HomeMy WebLinkAboutAG 17-134 - Parametrix, Inc RETURN TO: PW ADMIN EXT: 2700 ID#: 4285
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
1. ORIGINATING DEPT/DIV: PUBLIC WORKS/,
2. ORIGINATING STAFF PERSON: Desiree' Winkler EXT: 2711 _ 3. DATE REQ.By w8/7/23
3. TYPE OF DOCUMENT(CHECK ONE):
p CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
© CONTRACT AMENDMENT(AG#): 17-1 34 ❑ INTERLOCAL
❑ OTHER SUDDIernent#1 Q....mm _..m..
a. PROJECT NANIry:mCi�ty Center A
ccess Project
5. NAME OF CONTRACTOR: Parametrl , Inc,.
ADDRESS: 719 Second Ave Seattle, + 981nC .. TELEPHONE:
S1I�te 200 EPHONE:
FAX:
SIGNATURE � ..�RENAME: . Peacock TITLE: CEO'
6. EXHIBITS AND ATTACHMENTS:0 SCOPE,WORK OR SERVICES p COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90-101843-00 BL,EXP. 12/31/24 UBI#600-135-349 ,EXP. 04/30/2. 4
�
7. TERM: COMMENCEMENT DA f`1: t f � COMPLETION DATE: 12/31/2024
S. TOTAL COMPENSATION:$SUP „1 O $433�440.74 Tod 4.a 0 ,000.00 (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES 13 NO IF YES,MAXIMUM DOLLAR AMOUNT:
IS SALES TAX OWED: ❑YES 0 NO IF YES,$„ PAID BY: ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
O PURCHASING: PLEASE CHARGE TO:
306-440 - - -
9. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED .,.,.,.,.,_ INITIAL/DATE APPROVED
❑ PROJECT MANAGER
❑ DIVISION MANAGER
6 DEPUTY DIRECTOR DSW 7/27123
6 DIRECTOR
❑ RISK MANAGEMENT (IF APPLICABLE)
812/
8 LAW DEPT KVA 023
2
10. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: "/e _ _ COMMITTEE APPROVAL DATE: nla
SCHEDULED COUNCIL DATE: COUNCIL APPROVAL DATE: e
n/a n
'I1. CONTRACT SIGNATURE ROUTING
14/23...............m... ...e.—
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: 8/11/23 DATE REC'D;81_,.
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL,,/,DATE SIGNED
❑ FINANCE DEPARTMENT
VA,Aw DEPT
I,bN A'G ORY'C N R f m Dl I�Na'1 OR
IIL--
❑ CITY CLERK 5
e
❑ ASSIGNED AG# AG#
❑ SIGNED COPY RETURNED DATE SENT ......
COMMENTS:
EXECUTE" "ORIGINALS _
Additional funds to cover original scope of work to complele 10%design+environmental documentation of NEPA EA(upgraded from a NEPA DCE per FHWA).CIP project 207 has approved budget/carry over to cover this supplement 10.
V2020
SUPPLEMENT NO. 10
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement entered
into with Parametrix, Inc. effective the 23rd day of August 2017, identified as Agreement
No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018, Supplement
No. 2 dated May 10, 2018, Supplement No. 3 dated August 14, 2018, Supplement No. 4
dated July 11, 2019, Supplement No. 5 dated October 29, 2019, Supplement No. 6 dated
June 10, 2020, Supplement No. 7 dated July 14, 2021, Supplement No. 8 dated July 20,
2022, and Supplement 9 dated August 24, 2022. All provisions in the Agreement remain
in effect except as expressly modified by this supplement, "Supplement No. 10."
The changes to the Agreement are described as follows:
I
Section Il, Scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-10" attached hereto and incorporated by this
reference (Additional Services).
I I
Section V, Payment Provisions,
The maximum amount payable under this Supplement No. 10 inclusive of all fees and other
costs is Four Hundred Thirty-Three Thousand Four Hundred Forty and 74/100 Dollars
($433,440.74) for a total amount payable to the Consultant pursuant to the Agreement,
Supplement No. 1, Supplement No. 2, Supplement No. 3, Supplement No.4, Supplement No.
5, Supplement No. 6, Supplement No. 7, Supplement No. 8, and Supplement No. 9, inclusive
of all fees and other costs, to be an amount not to exceed Four Million Six Hundred Eight
Thousand and 00/100 Dollars ($4,608,000.00). The attached Exhibits "D-10," and "E-10,"
which describes the payment for work to be performed under this Supplement No. 10, is
hereby made a part of the Supplemental Agreement.
A. Hourly Rates: The direct(raw) labor rates and classifications and indirect cost rates
as shown on Exhibits"D-10," "E-10," are attached hereto and incorporated by this
reference.
Signed this 11th day of August 2023.
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
John Willis Jim errell
Its: Chief Executive Officer Its: Mayor
700 NE Multnomah, Suite 33325 8th Ave S
100 Portland, OR 97232 Federal Way, WA 98003
(503) 416-6075 (253) 835-2401
APPROV AS TO FORM:
Ryan Call, Ci�Attorney
1d I io- IWC I u llllll lm m'�Gluu rm
r u ulli V luo.
ii hJrl
I
=i,;'',m -m' �VU�ViWIVIV@iViV�V�IiVV�VIIIIIIIIIIIIIIIIIII�IIII ��� ��VIVI�I�
EXHIBIT A10
SCOPE OF WORK
City of Federal Way
Scope of Work: NEPA EA
II',J I..I: 0 1 :; 'I
The City Center Access (CCA) Project proposes to modify an existing interchange in Federal Way on Interstate 5
(1-5). Parametrix is under contract to complete the Access Revision Report(ARR), 10 percent design, and National
Environmental Protection Agency(NEPA) Documented Categorical Exclusion (DCE)evaluation for the preferred
Alternative (Alternative 2i) as detailed in Amendments 6 and 7.The City of Federal Way(City) executed
Amendment 8 on July 19, 2022, to extend the contract completion date to December 31, 2024. Amendment 9
was executed on August 24, 2022 to address out of scope items and additional services necessary for the project.
The City and Parametrix met virtually with WSDOT and FHWA on February 22, 2023 to discuss the CCA project
and its associated environmental impacts and anticipated displacements.The meeting was intended to help
WSDOT and FHWA determine if the project can remain categorically excluded from a detailed environmental
analysis or if the project requires an Environmental Assessment(EA). In May 2023, FHWA formally determined the
project requires an EA.This amendment captures the additional scope and budget necessary to prepare the EA
documentation, continue coordination with the Sound Transit Operations and Maintenance Facility(OMF) South
project, and for continued project management.
I &a 30 IC II`JV fl..V' ECI NIII vJ..I. AN I COMNdLl',,J ICA.1..1 0"�u S
Objective
PRR will perform additional community engagement tasks to support the CCA project during the Environmental
Assessment phase.
Alipprormau:,IIh
PRR will perform the following services for this subtask:
• Belmor Park engagement
• In-person open house
• Language services
• Community engagement report updates
Refer to the attached scope of work memo for more detail on the tasks and the budget summary.
s a.urn Ilpf ii c)rio
• Parametrix's community engagement efforts are captured under Task 42-4204.
City of Federal Way 554-2441-022
Scope of Work: NEPA EA 1 July 2023
Exhibit A10
SCOPE OF WORK (continued)
Objectives
Amendment 9 extended the project through the December 2024 but assumed a 5-month dormant period while
permits were being reviewed by external agencies. Since the NEPA changed to an EA and requires on-going
coordination with the reviewing agencies,the dormant period is no longer anticipated for this project.This task
includes the general management functions summarized below.
• Monthly Progress Reports and Invoices—Prepare a monthly invoice for services performed by Parametrix.
• Progress Meetings and Other Communication—Conduct virtual progress meetings with the City's core
management to review the scope, schedule, and budget status; upcoming project meetings,
communication, and work items; design review; and project strategy to resolve issues or barriers to
success.This task also includes email and phone calls with the City for general information and updates
and solving issues outside of the meetings.
• Budget and Schedule Tracking—Track the project budget using Parametrix in-house tools to verify that
progress is keeping pace with spending.
• Consultant Team Meetings—Conduct bi-weekly check-in meetings with the environmental lead to
communicate and coordinate work progress and upcoming activities.
• Schedule Updates—Schedule updates will be completed to guide project development and coordination.
Deliverables
• Monthly progress reports and invoices.
• Project schedule in PDF format.
• Minutes for City progress meetings.
Assumptions
• Project duration is through December 2024.The project is not anticipated to have a dormant period
• City progress meetings through 2024 were captured in Amendment 9.
• Budget assumes an additional 18 bi-weekly consultant team meetings.The meetings will be
approximately 30 minutes each and attended by two team members.
• NEPA Finding of No Significant Impact(FOSI)will be issued in Fall/Winter 2024.
• BA formal consultation concurrence letter will be received by June 2024.
• Up to two updates will be performed on the project schedule.
TASK 41 — ADDITIONAL 10% DESIGN AND COORDINATION
Subtask 41-4102 — 10':., Design and Coordination for SOUnd Transit Mew :Subtaski
The Consultant Team has been coordinating with the Sound Transit OMF South team to facilitate project
compatibility.The coordination efforts increased in September 2022 and have been on-going through 2023.This
task captures the work performed thus far and continues to provide coordination services throughout 2023, such
as those summarized below.
City of Federal way
554-2441-022
Scope of work: NEPA EA 2 July 2023
Exhibit A10
SCOPE OF WORK (continued)
m Share [[A design files, data and environmental documents
• Review Sound Transit OK4FSouthdesignanddocumentationandprovidewri8enfeedback
• Prepare for and participate in meetings with Sound Transit
Assumptions
0 |nZUZ4, coordination with Sound Transit isan1icipa1edt000ntinueunderthe [it/snevvconsu|tant
contract specific tothe CCA Phase 1 improvements.
TASK 42 — ENVIRONMENTAL EVALUATION
Coordination and preparation ofNEPA Environmental Assessment (EA)
The City and Parametrix met virtually with WSDOT and FHWA on February 22, 2023 to present the CCA project
and its associated environmental impacts and anticipated displacements.The meeting was intended to help
WSDOT and FHWA determine if the project can remain categorically excluded from a detailed environmental
analysis or if the project requires an EA. During the meeting, FHWA requested that Parametrix prepare a formal
written summary of the project and its impacts to additionally support their decision. In May 2023, FHWA
formally determined the project requires an EA. WSDOT followed up with the provision of multiple tools,
templates, and references specific to their internal step-by-step procedures. Many nf these guidance documents
are intended for projects that are in the beginning stages—not for projects such as this one, which have already
undergone:
• Significant coordination with stakeholders and the public
• Defined the purpose and need
• Identified a preferred alternative
• Prepared discipline studies for a documented categorical exclusion
• Received concurrence to Section lOG for Cultural Resources
• Started the clock for informal and formal consultation with the services for the Endangered Species Act
Because this project does not fit neatly into the templates and procedures provided by WSDOT,there will be close
coordination with the VVSDOT Environmental Services Office(ESO). |tis expected that close coordination with
WSDOT ESO will help structure the project's EA and other required documentation to meet their procedural
requirements and limit redundancy.
�ub�a�k ��-�2�2 — Scora �|ynhca /o ob1�sx)
Objective
The objective of this task is to comply with the administrative and EA documentation steps outlined in WSDOT's
PRO 400-a: Preparing an EA guidance, which includes 34 unique steps from project initiation to documentation of
the final decision.Tothe greatest extent possible, we worked with VVSDOTand FHVVAto clarify steps that would
be required by the City, WSDOT and FHWA.This task developed the EA scope of work commensurate of a project
of this size and scope.This included demonstrating and documenting that the project has already accomplished
many aspects of the environmental review process through development of the Non Access Feasibility Study and
the Access Revision Report—of which the practical design process outlined in the WSDOT Design Manual Chapter
ll0O was applied.
City urpeuerA Way 554-2441 oza
Scope orWork: mspwsA s /u|vzo2a
SCOPE OF WORK (continued)
Approach
Paramethx has performed the following services for this subtask:
• Reviewed VVSDOTs Pro 4OO-aguidance.
• Downloaded applicable submittal templates and documents provided as links inthe Pro4OO-a guidance,
m Reviewed VVSDOTs8uidance on ri8htsizinBthe analysis of environment disciplines to determine the
appropriate level ofdocumentation
• Prepared discipline matrix/assessment and distributed ittoFHVVA/VVSDOT for their input
w Provided a list of questions to VVSDOTto understand the review process, clarify Federal VVay's
responsibility for public involvement(e.g., scoping), and to confirm that the project can narrow the
comparison of alternatives toNo Build and the Preferred Alternative.
• Prepared for and held one (1) meeting with the City, FHWA and WSDOT to clarify project requirements.
Meeting attendance included three (3) Parametrix staff.
Deliverables
The following deliverables were prepared to support the EA scope development:
e Draft discipline matrix/assessment
• List ofquestions
• Meeting notes
Objective
To support the early initiation of the EA process according to VVSDOT s PKO4D0-o: Preparing on G4 guidance.
Approach
Under this task, ParametrixvviU:
m Develop the EA Initiation Letter and EA Coordination Plan according to the WSDOT-provided template
that will include the following activities:
o Expected dates for EA milestones including EA start date' publication date, estimated date of
decision
o Coordination with permitting agencies to understand required approvals and timelines utilizing
VVSDOT-provided template for communication.
• Schedule and conduct the Project Initiation Meeting(Meeting#1) to include the meeting agenda,
PowerPoint, Doodle Poll, prepare questions, meeting attendance (assume three Parametrixstaff)' and
meeting summary.
• MeetinB#2: Schedule and conduct a check in meeting to keep VVSDOT/FHVVA aware of schedule and to
discuss any questions or issues during EAdevelopment.
• Initiate and maintain environmental commitment file to supportVVSDOTs record keeping.
ommrpeue,a|Way 554 2441 ozz
ScopecxWom mspAEA 4 /u|vzoza
SCOPE OF WORK (continued)
• Prepare the EA annotated outline for City, WSDOT, and FHWA reviews
• Prepare final matrix of discipline reports for City, WSDOT, and FHWA verification.
Assumptions
• The EA Initiation Letter and EA Coordination Plan will emphasize activities that have occurred to date in
support of the NEPA process to demonstrate to WSDOT and FHWA that certain steps required as a
component of EA development have already been accomplished (e.g., Purpose and Need statement,
Alternatives Analysis).
• Project scoping is considered optional for the development of an EA and will not occur. Parametrix will
provide WSDOT with information such as public involvement summaries, Council meeting summaries,
and other documentation necessary to demonstrate the project has already solicited years of input from
the public and others(e.g.,study support team).
• It is assumed Parametrix will reach out to the following permitting agencies to understand likely permits
and timelines related to Phase 1 construction: Washington Department of Fish and Wildlife (WDFW)for
Section 4(f) and in-stream work, United States Corps of Engineers(USAGE)for work in waters of the U.S.,
National Marine Fisheries Service (NMFS) and United States Fish and Wildlife (USFW)for Endangered
Species Act, and Washington State Department of Ecology(Ecology)for Water Quality Certification and
Coastal Zone Management Certification. No vetting of local permitting issuance types and timelines will
occur.
• Materials prepared for Meeting#1 will be coordinated with the City only. It is expected that the
PowerPoint presentation will utilize existing slides from previous presentations to the greatest extent
possible.
• Due to FHWA's early input to the discipline matrix developed as part of this scope of work, it is assumed
the effort in preparing the final matrix of discipline reports will be minimal.
• Parametrix will track and respond to comments using the WSDOT-provided comment form.
• Draft and final versions of documents for WSDOT's review will be uploaded to SharePoint for WSDOT's
review. No hard copies will be submitted.
Deliverables
All deliverables will go through several reviews including the City, WSDOT, and FHWA.
• One (1) Draft, three (3) Revised Drafts, and one (1) Final EA Initiation Letter
• One (1) Draft,three (3) Revised Drafts, and one (1) Final EA Coordination Plan
• One (1) Draft and Final agenda, PowerPoint presentation, questionnaire and summary for Meeting#1
• One (1) Draft, three (3) Revised Drafts, and one (1) Final Annotated Outline
• One (1) Final Discipline Matrix
City of E ec9eiraV way
'34..24e41 022
Exliltrit:A10
SCOPE (]F WORK (condnued)
,Subiash42-42O4 — Develop Env|ron mental �\ss, soment (NevvSuVask)
01bJeciliwe
Fhrough application of WSDCT guidance, prepare an EA that meets WSDO F standards for a clear and concise
document that is understandable to a broader audience. Fhe objective is formal publication of a FONSI.
Approach
m Meeting#3: Parametrix will prepare for and attend a virtual meeting with the City, WSDOT, and FHWA to
review outcomes nfthe Discipline Reports, with the greatest emphasis on topics not previously covered
during the development of the DCE and Environmental Justice.
• K4eeting#4: ParametrixwiU prepare for and attend an in-person meeting with the City, VVSD0T and
FHWA for a formal briefing. The briefing packet will include the EA, annotated briefing agenda, briefing
agenda, attendee list,three hard copies of the document cover page for signature, and a recording of
comments from the briefing.
• Public Open House:At the time of Notice of Availability of the EA, Parametrix will review content and
attend the Open House, which will discuss the EA findings.
• Parametrix will prepare the NEPA Notice of Action for the EA,SEPA determination, NEPA Notice of Action
for the FON5|' and the FONS|
• Prepare the "up front" sections of the draft EA with the understanding that the following are complete:
General mapping(e.g,vicinity map), project description, purpose and need statement, and description of
a build (Preferred Alternative) and No Build alternative. Note: Per FHVVAsrequest, the Preferred
Alternative will be updated to include a description of alignment constraints in the vicinity of Belmor Park
(e.g, OMFSouth' 8PA, VVSDOT' Park& Ride lot).
m Prepare a series of maps that show the preliminary design combined with major environmental
information (e.g., wetlands, streams), areas of likely acquisition or easements, stormwater treatment, and
existing and proposed profiles of lane configurations.
• Evaluate the direct, indirect, and cumulative impacts per NEPA and SEPA requirements. Assumptions
regarding the documentation approach for each environmental element are shown in the table below.
City of Federal Way s54-2441-022
Scopeofvvoru: wenxsA s w|vzoza
cxmuitx10
SCOPE OF WORK (continued)
Air/Greenhouse Gas/Energy Prepare a description of the affected environment,current
conformity status,latest planning assumptions,analysis
methodology and results,potential operational and
construction impacts,recommended mitigation,and the
results of any interagency coordination(e.g.,PSRC).This
section will require a qualitative analysis for MSAT
emissions through application of Appendix A and C of
FHWA's interim guidance.It will also require a qualitative
analysis of operational emissions using the FHWA
Infrastructure Carbon Estimator(ICE)for construction
effects,which must be downloaded from Minnesota
Department of Transportation website. It is assumed data
inputs to ICE will include estimated Average Daily Traffic,
average speed of opening,and horizon years of build and
no-build alternatives can be integrated from previous work.
This exercise will not include the preparation of a Discipline
Report.All findings will be integrated into the body of the
EA for direct,indirect,and cumulative impacts with the
potential for attaching findings associated with qualitative
analyses such as the output from ICE.
Noise Drawing from the Final Draft Noise Discipline Report,will
prepare description of affected environment,analysis
methodology and results,potential operational and
construction impacts,recommended mitigation,and the
results of any interagency coordination(e.g.,Sound Transit).
Will include existing discipline report in the appendices.
Earth Drawing from the existing draft Wgeotechnical/hazards
report,will prepare description of affected environment,
analysis methodology and results,potential operational and
construction impacts,recommended mitigation.There are
no prime farmlands or mineral resources—these topics will
not be discussed.
Surface and Ground Water Using the existing Final Draft Preferred Alternative Iternrnative
Stormwater Report,prepare description of affected
environment,analysis methodology and results,potential
operational and construction impacts,and recommended
mitigation,and the results of any interagency coordination
(e.g.,WSDOT,King County).Potential to attach supporting
info as drawn from the Final Draft Preferred Alternative
Stormwater Report.
Floodplains No regulated flo.......
odplains in the project;therefore,this will
not be a topic of discussion in the EA.The exclusion of this
discussion will be provided in the introduction to the
chapter.
Visual Prepare description of affected environment,analysis
methodology and results,potential operational and
construction impacts,and recommended mitigation.
Prepare a separate abbreviated Visual Impact Assessment
according to WSDOT guidelines,which will not include visual
simulations,delineation of viewsheds or landscape units.
C..O$y of 4-i:`df'Y"aP WV/ay
54-2441-02 2
Scope of\Nork: Nl::.F'A,EA July 2023
Exhibit A1.0
SCOPE OF WORK (continued)
Wetlands,Streams,Fish,Wildlife Vegetation Usingthe existing Final Draft Wetland and Stream g Report
and Final Biological Assessment,prepare a description of
affected environment,analysis methodology and results,
potential operational and construction impacts,and
recommended mitigation.The Wetland and Stream Report
and formal consultation letters for ESA will be included in
the appendices.There will be a need for additional analysis
related to the removal of vegetation such as an estimate of
tree removal acreage using aerial imagery.No additional
field work will be necessary.
Land Use Using information drawn from the BA and the ARR,prepare
description of affected environment,analysis methodology
and results,potential operational and construction impacts,
and recommended mitigation.Will include as topic in the
EA,but will not prepare a memo or report for inclusion into
the Appendices.
Hazardous Materials Drawing from the Final Draft Hazardous Materials Report,
will prepare a description of affected environment,analysis
methodology and results,potential operational and
construction impacts,and recommended mitigation. Will
include Final Draft Hazardous Material Report in the
appendices.
Social and Environmental Justice Drawing from the existing Final Draft Environmental Justice
Memorandum,will prepare a description of affected
environment,analysis methodology and results,potential
operational and construction impacts,and recommended
mitigation.This effort will also include converting the
existing Final Draft Environmental Justice Memorandum to a
Discipline Report as required for EAs and EISs.This will
involve defining the EJ study area to a minimum of 0.50 mile
on each side of the study limits(note:prior assessment
emphasized only the area around the Belmor Park
neighborhood.)The methodology for the definition of the
study area will integrated into the discipline report.The
Discipline Report will follow the WSDOT template,
incorporating information contained in the existing EJ
memo to the greatest extent possible.The discipline report
will be expanded to:1)include areas at a minimum of 0.50
from the entire project study limits,2)discuss impacts in a
manner that does not include Sound Transit's acquisitions
related to Belmor Park,and 3)revise narrative to describe
alignment constraints(e.g.,OMF,BPA,WSDOT,King County
Metro). Updates to the report will also include the latest
American Community Survey(ACS)data and Washington
Office of Superintendent of Public Instruction(OSPI)school
enrollment data.One field visit will be necessary to verify
current residential occupancy in the area of the project's
alignment to current conditions.The discipline report will be
included in the appendices.
Cultural Resources Drawing
_
g from the
existing Cultural Resources Report,will
prepare a description of affected environment,analysis
methodology and results,potential operational and
construction impacts,and recommended mitigation.Will
include concurrence letter from the Washington
Department of Archaeology and Historic Preservation
(DAHP)and communications with the tribes as necessary.
City of Federal Wray S54-2441-022
Scope crFWof k: NEPA EA 8 July 2023
Exhibit A 1.0
SCOPE OF WORK (continued)
...Section 4 f/6(f) Drawing
�a.g from
ate �.
( ) from materials used in coordination with WDFW
o North Lake Access Road,will prepare a
description of affected environment,analysis methodology
and results,potential operational and construction impacts,
and recommended mitigation. Note: Since the project will
not result in property acquisition from WDFW,it was
confirmed that the project is categorized as"temporary
occupancy."The concurrence letter or email from WDFW
and FHWA approval will be included as an appendix.
