containing materials identified in the hazardous materials survey performed by Argus Pacific dated
12/27/13 have been legally removed from the above addressed structure completely.
Rick Estes
• ' 4-44444 4- k-,-**'-' *44'44:144A4i-4,-,';--
0
ARCUS
I AV ANNINIONINE 7.z
TRAINING-CONSULTING 1 I
Regulated Building Materials '-r,-- --;,,-,-:-
Assessment Report
lvt-=*,-1;--'1::;:30835 -y
Boys& Girls8th Club ofSouthg Kin
CountyAvenue
Federal Way, Washington ,
A
v
December 27,2013
* *
X0'0
x
T X4
i
#�T#F� G
ORGANIZATIONS
WITH - t1
HEALTH
i I
AND � "
SAFETY
SOLUTIONS �r
'1-1
�y
. S
Ulf I 0
8
ASBEST©S ,'
N©R T H W E S T Asbestos NW Batch#:
30620 Pacific Hwy S.#103,Federal Way,WA 98003
(253)941-4343
PCM Chain of Custody �(
Company Name: AS CrAAd _yp _____,_. __ Phone#
Address: Fax
Project Manager: �-- Date:
Email: PM Cell/4:�... 3�
Protect Location 3c,...1.6 Q- ?� s TV-LWProject# Cy (('
Number of Samples: Turn Around: Rush Samples: a
Sample ID fakM ice Location (L t Y'U Y3" Start Time �,, 3 Fibers/ 7
Sample Type tr) ,l/ E' End Time t, /e,. G3 Fields /tom
Pump# ia G Activity e l- Q U E A '1�� Total Time � Fibers/cc
` ,
Environment C ('rk-- -?�'7r1 red Start Rate
Protection 'f Lit. Worker End Rate Z.— Date
Decon �, Cert# Total Liters Sampled
Sample ID1 C; ;l``�j{ Start Time % 3 Fibers/
�i 4` location �p�
Sample Type /� =.cif. �/�Gl(� ?i�r 44'1End Time Fields
Pump# �,.� ���1r1 L,\-) I Q v5 Total Time 1
1L Activity "� d Fibers/cc
Environment f��F P \ i Alktkt.it (
S Start Rate
Protection y'4; { Worker End Rate Date
1 ,p( Cert# Total Liters Sampled %`
Decon }�
Sample ID 4 I Location !f'1y
/� ti. Start Time JC : (-'( Fibers; 2
Sample Type C L End Time 1 i , .3 Fields /DC
p .P
Pump# r1i;^. (,);i r) hrj. k t'/C7 Lid r Total Time C Fibers/cc
Activity ,%
Environment(LeGC4A Start Rate ) 4
Protection ('-)%b. 1 ' (L Worker End Rate 1 W Date
Decon ( �1 p[- Cert# Total Liters
Sampled �'
Sample ID Start Time Fibers/
Location Fields
Sample Type End Time
Pump# Total Time
Activity Fibers/cc
Environment Start Rate
Protection Worker End Rate Date
Decon
Cert# Total Liters Sampled
61c-
Sampled By: �>,e_ yfi . L5_. . r Date - Yl Time
Relinquished By: Date: Time.
Received By: Date:
/a : .
Analyzed By: " �. _�. Date:
}'z
• • . .
NORTHW
ASBESTEOST ,/'
S
Asbestos Northwest. LLC Asbestos NW Batch#: 201510568
30620 Pacific Hwy S. J4103, Federal Way, WA 98003
Phone-4 253.941.4343 Fax# 253.941.4175
Attn: Rick Estes Date Analyzed: 5/8/2015
Ascendent Inc Samples Analyzed: 3
106 Frontage Rd N. Pacific, WA 98047
Project Location: 30835 8th Ave Federal Way, WA
Project # Boys and Girls Club
Sample ID 1 Start Time 7:30 Fibers/ 71/100
Location Throughout house and basement Fields
Client ID B&G#16 End Time 10:00
Sample Type PN Total Time 150
Activity Remove ACM Wiring Fibers/cc 0.1161
Pump 002 Start Rate 2
Environment DampWorker Sam Ortiz End Rate 2 Date
Sam led 5-8:2015
Protection 1/2 Mask Cert it Total Liters 300 p
Sample ID 2 Start Time 7:34 Fibers/
Location Outside Decon Clean RoomFields 3/100
Client ID B&G#17 End Time 9:45
Sample Type OW Total Time 1
Activity Remove ACM Wiring —
Fibers/cc < 0.0021
Pump 006 Start Rate 10
Environment Clean Worker End Rate 10 Date
5;8/2015
Protection 1/2 Mask Cert# Total Liters 1310
Sampled
Sample ID 3 Start Time 10:00 Fibers/
Location BasementFields 2/100
Client ID B&G#18 End Time 11:30
Sample Type C1, Total Time 90
=activity Remove ACM Wiring Fibers/cc < 0.0021
Pump 006 Start Rate 14
Environment Clean Worker End Rate 14 Date
5`8/2015
Protection 1/2 Mask Cert ti Total Liters 1260
Sampled
Sampled By: Dennis StaplesDate: 5/8/2015
Analyzed By:4110• Date: 5/8/2015
1
Pag- of 1
• •
pscteana r.org
Puget Sound Clean Air Agency
Notification Case #: 201501174
This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall
be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)).