It was confirmed no Section 6(f)properties would be
affected by the project through the Washington Recreation
and Conservation Office(RCO).Therefore,Section 6(f)will
not be included as a consideration in the EA.The exclusion
of this discussion will be provided in the introduction to the
chapter.
Transportation _ mDrawing from the Non Access Feasibility Study and the
Access Revision Report(ARR),will prepare a description of
affected environment,analysis methodology and results,
potential operational and construction impacts,and
recommended mitigation. Will likely only include as a topic
in the EA and not include Non Access Feasibility Study and
ARR in the appendices.
Public Services andmm Utilities Will a very high level description of affected
environment,analysis methodology and results,potential
operational and construction impacts,and recommended
mitigation. A discipline report will not be prepared.
Cumulative Effects Drawing from WSDOT guidance,the BA,and ARR-will
prepare a description of affected environment,analysis
methodology and results,potential operational and
construction impacts.A discipline report will not be
prepared—information will be included in the body of the
document. Will likely include the preparation of a graphic
showing future land use in the project vicinity.
Assumptions
• The Purpose and Need statement included in the ARR will be integrated into the NEPA EA. No further
coordination or reworking of Purpose and Need statement will be required.
• The description of the Preferred Alternative will include information regarding design constraints such as
the Park& Ride lot, Belmor Park, BPA transmission towers, injunction culverts, and future alignment of
Sound Transit OMF South.
• For the purpose of this scope of work, it is assumed that the City will adopt NEPA to comply with SEPA
and issue a Determination of Non-Significance (DNS/MDNS) or Mitigated Determination of Non-
Significance.
• The City will publish the NEPA Notice of Availability(NOA) of the EA and the combined SEPA
determination for public review and comment.The City will also publish the NOA of the Finding of No
Significant Impact(FONSI) in the same manner.
• Parametrix will track and respond to comments using the WSDOT-provided comment form.
GLy of Federal�A/ay 554 2441-022
5colper o W wk: NEPA EA my 2023
FxhiblL AM
SCOPE OF WORK (continued)
• Draft and final versions of the EA and the comment forms will be uploaded to SharePoint for WSDOT's
review. Three hard copies of the EA and the document cover page will be prepared for the camera-ready
formal briefing. No other hard copies will be prepared.
• WSDOT and FHWA will provide comments clearly and concisely with no redundancy or conflicting
direction.
w Seven versions of the EA are expected to undergo WSDOT/FHWA review. With the City also providing
review at each submittal milestone.
o Version 1—send draft to City, City provides comments.
o Version 2—send revised draft toVVSDOTVVSDOT provides comments
o Version 3—send revised draft to City, City provides confirms revisions
o Version 4—send revised draft 1oVVSDOT VVSDOT sends toFHVVA and cooperating and
participating agencies for comment
o Version S—revise per FHVVA/cooperating and participating agencies
o Version 5—send revised draft to City, City provides confirms revisions
o Version7—sendreviseddrafttoVVSDOTVVSDOTsendsdmfttoFHVVAfor|ega| review
o Versions 8/9/1U—multiple rounds of revisions per legal review, includes Cit/s review
o Version 11—Camera ready document.
o Version 12—Revisions to EA following public open house, send revised draft to City
o Veoion13—sendreviseddraKtoVVSDOlVVSDDTsendstoFHVVAforpub|icationofF0NI|
• The project will receive a FONSI and an Environmental Impact Statement will not be necessary.
Deliverables
0 One (1) Draft, eleven (11) Revised Drafts, and one (l) Final Environmental Assessment.
otyof Federal Way 5s4 2441 oza
Scopeoreuru� wEpAEA 10 Ju|vzoza
Jeff CoopCivil Engineer 4
00
$73.58
18 18
18
$397.33
$1,324.44$2,271.94$3,993.72
Tyler NaboursEngineer 5
Transportation
008 8
8
$60.38
$483.04$828.61$144.91
$1,456.56
Administrator
Tresia Gonzales
Regional
00
22 22
Transportation
22
$91.55
$604.23
$2,014.10$3,454.99$6,073.32
Alyssa WorshamPlanner 5
Environmental
00
84
$43.51 467 383
467
2-Exhibit D10 Amendment 10_EA Budget.xlsx; PMX-Labor
$6,095.75
$20,319.17$34,855.50$61,270.43
Budget Analyst 3
Lori Gilbertson
6 6 00
6
$45.69
$82.24
$274.14$470.26$826.64
Contract Specialist 3
Jean Johnson
000
0
$55.53
$0.00$0.00$0.00$0.00
Contract Specialist 2
Cindy Oum
6 6 00
6
$36.96
$66.53
$221.76$380.41$668.70
Sr Graphic Designer
Patricia Yi
00
$44.75
88 88
88
$3,938.00$6,755.25$1,181.40
$11,874.65
Susan SwiftConsultant 3
Communication
00 5
$37.06
62 57
62
$689.32
$2,297.72$3,941.51$6,928.54
Debbie FetherstonCoordinator 4
Construction Project
00 3
$51.34
33 30
33
$508.27
$1,694.22$2,906.26$5,108.75
Mark MazzolaPlanning Specialist 6
Transportation
00 6
$78.72
66 60
66
$5,195.52$8,912.40$1,558.66
$15,666.57
Katheryn SeckelPlanning Specialist 5
Transportation
0
$60.58
12 126453
376 259
388
$7,051.51
$23,505.04$40,320.55$70,877.10
Jenny Bailey
Deputy
Exhibit D10
00
92 1082
$111.8092
$3,085.68
$10,285.60$17,643.92$31,015.20
Jenna AndersonCivil Engineer 4
$75.72
30 30 99 993414
198 150
327
$7,428.13
$24,760.44$42,474.06$74,662.63
0
54 54 99 9998
175
1520 1247
1673
$65.50$65.50
$86,960.00
$307,077.03$394,037.03
$30,544.36$39,403.70
$101,814.53$174,652.64$307,011.53$433,440.74
Labor Hours
Direct Labor Rates
30%
Rate
$0.00
$0.655
171.54%
$3,494.46$3,494.46$7,496.28$7,496.28$6,451.60$9,855.30
$74,516.89
$90,823.79
$101,814.53
Labor Dollars
OH:
Total:
Expense:
Subtotal:
Fixed Fee:
Labor Total:
Direct Labor:
Expense Total:
Parametrix Total:
Amendment Total:
Sub Consultant Total:
Vehicle Mileage (60 miles)
10% Management Reserve:
Parametrix Labor
DescriptionProject Management Project Management Additional 10% Design and Coordination Additional 10% Design and Coordination For Sound Transit Environmental Evaluation Scope ClarificationEA
InitiationDevelop Environmental Assessement
384142
38014102420242034204
Subtask
Task
2-Exhibit D10 Amendment 10_EA Budget.xlsx; PMX-Labor
Chad TinsleyIT Specialist 3
00
20 20
$48.08
20
$961.60$288.48
$1,649.53$2,899.61
Adam RomeyPlanner 5
Environmental
004 4
4
$49.49
$59.39
$197.96$339.58$596.93
Josh WozniakEngineer 4
Environmental
008 8
8
$74.04
$592.32$177.70
Exhibit D10
$1,016.07$1,786.08
Mike HallEngineer 4
Environmental
008 8
8
$61.87
$494.96$849.05$148.49
$1,492.50
Jens SwensenSpecialist 5
Transportation
00
$65.09
50 50
50
$976.35
$3,254.50$5,582.77$9,813.62
0
54 54 99 9998
175
1520 1247
1673
$65.50$65.50
$86,960.00
$307,077.03$394,037.03
$30,544.36$39,403.70
$101,814.53$174,652.64$307,011.53$433,440.74
Labor Hours
Direct Labor Rates
30%
Rate
$0.00
$0.655
171.54%
$3,494.46$3,494.46$7,496.28$7,496.28$6,451.60$9,855.30
$74,516.89
$90,823.79
$101,814.53
Labor Dollars
OH:
Total:
Expense:
Subtotal:
Fixed Fee:
Labor Total:
Direct Labor:
Expense Total:
Parametrix Total:
Amendment Total:
Sub Consultant Total:
Vehicle Mileage (60 miles)
10% Management Reserve:
Parametrix Labor
DescriptionProject Management Project Management Additional 10% Design and Coordination Additional 10% Design and Coordination For Sound Transit Environmental Evaluation Scope ClarificationEA
InitiationDevelop Environmental Assessement
384142
38014102420242034204
Subtask
Task
tiJir�ih y�..
dm�tic� u.�
h�
� li�ll�i�ium a
Parametrix
wsoo* oH Audit Letter ry
Pending-ANTE Table
lll �ll���i�s�i
lulhllti li��„ "
Exhibit D10
ANIL
M Wasihiiingtorm State Devek)pmerit 111)Mskmn
APDe��paiirtwnev4 of, T0airasiportatiom Dointract SerOces Office
1110 3ox 1(408
Olyirrilp�a WA98504-7408
734 5 Hii dersoin Way SW
'Immater,WA 98501-6504
8,00 833, (53818
vvv/Vvm::dc)f wo gov
May 31, 2023
Parametrix, Inc.
1019 39th Ave. SE, Suite 100
Puyallup, WA 98374-2215
Subject: Acceptance FYE 2022 ICR—Cognizant Review
Dear Brent Diemer,
We have accepted your firms FYE 2022 Indirect Cost Rate (ICR) of 171.54% of
Combined/Corporate (rate includes 0.28% Facilities Capital Cost of Money) based on
the "Cognizant Review" from the WSDOT Audit Office. This rate will be applicable
for WSDOT Agreements and Local Agency Contracts in Washington only. This rate
may be subject to additional review if considered necessary by WSDOT. Your ICR
must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
Any other entity contracting with your firm is responsible for determining the
acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 704-6397 or via email
con su Ita n tn.,i tes4,vks,sd# f.)v m -Nv.
Regards;
Elva-
Jun l,2023
SC14ATZIE HARVEY, CPA
Contract Services Manager
SH:HK
PARAMETRIX,INC.
StatementofDirectLabor,FringeBenefitsandGeneralOverhead
FortheFiscalYearEndedDecember30,2022
GeneralLedger
Balanceforthe
FiscalYearEndedUnallowableProposed
Description
December30,2022ExpensesRef.AmountPercent
DirectLabor$39,365,630$$39,365,630100.00%
FringeBenefits:
Vacation,sickleave,holidays9,170,3649,170,36423.30%
Payrolltaxes5,563,770(37,702)E5,526,06814.04%
Medicalinsurance5,497,5535,497,55313.97%
ESOPretirementplan7,500,0007,500,00019.05%
TotalFringeBenefits27,731,687(37,702)27,693,98570.35%
GeneralOverhead:
Administrativesalaries12,666,460(141,287)A12,525,17331.82%
Trainingsalaries1,090,8941,090,8942.77%
Bonuses/miscellaneoussalaries7,734,512(1,721,935)B6,012,57715.27%
Directsellingsalaries1,305,9001,305,9003.32%
Bidandproposalsalaries3,713,1723,713,1729.43%
Advertisingexpense206,563(206,563)C0.00%
Directsellingexpenses102,578(45,444)D57,1340.15%
Excisetaxes2,055,0092,055,0095.22%
Insurance951,290951,2902.42%
Officerent3,881,7683,881,7689.86%
Officeexpensesandsupplies180,825(88,569)F92,2560.23%
Staffappreciation/awards325,829(312,170)G13,6590.03%
Printing,copier/printersupplies41,07841,0780.10%
Telephone153,177153,1770.39%
Depreciation(includinggain/lossondisposal)1,680,4091,680,4094.27%
Amortization16,667(16,667)H0.00%
Businessmeals7,075(7,075)I0.00%
Autoexpense311,555(17,753)J293,8020.75%
Billedinhouseautos(228,870)(228,870)0.58%
Officetravel603,964(160,897)K443,0671.13%
Subscriptions,librarymaterial106,071106,0710.27%
Dues174,062(24,225)L149,8370.38%
Donations57,011(57,011)M0.00%
Professionallicenses39,23339,2330.10%
Postage,couriers,freight39,29739,2970.10%
Training/education389,260(12,401)N376,8590.96%
Fieldequipment/supplies17,11217,1120.04%
Surveyequipment/supplies137,464137,4640.35%
Healthandsafetyequipment/supplies24,64624,6460.06%
Billedinhouseequipment(404,069)(404,069)1.03%
Officefurniture8,6088,6080.02%
Officeequipment192,295(41)O192,2540.49%
Computersupplies,circuits589,758589,7581.50%
Software/maintenance2,832,2262,832,2267.19%
Recruitingcosts68,95568,9550.18%
Payroll,legalandaudit279,492(51,113)P228,3790.58%
TemporaryLabor55,54155,5410.14%
Consultingservices1,103,882(114,000)Q989,8822.51%
Baddebts118,300(118,300)R0.00%
Officemoving/remodeling18,77918,7790.05%
Personalpropertytaxes42,80042,8000.11%
Utilities/buildingmaintenance109,426109,4260.28%
Finance,bankcharges31,828(11,308)S20,5200.05%
TotalGeneralOverhead42,831,832(3,106,759)39,725,073100.91%
TotalIndirectCosts$70,563,519$(3,144,461)$67,419,058171.26%
PercentageofDirectLabor(LessFCC)179.25%171.26%
Facilitiescostofcapital(FCC)110,070T110,0700.28%
$67,529,128
PercentageofDirectLabor(IncludesFCC)171.54%
Seeaccompanyingnotes.CNFSDONOTEMAIL
4
Exhibit E10
City Center Access ProjectEnvironmental
Assessment Engagement
To: Jenna Anderson, Parametrix
From: Laura LaBissoniere Miller and Emma Dorazio, PRR
Date: Wednesday, July 5, 2023
Subject: Environmental Assessment Scope of Work Memo
DearJenna,
The following memo outlines PRR's recommendations for additional community engagement tasks
to support the City Center Access Project during the Environmental Assessment phase.
Belmor Park engagement—The City of Federal Way engaged Belmor Park residents throughout
planning and preliminary design. PRR recommends continued engagement during the
environmental review phase, including targeted email outreach and content for the neighborhood
newsletter to encourage residents to participate in the in-person open house.
In-person open house— PRR recommends planning an in-person community meeting (preferred
location at Belmor Park) to share and gather comments on the Draft EA. The in-person open house
will occur 15 days after the Notice of Availability of the signed Draft EA. PRR will develop a meeting
plan, display boards, and one handout to highlight key environmental findings. PRR will create, print,
and coordinate the mailing of a postcard notification. The City will coordinate additional notifications
(legal notice, press release, social media, etc.) Open house materials will be uploaded to the project
website.
Language services—The City of Federal Way is committed to engaging people who use languages
other than English in advancing the City Center Access project. PRR's language services specialists
will translate the postcard, meeting handout, and display boards for the project website, and provide
meeting interpretation in Korean, Russian, Spanish, and Vietnamese.
Community engagement report— PRR will update the community engagement report to reflect
comments on the Environmental Assessment.
Make I14 I e iin iungfO III rrIbiz.c in-i �
1 501 Fourth Ave.Ste. 550, Seattle, WA 08101 ��
Exhibit El
Budget summary:
Outreachactivity..........._..........._.................................... Cdost....................................
Belmor Park engagement $1,140
In-person open house $27,517
Translate display boards for $19,448
project website
Language services $36,091
.... .... ........... ... ............ ... .. .. . _... .._.... ...
Update engagement report $2,765
Estimated total $86,960
Please reach out with any questions or concerns,
Warm regards,
Laura LaBissoniere Miller
Illl �ul ���m �ii
PRR, Inc ll� � i iil� hi
WSDOT OH Audit Letter
Under wSDO.Review ANTE Table � Illlll�l �iui�iiuml ��
jjl I� II I Iliiiwlu�u
I ���I�I II 'll�ll��gliui
Imiu�uI lilllllluil
IIIUil{lumi
A2W
Wasl4lngton State 1)evOopnient DMskm
Contract S&MCeS OMCE�
w7o" De,IIIIpaiiiirtiiiimmM of Transportation PO Box 41408
Up inpia,WA 98504 7408
7345 Lindersoin Way SW
Runwatei,WA W1501-6bO4
T T)' '1-800 833 6MR,
wivvi wsdot wa,gov
July 28, 2023
PRR, Inc.
1501 Fourth Avenue, Suite 550
Seattle, WA 98101
Subject: Acceptance FYE 2022 ICR—CPA Report
Dear Lynnette Bradbury:
We have accepted your firms FYE 2022 Indirect Cost Rate (ICR) of 193.73% of direct
labor(rate includes 0.06%Facilities Capital Cost of Money)based on the"Independent
CPA Report," prepared by Smith Bunday Berman Britton, P.S. This rate will be
applicable for WSDOT Agreements and Local Agency Contracts in Washington only.
This rate may be subject to additional review if considered necessary by WSDOT. Your
ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with the firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 704-6397 or via email
Regards;
cGcatzfe
.................
Sch�,fl/ie I �)i,voy f hfl 28, 202]
SC14ATZIE HARVEY, CPA
Contract Services Manager
SH:BJO
PRR, Inc.
15014th Avenue
Seattle, WA 98101
Actuals Not To Exceed (ANTE) Table
2023-2024 Rate Period
Agreement: Y-11891 On-Call Communications&Public Involvement Services
Direct Labor Overhead NTE Fixed Fee NTE All Inclusive Hourly
Job Classifications Rate NTE Biling Rate NTE
193.73% 30.00%
Intern $ 24.50 $ 47.46 $ 7.35 $ 79.31
Junior Administrator $ 29.00 $ 56.18 $ 8.70 $ 93.88
Senior Administrator $ 48.08 $ 93.15 $ 14.42 $ 155.65
Manager $ 55.53 $ 107.58 $ 16.66 $ 179.77
Consultant 1 $ 39.00 $ 75.55 $ 11.70 $ 126.25
Consultant 11 $ 49.00 $ 94.93 $ 14.70 $ 158.63
Senior Consultant $ 82.00 $ 158.86 $ 24.60 $ 265.46
Associate Director $ 70.00 $ 135.61 $ 21.00 $ 226.61
Director $ 102.00 $ 197.60 $ 30.60 $ 330.20
Senior Director $ 108.00 $ 209.23 $ 32.40 $ 349.63
Principal $ 108.00 $ 209.23 $ 32.40 $ 349.63
1I
1
1
1
I
I
1
f
Michael Minor
& Associates
i
Pending - Safe Harbor Indirect Cost Rate Extension
Pending-Rate Table I
11
I I
i
i
44 �1
7/28/23, 10:21 AM Corporations and Charities System
BUSINESS INFORMATION
Business Name:
PARAMETRIX,INC.
UBI Number:
600 135 349
Business Type:
WA PROFIT CORPORATION
Business Status:
ACTIVE
Principal Office Street Address:
1019 39TH AVE SE, SUITE 100,PUYALLUP,WA, 98374-2115,UNITED STATES
Principal Office Mailing Address:
1019 39TH AVE SE, SUITE 100,PUYALLUP,WA, 98374,UNITED STATES
Expiration Date:
04/30/2024
Jurisdiction:
UNITED STATES,WASHINGTON
Formation/Registration Date:
04/26/1974
Period of Duration:
PERPETUAL
Inactive Date:
Nature of Business:
PROFESSIONAL, SCIENTIFIC &TECHNICAL SERVICES
REGISTERED AGENT INFORMATION
Registered Agent Name:
C T CORPORATION SYSTEM
Street Address:
711 CAPITOL WAY S, SUITE 204, OLYMPIA,WA, 98501-1267,UNITED STATES
Mailing Address:
GOVERNORS
Title Governors Type Entity Name First Name Last Name
GOVERNOR INDIVIDUAL BRENT DIEER
GOVERNOR INDIVIDUAL JOHN WILLIS
GOVERNOR INDIVIDUAL ROGER FLINT
https://ccfs.sos.wa.gov/#/BusinessSearch/Businessinformation 1/1
7/28/23, 10:23 AM Washington State Department of Revenue
business I,,,,00u
License formation: New search 13 clk to result
Entity name: PARAMETRIX, INC.
Business PARAMETRIX, INC.
name:
Ein'tity,type, Profit Coirlpoir t6oin
UBI #: 600-135-349
Business ID: 001
Location ID: 0001
Location: Active
Location address: 1019 39TH AVE SE
STE 100
PUYALLUP WA 98374-2115
Mailing address: 1019 39TH AVE STE 100
PUYALLUP WA 98374-2115
Excise reseller permit status: Click here
Secretary s: Oiclk herre
Page 2 of
Endorsements
https://secure.dor.wa.gov/gteunauth/_/#4 1/4
71/28/23, 10:23AM Washington State Department of Reveniue
Ei''�iiidoiii°sei,,�iiii'ients lield i Liceiine, # Catuilt Detaflis still"llitus Ex;�ifiia,Cioiil isstia
Castle IRock Active Apr-30-2( Apr-1 5-2(
Geinera Bus ness
Noin Resident
Centi,4iia Gene114i Active Apr-30-2( Dec-14-2(
Business ..r INon
Resdeint
Chdlhaiis Gene41 Active Apr-30-2( Dec-14-21
Business Non-
Resident
Chdian Geineir,A Active Apr-30-2( Apr-1 5-2(
Business INoin
Resident
Cheney Gerierali BU52013- Active Apr-30-2( Jan-1 5-2C
Business Non
Resdent
Concrete Generai Active Apr-30-2( Feb-16-2(
BUsiness - Non-
Resklent
Covington Geinei4i Active Apr-30-2( Jan-23-2C
Bushness INA o n
�Resident
Deer Park Geneirai Active Apr-30-2( Feb-17-2(
Bushness - Non
Resdeint
Duvd Gener,A cfive Apr-30-2( Jul-09-20
BLAsiriess .. one...
Resdeint
[:::atonvflie Gener4i Ac-bve Apr-30-2( Nov-28-2
Business .. M.-M-
hftps://secure.dor.wa.gov/gteunauth/—/#4 2/4
7/28/23,10:23 AM Washington State Department of Revenue
4'ieltl 2 1 icerise # Cotiw� P�)etails Stw i is Eiirpfii�afioii' issua
Resident
1::.:ATnonds Gener'41 Active Apr-30-2( Apr-1 2-2(
Business - INon-
Resident
[:�Mens[.)Urg Geineiral Alive Apr-30-2( Feb-17-2(
13LJS iness N o ri
1`�esiderit
Einurridaw (-.'�'enerA CUSTOOO( ActiVe Apr-30-2( Jan-23-2C
BLA!;iness .., Non
Resideint
Ep[irata GeneirA Active Apr-30-2( Dec-27-21
Business - Non
REsSdent
1::::eder41 Way 90-10184 Acfive Apr-30-2( Jan-25-2C
Geine4l Bushness -
Non-R: esideint
Governing People May include governing people not registered with Secretary of State
Governing people Title
DIEMER, BRENT
FLINT, ROGER
WILLIS, JOHN
Registered Trade Names
Registered trade names Status First issued
PARAMETRIX INC Active Dec-18-2018
hftps://secure.dor.wa.gov/gteunauth/—,t#4 3/4
7/28/23,10:23 AM Washington State Department of Revenue
Registered trade names Status First issued
PARAMETRIX, INC Active Dec-30-2021
PARAMETRIX, INC. Active Sep-16-1986
View (fitoii-4l [..ocatk)ir
The Business Lookup information is updated
nightly. Search date and time: 7/28/2023 10:22:22
AM
intact us
I iow a iP e we doing?
M ke our survey!
1')on't see what you expected?
Ihe llll( if your browser- is stgplljuorte
hftps://secure.dor.wa.gov/gteunauth/—/#4 4/4
RETURN TO: PW ADMIN EXT: 2700 ID#: 4142
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
1. ORIGINATING DEPT/DIV: P TBL.IC WORKS/
Desiree Winkler EXT: 2711 3. DATEREQ. /
2. ORIGINATING STAFF P[°I`ISO'\. r .,. "'
3. TYPE OF DOCUMENT(CHECK ONE):
p CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
0 CONTRACT AMENDMENT(AG#): 17-1 34 ❑ INTERLOCAL
❑ OTHER.. ..
4. PROJECT NAME: CItV Center Access PrOieCt
5. NAMEOFCONTRACTOR: PararnetriX„ Inc.
ADDRESS:y719 Second Ave, SUNte,20Q,, Seattle, WA 9810 TELEPHONE:
FAX:
SIGNATURE„SAME: Jeffa�ecl Pe ����.�...---- .... ........� .... ... .
. .�.�..: ___ TITLE:CEO
6. EXHIBITS AND ATTACHMENTS:0 SCOPE,WORK OR SERVICES 0 COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE# BL,EXP. 12/31r1` UBI#, ,EXP. / /
7. TERM: COMMENCEMENT DATE., COMPLETION DAT ICE, 12/31/2024
8. TOTAL COMPENSATION:$S U ,I, 1 „4 , TOt:4,1 74 f µ,2 , (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $
IS SALES TAX OWED: ❑YES 0 NO IF YES,$ PAID BY: ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT:, ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
O PURCHASING: PLEASE CHARGE TO: 306-4400-207-595-30410
....... ....... DATE,APPROVED
/
. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL
❑ PROJECT MANAGER
❑ DIVISION MANAGER
It DEPUTY DIRECTOR DSwen7122
A DIRECTOR EJwe/i91202z
❑ RISK MANAGEMENT (IF APPLICABLE)
6 LAW DEPT
KVA 8 19/2022
�10. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: Na COMMITTEE APPROVAL DATE: nla
SCHEDULED COUNCIL DATE: rda COUNCIL APPROVAL DATE: nla
11. CONTRACT SIGNATURE ROUTING
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: C, DATE REC,D:,
......... .........
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑ FINANCE DEPARTMENT _
C NATORY MAYOR OR DIRECTOR �
� LA D
( )
❑ CITY
CLERK W ..._..m.. � ..�
❑ ASSIGNED AG# AG#
❑ SIGNED COPY RETURNED DATE SENT:
COMMENTS:
EXECUTE„ "ORIGINA,IiS�, N..
Additional funds to cover original scope of work to complete 10%design+environmental documentation of NEPA DCE CIP project 207 has approved budget/carry over to cover this supplement 9.
Y'2020
SUPPLEMENT NO. 9
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement entered
into with Parametrix, Inc. effective the 23rd day of August 2017, identified as Agreement
No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018, Supplement
No. 2 dated May 10, 2018, Supplement No. 3 dated August 14, 2018, Supplement No. 4
dated July 11, 2019, Supplement No. 5 dated October 29, 2019, Supplement No. 6 dated
June 10, 2020, Supplement No. 7 dated July 14, 2021, and Supplement No. 8 dated July
19, 2022. All provisions in the Agreement remain in effect except as expressly modified
by this supplement, "Supplement No. 9."
The changes to the Agreement are described as follows:
Section Il, Sco e of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-9" attached hereto and incorporated by this
reference (Additional Services).
IM
Section V, Pa ment Provisions
The maximum amount payable under this Supplement No. 9 inclusive of all fees and other
costs is Three Hundred Ninety-One Thousand Four Hundred seventeen and 46/100 Dollars
($391,417.46) for a total amount payable to the Consultant pursuant to the Agreement,
Supplement No. 1, Supplement No. 2, Supplement No. 3 and this Supplement No. 4,
Supplement No. 5, Supplement No. 6, Supplement No. 7, and Supplement No. 8 inclusive of
all fees and other costs, to be an amount not to exceed Four Million One Hundred Seventy
Four Thousand Five Hundred fifty-nine and 26/100 Dollars ($4,174,559.26). The attached
Exhibits "D-9," "E-9-1," "E-9-2," and "E-9-3," which describes the payment for'work to be
performed under this Supplement No. 9, is hereby made a part of the Supplemental
Agreement.
A. Hourly Rates: The direct(raw) labor rates and classifications and indirect cost rates
as shown on Exhibits"D-9,""E-9-1,""E-9-2," and "E-9-3," are attached hereto and
incorporated by this reference.
Signed this day of "�' , 2022.
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
0
By: .. � By.
Flbffr Peacock ° irrr rrell
Its: Chief Executive Officer Its: Mayor
719 2nd Avenue, Suite 200 33325 8th Ave S
Seattle, WA 98104 Federal Way, WA 98003
(206) 394-3664 (253) 835-2401
APP VEQ AS TO F9N 4:
„fir° Ryan Call, City A orn
III1:0ar N' wiin e° IIlri
AM ANNAMAMMUNIUMMIMM
EXHIBIT A9
SCOPE OF WORK
City of Federal Way
City Center Access Project
Amendment 9
The City Center Access (CCA) Project proposes to modify an existing interchange in Federal Way on Interstate 5
(1-5). Parametrix is under contract to complete the Access Revision Report(ARR), 10 percent design, and National
Environmental Protection Agency(NEPA) Documented Categorical Exclusion (DICE) evaluation for the preferred
Alternative (Alternative 2i) as detailed in Amendments 6 and 7.The City of Federal Way(City) executed
Amendment 8 on July 19, 2022,to extend the contract completion date to December 31, 2024.
This amendment provides funding for 2022-2024 to address out of scope items and the extended project
duration to complete this phase of the project.
The out of scope items include:
• Responding to comments from the Washington State Department of Transportation (WSDOT) on the ARR
• Additional exhibits to address WSDOT review comments on the 10 percent design
• Additional efforts in coordinating and preparing injunction culvert alternatives and a workshop evaluation
process to select a preferred alternative
• Additional design, coordination, and documentation for the stormwater facilities related to adjacent
development plans, ongoing 6PPD quinone research (by others), and the preferred culvert alternative
• Additional environmental work to address a required formal consultation for the Biological Assessment
(BA) related to 6PPD quinone and stormwater runoff concerns for endangered species
• Additional environmental considerations for the preferred injunction culvert alignment
• Additional meetings with the Federal Highway Administration (FHWA) and WSDOT related the NEPA
participation
• Additional right-of-entry(ROE) coordination due to project delays caused by WSDOT lack of staff
availability and the culvert alternatives evaluation
• Coordination with the Washington State Department of Fish and Wildlife (WDFW) and the Washington
State Recreation and Conservation Office (RCO)for consideration of Section 4(f) and 6(f) as related to
WDFW North Lake access realignment
• Additional coordination for Section 106
• Additional public outreach services for the business briefing
• Additional design meetings and/or development review for Pape, Commons and Sound Transit
Operations and Maintenance Facility(OMF)South
City of Federal Way 554-2441-022
City Center Access Project 1 August 2022
Scope of Work Exhibit A9
SCOPE OF WORK (continued)
This effort assumes an extended project duration from August 1, ZOZ2 to December 31, 2OI4 The scope ofwork
for this Amendment includes completing the tasks summarized below.
Task 28 — Project M-cinagemonL
This task will be closed, and all project management will be captured in Task 38.
Task 30 — Public involvement and Communication
The City has requested additional public outreach support to keep the public informed during this project phase.
Panametrix and PRR will perform the work defined below.
Scope Amendment
* PRR will update the existing fact sheet to use for the duration of this project phase. It will reference the
environmental documentation and reviews underway and direct the public to stay informed by viewing
the City's website.The fact sheet will be translated into four languages(Korean, Russian, Spanish, and
Vietnamese). Contact information will be updated, and the reference to the hotline will be removed.
PRR's effort spent on the fact sheet update will be paid for using their current budget; no additional funds
are requested for this work.
• PRR will send periodic email updates (approximately quarterly) when documents are available for review
un the vvebsite.
0, PRR will provide strategic outreach assistance to the City for any unexpected outreach needs, as
requested by the City.
* Parametrixvvi|| review outreach materials prepared by PRR and provide feedback.
* Parametrixxvi|| coordinate with the City for their review of the outreach materials.
* Parametrix will assist the City and PRR with strategic outreach assistance, as requested by the City.
Assumptions
w The City will keep the website updated, including updating verbiage and posting documents.
• The City will coordinate printing fact sheets asneeded.
• PRR will no longer check the hotline voioemai|.
* Environmental document review findings and comments will be shared via website update and email
announcement.
* Upto4O hours of strategic outreach assistance will be provided byPRR.
* Up to 20 hours of strategic outreach assistance will be provided by Parametrix.
Deliverables
• Updated project fact sheet:two drafts and one final.The final version will be translated into four
languages.
* Upto10 email updates, draft and final, approximately quarterly.
City ofreueva|Way 554-2441-022
City Center Access Project z xumustzozz
Scope ofWork exhm/L As
SCOPE OF WORK (continued)
Task 31 — Study 8upportTeam and Design Teem Meetings
Regular check-in meetings with the Study Support Team, VVSDUTTrafc and Design, Executive Team, and
Bonneville Power Administration (BPA)are complete and no longer necessary to complete this phase of the
project. Coordination and meetings with the Injunction Culvert Team are captured under Task 36. Design
coordination and meetings with Sound Transit are captured under Task 41. Coordination and meetings with the
Environmental Team are captured under Task 4Z.This task will beclosed.
Task 32 —Addibono| Traffic Support
All work for this task has been completed;this task will beclosed,
Task 33 — Prehm|nary Engineering for the Preferred Alternative
This task will be closed, and all remaining 10 percent design and coordination will be captured in Task 41.
Task 34 — Environmental Documentation '
This task will be closed, and all remaining environmental documentation efforts will be captured in Task 42.
Task 35 —Access Revision Report (ARP)
This task will be closed, and all remaining ARR efforts will be captured in Task 39.
Task 3G — Injunction Cu|veds
There are three injunction culverts within the project limits. One crosses 1-5 at the south end of the S 320th St
interchange ramps, one is located under the northbound on-ramp, and one is under the northbound off-ramp.
The Consultant shall develop a Preliminary Hydraulic Design (PHD)for each culvert per the tasks below.
Assumptions
7C Final Hydraulic Design (FHD) Report for the three culverts will not be provided under this scope.This would be
provided at a later phase of design.
Out of Scope Work (Work Completed) —Concept Alternative Alignments Design, Evaluation, and
Selection
The purpose of this task was to prepare concept-level design for two alternative alignments for the crossing at
S32OthItandfoura|ternadvea|iQnmentsforthecrnssin8at |-S, eva|uatethea|ternatives' andfaci|itatese|ection
by the agencies of one preferred channel alignment for the referenced crossings to be documented in the PHD
reports.
N/b/-kbreakdow/n
Prepared the following analyses and led workshop meetings to facilitate selection of the preferred channel
alignment:
w Performed analysis and engineering for conceptual design for two stream alignment alternatives at
S 320th St("ExistinQ Stream A|iQnment^ and "East Alternative"), and four stream alignment alternatives at
1-5 crossing("Existing Stream Alignment," "North A|ternative," "Central A|ternative," and "South
A|ternative^).
w Quantified of channel characteristics for all alternatives referenced above.
City of Federal Way 55*2441-022
City Center Access Project a Avuvstacoz
Scope of Work Exhibit AS
SCOPE OF WORK (continued)
• Facilitated the following meetings and workshops for evaluation of selection criteria, criteria weighting,
criteria scoring, and discussion:
Culvert Alternatives Evaluation workshop in June 2021
Culvert Alternatives Evaluation Criteria Weighting workshop in October 2021
Culvert Alternatives Evaluation Scoring workshop in October 2021
(WSDOT requested a project pause from November 2021 through January 2022)
Culvert Alternatives Discussion in February 2022
Culvert Preferred Alternative Refinements in March 2022
Assumptions
• The agencies involved selected a single preferred channel alignment to be documented in the PHD
reports.
• No additional budget is requested for this subtask because the work has been completed and the
preferred alternative has been selected.
Deliverables
• Workshop meeting materials, including agendas, exhibits, evaluation spreadsheet, and minutes, were
developed and distributed to workshop attendees.
• The following exhibits previously prepared for the workshops will be included in the PHD as appendices:
Alternative Alignment Concept Plan Sheets and Profiles Sheets
Alternative Alignment Weighting and Scoring Spreadsheet
Scope Amendment for Additional Support for PHD Revision for New and Updated Requirements
The purpose of this subtask is to provide additional support to revise PHD reports to meet new and updated
requirements of latest WSDOT PHD Template (H_HD_Template_2022-S.docx) and also includes additional work
performed to study and coordinate discussion of historical fish presence with WSDOT and WDFW.
Work breakdown
Provide the following support to revise the PHD reports for the referenced crossings to meet current WSDOT PHD
practice and process.
• Carry over completed PHD documentation to latest WSDOT PHD template.
• Prepare additional site and watershed review with regards to historical fish presence and discuss with
WSDOT and WDFW.
• Prepare additional geotechnical, geomorphic, and longitudinal channel profile analyses per latest
template.
• Prepare additional report figures per latest template.
• Perform additional site survey of the existing channel cross sections in the immediate vicinity upstream of
the 1-5 culvert crossing.
• Prepare and upload deliverables per WSDOT-provided "PHD-FHD_Deliverables.docx' and
"ProjectDocumentation CAD Dfiles.xlsx"to ProjectWise.
City of Federal Way 554-2441-022.
City Center Access Project 4 August 2022
Scope of Work Exhibit A9
SCOPE OF WORK (continued)
su.uirnptionITn
• WSDOT will require the PHD reports to be delivered using the current WSDOT PHD template
(H_HD_Template_2022-5.docx) provided May 6, 2022.
• The design for replacing the three referenced crossings will be documented in two separate PHD reports.
One report will document the replacement of both WDFW culvert ID 995300 and WDFW culvert
ID 995299.
One report will document the replacement of WDFW culvert ID 992364 and WDFW culvert ID
420614.Since the completion of the original scoping for this project phase, WDFW updated and
separated a downstream segment of the barrier as a private structure (WDFW culvert ID 420614,
beneath Winged Foot Way), which is directly connected to WDFW culvert ID 992364.
• One "Review Draft" PHD report will be provided to WSDOT headquarters for review each for the two
reports referenced above.
• WSDOT will provide one set of consolidated comments each for the two reports referenced above.
• One "Draft" PHD report each for the two reports referenced above will be prepared, revised in response
to review comments provided.
• The preliminary scour analysis will not be performed at this time due to limited geotechnical information;
it will be deferred to the next design phase.
• Additional template changes, if any, after July 31, 2022,will not be included.
DanuIliveitaItuIa:,;
• The deliverables for this task are documented in Subtask 36.4, Subtask 36.6, and Subtask 36.8 of
Amendment 6, executed in June 2020.
The Consultant will provide progress reports and monthly invoices to the City of Federal Way that cover the
extended time from August 2022 through December 2024 and the'additional work in this amendment, including
coordination and schedule updates.The progress reports will be prepared in a format approved by the City's
Project Manager and will describe work performed by the Consultant Team members during the current
reporting period.
MointNy t:Irrogr ss I[Repol a and Ilnv6ices
The Consultant will provide progress reports and monthly invoices to the City of Federal Way that cover the
extended time from August 2022 through December 2024 and the additional work in this amendment.
f.
.N SS IlM etiriigs r:ind tttll�N��ir t:'cuaa°.ur na.uni a�utfon
I iraatrE
The Consultant Team will conduct virtual progress meetings with the City's core management to review the
scope, schedule, and budget status; upcoming project meetings, communication, and work items; design review;
and project strategy to resolve issues or barriers to success.This task also includes email and phone calls with the
City for general information and updates and solving issues outside of the meetings.
City of Federal Way
554-2441-022
City Center Access Project 5 August 2022
Scope of Work Exhibit A9
SCOPE OF WORK (continued)
Consultant Team Meetings
The Consultant will hold Consultant Team check-in meetings to communicate and coordinate work progressand
upcomin8activities.Thesemeetin`swiUbeattendedbytheprojectmana0eranddiscip|ine |eads.
Schedule Updates
Schedule updates will be completed to guide pro/ectdeve|opment and coordination,
Scope Amendment
Extend project duration from August 2022 through December 2024 due to BA formal consultation and extended
injunction culvert and Section 1O6work.
Assumptions
• Up to 23 invoices are anticipated for the remaining work.The project will likely be dormant for at least
6 months while permits are being reviewed by external agencies.
• City progress meetings will be attended by two staff, conducted via Teams, at approximately 1 hour each.
Upto29 City progress meetings are anticipated, which is approximately one per month. Some months
may have more than one meeting, and other months may not have any due to permitting reviews and
project inactivity.
• [onsu|tantTeamcheck-inmeetingswi|| beattendedbythreestaf[ conductedviaTeams' at
approximately 30 minutes each. Up to 29 consultant team check-in meetings are anticipated, which is
approximately once a month. Some months may have more than one meeting and other months may not
have any due to permitting reviews and project inactivity.
• 8A formal consultation concurrence letter will be received by May ZOZ4.
• Upto three updates will be performed on the project schedule.
Deliverables
• Monthly progress reports and invoices.
w Project schedule in PDF format.
• Minutes for City progress meetings.
Task 39 —/4cuess Revision Report (APR)
Parametrix has incorporated review comments from the City,VVSDOT and FHVVA.The last round of comments
received from WSDCT at the end of March 2022 have been incorporated, and the updates have been reviewed
and approved by WSDCT.The final report is compiled and being routed for signatures.The additional funds will
facilitate document finalization and coordination for the remaining signatures, including the following:
w Sound Transit,Tacoma Dome Link Extension (TDLE) Project Representative
• King County Road Services, Engineering Services Manager
• VVSDOT Management of Mobility Director
w VV5DOT Headquarters Traffic
• VV3DOTNVV Region Traffic Engineer
City of Fed era|Way 5s4'2441-022
City Center Access Project s Auaystzozz
Scope ofWork snh/b/t«e
SCOPE OF WORK (continued)
• VVIDOT Assistant StateDesign Engineer
• FHVVA Safety/Design Engineer
Out of Scope Work(Work: Completed)
Updated the ARRto incorporate the last round of review comments received from VVSDOTatthe end of
Maroh2Q2Z.
DeUlverabUes
a Signed ARRdocument.
Tmsk4O — Basemap Update for PrehminaryDesign
All work for this task has been completed;this task will beclosed.
Tash41 —/\dci/tions| 1O Pei cent Design and Coordination '
The 10 percent roadway design was completed, and review comments were received in spring 2021 from the
City, VVSDOT Sound Transit, BPA, BP Olympic Pipeline, and adjacent developments (IRG/ESM, Commons, and
DaVita).The roadway design has been updated to reflect the review comments, but the final deliverables have
not been produced since the injunction culvert improvements and stormwater facility footprints are pending.The
stormwater system design and draft technical information report(T|R) were completed in spring 2OZl, and review
comments were received from the City, VVSDOT Sound Transit, and adjacent developments (|RG/ESM and The
Commons).The stormwater system updates and TIR finalization were put on hold until the injunction culvert
preferred alternative was selected.The design expanded from the original design scoped in Amendments 6 and 7.
Out of Scope Work (Work Completed)
The following out of scope work has been completed:
w BPA Trail Extension project:the Consultant created a conceptual design figure and planning-level cost
estimate for the S 324th St and 23rd Ave S multiuse path, including areas of temporary asphalt path and
connection to 11th Place S.This work has been completed, and there will be no further work on this.
* Additional coordination with adjacent developments, including The Commons, BPA, IRG/ESM, and DaVita,
has been completed for this phase; no further coordination is anticipated.
• A typical section of the |'SSouthboundS317thSt Bridge Crossing was created per aVVSDOT request to
confirm the roadway improvements fit under the existing bridge.
Scope Amendment
The following out of scope work will be performed to complete this project phase.
• Create a plan view exhibit displaying the S 324th St southbound (SB) off-ramp passing under the existing S
320thSt bridge per VVSDOT request for roadway improvements.
w Prepare an exhibit that provides detail tributary layout and conveyance flow path for the four facilities at
the Park and Ride lot(TDA1Z' 16, 17 and 23).
w Update the stormwater management(SWM)facilities for the CCA Project at the Park and Ride lot to
account for the Sound Transit light rail SWIM facility and up to one culvert alignment. CCA SWM facilities
may need to be adjusted in future design phases depending on construction timing of other projects that
impact the Park and Ride lot.The CCA design will not modify the location or footprint of the Sound Transit
City v,Federal Way ss4 2*41'022
City Center Access Project r Aueustaoza
Scope ofWork e^uuit As
SCOPE OF WORK (continued)
light rail SWM facility.The CCA design will not reflect any future SWM facilities or modification to the
existing Park and Ride SWM facility that may be required for mitigation of lost parking stalls due to the
injunction culvert.
• Stormwater system updates and TIR finalization to accommodate the injunction culvert preferred
alternatives, Pape development located northeast of the S 320th St and 1-5 Northbound Ramp
intersection, development located southwest of the proposed S 324th St alignment and Weyerhaeuser
Way, and development plans at the Federal Way Commons Mall.
• Additional coordination with Sound Transit TDLE/OMF South, including design information exchanges,
email and phone communication, and up to five meetings attended by two attendees, are anticipated to
continue through this phase. '
• Continued coordination with the BP Olympic pipeline to understand potential pipeline relocation costs
due to pipeline crossings and proximity to the CCA improvements.
Deliverables
• BPA Trail Extension project conceptual design figure and planning-level cost estimate (completed)
• 1-5 Southbound and S 317th St Bridge Crossing typical section (completed)
• Final Stormwater TI R
• Meeting materials and design information for Sound Transit
• Park and Ride stormwater tributary exhibit
• S 324th SB Off-Ramp and Existing S 320th St Bridge plan view exhibit
The following final conceptual design deliverables will be reproduced after the injunction culvert and stormwater
facility conceptual design is complete.
• Project footprint exhibit, including aerial imagery, roadway, stormwater footprints, critical areas, existing
right-of-way, injunction culverts and appropriate descriptive labeling.
• Data Documentation Initiative (DDI) Forward Compatibility Exhibit referencing in stormwater facilities and
other major elements.
• Preliminary Profile Exhibits and Roadway Model Cross-Sections (50-foot intervals)for roadway.Three-
dimensional (3D) modeling for SWM facilities will be prepared in the next design phase.
• MicroStation design files for City and WSDOT records.The MicroStation design files for stormwater design
will include facility footprints only. Conveyance design and 3D design will be completed in later phases.
Cultural Resources
HRA submitted the draft Cultural Resources Methodology Memorandum to WSDOT in June 2021. Following the
submittal, HRA and Parametrix coordinated with WSDOT on revisions to methodology,followed by review of and
comment on WSDOT's cover letter to the Washington State Department of Archaeology and Historic(DAHP). In
September 2021,WSDOT sent the methodology over to DAHP for their review and approval. WSDOT received
DAHP's response to the Area of Potential Effect(APE) later in September 2021, which had several comments,
including what should be included in the APE.The project team was coordinating with WSDOT to finalize the
methodology when notified by the WSDOT Team to put the Federal Way CCA Project on hold into the New Year.
City of Federal way 554-2441-022
City Center Access Project 8 August 2022
Scope of Work Exhibit A9
SCOPE OF WORK (continued)
When it was determined that WSDOT would continue to provide NEPA environmental review as was originally
planned,the consultant team continued where things left off in fall of 2021. In April 2022,the consultant team
sent WSDOT a new methodology. Efforts included the following:
• Met with WSDOT to go over approach and followed up with a revised APE for their approval.