Fee Amount Paid $275.00
Credit Card Transaction # ATOFCFD05784
Transaction Date 03/26/15
Owner's Name Boys and Girls Club Phone (206) 621-8884
Project Street Address 30835 8th ave s
City Federal Way Zip 98003
Contact Person Wade Meyer Phone (206) 621-8884
Mailing Address
This project includes asbestos removal.
Project Size linear feet / 800 square feet
Project Start Date 04/05/15 Completion Date 05/30/15
Asbestos will be removed by a licensed asbestos abatement contractor
Contractor ascendent Ilc Contractor Job #
Contact rick estes Phone (253) 939-437!
Mailing Address po box 1150
sumner, WA 98390
This project includes a demolition.
Demolition Start Date 04/09/15 Completion Date 05/30/15
Demolition will be completed by a demolition contractor
Demo Contractor ascendent Ilc Contractor Job #
Contact rick estes Phone (253) 939-431
Mailing Address po box 1150
sumner, WA 98390
(1) I certify that the information I have provided is to the best of my knowledge true and accurate.
(2) I understand that I must file an Amendment to this Notification if:
• The type of project has changed. The project types are asbestos and demolition.
• The quantity of friable asbestos to be removed meets a larger project category.
• The project's start or completion date has changed.
(3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that
includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If
there is no street address, I have used a building number.
(4) I understand the fees for this Notification are nonrefundable.
Create Another Notification View History Loa Out
If you have questions, contact us at asbestos@pscleanair.org or 206.689.4058.
• •
•
Dept. of Labor & Industries, Division of Occupational Safety &
Health
Asbestos Project Notification Form
Form ID: 98222##1499Ascen091130
Notice Date: 3/26/2015
Start Date: 4/5/2015
Completion Date: 5/30/2015
Status: Initial
On Hold
Site Work Hours: 700am - 330pm
Site Work Days:
Monday
Tuesday
Wednesday
Thursday
Friday
Contractor: Ascendent LLC
Job Site C.A.S.: Julio Ruiz
Your email address: restes@ascendentdemo.com
Contractor Phone Number: 253-273-3153
Property Owner
Name:
Owner's Agent: Wade Meyer
Company: Federal way boys&girls club
Address: 30835 8th ave s
City: Federal Way State: wa Zip+4: 98003
Phone: 206-621-8884
Job Site
Address: 30835 8th ave s
Building Name: Abandoned house
Room: all
City: Federal Way
Zip +4: 98003
County: King
Facility
Type:
Age: 1950
Size: 1100
Type of activity: Demolition
Quantity of Asbestos to Be Removed Indoors
Quantity: 985 square feet
Popcorn ceiling
VAT
Other:WALL TEXTURE
Quantity: linear feet i
Other:ROOF PEN MASTIC, DUCT SEALANT, EXTERIOR WINDOWS,
Control Measures
Neg. pres. enclosure
Wet methods
HEPA vacuum
Critical barriers
Manual methods
Respiratory Protection
1/2 mask APR
Type C pressure demand
Comments:
Date/Time Submitted
3/26/2015 11:26:29 AM
• • .
DEPARTMENT OF COMMUNITY DE\'1 i OemENTSeKvici:s
Aiiimin. .4A„
33325 5"'Avonue South
Federal Way.WA 95UO3-6325
CITY OF 253-8.15-2(107;Fax 253-835-2609
Federal Way www.c11Yf1:10efulway.Conl
-1,0S). BAS S.
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required co remove any structure or structures on a subject property.Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review, An environmental review and
submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can
be issued.
0 Prior to submitting a demolition permit,the following items(as applicable)must be signed by the respective
agency(see Demolition Permit Contact List).