• Redefined the APE as being one parcel out(to no more than 500 feet)from the area of direct impacts
(ADI)for the project.The previous version looked one parcel out,which in some instances resulted in a
larger APE (e.g.,former Weyerhaeuser property)
• Extended the APE to the north and south to account for proposed improvements limited to the existing
roadway prism
• Added two more historic structures due to time lapse (previously looked at historic properties from 1976,
now using 1977 as the base year)
• Updated the background research
• Updated some information in the existing conditions description
• Updated ROES to emphasize cultural resources needs, and Federal Way submitted the new ROE requests
to the property owners
• Prepared draft letter describing upcoming cultural field work(summer/fall 2022)
• Sent revised memo with culvert language and revised APE to WSDOT May 27,2022
• Reviewed and provided comment to WSDOT's letter to DAHP for APE/methodology concurrence
Status'
• WSDOT submitted the letter with APE/methodology to DAHP on June 15, 2022
• DAHP's concurrence to the APE and methodology was received June 28, 2022
• WSDOT distributed the request for concurrence to the tribes on June 29, 2022
Barring tribal concerns with the APE and methodology,the cultural field study is expected to commence in
August 2022,followed by the preparation of the Cultural Resources Report.
Upcoming work:
• Coordinate with City to provide security support for the field work team
• Coordinate utility locates
• Conduct archaeological inventory
• Prepare the Cultural Resources Technical Report
Out of Scope Work and Scope Amendment
• See attached scope and fee from Historical Research Associates, Inc. (HRA).
City o9'Federal way
554-2441-022
City Center Access Project (august 2022
Scope of Work Exhibit.As
SCOPE OF WORK (continued)
Biological Assessment
Due to uncertainties about the requirements for analyzing impacts related to contaminants in stormwater runoff
(e.g., 6PPD quinone), development of the Endangered Species Act(ESA) consultation document (the BA)was put
on hold following the pre-BA meeting in July 2021. In addition to the delay because of uncertainties around
stormwater,the project was put on hold until early 2022 per WSDOT's request.The project team received
direction from WSDOT to resume work on the project in February 2022. Updated guidance from WSDOT
concerning impact analyses included elements that were not anticipated in previous scopes of work.
The draft BA was prepared to incorporate the expanded documentation itemized below and was submitted to the
City for review on June 2, 2022. Parametrix received comments from the City on June 24. Parametrix revised the
first draft report and delivered it to WSDOT for their review on June 30, 2022. Parametrix received comments
from WSDOT on the first draft BA on August 4, 2022. Now that WSDOT has confirmed the project will need to
undergo formal consultation, an additional round of review and revision with FHWA will be required.
In addition to providing new guidance (in July 2022)for analysis of impacts related to stormwater runoff,WSDOT
has recently informed us that projects must be presented again at a pre-BA meeting if consultation does not
begin within 6 months of the original pre-BA meeting. We anticipate developing an abbreviated, "refresher"
presentation for this project.
Out of Scope Work(Work Completed)
• Expanded the analysis area to include West Fork Hylebos Creek, East Fork Hylebos Creek,the main stem
of Hylebos Creek, Mill Creek, the Green River, and marine waters in Commencement Bay and Elliott Bay.
• Developed text identifying critical habitat for ESA-listed species in those waterbodies and describing the
use of those waterbodies by ESA-listed species.
• Prepared detailed descriptions of existing and proposed stormwater management systems in each of
24 threshold discharge areas, including the characterization of flow paths from the project area to
receiving waters.
• Performed qualitative analysis of the potential for project-related changes in impervious surface area to
result in increased levels of contaminants in stormwater runoff entering surface waters.
Scope Amendment
• Meet with WSDOT to discuss comments received on August 4, 2022, and achieve clarity on next steps.
• Expand level of detail in project description, develop two additional figures, expand stormwater analysis,
and address several dozen minor comments from WSDOT.
• Present the project again at a pre-BA meeting.
• Review, evaluate, and address comments from FHWA.
Assumptions
• Per WSDOT's comments received on August 4, 2022, incorporate requirements specified in the July 2022
stormwater analysis guidance.
• WSDOT's second review will be limited to confirming that August 4 comments have been appropriately
addressed; only minor revisions to the document text will be required.
City of Federal way 5S4-2441-022
City Center Access Project 10 August 2022
Scope of work Exhibit A9
SCOPE OF WORK (continued)
Environmental Justice Assessment Memo
The draft Environmental Justice (EJ) Report was completed and received comments from WSDOT in June 2021.A
meeting was held with WSDOT in July 2021 to discuss the expansion of the EJ assessment memo regarding
potential displacements on the Belmor property associated with the roadway expansion and injunction culvert
alignment. WSDOT requested additions/revisions that are beyond the typical narrative for this memo type.The
revisions to this document were put on hold until the alternative for the injunction culvert was selected and
public involvement was completed.
Scope Amendment
• Describe injunction culvert alternatives, and describe why the preferred alternative was selected.
• Provide greater detail regarding public involvement, including the last round that occurred in late
summer/fall 2021 and anything thereafter.
• Look into higher resolution demographic data for Belmor Park, especially related to age (senior living
community).
• Add context to the TDLE/OMF South project schedules and anticipated impacts.
• Update the EJ Screen/school enrollment numbers and census data, given the project delay.
Section 4(f)
Documentation describing compliance with Section 4(f) of the U.S. Department of Transportation Act will be
required because the roundabout at Weyerhaeuser Way S and the future S 324th St extension involves the
realignment of the WDFW-owned lake access roadway.Additional coordination will be required because the
project was funded through RCO.
Section 4(f) prohibits the FHWA from approving a project or program that uses land from a significant public park,
recreation area, wildlife or waterfowl refuge, or historic site unless: (1)the project will have no more than a "de
minimis impact"; or(2)there is no feasible and prudent avoidance alternative to the use of the land, and the
project includes all possible planning to minimize harm to the property.
Although it has been confirmed through RCO that the project would not create a "conversion" of the RCO-funded
recreational access to North Lake, RCO review of the final change/impact is required. RCO and WDFW will need to
agree on the revised grant boundary for the realigned lake access roadway.
At this early stage, work accomplished includes establishing project contacts with WDFW and RCO, providing
background and project information, and meeting and coordinating with WSDOT to identify the appropriate level
of documentation.
Out of Scope Work(Work Completed)
• Reviewed information on the RCO website related to North Lake access and sources of grant funding.
• Prepared memo for WSDOT to ascertain if project type was exempt.
• Coordinated with WSDOT to identify process for compliance and to understand their participation in the
process.
• Communicated with RCO and WDFW via several emails to understand next steps and provide
information.
City of s::ede1.ai Way
554 2441.-022
City Center Access Project 11 August 2022
SCOPE OF WORK (continued)
Scope Amendment
• Prepare de miminis narrative to document the determination for federal approval (draft and final), which
includes:
v Analyzing alternatives and describing why the alignment was chosen.This will involve using previous
design work showing that we looked at more than one alternative along with a narrative that
describes why the other options would not work.
• Discussing public review and comment process, including when the public participation occurred.
• Summarizing the environmental and cultural resource assessments.
• Prepare and send a formal letter of request to WDFW from the City of Federal Way(on their letter head)
with the specifics of their proposal using WSDOT format.The de miminis finding will be included.
• Coordinate with WDFW, including up to two meetings to answer their questions regarding the project
design.
• Coordinate with RCO.Although it is assumed road relocation would not create a grant compliance issue
since the project would not prohibit or close access to the site, there will likely be some level of
coordination with RCO.
Ecosystems/Hazmat/ Noise/ NEPA DCE Worksheet
The draft Ecosystems Report was completed in April 2021, was reviewed by WSDOT, and was revised. Following
the initial draft and revisions, it was revised two separate additional times,first to account for the improvements
at S 324th St and Weyerhaeuser Way,which was scoped in Amendment 7, and then for a minor change to
remove a wetland that was not formally delineated on IRG property and found not to be a wetland through an
outside source.This report is mostly complete.
The Noise Report and Hazmat reports are complete per WSDOT's review.
The draft NEPA DCE Worksheet is mostly complete, with some sections waiting for input from the remaining
environmental considerations(e.g., cultural). FHWA's approval of the DCE is on hold until Section 106,
Section 4(f), and ESA processes are finalized.
Scope Amendment
• Ecosystems—Wetland review of injunction culvert footprint, updates to impacts section, and review of
any changes in code and regulations that were made during the project delay.
• All—Minor revisions to project description.
Other
Out of Scope Work (Work Completed)
Other circumstances that required additional environmental evaluation'.
• In January 2022, WSDOT proposed an Independent Utility approach for the CCA Project NEPA
documentation.The project team analyzed this NEPA approach and met with the City, WSDOT, and
FHWA to discuss this approach. After the analysis and discussion,the Independent Utility approach was
not implemented due to lack of benefit and anticipated increased cost to the project.
City of Federal Way 5 4-2441-022
City Center Access Project 12 Augusf:2022
Scope of Work Exhibit A9
SCOPE OF WORK (continued)
Task 43 — Rights of Entry
Out of Scope Work (Work Completed)
Due to the extended timeline, ROEs needed to be extended.Some new letters and those that were not received
during the initial suite of ROES were also requested.The ROES are needed for the upcoming cultural resources
work.While the City obtains the ROES, Parametrix has provided locations, prepared a tracking spreadsheet, and
provided other documentation for that work. Parametrix submitted a request for ROE extension at the end of
March 2022.The City has been working to secure the ROES until the end of December 2022.
Also,the WSDOT General Permit for field investigations was set to expire on July 31, 2022. Parametrix
coordinated with the City to be extend the permit through December 2022.
Task 44 — Outreach -® PRR
This task will be closed and all public outreach for PRR and Parametrix will be captured in Task 30.,
Task 45 — poise— Michael Minor
The scope and budget from Amendment 7 remains unchanged.This work has not been performed yet.The task
will remain open.
a:A 46 - Dk"sigl i ,ku_'u`u"l�il]iiv s ;:ind Ev:lflu�:�li(")i ii ficir F'I ahgm ne�0, of S 32+11 I"(rVY
TIII w )ii,k foi ulnis iasl< Iliac been ao nq Iete�i; iIlds iaswl< wiiH IlDe dosed,
AH1 woi,kun:no this tass< Ilias [nieeun coirng.nllneted ilds tas nW flI L)e dosed,
n s1k 4 6 -... U ciid,,i1e C;o,,st l:wsiiliiat
Scope Amendment
Parametrix will update the high-level cost estimates for Phases 1, 2, 3A, and 3B reflecting the preferred culvert
alternative, Olympic Pipeline relocation, City's potential portion of the BPA tower relocation costs, and Park and
Ride parking stall replacement.
Deliverables
0 Draft and final engineer's estimate (Excel and PDF formats)
Management Reserve
Provide 10 percent of fee for scope items that may arise during the FHWA review and USFS/NMFS formal
consultation of the environmental documentation and other design and environmental requirements.
City of Federal way 554-2441-022
City Center Access Project 13 August 2022
Scope of work Exhibit A9
......... OF
IF
qp
ll--7 A rw 13"A
M
2 p g. . . .
--d-q
-'A IP
-LL
ro
i
E so
----------
�77——i 1
.
—-....--- --------
2 a q .9
I s ,z
P.E
F& �6
Ecu
12
iEs
g m
-21
i
i
1
�I
J
Parametrix l
WSDOT OH Audit Letter 1
Pending-ANTE Table
1�
i
VJ
J
0
i
1
� J
% � r
IJ �I
Ih...111'II:H..1. II°)9
mmm
Washington State Davi,flopinrient DMsktin
Conti w t ,e rwi n r,Ut ice
Department ""ra r @V n i+r i Box 474M3
t'A4r ;ri ia,WA 9850,4 F'40d8,
7345 Underson Way SW
Ituraivva^ eu rd44:4h501.d?504
'a: 9 Kill dl;:3 6 8B
May 12, 2022
Parametrix, Inc.
1019 39t" Avenue SE, Suite 100
Puyallup, WA 98374-2215
Subject: Acceptance FYE 2021 ICR—Cognizant Review
Dear Janice Walden:
We have accepted, your firms FYE 2021 Indirect Cost Rate (ICR) of 172.55% of
Combined/Corporate (rate includes 0.11% Facilities Capital Cost of Money) based on
the"Cognizant Review"from the WSDOT Audit Office. This rate will be applicable for
WSDOT Agreements and Local Agency Contracts in Washington only. This rate may
be subject to additional review if considered necessary by WSDOT. Your ICR must be
updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
Any other entity contracting with your firm is responsible for determining the
acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
Regards;
haw „
C' tIK K. JON'SON
Contract Services Manager
EKJ:ah
Certification of Final Indirect Costs
Firm Name: Parametrix,Inc.
Indirect Cost Rate Proposal: 172,55
Date of Proposal Preparation (mm/dd/yyyy): 4/11/22
Fiscal Period Covered (mm/dd/yyyy to mm/dd/yyyy): 1/2/2021 - 12/31/2021
1, the undersigned, certify that 1 have reviewed the proposal to establish final indirect cost rates
for the fiscal period as specified above and to the best of my knowledge and belief.-
1.)All costs included in this proposal to establish final indirect cost rates are allowable in
accordance with the cost principles of the Federal Acquisition Regulations(FAR) of title 48,
Code of Federal Regulations(CFR), part 31.
2.) This proposal does not include any costs which are expressly unallowable under the cost
principles of the FAR of 48 CFR 31.
All known material transactions or events that have occurred affecting the firm's ownership,
organization and indirect cost rates have been disclosed.
Signature: -
Name of Certifying Official*(Print): Jeff Peacock
Title: President,CEO
Date of Certification (mm/dd/yyyy): 04/19/2022
*The"Certifying Official" must be an individual executive or financial officer of the firm at a level
no lower than a Vice President or Chief Financial Officer, or equivalent,who has the authority to
represent the financial information utilized to establish the indirect cost rate for use under Agency
contracts.
Ref. FHWA Directive 4470.1A available on line at:
ht�t w /wivvv.fhwv riot r.ovlfleo5 /din'e�t9vu or�� I i 4'iCp°1 a htni
O/H Certification; Nov 2010
EXh 111H�!jff D9
PARAMETRIX,INC.
Statement of Direct Labor,Fringe Benefits and General Overhead
For the Fiscal Year Ended December 31,2021
General Ledger
Balance for the
Fiscal Year Ended
December 31, Unallowable Proposed
Description 2021 Expenses Ref. Amount Percent
Direct Labor $ 34,409,131 $ $ 34,409,131 100.00%
Fringe Benefits:
Vacation,sick leave,holidays 7,353,992 7,353,992 21.37%
Payroll taxes 5,223,649 (33,028) E 5,190,621 15.09%
Medical insurance 4,707,654 4,707,654 13.68%
ESOP retirement plan 11,495,150 11,495,150 33.41%
Total Fringe Benefits 28,780,445 (33,028) 28,747,417 83.55%
General Overhead:
Administrative salaries 11,246,602 (71,054) A 11,175,548 32.48%
Training salaries 758,401 758,401 2.20%
Bonuses/misc.salaries 9,287,479 (1,767,064) B 7,520,415 21.86%
Direct selling salaries 1,377,124 1,377,124 4.00%
Bid and proposal salaries 3,514,619 3,514,619 10.21%
Advertising expense 128,034 (128,034) C 0.00%
Direct selling expenses 61,160 (20,375) D 40,785 0.12%
Business taxes 2,047,195 2,047,195 5.95%
Insurance 865,256 865,256 2.51%
Office rent 4,180,663 4,180,663 12.15%
Office expenses,supplies,remodeling and business meals 146,530 (56,038) F 90,492 0.26%
Staff appreciation/awards 70,137 (58,146) G 11,991 0.03%
Printing,copier/printer supplies 46,940 46,940 0.14%
Telephone 187,302 187,302 0.54%
Depreciation(including gain/loss on disposal) 1,652,585 1,652,585 4.80%
Amortization 14,583 (14,583) H 0.00%
Auto expense 204,382 (11,938) 1 192,444 0.56%
Billed in-house autos (185,993) (185,993) -0.54%
Office travel 161,663 (34,987) 1 126,676 0.37%
Subscriptions,library material and dues 238,380 (26,232) K 212,148 0.62%
Donations 60,802 (60,802) L 0.00%
Professional licenses 30,559 30,559 0.09%
Postage,couriers,freight 29,116 29,116 0.08%
Training/education 208,380 208,380 0.61%
Field equipment/supplies 120,008 120,008 0.35%
Health and safety equipment/supplies 25,368 25,368 0.07%
Billed in-house equipment (382,220) (382,220) -1.11%
Office equipment 178,810 (33) M 178,777 0.52%
Computer supplies,circuits 490,719 (779) M 489,940 1.42%
Software/maintenance 2,455,923 2,455,923 7.14%
Recruiting costs 101,004 101,004 0.29%
Payroll,legal and audit 24,080 187,962 N 212,042 0,62%
Temporary labor 17,438 17,438 0.05%
Consulting services 817,053 (114,000) 0 703,053 2.04%
Bad debts 102,300 (102,300) P 0.00%
Utilities/building maintenance 72,689 72,689 0.21%
Finance,bank charges (58,908) 66,578 Q 7,670 0.02%
Paycheck Protection Program credit - (7,494,983) R (7,494,883) -2138%
Total General Overhead 40,296,163 (9,706,708) 30,589,455 88.90%
Total Indirect Costs $ 69,076,608 $ (9,739,736) $ 59,336,872 272.45%
Percentage of Direct Labor(Less FCC) 200.75% 172.45%
Facilities cost of capital(FCC) 37,736 S 37,736_ 011%
$ 59,374,608
Percentage of Direct Labor(includes FCC) 172.55%
See accompanying notes.
4-
E:: .V.HDI I I II::9
PARAMETRIX,INC.
Statement of Direct Labor,Fringe Benefits and General Overhead(Continued)
For the Fiscal Year Ended December 31,2021
References
A. Labor costs incurred in defense of contract performance issues per 48 CFR 31.205-47(f)(5)(A);Collection costs
unallowable per 48 CFR 31.205-3;Organizational Cost pertaining to acquisitions per 31.205-27.
B. Share value-based bonuses unallowable per 48 CFR 31.205-6(i); Limitation on allowability of senior executive
compensation per 31.205-6(p); Personal vehicle use unallowable per 48 CFR 31.205-6(m)(2).Gifts unallowable per 48
CFR 31.205-13(b).
C. Nonallowable public relations and advertising costs per 31.205-1; Promotional materials unallowable per 48 CFR
31.205-1(f)(5).
D. Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per 48 CFR 31.205-51; Excess lodging and per
diem unallowable per 48 CFR 31.205-46.
E. Fringe benefits associated with labor deemed unallowable per 48 CFR 31.201-6(a).
F. Gift unallowable per 48 CFR 31.205-13(b); Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per
48 CFR 31.205-51.
G. Entertainment unallowable per 48 CFR 31.205-14;Gifts unallowable per 48 CFR 31.205-13(b);Alcohol unallowable per
48 CFR 31.205-51.
H. Amortization unallowable per 48 CFR 31.205.49.
I. Personal vehicle use unallowable per 48 CFR 31.205-6(m)(2).
J. Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per 48 CFR 31.205-51;Excess lodging and per
diem unallowable per 48 CFR 31.205-46.
K. Dues to social clubs unallowable per 48 CFR 31.205-1(f)(7),31.205-14; Lobbying unallowable per 48 CFR 31.205-22(c).
L. Donations unallowable per 48 CFR 31.205-8.
M. Prior period cost unallowable per 31.203(g).
N. Legal costs incurred in defense of contract performance issues per 48 CFR 31.205-47(f)(5)(A);Organizational Cost
pertaining to acquisition per 31.205-27. Recovery of prior year disallowed legal costs.
0. Nonallowable public relations and advertising costs per 48 CFR 31.205-1.
P. Bad debt unallowable per 48 CFR 31.205-3.
Q. Interest,late fees unallowable per 48 CFR 31.205-20. Forgiveness of previously disallowed PPP interest expense.
R. Credit for Paycheck Protection Program(PPP)loan forgiveness per 48 CFR 31.201-5.
S. Cost of money adjustments per 48 CFR 31.205-10(a).
See accompanying notes.
-5..
a
x
w x
ry I ry
ea
1. m m m 3 0
o oa rs rr a"W�a' m
sa
a
E 1sjje8oad5 s7Dej7uo.. —,I
3
0 o ry
n o o rva o o ry m ry '�
7ue7sgssy anB7e�7sJul-pv
N
.... ....... n
E'ue»nsuaa
s 11-iunwwo3,
S 7speuady
bupuuepd uoge:wodsuej1 �
0 0 0 o ry �y
buluueyd uogle7iodsueiy ,o o 0 o ti e
m m •.•
.t
m..
Z x 091 L 7si�euad n
bwuueld uOIMJodsueuj
C-7speuade�N
Suwueld uope7uodsueu1
a n ri w w r'
w � � i.^o
-1aauubu3 uogeyodsuejy
0 0
E-l'!p aad5
buruued �3 U 1 uo a odsuej m
I. .n
_____ .•S]si�epadr� m n
8upu-e d uopeyodsue,
m m
m m
S-�sgeoady y �. o
b--fd uW;le .dsuwj
o a o o H N
ry ry o o ry Q ry eu
m v i
� o 0
ae
t_ ,n n
a
Q — _ ?
\ — c x
— E
2 E - m �
o L
° d m
c o
c w E
E r E
K E m
S m man m
pPo
I�
Historical Research
Associates
WSDOT OH Audit Letter
Approved ANTE Table,
1
11
f
l
Aft
Washington State I u yellollliuiivent IIIAylsuon
Department of Traiinsportation o Ili'rc A ,e, Vic"u.,r ffic;
.rrrivu r1a„'^i•„ 9 fl]l 6504
'i..�Y° 1 80&1,331 6 iffl
rnnr w vvsrrR)t,ov""i.r,lov
July 7, 2022
Historical Research Associates, Inc.
125 Bank Street, 51" Floor
Missoula, MT 59802
Subject: Acceptance FYE 2021 ICR—Cognizant Review
Dear Reidun Nielsen:
We have accepted your firms FYE 2021 Indirect Cost Rate (ICR) of 106.18%of direct
labor based on the "Cognizant Review" from the Montana Department of
Transportation. This rate will be applicable for WSDOT Agreements and Local Agency
Contracts in Washington only. This rate may be subject to additional review if
considered necessary by WSDOT. Your ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
Any other entity contracting with your firm is responsible for determining the
acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
�corisu,I a iigilil(sika I n—S(I()—t-m 111 Ly -
Regards;
w �
ERIK K. JONSON
Contract Services Manager
EKJ:ah
K 11 I1111:311 11 ll:::::::9.."I
Actuals Not To Exceed Table (ANTE)
WSDOT Agreement:
Historical Research Associates, Inc.
1904 Third Ave Ste 240
Seattle, WA 98101
Job Classifications Direct Labor Hourly
Billing Rate NTE
ADMINISTRATIVE ASSISTANT 3 $27.94
ADMINISTRATIVE ASSISTANT 5 $34.16
COMMUNICATIONS CONSULTANT 3 $34.61
CONTRACTS SPECIALIST 3 $29 26
VT SPECIALIST 3 $4
634
TRANSPORTATION ENGINEER 2 $4105
TRANSPORTATION PLANNING SPECIALIST 1 $32.2.9
TRANSPORTATION PLANNING SPECIALIST 3 $38,26`
TRANSPORTATION PLANNING SPECIALIST 5 $61.2.0
Exhibit C
ri
ti
ry
oo
ro
ho
rn
O
.................
f6 q 0 q 0 q 0 q 0 R 0 R 0 q 0 E
'0 0 0 0 0 0 0
In 'A Vb
0 0 0 0 0 0
00.
16
0 0 0 0 0 0 0
16 .� ll�
0 'm -ma
0
eww3 N luelinsuo:) 0
,O!ZE!Ioo Sq 'P
1 o o
o o o o o d cs 'n
"d
einel joi3aj!o
'jall!vq aj aluosslgel cA ob .6
M a,
A m o o o c o o
to
o o 5
c,
Sl o o o o. o.0 m R
o 6 6 c; ci::ci
o
x 2
cc
OC
m
E
E cc
o cc
o
10 r
ce
E o r
'A o
E u
u
o
ffi '
2 o wr a o o w m N m w
o m m Iv -e Itr
'1V ij
a
PRR, Inc
Pending wsool off Letter
Pending - ANTE TableI
�I II III
I� � 111 , Illi
INIIIIII �i i
Iryhay4*. �r ��
IFS �
�I��IOYh� p' I y�l
4 � Ii7� Sj
II Illllllllllh�u��,���
Michael Minor I�II�� II
& Associates
Safe Harbor Indirect CostRate Extension
Nate Table
I �II��Vrll il;,
Iliilllulu�i�,!
� 1� r
Ih II II V II 9
AOL
Washington State Devehqxrnent 1)11AMon
Contract Se via Office
Department of Transportation PO Box 47408
OlyiinrAa,WA 98504 7408
7345 V undeirson Way SW
-hunwateir,WA 98501 6504
I I Y: 1 100 fa 6'88
June 23, 2022
Michael Minor& Associates, Inc.
4923 SE 26'h Avenue
Portland, OR 97202
Subject: Acceptance FYE 2021 ICR—Audit Office Review
Dear Michael Minor;
Transmitted herewith is the WSDOT Audit Office's memo of"Acceptance" of your
firm's FYE 2021 Indirect Cost Rate (ICR) of 79.49% of direct labor. This rate will be
applicable for WSDOT Agreements and Local Agency Contracts in Washington only.
This rate may be subject to additional review if considered necessary by WSDOT.Your
ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with your firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
consultantrates,'..
R.e ards;
ERIK K. JONSON
Contract Services Manager
EKJ:ah
II II I3 1 II 9 3
Date 7/5/22
Minor&Associates, �. ... .. ....... ...�.. ...._
es Inc Proposed ICR Proposed
Company Name: Michael Fixed Fee
Address: 4923 SE 36th Avenue
City/State/Zip Portland,OR 97202 0.7949 0.3
Subject:Proposed Hourly Rate Statement
Attention:Manager,Consultant Services Office
Below are the highest anticipated hourly billing rates for the identified labor classifications.
Michael Minor&Associates,Inc. certifies they have an accounting system that contains separate accounts
or sub-accounts for unallowable costs in accordance with FAR(48 CFR Part 31),and the capacity to track direct costs that are
allocable directly to projects.
Michael Minor&Associates,Inc. also certifies they have a labor-charging/time keeping system that is
complete and sufficiently detailed to allow for a proper determination of direct and indirect labor costs.
Labor Classifica
tion Labor Rate Indirect Fixed Fee NTE Rate
Cost Rate Add Row
Principal $75.00 $59.62 $22.50 $157.12 Delete Row
Traffic Analyst $35.00 $27.82 $10.50 $73.32
Respectfully,
-------------
Signature
..... .. . ......
Title Principal,President
V
1
Il11 h
1�V
Parametriz
wsooTox Hoer ieacer ��IIIi Ii IViH� III
Approved ANTE Tab Ili � � l 111 ill ��
i I IIII! ii�'I�
Irt
MPA Actuals Not To Exceed Table (ANTE)
WSDOT Agreement:
Parametrix, Inc.
1019 39th Avenue NE, Suite 100
Puyallup, WA 98374
Direct Labor Overhead Fixed Fee All Inclusive
Job Classifications Hourly Billing NTE* NTE Hourly Billing
Rate NTE 172.55% 30.00% 1 Rate NTE
Administrative Assistant 3 $24.27 $41.881 $7.28 $73.43
Administrative Assistant 3 $29.20 $50.38 $8.76 $88.34
Administrative Assistant 3 $M94 $53.39 $9.28 $93.61
Audit Specialist- DOT 4 $48.97 $84.50 $14.69 $148.16
Bridge En sneer 1 $42.35 $73.07 $12.71 $1.28.13
Bridge Engineer 3 $51.08 $88.14 $15.32 $154.54
Bridge Engineer 5 $63.16111 $108.98 $18.95 $191.09
Bridge Technician 2 $26.00 $44.86 $7.86 $78.66
Budget Analyst 3 $37.65 $64.97 $11.30 $113.91
Budget Analyst 3 $44.36 $76.54 $13.31 $134.21
Civil Engineer 2 $37.97 $65.52 $11.39 $114.88
Civil En ineer 4 $87.56 $151.08 $26.27 $264.91
Communications Consultant 3 $17.00 $29.33 $5.10 $51.43
Communications Consultant 3 $28.60 1 $49.35 $8.58 $86.53
Communications Consultant 3 $30.03 $51.82 $9.01 $90.86
Communications Consultant 3 $31.44 $54.25 $9.43 $95.12
Communications Consultant 3 $32.41 $55.92 $9.72 $98.05
Communications Consultant 3 $34.80 $60.05 $10.44 $105.2.9
Communications Consultant 5 $54.25 $93.61 $16.28 $164 13
Communications Consultant 5 $55,00 $94.90 $16.50 $166.40
Communications Consultant 5 $40.87 $70.52 $12.26 $123.65
Construction Project Coordinator 2 $54.14 $93.42 $16.24 $163.80
Construction Project Coordinator 3 $57.69 $99.54 $17.311, $174.54
Construction Project Coordinator 3 $58 97 $101.75 $17.69 $178.41
Construction Project Coordinator 4 $46.97 $81.05 $14.09 $142.11
Construction Project Coordinator 4 $47,98 $82.79 $14.39 $145.16
Construction Project Coordinator 4 $85.39 $147.34 $25.62 $258.35
Contracts Specialist 2 $35.36 $61.01 $10.61 $106.98
Contracts Specialist 2 $35.73 $61.65 $10.72 $108.10
Contracts Specialist 2 $43.46 $74.99 $13.04 $131.49
Contracts Specialist 3 $5188 $91.24 $15.86 $159.99
Contracts Specialist 3 $60.30 $104.05 $18.09 $182.44
Contracts Specialist 3 $83.20 $143.56 $24.96 $251.72
,Deputy $69.89 $120.60 $20.97 $211.45
Deputy $87.50 $150.98 $26.25 $264.73
Deputy $108.61 $187.41 $32.58 $328.60
Deputy $112.81 $194.65 $33.84 $341.31
Deputy $150.90 $260.38 $45.27 $456.55
lDeputy $166.40 $287.12 $49.92 $503.44
Deputy $260.00 $448.63 $78.00 $786.63
209.29 $36.391 $366.96
Director $12L29 $
Director $129.87 $224,09 $38-96 $392.92
Drafting Technician 3 $29-03 $50-09 $8.71 $87M,
Drafting Technician 3 $38.50 $66,43 $11.55 $116.48
Engineer $37.97 $65.52 $1139 $114.88
En2ineer..... $65.54 $113.09 $19.66 $198.29
Engineer $109.01 $188.10 $32.70 $329.81
En2lineering Aide 2 $2�6.00 $44.86 $7.80 $78.66
Engineering Aide 4 $29.02 $50.07 $8.71 $8T80
Engineering Aide 4 $31.96 $55.15 $9.59 $96.69
Engineering Assistant 2 $38.30 $66.09 $11.49 $115.88
Engineering Technician 3 $45.84 $79.10 $13.75- $138.69
Engineering Technician Lead $52.00 $89.73 $15.60 $15733
Engineering Technician Lead $57.55 $99.30 $17.27 $174.12
Engineering Technical Supervisor $67.21 $115.97 $20.16 $203.34
Environmental Engineer 2 $4114 $70.99 $12.34 $124.47
Environmental En2ineer 4 1 $49.38 $85.21 $14.81 E_��149AO
Environmental Engineer 4 $54.91 $94.75 $16.47 $16613
�Environmental En2ineer 4 $63.16 5108.98 $18 $191,09
�Environmental Engineer 4 $70.521 $121.68 $21.16 $213.36
Environmental Planner 2 $40.00 $69.02 $12.00 $121.02
Environmental Planner 5 $46.21 $79,74 $13.86 $139.81
Environmental Planner 5 $48.67 $83.98 $14.60 $147.25
Environmental Planner 5 $50.79 $87.64 $15.241 $15167
Environmental Planner 5 $72.99 $125.94 $21.90 $220.83
Environmental Specialist 3 $22.88 $39.48 $6.86 $69.22
Environmental Specialist 3 $23.92 $41.27 $7.18 $72.37
Environmental Specialist 3 $33.53 $57.86 $10.06 $101.45
Environmental Specialist 3 $37.11 $64.03 $11.13 $112.28
Environmental Specialist 5 $32.45 $55.99 $9.74 $98.18
Environmental Specialist 5 $39.00 $67.29 $11.70 $117.99'
Environmental Specialist 5 $46.80 $80.75 $14.04 $141.59
Facilities Engineer 1 $46.58 $80.37 $13.97 1 $140,93
Facilities Engineer 1 $46.91 $80.94 $14.07 $141.93
Facilities Engineer 1 $57.69 $99.54 $17.31 , $174.54
Facilities Engineer 1 $6939 $119.73 $20.82 $209.94
Facilities Engineer 4 $49.21 $84.91 $14.76 $148.88
Facilities Engineer 4 $85.04 $146.74 $25.51 f $257.29
Facilities Engineer 4 $87.56 $151.08 $26.27 $264.91
Facilities Planner 1 $35.57 $61.38 $10.67 $107.62
Facilities Planner 2 $40.0,10 $69.02 $12,00 $121.02
Facilities Planner 2 $55.01 $94.92 $16.50 $166.43
IT Specialist 3 $30.65 $52.89 $9,20 ' $92.73
IT Specialist 3 $31.00 $53.49 $9.30 $93.79
IT Specialist 3, $43.04 $74.27 $12.91 $,130.22
IT Specialist 3 $6120 $105.60 $18.36 $185.16
IT Specialist 3 $80,48 $138.87 $24.14 $243.49
Land Survey 2 $33.28 $57.42 $9.98 $100.69
Land Survey 2 $37,00 $63.84 $11.10 $111.94
�Land Survey 3 $45.50, $78.51 $13.65 $137.66
'Land Surn 3 $56,16 1 11111111 $96 90 ....... $16 85 $169.91
Land Survey 3 $75.00 $129.41 $22,50 $226.91
Mechanical Engineer $37.97 J $65.52 $11.39 $114.88
Mechanical Engineer Su er0sor $87.56 $151.08 $26.27 $264.91
Senior Graphic Designer $26.00 $44.86 $7.80 $78.66
Senior Graphic Designer $48.10 $83.00 $14.43 $145.53
Transportation Engineer 2 $37.97 $65.52 $11.39 $114.88
Transportation Engineer 3 $42.35 $73.07 $12.71 $128.13
Transportation Engineer 4 $51.08 $88A4 $15.32 $154.54
Transportation Engineer 5 $63.16 $108.98 $18.95 $191.09
,Transportation Engineer Intern $26.00 $44.86 $7.80 $78.66
iTransportation Planning Specialist 1 $35.57 $61.38 $10.67 $107.62
Transportation Planning Specialist 3 $40.00 $69.02 $12.00 $121.02
Transportation Planning Specialist 5 $50.79 $87.64 $15.24 $153.67
Transportation Plannin2 S ecialist 5 $55.01 $94.92 $16. 0 $166.43
Transportation Planning Specialist.5 $78.171 $134.88 $23.45 $236.50
Transportation Planning Technician 1 $24.20 111111 $41.76 $7.26 $73.22
Transportation Planning Technician 2 $..
35.57 $61.38 $10.67 $107.62
Transportation Planning Technician 3 $50.79 $87.64 $15.24 $153.67
Transportation regional Administrator $166.40 ' $287.12 $49.92 $503.44
Transportation Technical Engineer $104.76 $180.76 $31.43 $316.95
Transportation Technical Engineer $166.40 $287.12 $49.92 $50144
Transportation Technician 1 $17.00 $29.33 $5.10 $51.43
Transportation Technician 3 $26.00 $44.86 $7.80 $78.56
Transportation Technician 3 ( $30.03 $51.82 $9.01 $90.86
Transportation Technician 3 $32.26 $55.66 $9.68 $97.60
$0.00 $ M L-00
Amok
Om WasNington State Devellopment DMsioin
C','cjntract SerOces Office
Department of Transportation FIO Box 47408
Ciymp;a,WA 9B504 7408
7345[Jnd�'mrson Way SW
Turnw-ater,VVA 985�01-6504
FIFY: 1-8010 833 CM88
wvvw.wsdot.vva.gov
August 24, 2022
PRR, Inc.
1501 Fourth Avenue, Suite 550
Seattle, WA 98 101
Subj ect: Acceptance FYE 2021 ICR—CPA Report
Dear Lynnette Bradbury:
We have accepted your firms FYE 2021 Indirect Cost Rate (ICR) of 166.3 1% of direct
labor(rate includes 0.04%Facilities Capital Cost of Money) based on the "Independent
CPA Report," prepared by Smith Bunday Berman Britton, P.S. This rate will be
applicable for WSDOT Agreements and Local Agency Contracts in Washington only.
This rate may be subject to additional review if considered necessary by WSDOT. Your
ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with the firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
cons ultantrateskwsdot.w a.gov.
Regards;
..........
LX1X1 K. J%J I N 13 VIII NT
Contract Services Manager
EKJ:ah
PRR, Inc.
15014th Avenue
Seattle, WA 98101
Actuals Not To Exceed (ANTE) Table
2022-2023 Rate Period
Agreement:
Job Classifications Direct Labor Overhead NTE* Fixed Fee NTE All Inclusive Hourly
Rate NTE* Biling Rate NTE
166.31% 30.00%
Intern $ 23.75 $ 39.50 $ 7.13 $ 70.37
Junior Administrator $ 27.73 $ 46.12 $ 8.32 $ 82.17
Senior Administrator $ 40.16 $ 66.79 $ 12.05 $ 119.01
Manager $ 50.87 $ 84.61 $ 15.26 $ 150.74
Consultant 1 $ 37.00 $ 61.53 $ 11.10 $ 109.63
Consultant 11 $ 47.51 $ 79.02 $ 14.25 $ 140.78
Senior Consultant $ 80.34 $ 133.61 $ 24.10 $ 238.04
Director $ 101.50 $ 168.81 $ 30.45 $ 300.77
Associate Director $ 66.83 $ 111.15 $ 20.05 $ 198.03
Senior Director $ 107.03 $ 178.00 $ 32.11 $ 317.13
Principal $ 107.03 $ 178.00 $ 32.11 $ 317.13
Confidential PRR,Inc.2020 ANTE TABLE 9/8/2022 Page 1
8/18/22,12:50 PM Corporations and Charities System
BUSINESS INFORMATION
............ ..........
Business Name:
PARAMETRIX,INC.
UBI Number:
600 135 349
Business Type:
WA PROFIT CORPORATION
Business Status:
ACTIVE
Principal Office Street Address:
1019 39TH AVE SE,SUITE 100,PUYALLUP,WA,98374-2115,UNITED STATES
Principal Office Mailing Address:
1019 39TH AVE SE,SUITE 100,PUYALLUP,WA,98374-2115,UNITED STATES
Expiration Date:
04/30/2023
Jurisdiction:
UNITED STATES,WASHINGTON
Formation/Registration Date:
04/26/1974
Period of Duration:
PERPETUAL
Inactive Date:
Nature of Business:
PROFESSIONAL,SCIENTIFIC&TECHNICAL SERVICES
REGISTERED AGENT INFORMATION
Registered Agent Name:
C T CORPORATION SYSTEM
Street Address:
711 CAPITOL WAY S,SUITE 204,OLYMPIA,WA,98501-1267,UNITED STATES
Mailing Address:
GOVERNORS
Title Governors Type Entity Name First Name Last Name
GOVERNOR INDIVIDUAL JEFFREY PEACOCK
GOVERNOR INDIVIDUAL BRENT DIEMER
https://ccfs.sos.wa.govt#/BusinessSearch/Businessinformation 1/1
8/18/22, 12:52 PM Washington State Department of Revenue
< Bu"!wIIIVYIness t.a okup
License Information: Now search Back to resuulh s
Entity name: PARAMETRIX, INC.
Business name: PARAMETRIX,INC.
Entity type: Profit Corlporaatt:orun
UBI#: 600-135-349
Business ID: 001
Location ID: 0001
Location: Active
Location address: 1019 39TH AVE SE
STE 100
PUYALLUP WA 98374-2115
Mailing address: 1019 39TH AVE STE 100
PUYALLUP WA 98374-2115
Excise tax and reseller permit status: tak i<here
Secretary of State status: Ock(here
Page i" of 6 ip'iilW
Endorsements is llld at this toc Il..iiceinse 9 Count l)eta'iiflr staalf:lps lixpfi atholin IJA II'Ilm'.rt lirsar ruaiice
C erntraafllau GE:!mr ral Ilfknsiinerss A tivp Apr-30-2023 Dec-14-2018
-IINoin Ili aeslide nt
C elhaall s General Business Active Apr-30-2023 Dec-14-2018
Non tturn,asils:l ml:
Chelan t.AericrA Iltuusurness Active Apr-30-2023 Apr-15-2021
Non.Resident
Cheiney t-e neir ul i"tnursi nee s. B U`2013 003 Active Apr-30-2023 Jan-15-2019
L1a:alrn l:,unaslrie ntt:
https://secure.dor.wa.gov/gteunauth/—/#4 1/3
8n8/22.12:52Pw Washington State Department mRevenue
Endorsements held ot thulou License# Count Details Status sxrmuvnum First issuance
[omc,ote GeneiraU Business Acdve Feb'28'2023 Feb'18_2022
Non Resident
[ovingtonGenera� Act�ve Apr-30'2023 ]xn'23'2013
Business Nom-Resident
Deer Park GenemU Business Ac:tive Feb'28'2023 Feb'17'2022
Non-Resident
DuvaYUGeneiraUBusimess AcbW Apr-30'2023 ]u|'09'2013
"non-Resident
EmtmnviUeGeneraU Business A�Aive Apr-30-2023 Nov'28'2017
Non-Resilent
EdmomdsGenera| Business Actve Apr-30'2023 Apr-12'2021
Non-Residemt
EUensburgGenei4 Active Feb'28'2023 Fob'17'2022
Business Non-Rasident
EnumclawGenera\Business [UST0000523 Auve Apr-30'2023 ]an-23-2013
Non-111esident
Ephirma General 8usiness Active Apr-30'2023 Doc'27'2016
Non-Resident
Federa|Way GeneraU 90'101843'00 Acive Apr-30'2023 ]an'25'2000
Business Non-Rasident
FifeGeneeABusiness Achve: Apr-30'2023 ]an'13'2017
Nmn-Resilent
Governing People May include governing people not registered with Secretary*m=
Governing people Title
o|swsR, anENT
PsA[O[K,]srFREY
Registered Trade Names
Registered trade names smms First issued
PARAMETR|X|Nc Active Dec'18'2018
PAnAxxsTn|X, |m[ Active oec'30'2021
PAnAmsTn|X, |N[. ^ Active Scp'16'1986
https://secure.dor.wa.gov/gteunauth/—/#4 2/3
-
onomu. u:suPM Washington State Department of Revenue
View Additional Locations
The Business Lookup information is updated nightly.Search date and time:8/18/2022
12:51:S6pm
Contact us
Howave we doing?
rahe oarsmrmW
Don't see what YOU expected?
ChecIlk if your 11browserissur.i1pmrted
_
https://seovre.00rwo.00v/gteunoumL/w4 om
RETURN TO.,. PW ADMIN EXT: 2700 ID#: Ll
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
1. ORIGINATING DEPT/DIY: PUBLIC WORKS/
2. ORIGINATING STAFF PERSON: Desi .ee Winkler... EXT: 2711 3. DATE REQ.By. 7/ 1
/22
3. TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
0 CONTRACT AMENDMENT(AG#): 1 7-134 ❑ INTERLOCAL
m OTHER Supplement NO 8
4. PROJECT NAME: City Center Access Protect
5. NAME OF CONTRAC'.TOW Parmetrix
ADDRESS; 7�1 2ND A...
'� JI�F SUITE0 SEATTt_E WA ' 8104 „.�.'&i1,I PI6IJN@ :2C�C '19, 8t�4 .... .....
F:-PvI��)'n :..Jenny Anderson <JAnder On(a-)D irametrix.com>
SIGNATURE NAME: Jeffrey Pe coo
6. EXHIBITS AND ATTACHMENTS:0 SCOPE,WORK OR SERVICES 0 COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#, BL,EXP. 12/31/..,_._..... ,UBI EXP. � ..-_..............�n,..
7. TERM: COMMENCEMENT DATE: COMPLETION DATE: Dec 31, 2024
8. TOTAL COMPENSATION:s n0 change_Wlth this SUppl. 8 (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES d NO IF YES,MAXIMUM DOLLAR AMOUNT: ..................................
IS SALES TAX OWED: ❑YES ❑NO IF YES,$ ,, PAID BY: ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: -- p RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
O PURCHASING: PLEASE CHARGE TO: 3064400-208-595-63-xxx(Po )
9. DOCUMENT/CONTRACT REVIEW INITIAL P
.�DATE REVIEWED INITIAL..............AT.EPROV ED
..........................�........ .
❑ PROJECT MANAGER
❑ DIVISION MANAGER
8 DEPUTY DIRECTOR DSW 7114/22
8 DIRECTOR EJW 7/15/2022
❑ RISK MANAGEMENT (IF APPLICABLE)
8 LAW DEPT TMW 7/15/22
10. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: "la COMMITTEE APPROVAL DATE:
SCHEDULED COUNCIL DATE: "/a COUNCIL APPROVAL DATE:
11. CONTRACT SIGNATURE ROUTING
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: 7115122 DATE REC'D:7118/22
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
EXHIB.............. .........,,
ITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑ FINANCE DEPARTMENT
8 LAW DEPT
8 SIGNATORY MAYOR OR DIRECTOR
❑ CITY CLERK
❑ ASSIGNED AG#
❑ SIGNED COPY RETURNED DATE SENT:
COMMENTS:
EXECUTE" "ORIGINALS
1/2020
SUPPLEMENT NO. 8
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement entered
into with Parametrix, Inc. effective the 23rd day of August 2017, identified as Agreement
No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018, Supplement
No. 2 dated May 10, 2018, Supplement No. 3 dated August 14, 2018, Supplement No. 4
dated July 11, 2019, Supplement No. 5 dated October 29, 2019, Supplement No. 6 dated
June 10, 2020, Supplement No. 7 dated July 14, 2021. All provisions in the Agreement
remain in effect except as expressly modified by this supplement, "Supplement No. 8."
The changes to the Agreement are described as follows:
I
Section IV, Time for Beginning and Completion, shall be amended to extend the
completion date to December 31, 2024.
Signed this ! day of , 2022.