NOTE iv APPLICANT; Utilities shall he discunnecied and services perjnrrrted,if applicuble,prior to issuance of dee demolition permit.All applicable
hems below we to be gt,nrd anti dare(by the respective agency represetttutivea'.
1.ASBESTOS ABATEMENT 6. E RICM , //
(Copy of approval form and asbestos survey from Puget Sound Clean Air ( ity . b% h o an r-• , ) ///
Agency provided) �- fJ-/ I
(Puget Sound Energy) l�
(CCiity Federal
+edWay
'ud ng Ica)
2.GAS SUPPLY 7.FUEL STORAGE TANKS >V 3-> rel S
(Gas to be shut off,me Pr moved and final bill paid) (Above or below grade fuel tanks, have been pumped or removed
` ice off,
under Fire DepaRn^ent permit prior to any dis antle/Excavation)
Puget Sound Energy) .S KyC2 /7/f).�i ya,�-f 4/1/-t> .r.r re c ,f rr
r ouch yang Flre.and F stye)
T(ir f e t"...�. (� �.' r) /4_4_,.? 4,r'_' iz,i r. •mac
bl ) /'r c o�-c,J,' 4',....�,j' - , (. j . ,�P -
3.SEPTIC SYSTEM 8.WATER-Public Source (Check applicable box) �j� /,c
(Tank to be removed or tank to be drained and filled) ��Meter to be removed and final utility bill paid �� ,-- t.tll//��
r:::Meter to remain and be protected
(King County Environmental Services) (Water Supplier)
**'.***OR **..**
4.SANITARY SEWER (Check applicable box) 9.WATER-Private Well (Check applicable box)
a Sewer line capped at property line r Private well filled and capped
c Existing sewer line to remain and be used by proposed new structure ;:i Private well to be Used for other purposes
(talcehaven utility District) King County Environmental Services)
5.GARBAGE
(All household garbage disposed off and final bill paid)
(Waste Management/Other Company)
❑ Completed Construction Permit Application form
❑Provide the following fees: 1. Demolition Permit Fee Based on valuation,See table on pg 4 iff the construction permit application.
2.Automation Fee $6.00
3. WA State Surcharge $4.50
Bulletin 4122-luuuury I.2011 Nage 1 of 1 k.\tlanUuuts\Demolition Permit Reguiren ants
• • .
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 8th Avenue South
Federal Way,WA 98003-6325
CITY OF v' = 253-835-2607;Fax 253-835-2609
Fe ci e ra l W Y www.cityoffederalway.com
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and
submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can
be issued.
❑ Prior to submitting a demolition permit,the following items(as applicable)must be signed by the respective
agency(see Demolition Permit Contact List).
NOTE TO APPLICANT: Utilities shall be disconnected and services performed, if applicable,prior to issuance of the demolition permit.All applicable
items below are to be signed and dated by the respective agency representatives.
1.ASBESTOS ABATEMENT 6. ELECTRICITY
(Copy of approval form and asbestos survey from Puget Sound Clean Air (Electricity to be shut off and meter removed)
Agency provided)
(Puget Sound Energy)
• (City of Federal Way Building Official)
2.GAS SUPPLY 7. FUEL STORAGE TANKS
(G s to be shut off, meter removed and final bill paid) (Above or below grade fuel tanks, have been pumped or removed
' / 0 8 s g G S790 under Fire Department permit prior to any dismantle/excavation)
(Puget Sound Energy)
(South King Fire and Rescue)
3.SEPTIC SYSTEM 8.WATER- Public Source (Check applicable box)
(Tank to be removed or tank to be drained and filled) o Meter to be removed and final utility bill paid
o Meter to remain and be protected
(King County Environmental Services) (Water Supplier)
******OR******
4.SANITARY SEWER (Check applicable box) 9.WATER- Private Well(Check applicable box)
o Sewer line capped at property line n Private well filled and capped
o Existing sewer line to remain and be used by proposed new structure o Private well to be used for other purposes
(Lakehaven Utility District) (King County Environmental Services)
5.GARBAGE
(All household gar a d' sed off and finalfit)t bill paid) , J
v1,t.1 R — l+ry eF fN+
(Waste Management/Other Company)
❑ Completed Construction Permit Application form
❑ Provide the following fees: 1.Demolition Permit Fee Based on valuation.See table on pg 4 of the construction permit application.
2.Automation Fee $6.00
3. WA State Surcharge $4.50
Bulletin#122—January 1,2011 Page 1 of 1 k:\Handouts\Demolition Permit Requirements
w 4111
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
k 33 325 8th Avenue South
Federal
CITY OF r Way,l� a 98003-6325
253-835-2607;Fax 253-835-2609
Federal Way tV N1,.Gtvof)ederalwm.com
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required to remove any structure or structures on a subject property.Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and
submittal of an environmental checklist may be required. which will extend the time period before a demolition permit can
be issued.