PARAMETRIX, INC.: CITY OF ERAL 1AY:
By: By:
4Jeey0eaL7-- rn Ferrell
Its: Chief Executive Officer Its: Mayor
719 2nd Avenue, Suite 200 33325 8th Ave S
Seattle, WA 98104 Federal Way, WA 98003
(206) 394-3664 (253) 835-2401
APPROVED AS TO ORM:
Ryan Call, City Attorn
7/15/22, 11:50 AM Corporations and Charities System
BUSINESS INFORMATION
.............--.... ......... ......
Business Name:
PARAMETRIX,INC.
UBI Number:
600 135 349
Business Type:
WA PROFIT CORPORATION
Business Status:
ACTIVE
Principal Office Street Address:
1019 39TH AVE SE,SUITE 100,PUYALLUP,WA,98374-2115,UNITED STATES
Principal Office Mailing Address:
1019 39TH AVE SE,SUITE 100,PUYALLUP,WA,98374-2115,UNITED STATES
Expiration Date:
04/30/2023
Jurisdiction:
UNITED STATES,WASHINGTON
Formation/Registration Date:
04/26/1974
Period of Duration:
PERPETUAL
Inactive Date:
Nature of Business:
PROFESSIONAL,SCIENTIFIC&TECHNICAL SERVICES
REGISTERED AGENT INFORMATION
.................... ......
Registered Agent Name:
C T CORPORATION SYSTEM
Street Address:
711 CAPITOL WAY S,SUITE 204,OLYMPIA,WA,98501-1267,UNITED STATES
Mailing Address:
GOVERNORS
-.......... .......
Title Governors Type Entity Name First Name Last Name
GOVERNOR INDIVIDUAL JEFFREY PEACOCK
GOVERNOR INDIVIDUAL BRENT DIEMER
https://ccfs.sos.wa.gov/#/BusinessSearch/Businessinformation 1/1
7/15/22,11:51 AM Washington State Department of Revenue
< Business Lookulp
License Information: ll'Jew seavch 113ack to Tresults
Entity name: PARAMETRIX, INC.
Business name: PARAMETRIX, INC.
Entity type: Profit.Corporation
LIBI#: 600-135-349
Business ID: 001
Location ID: 0001
Location: Active
Location address: 1019 39TH AVE SE
STE 100
PUYALLUP WA 98374-2115
Mailing address: 1019 39TH AVE STE 100
PUYALLUP WA 98374-2115
Excise tax and reseller permit status: Olick Ihoeire^
Secretary of State status: ("Jid<here
< Page 2 of 6 >
Filter
[Eividoirseii,nents
Endairsements i-iield at this Noc License count Details Status Exphiation dat Fbist issimice
Centraha Geneirall ilusiness Active Apr-30-2023 Dec-14-2018
... Noin.11:tesideint
Chehahs General :tUsiness Active Apr-30-2023 Dec-14-2018
Noon Iltesident
Chelan Geneirall Business Active Apr-30-2023 Apr-15-2021
Non :kesideint
(.-.1heney Geineiral 11:3usiness- BUS2013 003 Active Apr-30-2023 Jan-15-2019
INoin-Ilteusildent
hftps://secure.dor.wa.gov/gteunauth/—/#5 1/3
rnomu. n:mxm Washington State Department mRevenue
Endorsements held at this mcLicense# Count Details Status Expiration dal First issuance
Concrete Genera| 8usinea Active Feb'28-2023 Feb'16-2022
Non-ResHent
[mvinQtonGenermU Active Apr-30'2023 )xn'23'2013
Business Non-Re»ident
Deer ParlirGeneirraUBusineus Active Feb'28'2023 Feb'17'2022
Mon-Resident
Duva|UGeneraiBusiness Active Apr-30'2023 ]u|'09'2013
Nom-Resident
EatonviUeGeneraiBusiness Active Apr-30'2023 Nm-28'2017
Non-Resident
Edmonds Geneva| Business Active Apr-]0'202] Apr-12'2021
Nom-Resident
EDensburgGenerA Aci:Jve Feb'28'2023 Feb'17'2022
Business Mon-Resident
EnumcUawGeneimiBusiness [UST0000523 Active Apr30'2023 ]an'23'2013
Non-Resdent
Ephirala General gusincsy Active Apr-30'2023 Dec'27'2010
Non-Resident
FederA Way GeneirA 90'101843'00 Active Apr-30'2023 ]an'25'2000
Business Non-geodknt
F�feGonera| Business Active Apr30'2023 bn'13'2017
Non-Resident
Governing People May include governing people not registered with Secretary*State
Governing people Title
msmsR, ansmT
psAcocK,JsFpnsv
Registered Trade Names
Registered trade names Status First issued
PAnAxxsTn|x|N[ Active oec'18'2018
PARAK4ET0X, |N[ Active oec'30'2021
PARAK4ETR|X, |N[. Active Sep'16'1988
hupv:xnooum.ovcwa.nvwnteunaumL/#o um
7/15/22,11:51 AM Washington State Department of Revenue
View Additional Locations
The Business Lookup information is updated nightly.Search date and time:7/15/2022
11:52:11 AM
Contact ups
11 rm/v acre we doungr
Tallke our suurvey!I
Don't:see What you expected?
Check if your IIbirowser is supported
https://secure.dor.wa.gov/gteunauth/_/#5 3/3
RETURN TO: PW ADMIN EXT: 2700 ID#: 3928
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
1. ORIGINATING DEPT/Div: PUBLIC WORKS/CAPITAL ENGINEERING
2. ORIGINATING STAFF PERSON: NAVEEN CHANDRA EXT: 2729 3. DATE REQ.BN':'6/15/21
3. TYPE OF DOCUMENT(CHECK ONE):
O CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
m CON rN"IAC r AMI7NI)Mh;�N°r(rAG#�): 17-134 ❑ INTERLOCAL
0 OTHER R SUPPLEMENT#7�
4. PROJECT NAME: CITY CENTER ACCESS PROJECT
5. NAME OF CONTRAC"fOR;, PARAMETRII a INC _
ADDRESS: 719 2ND AVENUE _-E S�J��Ic , :�. �ET�I.E, A 1�ti4 �"�i.r.��r�O �,.,20m 394- 664
mm_._...�
E-MAIL;SGLO'V"ER� PARAMETRI .COM FAQ;655 542-6353
SIGNATURENAME-JEF"`ERY PEACOCK T'Ir2ar::CEO
6. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES ❑COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 m101843m 0 BIL,EXP.12/31�� um#,600135349
7. TERM: COMMENCEMENT DATE:AUGUST 23, 2017 COMPLETION DATE: JULY 30, 2922
8. TOTAL COMPENSATION:$3 7 3.�14 0_(. 37,43 1 N C TH IS d (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: la YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: s 93530.61 ( 0 THIS AM D)
IS SALES TAX OWED: ❑YES ❑NO IF YES,$, 93 8(. t 9 TH I AMP _ PAID BY: ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: .,. .,.,., "�RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
❑ PURCHASING: PLEASE CHARGE TO: 306-4400-207-595-30-411
9. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED
6 PROJECT MANAGER NC 1"-21
6 DIVISION MANAGER SLH 619@021
6 DEPUTY DIRECTOR DSW W9121
8 DIRECTOR EJW 6/1 512 0 2 1
❑ RISK MANAGEMENT (IF APPLICABLE)
8 LAW DEPT KvA 6/15/2021
10. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE:,., COMMITTEE APPROVAL DATE:
SCHEDULED COUNCIL DATE: COUNCIL APPROVAL DATE:
11. CONTRACT SIGNATURE ROUTING 1,,�`',,,
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: LJA 0.�+►, DATE REC'D: r ,, h ( 2A
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑ FINANCE DEPARTMENT
,�eI.AW DEPT I 1 I
,t'SIGNATORY(MAYOR OR DIRECTOR)
�KCCITY CLERK �T 0' , I
❑ ASSIGNED AG# AG# _ t
❑ SIGNED COPY RETURNED DATE SENT:
COMMENTS:
EXECUTE" "ORIGINALS
V/?'4'20
SUPPLEMENT NO. 7
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc. effective the 23rd day of August 2017, identified as
Agreement No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018,
Supplement No. 2 dated May 10, 2018, Supplement No. 3 dated August 14, 2018,
Supplement No. 4 dated July 11, 2019, Supplement No. 5 dated October 29, 2019 and
Supplement No. 6 dated June 10, 2020. All provisions in the Agreement remain in effect
except as expressly modified by this supplement, "Supplement No. 7."
The changes to the Agreement are described as follows:
I
Section II, Scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-7" attached hereto and incorporated by this
reference (Additional Services).
I I
Section IV, Time for Beginning and Completion, shall be amended to,extend the
completion date to July 30, 2022.
III
Section V, Payment Provisions The maximum amount payable under this Supplement No. 7
inclusive of all fees and other costs is Two Hundred Forty-Nine Thousand Three Hundred
Thirty-Seven and 43/100 Dollars ($249,337.43) for a total amount payable to the Consultant
pursuant to the Agreement, Supplement No. 1, Supplement No. 2, Supplement No. 3,
Supplement No. 4, Supplement No. 5, Supplement No. 6, and this Supplement No. 7,
inclusive of all fees and other costs, to be an amount not to exceed Three Million Seven
Hundred Eighty-Three Thousand One Hundred Forty-One and 80/100 Dollars
OCRA`V ieY II V-CG,`w4;u.omo dlr.[rxnlmeua`If urcspo.a,ea\4:y,G.a rrtaAa:e:a:a\1Q1V"7�.Ganua9,ul¢.00-.0„ramuvcn¢ II°AAA.7:4111\.A.n,irai I:�0,;nl\n 111 NA 1'Y'll8A[°1"...AG k7 0 C,C..G.AuulgAlkir[c is
Nan"X,arcn-
($3,783,141.80). The attached Exhibit"D-7" and "E-7,"which describes the payment for work
to be performed under this Supplement No. 7, is hereby made a part of the Supplemental
Agreement.
Signed this elday of 2021.
wumm
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
By: , By:
JAlc;' eacock i Feri' 11
Its: Chief Executive Officer Its: Mayor
719 2nd Avenue, Suite 200 33325 8th Ave S
Seattle, WA 98104 Federal Way, WA 98003
(206) 394-3664 (253) 835-2401
APPROVED AS T ORM:
�f',e / ll, CityRyan �Ca A n
y
IO\TRAFFIC\Grants&Projects\Projects\Qry Center Access\2017\Consultant Agreement-PNIS 2017\A men dment#7\FinaI\2 I-IN Al,DRAFT-AG 17-134 CCA Supplement
No7 doer
RETURN TO: PW ADMIN EXT: 2700 ID#: 374°
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
1. ORIGINATING DEPT/DIv: PUBLIC WORKS/STREETS
2. ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:RUSH
3. TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
❑ CONTRACT AMENDMENT(AG#):17-134 ❑ INTERLOCAL
($ OTHER SUPPLEMENT#6
4. PROJECT NAME:CITY CENTER ACCESS
5. NAME OF CONTRACTOR:PARAMETRIC,INC
ADDRESS:719 2ND AVENUE SUITE 200.SEATTLE,WA 98,104 TELEPHONE:(206)394-3664
E-MAIL:SGLQVEERgPARAMET'RIt.COM FAX:(855)542-6353
SIGNATURE NAME:JEFFERY PEACOCK TITLE:CHIEF EXECUTIVE OFFICER
6. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 101843 000 00 BL,EXP.04/30/2021 UBI#600135349 EXP.
7. TERM: COMMENCEMENT DATE:AUGUST 23,2017 COMPLETION DATE:DECEMBER 30 2021
8. TOTAL COMPENSATION:$3.533.80437(INCL$1.199.721.62 THIS AMD) (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: X YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $93580.61(INCL$28482 THIS AMD)
IS SALES TAX OWED: ❑YES ❑NO IF YES,S PAID BY: ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
❑ PURCHASING: PLEASE CHARGE TO:306-4400-208-59,E-63 _
9. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED
X PROJECT MANAGER NG L5 H 2-2c
X DIVISION MANAGER SLH 05/05/2020
X DEPUTY DIRECTOR OSW 5/6120
X DIRECTOR
❑ RISK MANAGEMENT (IF APPLICABLE)
X LAW DEPT ER 5/15/2020
10. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: COMMITTEE APPROVAL DATE:
SCHEDULED COUNCIL DATE: COUNCIL APPROVAL DATE:
11. CONTRACT SIGNATURE ROUTING
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: DATE REC'D:
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑ FINANCE DEPARTMENT
❑ LqLDEPT r
IB-S[GNAToRy(MAYOR OR DIRECTOR)
❑ CITY CLERK
❑ ASSIGNED AG# AGS
❑ SIGNED COPY RETURNED DATE SENT:
❑RETURN ONE ORIGINAL
COMMENTS:
EXECUTE"2"ORIGINALS
1/2018
SUPPLEMENT NO. 6
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc. effective the 23rd day of August 2017, identified as
Agreement No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018,
Supplement No. 2 dated May 10, 2018, Supplement No. 3 dated August 14, 2018,
Supplement No. 4 dated July 11, 2019 and Supplement No. 5 dated October 29, 2019.
All provisions in the Agreement remain in effect except as expressly modified by this
supplement, "Supplement No. 6."
The changes to the Agreement are described as follows:
I
Section II, Scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-6" attached hereto and incorporated by this
reference (Additional Services).
I I
Section IV, Time for Beginning anti Completion, shall be amended to extend the
completion date to December 30, 2021.
III
Section V, P ions
A. Hourly Rates: The direct (raw) labor rates and classifications and indirect cost rate
as shown on Exhibits "D-6" and "E-6" are attached hereto and incorporated by this
reference.
C. The maximum amount payable under this Supplement No. 6 inclusive of all fees
and other costs is One Million One Hundred Ninety-Nine Thousand Seven Hundred
Twenty-One and 62/100 Dollars ($1,199,721.62) for a total amount payable to the
Consultant pursuant to the Agreement, Supplement No. 1, Supplement No. 2,
Supplement No. 3, Supplement No. 4, Supplement No. 5 and this Supplement No.
6, inclusive of all fees and other costs, to be an amount not to exceed Three Million
Five Hundred Thirty-Three Thousand Eight Hundred Four and 37/100 Dollars
1:.\l R UTI C\(vcmrs it Pruicccc\T'roµ•cec\ran-Ce r lease\NI 7\r:onsaram r\g,re ,,c -1'\rC 21)17\\mrndincnr it G\Drn Fr 2\%G 17 134 CC\Supplcm ,\o 6 d,—
($3,533,804.37). The attached Exhibit "D-6 and "E-6,'which describes the
payment for work to be performed under this Supplement No. 6, is hereby made a
part of the Supplemental Agreement.
Signed thisday off_/ 2020.
''
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
B � BY:
Y
i Peacock */JimFerZreI1I
Its: Chief Executive Officer It/,. /
ts Mayor
719 2nd Avenue, Suite 200 33325 8th Ave S
Seattle, WA 98104 Federal Way, WA 98003
(206) 394-3664 (253) 835-2401
APPROVED AS TO FORM
r
J. Ryan Call, City Attorney
K\-I It\I'FTC\(draw,ri 1'rt,µcrs\rngccrs\Cm'Ccnrcr\cccs\21117\Cun ad un,\greancnr-PMX 2017\\1101 nnr 8 G\Drdr 2\V;17-13+CC\Suppl--No 6 Jnc.
Parametrix
ENGINEERING PLANNING ENVIRONMENTAL SCIENCES
Exhibit A6
SCOPE OF WORK
City of Federal Way
City Center Access Project
Amendment 6
PROJECT UNDERSTANDING
The City Center Access Project proposes to modify an existing interchange in Federal Way on Interstate 5 (1-5).
Parametrix is under contract to complete the Access Revision Report(ARR) (formerly referred to as the IJR).
Amendment 4 transferred funds from the original contract tasks for Environmental Documentation, Preliminary
Engineering and part of the ARR documentation to complete additional study analysis and outreach requested by
the Study Support Team to identify/confirm the preferred alternative.The preferred alternative has been selected
(Alternative 2i), and this amendment provides funding for an updated survey base map, Preliminary Engineering,
Environmental Documentation, public outreach, completion of the ARR, and Preliminary Hydraulic Design Reports
for three culverts within the project limits.
Amendment 5 includes the design for the items listed below for Alternative 2i:
• Preliminary design of 324th four-lane bridge with braided ramps as a modified interchange with 1-5/
S 320th interchange. Preliminary design includes roundabouts at 1-5 ramps and S 324th. Preliminary design
of a DDI will be required to not preclude it in the future.
• Realignment of 324th from current design will be required due to Bonneville Power Administration (BPA)
power line relocation.
• Preliminary design for roundabouts at 23rd S/S 324th and 324th/Weyerhaeuser.
• Preliminary design for two to three lanes on S 324th from I-5 to Weyerhaeuser.
• Preliminary design for five lanes on S 324th from SR 99 to 23rd S.
• Preliminary design of intersection improvements at SR 99 and 5 324th Street focused on solution that
manages westbound queues.This includes an added southbound (SB) and northbound (NB) left-turn lane.
The need for an NB right-turn lane will be evaluated and included in the design if needed.
• Preliminary design for high-occupancy vehicle (HOV) lanes on S 320th from 1-5 to Military Road.
Preliminary design for a retained right-turn lane eastbound between 25th and the SB on-ramp in addition
to the HOV lane.
• This project does not include intersection improvements at SR 99/S 320th Street and Military Road/S 320th
Street.
Assumptions include:
• S 320th Bridge
City of Federal Way 554-2441-022
City Center Access Project I March 2020
Scope of Work Exhibit AIS
SCOPE OF WORK (continued)
> Replace existing bridge for extra lane and multimodal facilities. New width across 1-5 will
accommodate City Center Access(CCA) improvements and 20 feet for future widening of 1-5.
> Match into existing 1-5.
> Sidewalks/paths will follow existing roads—may both be less than 5 percent.
> WSDOT may require additional widening to discount gutter.
> Sidewalk to be on north side of bridge.
■ S 324th Bridge
> Construct new bridge;span lengths to accommodate future 1-5.
> Roundabouts at 1-5 to be in final location.
> Bridge structures for the braided ramps to be in final—1-5 widening location.
> Designed to not preclude a diverging diamond (which will require the design of both alternatives).
> Will meet Americans with Disabilities Act(ADA) requirements for new road.
> Will include multimodal path on the north side and sidewalk on the south side.
> WSDOT standards may require additional lane width to accommodate stormwater facilities.
> Design will be based on BPA design of relocated towers.
• Preliminary impacts to the park-and-ride would be understood and potential areas for the relocation.
Redesign of the parking lot is not included in this scope of work.
• A phasing plan will be developed to support City's decision-making for project funding.
Task 29 — Project Management
Subtask 29.1 — Project Management Plan
The Consultant will prepare a Project Management Plan outlining the scope of work, schedule, budget, change
management process, communication protocol, and quality assurance and control procedures.The Project
Management Plan will be updated periodically during the life of the project and will be shared with team
members and City of Federal Way staff.This task also includes scoping activities for subsequent work orders.
Subtask 29.2— Monthly Progress Reports and Invoices
The Consultant will provide a monthly progress report with monthly invoices to the City of Federal Way that will
describe work performed by the Consultant Team members during the current reporting period.The progress
reports will be prepared in a format approved by the City's Project Manager.This format will include the
following:
• A listing of activities by work element performed during the reporting period, including meetings held and
deliverables.
• A listing of problems and issues encountered during the reporting period and their resolution.
• A listing of activities to be accomplished during the next reporting period.
City of Federal Way 554-2441-022
City Center Access Project 2 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Subtask 29.3— Progress Meetings and Other Communication
The Consultant Team will conduct weekly progress meetings with the City's core management to review the
scope, schedule, and budget status; risk matrix tracking list; upcoming project meetings, communication, and
work items; design review; and project strategy to resolve issues or barriers to success. Communication will also
occur via email and telephone. Forty meetings are assumed by phone and three in person in Federal Way
attended by three staff.This task also includes email and phone calls with the City for general information and
updates and solving issues outside of the meetings identified above.
Subtask 29.4—Subconsultant Coordination
The Consultant will develop and maintain subcontracts with subconsultants, coordinate progress reporting and
billing through the Consultant project manager,coordinate work products, and conduct quality assurance on
submittals.
Subtask 29.5— Consultant Team Meetings
The Consultant will hold biweekly Consultant Team check-in meetings to communicate and coordinate work
progress and upcoming activities.These meetings will be attended by project leads and other key staff. Biweekly
Consultant Team check-in meetings will be via telephone and up to 1 hour each.
Assumptions
• This project will be completed in 18 months after the traffic operations and safety analysis is complete
and agreed upon.
Deliverables
• Subconsultant Agreements (maintained in Consultant's files).
• Monthly progress reports and monthly invoices.
• Risk management tracking list for monthly progress meetings.
• Draft and final Project Management Plan, including Quality Assurance/Quality Control Plan.
• Updates to the Project Management Plan.
Task 30 — Public Involvement and Communication
Subtask 30.1 — Public Involvement Oversight and Project Management
The Consultant will provide monthly progress reports with monthly invoices to the City of Federal Way that will
describe work performed by the Consultant Team members during the current reporting period.This format will
include the following:
• A listing of activities by work element performed during the reporting period, including meetings held and
deliverables.
• A listing of problems and issues encountered during the reporting period and their resolution.
• A listing of activities to be accomplished during the next reporting period.
City of Federal Way 554-2441-022
City Center Access Project 3 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Table 30-1.Summary of Public Outreach and Communications
Task Assumptions Deliverables
Public outreach PRR will develop schedule for deliverables in this scope based Deliverables schedule for 2020
schedule on agreed-upon schedule.
Public involvement Assumes up to 12 one-hour meetings by phone between July
check-in meetings 2020 and July 2021.
Consultant Team Assumes up to 12 one-hour meetings by phone between
check-in calls March 2020 and March 2021,with the possibility of 2 in-
person meetings.
Monthly progress Assumes 12 progress reports. 12 progress reports
reports 12 invoices
Subtask 30.2— Stakeholder Engagement (Design Workshops)
The Consultant will support up to two design workshops with area property owners and residents.The Consultant
will plan and implement logistics, staffing, and facilitation, and will provide note-taking support during the
meetings.The Consultant will summarize the workshop information and participant feedback into one summary
document.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task: one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 30-2 summarizes the stakeholder engagement activities for this project.
Table 30-2.Summary of Stakeholder Activities
Task Assumptions(if applicable) Deliverables
Design workshops Logistics,staffing,and note-taking support for up to two design Two email invitations
workshops with property owners.
Two email reminders
PRR will design and distribute two email invitations for each Two agendas
workshop:one invitation and one follow-up reminder.
City will identify property owners, residents,or other participants to
Two sign-in sheets
be invited and provide contact information. One design workshop
Parametrix and the City will provide workshop materials,such as summary
maps and sketches.Assumes no additional handouts or display
boards from PRR beyond the workshop agendas, one updated fact
sheet,three updated display boards,and one interactive comment
board created for Subtask 30.5.
Workshops are assumed to be up to 3 hours in duration. PRR will
provide two staff members. Parametrix will provide three staff.This
City of Federal Way 554-2441-022
City Center Access Project 4 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Task Assumptions(if applicable) Deliverables
assumes the City's attendance. PRR will assist with planning,travel,
and day-of preparations. PRR will document workshop information
and feedback into one workshop summary.
The City will cover any expenses related to room rentals or
reservations.
Contingency plans under COVID-19:
Should there be a ban or recommendation against gatherings of 10
or more people, PRR will work with the City and Parametrix to
schedule remote design workshops via a video conferencing
platform,such as Zoom or GoToMeeting.A video conference could
include a chat feature,optional breakout rooms, polling,or post-
event surveys. PRR will email workshop materials,such as maps,
sketches,fact sheets,and workshop agenda,in advance of remote
design workshops.
Subtask 30.3— Community Events and Engagement
The Consultant will continue to support City with communicating to the general public in the project area.
The Consultant will create an updated outreach plan to identify opportunities for the project team to share
information with Federal Way residents, businesses, and visitors about the proposed design solution. In
coordination with City staff,the Consultant will coordinate one tabling event, one open house, and one online
open house.The Consultant will plan and implement logistics and staffing for the tabling event and in-person
open house, coordinate the management of a vendor to update the previous open house content, and host and
maintain the online open house for up to 3 months.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill this task: one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 30-3 summarizes the community engagement activities.
Table 30-3.Summary of Community Engagement Activities
Task Assumptions(if applicable) Deliverables/Work Products
Informational tables at a Logistics,staffing,and note-taking support from one PRR One updated outreach plan
fair or festivals staff member.
One sign-in sheet
Assumes City will provide multilingual staff.
Comment forms and
Assumes the tabling event is up to 6 hours. comment collection box
City of Federal Way 554-2441-022
City Center Access Project S March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Task Assumptions(if applicable) Deliverables/Work Products
Assumes participation of at least one representative from the One event summary,
City of Federal Way and one representative from Parametrix including photos the City can
at each event. use for social media or other
project materials.
City of Federal Way to cover registration fees and costs
associated with giveaways or promotional items.
Contingency plans under COVID-19:
Should there be a ban or recommendation against gatherings
of 10 or more people,the City and Parametrix could consider
alternative community engagement opportunities such as
extending the online open house,developing a mailer
acknowledging the canceled event(s) but providing a project
update and encouraging contact,expanded social media
directing residents to the project website and/or hosting a
live Q&A for the project area.
Open house Assumes use of updated display boards and updated fact One open house postcard
sheets created for Subtask 30.5.Parametrix will provide maps invitation
or sketches.
One email invitation
Assumes the City will draft and issue any press advisories or
social media notifications about the project team's One sign-in sheet
attendance at community events.
Comment forms and
PRR will collect and summarize comments. comment collection box
Logistics,staffing,and note-taking support from two PRR One event summary,
staff members. including photos the City can
use for social media or other
Assumes City will provide multilingual staff. project materials.
Assumes the open house is 3 hours.
Assumes participation of at least one representative from
City of Federal Way and three representatives from
Parametrix.
City of Federal Way to cover fees and costs associated with
room rentals.
Assumes use of updated display boards and updated fact
sheets created for Subtask 30.5. Parametrix will provide maps
or sketches.
Assumes the City will draft and issue any press advisories or
social media notifications about the open house.
City of Federal Way 554-2441-022
City Center Access Project 6 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Task Assumptions(if applicable) Deliverables/Work Products
PRR will design an open house postcard invitation and
arrange for printing. PRR will pay for postage and creation of
the mailing list.
Contingency plans under COVID-19:
Should an in-person open house be discouraged or cancelled,
the City and Parametrix may consider extending the online
open house or transitioning to a live-streamed in-person
open house. Enhancements to an online open house could
be considered such as:expanded social media advertising,a
narrated slide show,an online survey to complement the
online open house,a webinar or a telephone town hall.
Online open house PRR will write an email invitation.The City will distribute it to One online open house
the project listserv. content update
PRR will collect and summarize comments. Up to three additional
graphics
Consultant will update previous online open house site and
content and use the new open house materials to develop 3 months of site hosting and
draft, revised,and final content for the online open house. basic maintenance
Consultant will provide up to three additional graphics Zip file of website files and
formatted for the online open house. database of
federalwaycitycenter.org
Consultant will translate online open house web content into
Korean and Spanish.
Consultant will host the site and provide basic site
maintenance and hosting for up to 3 months.
Consultant will take down website at conclusion of the online
open house period and send files to City of Federal Way as a
zip file.
Community outreach Consultant will compile a comprehensive outreach summary One outreach summary
summary of all engagement events and activities. report
Subtask 30.4—Support City Website
The Consultant will continue to provide City staff with content and updates for the project website.This task
assumes the City will provide back-end IT support for the website.Table 30-4 summarizes the support activities
for the City website.
City of Federal Way SS4-2441-022March 2020
City Center Access Project
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task: one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 30-4.Summary of Support Activities for the City Website
Deliverables/Work
Task Assumptions(if applicable) Products
Content updates for City PRR will develop draft,revised,and final content for up to three Up to three website
Center Access informational website updates. content updates
webpage on City of Federal consistent with email
Way website PRR will provide up to three additional graphics formatted for updates and public
the website events
Subtask 30.5— Public Information Materials and Special Graphics— Additional
The original scope of work included materials development to support outreach activities.Additional
informational materials are needed to support the activities added in this scope of work.The Consultant will
develop additional materials and conduct additional activities to support public outreach efforts.Tasks may
include developing graphics, drafting written materials, and performing other miscellaneous activities.
This task assumes up to three rounds of review for all public information materials: one round with the Prime,
one round for substantive feedback from the City, and one for minor feedback or final approval from the City.
This task assumes all feedback comes as consolidated feedback with clear direction from the reviewer.
Table 30-5 summarizes the support activities for developing public information materials and special graphics.
Table 30-5.Summary of Support for Public Information Materials and Special Graphics
Task Assumptions(if applicable) Deliverables
Project materials Up to 15 informational display boards. Printer-ready artwork for one
project update fact sheet,
One reusable display board to be used for interactive three informational boards,
comment-gathering using sticky notes at public meetings and one comment board
and events.
One project update fact sheet
Assumes PRR will print display boards and fact sheet. translated into Spanish and
Korean
One project update fact sheet.PRR will translate the fact
sheet into Korean and Spanish and manage QA/QC.
Graphics work will be completed by PRR graphic designer,
with Parametrix providing source content,such as maps,
design sketches,etc.
Listsery email updates PRR will develop draft, revised,and final content for up to Up to three listsery email
three listsery email updates. updates
City of Federal Way 554-2441-022
City Center Access Project S March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Subtask 30.6— Environmental Justice Outreach
The Consultant will coordinate up to three community group briefings for defined Environmental Justice (EJ)
communities.Several EJ meetings have taken place and are documented in the 2019 final Outreach Report.The
Consultant will continue to plan,schedule, and support project briefings with environmental justice groups and
service providers,such as English as a Second Language (ESL) class presentations.
The Consultant will plan and implement logistics, staffing, and facilitation and provide note-taking support for
these meetings.The Consultant will translate meeting materials for Korean-or Spanish-speaking participants at
community and business meetings with attendees who speak Korean or Spanish.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task:one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 30-6.Summary of Environmental Justice Outreach Activities
Task Assumptions(if applicable) Deliverables
EJ community group Logistics,staffing,and note-taking support for up to two public EJ Three sign-in sheets that
briefings group briefings.Meetings are assumed to last up to 2 hours each. include Korean and Spanish
translations
PRR will create one email invitation for each meeting and up to a
total of 6 hours of invitation calls to EJ community leaders or Three comment forms,
organization members.PRR will translate email invitations into with Korean and Spanish
Spanish or Korean. translations and comment
box
Briefings are assumed to be staffed by one PRR staff member,
including initial planning,travel,and day-of preparation.Also Three agendas,with
assumes at least one Parametrix staff and one City staff person will Korean and Spanish
attend.The City will arrange for interpreters to attend. translations
Assumes use of updated display boards and updated fact sheets Three email invitations to
created for Subtask 30.5.Parametrix will provide maps or sketches. EJ organizations and
members,relevant
PRR will prepare one combined summary of the EJ briefings.PRR will neighborhood areas
collect comment forms and provide translation of any in-language
comments to English for inclusion in the summary. PRR will translate One E1 outreach summary
the EJ briefings summary to Korean and Spanish.
One EJ outreach summary
PRR will also translate other meeting materials,such as sign-in translated into Korean and
sheets,comment forms,captions,or headings on Parametrix- Spanish
provided maps/sketches or additional meeting handouts.
PRR will handle QA/QC of translated materials produced at PRR.
Contingency plans under Covid-19:
Should there be a ban or recommendation against gatherings of 10
or more people,the City and Parametrix could schedule remote EJ
briefings with video and dial-in options. Online outreach tools
City of Federal Way
554-2441-022
City Center Access Project 9 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Task Assumptions(if applicable) Deliverables
such as social pinpoint could be considered.Additionally,the
project team could consider working with local leaders to help
send out information about the project to their networks via
email, phone calls, or social media posts.
Subtask 30.7— Comment Management
The Consultant will continue to manage public correspondence and track comments.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task: one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 30-7.Summary of Comment Management Activities
Task Assumptions(if applicable) Deliverables
Continue to maintain PRR will add new contacts and comments to existing comment Up to six list updates
project email distribution database on a monthly basis.
list
Maintain comment PRR will update the database with contacts and comments Up to six database
database and summarize following briefings and other public meeting. updates
comments after public
events PRR will provide a final summary of comments at the end of the One final comment
year. summary
Monitor project hotline PRR will check the project hotline once per month and send a 12 hotline summary
summary report. reports
Subtask 30.8— Strategic Assistance
As directed by the City,the Consultant will address community concerns and other issues that arise.The
Consultant may participate in strategy sessions, impromptu meetings, correspondence, and telephone calls with
City staff.The Consultant will document those activities through action item lists,track follow-through activities,
and identify the next steps in the process.
Special projects may be assigned as identified by City, such as conducting additional community outreach, briefing
materials for local leaders or officials, and preparing project information and graphics.Table 30.8 summarizes the
strategic assistance required by the City.
City of Federal Way 554-2441-022
City Center Access Project 10 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Table 30.8.Summary of Strategic Assistance Activities
Deliverables/Work
Task Assumptions(if applicable) Products
Strategic assistance Assumes up to 40 additional hours of Consultant support for Memorandum
strategic assistance and special projects as assigned by the City. documenting direction
from the City
Task 31 — Study Support Team and Design Team Meetings
Subtask 31.1 — Study Support Team and Design Team Meetings
The Consultant Team will organize and lead meetings to coordinate with the WSDOT Design Team,the Executive
Team, and the Study Support Team members to complete the ARR document reviews, obtain signatures on the
ARR, and conduct reviews of the preliminary design and the environmental documentation.
The Consultant Team will prepare agendas, provide information prior to the meetings, develop presentations, and
prepare meeting minutes. Outreach to the Study Support Team is included in this task as required to
communicate goals, information, and meeting attendance, and to answer questions about information provided.
Assumptions
• Seventeen meetings with WSDOT Traffic and Design (t12 by phone and five in person in Federal Way;
attendance by two Parametrix staff).
• Meetings with Sound Transit(three meetings assumed; attendance by two Parametrix staff; location at
Sound Transit)
• Meetings with Executive Team (four meetings assumed; attendance by three Parametrix staff; location in
Federal Way).
• Meetings with Study Support Team (two meetings assumed; attendance by two Parametrix staff; location
in Federal Way).Additional Study Support Team Meeting budget is provided for under task 4.0 to support
two additional meetings with the Study Support Team.
• Meetings with the Environmental Team (four meetings assumed;attendance by three Parametrix staff;
location in Federal Way for two meetings and on phone for two meetings).
• Meetings with Tribes(four meetings assumed; attendance by two Parametrix staff). It is assumed all
meetings with the tribes would be set up by City staff and at the Tribe's location.
• Meetings with BPA(two meetings assumed; attendance by two Parametrix staff,with one on the phone
and one in person).
Deliverables
• Materials for team meetings.
• Agendas and meeting minutes.
City of Federal Way 554-2441-022
City Center Access Project 11 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Task 32 — Additional Traffic Support
Subtask 32.1 —Traffic Support for Design Alternative (DDI)
The ARR Synchro Build model will be modified to depict a diverging diamond interchange (DDI)to determine the
required capacity and storage needed to support design.
Assumptions
• The AM and PM peak period Synchro model developed for the ARR analysis will be used.
• Traffic volumes and year of analysis will remain consistent with the ARR analysis.
Deliverables
• Final Synchro model.
Subtask 32.2— Policy Point 3 and Environmental Document Traffic Operations Analysis—Amended
The VISSIM models will include the analysis periods of 4 to 9 a.m. and 1 to 6 p.m. and will include local arterial
intersections on S 320th and 324th Streets from 23rd Avenue S to Weyerhaeuser Way S.This requires the local
volume forecasts to be extrapolated beyond the peak hour and increases the calibration study area. Budget also
exists under tasks 21,22 and 23 to support the completion of the Traffic Operations Analysis.
Deliverables
• No change to deliverables.
Task 33 — Preliminary Engineering for the Preferred Alternative
Subtask 33.1 — Preliminary Design
The Consultant will advance the conceptual design of the preferred alternative to a preliminary design level using
the WSDOT design manual;AASHTO's A Policy on Geometric Design of Highways and Streets, 6th Edition (2011);
and City of Federal Way design standards.The preliminary design will be informed by the design parameters,the
stormwater design and analysis, and the environmental mitigation measures as detailed in other areas of this
scope of work.This task also includes the realignment of S 324th Street and the 1-5 ramps to accommodate the
forthcoming design from BPA.
A detailed preliminary design estimate of construction will be developed,which will include an electronic Excel
workbook utilizing the City standard format.An estimate calculation notebook will be developed as a backup to
the electronic estimate workbook.
The Consultant will advance the horizontal layout of roadway elements, including sidewalk and shared-use paths.
Vertical layout of roadway elements will be updated to include profiles along each alignment and at intersections
and driveways. Modeling will not include superelevations and tapers. Modeling will not include fine grading at
intersections, curb returns, or curb ramps. Base map will be developed with lidar photogrammetry limiting design
detail for the effort.
City of Federal Way 554-2441-022
City Center Access Project 12 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Assumptions
Amendment 5 includes the design for the items listed below for Alternative 2i:
• Preliminary design of 324th four-lane bridge with braided ramps as a modified interchange with 1-5/
S 320th interchange. Preliminary design includes roundabouts at 1-5 ramps and S 324`h. Preliminary design
of a DDI will be required to not preclude it in the future.
• Realignment of 324th from current design will be required due to BPA redesign.
• Preliminary design of a DDI will be required to not preclude it in the future.
• Preliminary design for roundabouts at 23rd S/S 324th and 324th/Weyerhaeuser.
• Preliminary design for two to three lanes on S 324th from 1-5 to Weyerhaeuser.
• Preliminary design for five lanes on S 324th from SR 99 to 23rd S.
• Preliminary design of intersection improvements at SR 99 and S 324th Street focused on solution that
manages westbound queues.This includes an added SB and NB left-turn lane. Continue monitoring for
the need for an NB right-turn lane.
• Preliminary design for HOV lanes from 1-5 to Military Road and will drop into existing right-turn lane.
• Preliminary design for a retained right-turn lane eastbound between 25th and the SB on-ramp in addition
to the HOV lane.
• This project does not include intersection improvements at SR 99/S 320th Street and Military Road/
S 320th Street.
Assumptions include:
• 320th Bridge
Replace existing bridge for extra lane and multimodal facilities. New width across 1-5 will
accommodate CCA improvements and 20 feet(to be verified with Compatibility Report from ST/
WSDOT)for future widening of 1-5.
Match into existing 1-5.
Sidewalks/paths will follow existing roads—may both be less than 5 percent.
WSDOT may require additional widening to accommodate stormwater conveyance.
> Sidewalk on bridge to be on north side of bridge.
• 324th Bridge
> Construct new bridge; span lengths to accommodate future 1-5.
Roundabouts at 1-5 to be in final location.
> Bridge structures for the braided ramps to be in final—1-5 widening location.
Designed to not preclude a diverging diamond (which will require the design of both alternatives).
Will meet ADA for new road.
Will include multimodal path on the north side and sidewalk on the south side.
City of Federal Way 554-2441-022
13 March 2020
City Center Access Project
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
> WSDOT standards may require additional lane width to accommodate stormwater conveyance.
> Design will be based on BPA design of relocated towers.
• Preliminary impacts to the park-and-ride would be understood, and potential areas for the relocation will
be identified. Redesign of the parking lot is not included in this scope of work.The design will be
accomplished in the current version of InRoads in use at WSDOT.
• Microstation and InRoads will be the main design platforms. At the end of the project, design files will be
translated into AutoCAD/Civil 3D and provided to the City.
• 11-inch by 17-inch plan sets will not be developed. PDFs of the project area showing aerial, project layout,
critical areas, and impact area.
• A project phasing plan will be a one-page excel document that will show project packages, approximate
cost, and year to be constructed to support City's decision-making for project funding.
• Right-of-way estimates will be developed using the existing GIS data on property lines. It is understood
that the GIS data could be+/-10 feet off real property line.With this understanding, a contingency factor
will be placed within the estimate.
• Three rounds of review and updates for deliverables, including City,WSDOT, and FHWA reviews.
Deliverables
• Project footprint exhibit will be provided in roll plot form (up to eight PDFs).This will include the aerial,
roadway, stormwater footprint, critical areas, existing right-of-way, and appropriate descriptive labeling.
• Potential Areas for Park and Ride Relocation Exhibit.
• Forward Compatibility Exhibit with DDI Roll Plot.
• Preliminary Profile Exhibits and Roadway Model Cross-Sections(50-foot intervals).
• Plan sheets as a direct result of Inroads output with WSDOT.xin file for verification of layout.
• One draft and final engineer's estimate of construction (Excel workbook and backup notebook
documentation)
• Project Phasing plan (Excel workbook).
Subtask 33.2 — Design Verification
The Consultant will continue to work with the Study Support team that was started in conceptual design portion
of the project to coordinate the advancement of the preliminary design.
The Consultant will develop the Basis of Design, design parameters, design analyses, and a safety analysis.
Prepare Basis of Design Document per WSDOT Design Manual 300.06(2) and 1100.
The Consultant will prepare a Basis of Design document using the template and instructions found at
www.wsdot.wa.,gov/Design/Support.htm.
Prepare Crash Analysis Report(WSDOT Design Select design elements in cooperation with the City and WSDOT
and prepare a Project Design Parameters template as found at www.wsdot.wa.gov/Design/Sulopor-t.htm. Lane-
City of Federal Way 554-2441-022
City Center Access Project 14 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
and shoulder-width dimensions will use Operational Analysis (HSM and HCM) methods using crash analysis data
prepared herein.
Safety Analysis (WSDOT Design Manual 321)
The Consultant shall develop the following to support design analyses (deviations):
• Meet with Headquarters Safety Technical Group to verify the scope of safety analysis according to Design
Manual 321.04 and Section 8.1 of the Safety Analysis Guide.
• Prepare an ISATe (Interstate Safety Analysis Tool enhanced) analysis to assess differing lane/shoulder
widths.Summarize the predicted collisions.
• Prepare a WSDOT Crash Modification Factors spreadsheet template to assess differing lane/shoulder
widths.Summarize the predicted collisions.
• Prepare a Crash Analysis Report per Design Manual 321.08(1).
Prepare Design Parameters (WSDOT Design Manual 300.06)
Prepare Design Parameters document for horizontal and vertical alignments and for widths of elements for
WSDOT facilities. It is anticipated that elements not having a large impact on the project footprint will not be
designed.The Consultant shall use the template found at www.wsdot.wa.gov/design/supr)ort,htm.
Prepare Design Analysis (WSDOT Design Manual 300.06(4) and 1106.04(2))
Prepare variance requests if needed using the template found at www,wsdot.wa.gov/design/support.htm,such
as:
• Travel-lane width.
• Shoulder width (left and right).
Assumptions
• WSDOT will provide crash data from the Safety Analyst and Collision Data Mart for Consultant's use.
• WSDOT will provide a Crash Analysis Report(CAR)template and instructions from
httg://wwwi.wsdot.wa.gov/riskmanagement/`shs/safetvtools,htm.
Two review cycles for each document, including City and WSDOT.
Deliverables
• Draft and Final Basis of Design (electronic).
• Draft and Final Safety Analysis.
• Draft and Final Design Parameters.
■ Draft and Final Design Analyses(two are assumed).
City of Federal Way 554-2441-022
City Center Access Project 15 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Subtask 33.3—Stormwater Design and Report
The stormwater design and report will be conducted only on the preferred alternative (Alternative 2i) and will be
based on the stormwater design criteria and stormwater screening developed as part of the conceptual design
portion of the project.
The Consultant will review geotechnical information obtained by the geotechnical engineer during the conceptual
design portion of the project for parameters related to stormwater BMP selection and design. Stormwater BMP
selection and design will be updated in future design phases as additional geotechnical information is obtained.
The Consultant will compile stormwater design information for use by the Environmental Team to perform the
HI-RUN analyses.The Environmental Team will perform the HI-RUN analyses under Task 34.3.
The Consultant will prepare a draft Preferred Alternative Stormwater Report that includes analyses of each TDA
within the project area of the Preferred Alternative and will prepare a planning level opinion of cost.The draft
Preferred Alternative Stormwater Report will be prepared based on the format of a Technical Information Report
(TIR) and reflect the analyses for all TDAs regardless of jurisdiction.A separate report for King County or WSDOT is
not included.The TIR format will reflect sections applicable for preliminary engineering.
The Consultant will coordinate with WSDOT to obtain design criteria and record drawings for the three existing
WSDOT stormwater facilities noted in the Assumptions below.The Consultant will coordinate with WSDOT to
determine applicable requirements if the facilities are modified due to encroachment impacts associated with
proposed ramps.
The Consultant will meet with the City staff to discuss City comments on draft Preferred Alternative Stormwater
Report.
The Consultant will prepare a final Preferred Alternative Stormwater Report.
Deliverables
■ Preferred Alternative Stormwater Report(draft PDF and final paper and PDF).
Assumptions
■ Based on prior project phases,the Preferred Alternative (Alternative 2i) may include up to the following
number of new stormwater facilities:
> Facilities owned, operated, and maintained by the City: Up to six. In areas of existing development,
facilities will be designed as underground facilities to provide enhanced treatment. In areas not
currently developed,facilities will be designed as open facilities to provide enhanced treatment.
> Facilities owned, operated, and maintained by King County: Up to four. In areas of existing
development,facilities will be designed as underground facilities to provide enhanced treatment. In
areas not currently developed,facilities will be designed as open facilities to provide enhanced
treatment.
• Facilities owned, operated, and maintained by WSDOT: Up to eight. Facilities will be designed as open
facilities to provide enhanced treatment.
■ Open stormwater management facilities will be designed as combined stormwater treatment wetlands/
detention ponds.
City of Federal Way 554-2441-022
City Center Access Project 16 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• Underground stormwater management facilities will be designed using a two-facility treatment train.The
use of proprietary treatment BMPs will be determined in future design phases.
• There will be no stormwater pump stations.
• There will be a separate WWHM2012 or separate MGS Flood analysis for each stormwater facility due to
the variability in site constraints and elevation constraints. Facility footprints will not be pro rated based
on a sample analysis.
e Stormwater analyses for areas within City jurisdiction will be based on the 2016 King County Surface
Water Design Manual and errata and the 2016 Federal Way Addendum to the King County Surface Water
Design Manual.
• Stormwater analyses for areas within County jurisdiction will be based on the 2016 King County Surface
Water Design Manual and errata.
• Stormwater analyses for areas within WSDOT right-of-way will be based on the 2014 Highway Runoff
Manual and the February 2016 Supplement.
• Detailed geotechnical site investigation will be performed for the Preferred Alternative in future design
phases. LID BMPs are assumed to not be technically feasible.
• Areas within King County are within King County's Urban Growth Area and will be considered a "Small
Road Improvement and Urban Road Improvement Project."
• Stormwater design documentation for the HI-RUN analyses will be prepared for up to 14 Threshold
Discharge Areas.