❑ Prior to submitting a demolition permit,the following items(as applicable)must be signed by the respective
agency(see Demolition Permit Contact List).
NOTE To.4PPLICA:vT: Utilities shall be disconnected and services performed,if applicable,prior to issuance of the demolition permit.All applicable
items below are to be signed and dated by the respective agency representatives.
1.ASBESTOS ABATEMENT 6. ELECTRICITY
(Copy of approval form and asbestos survey from Puget Sound Clean Air (Electricity to be shut off and meter removed)
Agency provided)
(City of Federal Way Building Official) (Puget Sound Energy)
2.GAS SUPPLY 7.FUEL STORAGE TANKS ?j c4 $.> W r!t
(Gas to be shut off, meter removed and final bill paid) (Above or below grade fuel tanks, have been pumped or removed
under Fire Depart ent permit prior to any dis antle/excavation)
C dp
(Puget Sound Energy) 5/ y1©-F- fr 4 ,th, (H /( yI.
r [� i flouts�tng Fire and R scye)
.._4: . ) irke- --111;,.i..A,7.1.i_saivh
3.SEPTIC SYSTEM 8.WATER-Public Source (Check applicable box)
(Tank to be removed or tank to be drained and filled) Meter to be removed and final utility bill paidi
deter to remain and be protected
_,X___Zddial,,---1 ) tAxig,ii .
(King County Environmental Services) Wa
ffiCIUCA
(Nlater Supplier)
****** OR******
4.SANITARY SEWER (Check applicable box) 9.WATER-Private Well (Check applicable box)
) Sewer line capped at property line Private well filled and capped
Existin
sewer line to remain and be used by proposed new structure Private well to be used for other purposes
(Lakehaven Utility District) (King County Environmental Services)
5.GARBAGE
(All household garbage disposed off and final bill paid)
(Waste Management/Other Company)
0 Completed Construction Permit Application form
0 Provide the following fees: 1. Demolition Permit Fee Based on valuation.See table on pg 4 of the construction permit application.
2.Automation Fee $6.00
3. %VA State Surcharge $4.50
Bulletin#122-January 1,2011 Page 1 of 1 k:Uiandout;\Demolition Permit Requirements
•
•
• DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 8th Avenue South
Federal Way,WA 98003-6325
CITY OF
253-835-2607;Fax 253-835-2609
Federal Way wwwcityoffederalway.com
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and
submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can
be issued.
0 Prior to submitting a demolition permit,the following items(as applicable) must be signed by the respective
agency (see attached Demolition Permit Contact List).
NOTE TO APPLICANT: Utilities shall be disconnected and services performed, if applicable,prior to issuance of the demolition permit.All applicable
items below are to be signed and dated by the respective agency representatives.
1.ASBESTOS ABATEMENT 6. ELECTRICITY
(Copy of approval form and asbestos survey from Puget Sound Clean Air (Electricity to be shut off and meter removed)
Agency provided)
(Puget Sound Energy)
(City of Federal Way Building Official)
2. GAS SUPPLY 7. FUEL STORAGE TANKS
(Gas to be shut off, meter removed and final bill paid) (Above or below grade fuel tanks, have been pumped or removed
under Fire Department permit prior to any dismantle/excavation)
(Puget Sound Energy)
q1-( IovrOl (South King Fire and Rescue)
3. SEPTIC SYSTEM 8.WATER- Public Source (Check applicable box)
(Tank to be removed or tank to be drained and filled) o Meter to be removed and final utility bill paid
eter rem ' and be protected
7//1--
King County Environmental Services) (Waterier
Supp( }
******OR******
4.SANITARY SEWER (Check applicable box) 9.WATER- Private WellCheck applicable box)
PP
❑Sewer line capped at property line ❑Private well filled and capped
❑Existing sewer line to remain and be used by proposed new structure o Private well to be used for other purposes
(Lakehaven Utility District) (King County Environmental Services)
5.GARBAGE
(All household garbage disposed off and final bill paid)
(Waste Management/Other Company)
0 Completed Construction Permit Application form
0 Provide the following fees: 1.Demolition Permit Fee Based on valuation.See table on pg 4 of the construction permit application.
2.Automation Fee $6.00
3. WA State Surcharge $4.50
Bulletin#122—January 1,2011 Page 1 of 1 k:\Handouts\Demolition Permit Requirements