• The Preferred Alternative Stormwater Report will include the following:
> Project Overview.
Conditions and Requirements summary.
> Offsite Analysis based on Level 1 Analysis.
> Preliminary Flow Control, LID, and Water Quality Facility Analysis and Design.
Preliminary Conveyance System Analysis and Design.
> Identification of Special Reports and Studies.
> Identification of Other Permits.
> TIR Worksheet for each TDA. Only sections relevant to preliminary engineering will be included.
> Off-Site Analysis Drainage System Table.
Preliminary Water Quality Facility Sizing Worksheets for applicable BMPs.
> Preliminary Flow Control and Water Quality Facility Summary Sheet for each TDA.
• The overall project vicinity map will be adapted to title block for the TIR.
> The drainage subarea exhibits will be enlarged from the main delineation CADD files, with callouts
added.There may be multiple TDAs shown on a single map.
> The soil mapping exhibits will use the drainage subarea exhibits as a base and then soil mapping
added from the NRCS website and/or information from Shannon &Wilson.
City of Federal Way 554-2441-022
City Center Access Project 17 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• The Preferred Alternative Stormwater Report will be up to 500 pages, including exhibits and appendices.
• Erosion control and stormwater pollution prevention planning for construction will be addressed in future
design phases.
• The existing WSDOT stormwater facility in the northwest corner of the I-S/S 320th Street interchange will
not be impacted.
• The existing WSDOT stormwater facility in the southeast corner of the 1-5/S 320th Street interchange will
be mitigated for area and volume impacts due to proposed ramp encroachment by an equal area and
volume adjacent to the existing stormwater facility.
• The existing WSDOT stormwater facility on the east side of 1-5 at the proposed S 324th Street crossing will
be mitigated for area and volume impacts due to the proposed ramp encroachment by an equal area and
volume adjacent to the existing stormwater facility.
• Conveyance analysis and design will be based on the WSDOT conveyance spreadsheet.The analysis will
be to support the conveyance systems to route stormwater from proposed improvements to proposed
stormwater facilities and to discharge locations. Network modeling, if required, can be performed in
future design phases.
• The Level 1 Downstream Analysis will be limited to support the Preliminary Engineering as follows:
Email or telephone conversation with City and WSDOT to determine the location of any existing
conveyance problems within 1/4 mile of the project area.
• Review information available through King County Map for existing problems or areas of concern
that may impact stormwater design.
• Field observations and photographs at proposed stormwater facility locations to determine existing
problems or constraints that may impact stormwater facility design.
Subtask 33.4— Preliminary Structural Design
Conceptual Wall Design
The Consultant will provide conceptual retaining wall location and likely type required to accommodate the
proposed improvements on the plans and for use in determination of cost, impact area, and environmental
effect.
Assumptions
• No wall plans will be provided;walls will be identified in the Project Footprint Exhibit defined in
Subtask 33.1.
• Preliminary geotechnical information will be used from Shannon &Wilson to identify wall type for costs.
Deliverables
• Wall location and type will be included in project footprint as defined under subtask 33.1
City of Federal Way 554-2441-022
City Center Access Project 18 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Noise Wall Design
The Consultant will provide preliminary noise wall location(s) and height(s) required to accommodate the
proposed improvement. Noise wall information will be derived from the technical noise study provided in Section
34.2,subsection b.
Assumptions
• It is anticipated that a noise wall will be required at the northbound 1-5 off-ramp and on the northbound
1-5 on-ramp, in part to replace the existing berm currently shielding residences from 1-5 and also to
prevent any noise impacts from traffic along S 342th Street.
• Other noise walls may be required as necessary based on the results of the study, including residences at
the intersection of S 3201h Street and Military Road.
• General noise wall details to include wall start and end points and top of wall elevations will be produced
and provided in the Noise Technical Report(see 34.2b).
• No noise wall foundation or connection design will be provided at this design stage.
Subtask 33.5— Utility Location
Subsurface utility locations for BP oil line will be determined to support the preliminary design based on the
preferred alternative.The consultant will request other utilities' as-builts for a cursory determination of buried
utilities.
Assumptions
• Utility location for BP will be done by a single utility location firm as part of the Consultant's contract.
As-builts will be provided by all public and private utilities within the project limits.
Deliverables
• Utility Coordination Log.
• Subsurface Utility Location Report.
33.6 — Base Map Update for Preliminary Design
The base map will be updated with aerial mapping with lidar and photogrammetry.The lidar will provide
topographic information suitable to provide 1-foot contours.This work includes 2 weeks of additional on-ground
field survey to pick up existing stormwater facility culverts and manhole inverts as well as critical area
delineations.
Supplemental survey for final design will be completed at a later phase.
Assumptions
• Survey efforts will be limited to the level of design needed to support the preliminary design of the
preferred alternative for environmental documentation efforts.
City of Federal Way 554-2441-022
City Center Access Project 19 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Deliverables
• Updated Microstation base map that includes all areas needed for the preferred alternative, including an
updated surface for use in InRoads.
• Updated base map in AutoCAD Civil 3D format with DTM surface.
Subtask 33.7— Rights of Entry
The Consultant will maintain the Right of Entry Poster and Excel spreadsheet identifying parcels for which rights of
entry (ROE) are needed and granted as well as notes about conditions of entry.
Assumptions
• The City will secure the ROE.
Deliverables
• Poster map and spreadsheet with parcel numbers, addresses, and owners submitted electronically with
updates.
Task 34 — Environmental Documentation
Environmental documentation is intended to address compliance with the National Environmental Policy Act
(NEPA),the State Environmental Policy Act(SEPA), Section 7 of Endangered Species Act(ESA), and Section 106 of
the National Historic Preservation Act.
Subtask 34.1 —SEPA Checklist
SEPA approval will be led by the City of Federal Way.The City plans on adopting NEPA for SEPA.
Assumptions
• No additional information will be needed by the Consulted.
Deliverables
• No deliverable required.
Subtask 34.2— Documented Categorical Exclusion
This scope of work assumes that a Documented Categorical Exclusion (DCE)will be prepared in compliance with
the National Environmental Policy Act(NEPA).
The Consultant will provide detailed analyses pertaining to ecological resources, noise, hazardous waste, and
protected populations (Environmental Justice) in support of the DCE.The results of the analyses will be submitted
in draft, revised draft, and final reports. Detailed analyses regarding endangered species are covered under
Task 2, and cultural resources are covered in Task 3.These analyses will focus on the impacts that may result from
the preferred alternative.The work will culminate with the preparation of a NEPA Categorical Exclusion
Documentation Form.
a. Ecological Resources
City of Federal Way 554-2441-022
City Center Access Project 20 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
The Consultant will redelineate wetlands within 300 feet of the preferred alternative, applying
methods specified in the U.S. Army Corps of Engineers (USACE)Wetlands Delineation Manual
(Environmental Laboratory 1987) and the Regional Supplement to the Corps of Engineers Wetland
Delineation Manual:Western Mountains,Valleys, and Coast Region (Version 2.0) (USACE 2010).The
Consultant will identify wetland boundaries in the field and mark them with numbered flagging.The
Consultant will have all wetland flag locations instrument-surveyed by professional land surveyors.
The Consultant will classify wetlands according to the U.S. Fish and Wildlife Service(USFWS) and
hydrogeomorphic(HGM) classification systems and rate them according to the applicable local
jurisdiction's critical areas ordinance and the currently accepted version of the Washington State
Wetland Rating System.
The Consultant will reclassify streams and identify ordinary high water mark for each.The Consultant
will collect incidental observations of other sensitive resources in the study area during the wetland
delineation.
The Consultant will prepare an ecological report to document resources identified within the WSDOT
and local rights-of-way.The Consultant's CADD staff will generate figures, buffer areas, and potential
impact area estimates.
b. Noise
Noise
The Consultant will conduct noise analysis based on the guidelines presented in the current Federal
Aid Policy Guide,Sub-chapter H, Part 772, Procedures for Abatement of Highway Traffic Noise and
Construction Noise(Federal Highway Administration [FHWA] 2010) and the 2011 Traffic Noise Policy
and Procedures (Washington State Department of Transportation [WSDOT] 2012). Prior to starting
the study,the Consultant will discuss the project with the City and WSDOT to identify any potential
issues and review potential monitoring and modeling locations.
A reconnaissance of the project area will be performed by the Consultant to identify the land uses
and locate noise-sensitive properties in the project area as described in the Procedures for
Abatement of Highway Traffic Noise and Construction Noise. Physical and terrain features that affect
noise propagation and features that may be altered during construction will be identified.
Noise measurements and traffic counts will be conducted at six to eight selected locations along the
project area to validate the traffic noise model and to ensure complete description of existing noise
levels that are representative of the land uses in the project area. Measurements near existing active
roadways will be conducted for a 15-minute sampling period during daytime off-peak hours(10 a.m.
to 4 p.m.)when traffic is moving freely.Traffic counts and FHWA modeling classifications will be
conducted concurrently with the noise measurements. Noise sources will be noted, and those that
may interfere with future determination of noise abatement will be identified. Photos and diagrams
of the monitoring sessions will be included for reference.
Traffic noise levels at each traffic noise measurement site will be predicted using the FHWA Traffic
Noise Model (TNM)version 2.5 for model validation.The predictions will use the existing roadway
configurations and the traffic counts from the noise measurement survey.The sound level
predictions from TNM will be compared with the measured sound levels to reach close agreement of
±2 decibels(dB).
City of Federal Way 554-2441-022
City Center Access Project 21 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Based on site visits, review of aerial mapping, and land use inspection, a set of representative noise
modeling sites will be located throughout the project area. Frequently, one noise modeling site can
be used to represent several nearby locations expected to have similar or slightly lower noise levels
than the modeling site.The number of modeling sites will be sufficient to accurately predict existing
and future (year 2040) No-Build and future Build traffic noise levels, identify potential traffic noise
impacts, and evaluate traffic noise abatement measures. Based on review of the overall project area
using recent aerial mapping and land use data, it is estimated that between 30 and 50 modeling sites
will be necessary to provide a comprehensive noise analysis and provide sufficient data for assumed
noise wall optimization analysis.
Using the validated noise model, existing peak hour traffic volumes will be used with posted speed
limits to calculate existing peak hour noise levels at each of the modeling sites.Traffic noise level
projections will also be performed for the same sites using the future No-Build traffic volumes.These
predicted noise levels will be used for comparison with the future Build noise levels and to aid in the
understanding of the potential change in project area noise levels.
Future Build noise levels during peak hour will be modeled at the selected noise-sensitive sites,with
the proposed new and improved roadways and ancillary facilities included.The future Build traffic
noise levels will be compared to the approach or exceed and substantial increase noise criteria using
the WSDOT policy. For residences, noise impacts occur if future traffic noise levels approach or
exceed 66 dBA(A-weighted decibels) Leq (equivalent sound level) during peak hours or if noise levels
increase by 10 dB or more over the existing condition modeled noise levels. Using the modeled noise
levels, project-related traffic noise impacts will be identified.
In accordance with FHWA and WSDOT requirements, noise abatement measures will be considered
at locations along the alignments where traffic noise impacts are predicted.The noise abatement
analysis will provide location, length, height, profile, estimated cost(using WSDOT policy), and
number of benefiting noise-sensitive properties for each proposed barrier.This information will be
used to show compliance with WSDOT criteria for reasonable and feasible noise abatement for any
recommended noise barriers. For those areas with noise impacts and no recommended noise
abatement measures,the analysis will provide a discussion for these impacts and specifically note
reasons for not including any noise abatement.
Construction activities that may cause annoyance at nearby noise-sensitive land uses will be
qualitatively assessed in accordance with WSDOT procedures. Local laws applying to construction
noise will be discussed and included in the Noise Report described below.
A Noise Report summarizing the finding of the noise study will be prepared by the Consultant and will
follow WSDOT requirements for traffic noise studies.The report contents will include an introduction
to acoustics and a discussion of land use, analysis methodology, existing noise levels,future No-Build
and Build noise levels, noise impacts, and noise abatement analysis and mitigation recommendations
for locations with impacts.The report will follow WSDOT policy for a traffic noise technical analysis. It
will provide existing and proposed alignments on vicinity-scale maps. Impacts, monitoring locations,
and sensitive receivers will be shown on area maps at an appropriate scale.Tables,with comparisons,
will be prepared to aid in the understanding of project impacts and mitigation.A discussion of
potential impacts to future land uses in the context of existing and planned land uses will be
provided. Construction noise impacts and local regulations, as described above, will be discussed.
Assumptions:
City of Federal Way 554-2441-022
City Center Access Project 22 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
1. The study area will begin in the north end just south of S 317th Street and continue south to
S 336th Street(end of existing noise wall/berm combination). It is assumed that the existing
noise wall would be integrated with any new noise abatement along the west side of 1-5.The
east-west study area would be between Pacific Highway on the westside, and Military Road
at S 320th Street on the west side.This will include the residential area at the east end of the
corridor at Military Road (537th Place and S 322 Street).
2. CAD files in AutoCAD or MicroStation for the existing roadway alignment and proposed
roadway alignment, including aerial photo(s) and topographical information,will be utilized in
the analysis.As-builts for existing noise walls and earth berms along the west side of 1-5 from
S 324th Street and S 333rd Street may also be required.
3. Traffic data, including turning movements for major arterial cross streets, is required.The
traffic data will include existing;future No-Build; and future Build volumes,speeds, and
percentage of vehicle types (e.g., passenger vehicles, medium trucks, and heavy trucks).
Roadways and highways necessary will include north-and southbound traffic on 1-5, including
all on/off-ramp traffic.Traffic along arterial roadways will include S 320th Street,S 324th
Street, 23rd Avenue S, and Gateway Center Boulevard S.
c, Hazardous Materials
Based on a more detailed look at the preferred alternative and potential methods of construction,
the Consultant will evaluate the potential for the project to encounter hazardous materials.The
consultant will review the hazardous material information identified by Environmental Data
Resources (EDR) and the online Washington State Department of Ecology(Ecology) Cleanup Site
Search Tool.Then the consultant will prepare a brief technical memorandum that identifies any sites
within 1/2 mile of the project area and describe why these sites are unlikely to be encountered during
construction.The findings will be documented in a technical memorandum.
d. Environmental Justice
Because there are protected populations in the project vicinity, documentation will be prepared in
accordance with WSDOT's guidance for Categorically Excluded projects to ensure compliance with
environmental justice(EJ) requirements. Demographic data will be obtained through the FHWA-
approved "EJScreen" and the Office of Superintendent of Public Instruction (OSPI)websites.The
analysis will use WSDOT guidance (TSK 458-d: Determining Project Effect on EJ Populations) and be
documented according to the EJ template provided on WSDOT's website.
e. Categorical Exclusion Documentation Form
The Consultant will prepare a draft NEPA Categorical Exclusion Documentation Form.The form will
rely on the findings of the discipline analyses completed as part of this scope of work as well as the
preliminary design of the preferred alternative.The City will review and the Consultant will revise the
form to address City comments.The City will be responsible for submitting the revised form to
WSDOT.
Assumptions
■ The project will not adversely affect EJ populations,
City of Federal Way
554-2441-022
City Center Access Project 23 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• The project will not require supplemental documentation for Section 4(F) or 6(f) (assumed no impacts to
Section 4(f) or 6(f) properties), air quality (project not in a current EPA 20-year maintenance area); nor
will it require additional supplemental documentation for floodplains (none identified in study area),
groundwater(no EPA-mapped sole source aquifers in the study area), energy, land use,visual, or public
services.
Deliverables
• Preliminary draft, revised draft, and final wetland report.
• Preliminary draft, revised draft, and final noise analysis technical memorandum.
• Preliminary draft, revised draft, and final hazardous materials technical memorandum.
• Preliminary draft, revised draft, and final environmental justice memorandum.
• Draft and final NEPA Categorical Exclusion Form.
Subtask 34.3— Endangered Species Act
To comply with Section 7 of the Endangered Species Act(ESA),this scope of work assumes the preparation of a
Biological Assessment(BA) addressing the potential impacts of the proposed action on species and habitat that
are protected under the ESA. However, as a first step in this scope of work,the Consultant will confirm the
appropriate level of documentation with the City and WSDOT. If the analysis finds no potential for effects on
ESA-listed species,these findings will be documented in the WSDOT No Effects Assessment format.Such an
assessment is typically used for projects that result in a no-effect determination but that require additional
documentation and analysis(including projects that create new impervious surfaces and new highway
interchanges). A similar level of effort as described here would likely be required to support a no-effect
determination.
To meet the needs of reviewers at the U.S. Fish and Wildlife Service (USFWS) and the National Marine Fisheries
Service (NMFS),the analysis will be based on at least 30 percent design documents.The BA will be prepared in
accordance with the scope and quality requirements in the current version of the WSDOT Advanced Training
Manual for Biological Assessment Preparation for Transportation Projects and using WSDOT's biological
assessment template. By meeting those requirements,the BA will also meet the requirements of the USFWS's
and NMFS's ESA Section 7 Consultation Handbook(1998).
Project activities with the potential to affect ESA-listed species include (1) creation of a new highway interchange
that could facilitate additional development, and (2) creation of pollution-generating impervious surfaces(PGIS).
The BA will include an evaluation of potential direct and indirect effects of the preferred alternative on species
that are listed as threatened or endangered under the ESA, species that are proposed for listing, and designated
or proposed critical habitat for listed species.The BA will also analyze the effects of interrelated and
interdependent actions and will address effects on essential fish habitat (EFH).
The analysis will follow WSDOT guidelines for addressing the potential effects of land use changes that may result
from the creation of a new highway interchange.The analysis will also address potential changes in pollutant
loadings in waters that receive discharges from facilities that detain and treat stormwater from existing and new
PGIS in the project area, based on the results of highway runoff modeling.Analysts will use the end-of-pipe
loading subroutine of WSDOT's Highway Runoff Dilution and Loading(HI-RUN) model for this exercise. If the
results of the loading subroutine trigger the use of the receiving water dilution subroutine,the additional effort
associated with using the latter subroutine would be completed under a separate scope and budget.
City of Federal Way 554-2441-022
City Center Access Project 24 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Based on the current status and distribution of ESA-listed and proposed species that may occur in the project
action area, it is anticipated that the BA will address two species of fish, both of which are listed as threatened
and are under the jurisdiction of NMFS.These are Puget Sound Chinook salmon and the Puget Sound steelhead
trout.The BA will also address potential effects on designated critical habitat for these species. Based on the
location of the project action area relative to stream reaches where these species have been documented,the
potential for project-related effects on these species or their critical habitat is very low.To err on the side of
caution,the assumption for this scope of work is that an effects determination of"may affect but not likely to
adversely affect" is appropriate for these species and critical habitat.As noted above, a similar level of effort
would likely be required to support a no-effect determination.
Based on the lack of potentially suitable habitat in the project vicinity,the project is not expected to have the
potential for any effects on the following species, all of which are under the jurisdiction of the USFWS: marbled
murrelet, streaked horned lark,yellow-billed cuckoo, bull trout, or North American wolverine.The BA will include
brief descriptions of the status, range, and habitat requirements of these species,along with an explanation of
why no effects are anticipated.
In order to present a thorough analysis and to minimize the potential for re-initiation of ESA consultation at a
later date,the BA will need to include a detailed description of the proposed action sufficient to complete the
effects determination.The Consultant will work with staff from the City of Federal Way to provide the following
information to the extent possible or to develop performance specifications in lieu of detailed information:
• Detailed project description that includes all pertinent information on construction activities, including
construction methods,timing, schedule, and phasing, and a list of all construction equipment required.
• Engineering design plans showing locations of all known streams,wetlands,stream crossing structures,
and road/bridge alignments.
• Location of all staging/stockpile areas, clearly identified and delineated.
• The location, and a detailed description, of any in-water/over-water work activities, including the number,
size, composition, and location of all temporary/permanent culverts, as well as the footprint of all in-
water structures.
• Information on stormwater treatment and detention specifications. At a minimum,the Consultant will
fully complete the WSDOT ESA Stormwater Checklist before preparing the BA.
• A list of proposed water quantity and quality BMPs for project construction and operation.
+ Conceptual mitigation plans, if available,that address permanent impacts to project area streams and
wetlands.
The Consultant will submit a first draft of the BA to the City. City staff will review the draft document and provide
a single set of nonconflicting comments, either in the form of tracked changes in the Microsoft Word file or as a
separate list.After receiving the City's consolidated comments,the Consultant will produce a revised draft BA for
City staff review and confirmation that comments have been addressed appropriately.The BA will then be
submitted to the agency(FHWA)that will be responsible for coordinating the ESA Section 7 consultation process
with NMFS and USFWS.
After receiving a set of nonconflicting comments from the agency responsible for consultation,the Consultant will
produce a final draft BA.
City of Federal Way 554-2441-022
City Center Access Project 25 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Deliverables
• Draft BA.
• Revised Draft BA for FHWA.
Subtask 34.4— National Historic Preservation Act
The Consultant will support compliance with Section 106 of the National Historic Preservation Act by providing
the following services (HRA already tasked for this work;this scope replaces Parametrix budget removed in
Amendment 4 and supplements HRA's original budget to cover additional area):
Define Area of Project Effects(APE)—The Consultant will assist in defining the APE based on the preliminary
design of the preferred alternative and prepare a work plan.An aerial map and topographic map of the APE will
be included.The Consultant will also assist in drafting formal Section 106 consultation letters on behalf of WSDOT
if requested. In keeping with WSDOT's procedures,the City will be responsible for submitting the map to WSDOT
and Department of Archaeology and Historic Preservation (DAHP).This APE is subject to change depending upon
refinement of the project design as well as approval of WSDOT and DAHP.
Refine Background Research—The Consultant will refine documentation results from background research
developed during alternative screening to focus on the preferred alternative.
Locate Utilities—Once the APE has been approved, and prior to archaeological fieldwork,the Consultant will
arrange for utility locates to meet the requirements of Washington's new Underground Utilities regulations
(RCW 19.122).This requires obtaining a locate survey for any type of excavation on public and private property
that will exceed 12 inches in depth. A locate service must be notified by the excavator(HRA) at least 2 business
days before digging, and the area of proposed excavation must be marked with paint as described in
RCW 19.122.030.The Consultant will not mark the area in paint but will provide the locate service with adequate
documentation in the form of maps and a text description to complete the survey.
Conduct Archaeological Inventory—The Consultant's archaeologists will conduct a surface and, where feasible,
subsurface inventory of the APE. For the proposed fieldwork,the Consultant's field staff will consider ground
visibility, slope,sediment saturation, and degree of previous disturbance in implementing field survey methods,
which is anticipated to consist of one to two transects spaced at up to 40-meter intervals within the APE.The field
crew will excavate up to 90 shovel probes where feasible.The Field Supervisor will adjust methods to the field
conditions encountered but will not compromise the goal of inventorying the overall project area by one or more
methods.
In general,shovel probes will measure approximately 35 to 40 centimeters(14 to 15.7 inches) in diameter and
will be excavated to sterile soils (e.g.,glacial till or"C" horizon) or until halted by a buried obstacle. Excavated
sediments will be screened through 0.25-inch hardware mesh, and additional radial probes will be excavated at 5-
to 10-meter intervals to investigate any finds. Basic information will be recorded for each probe on HRA field
forms, including final depth,soil color and consistency, and any disturbances.
Archaeological materials will be documented and returned to the shovel probe and the probe backfilled. Under
this scope, up to one archaeological site or one isolated find will be recorded.As feasible,the Field Supervisor will
record survey transects, shovel probe locations, and archaeological resources using a handheld GPS instrument.
Survey mapping information will be recorded on field maps and, as appropriate, DAHP resource forms.
City of Federal Way
554-2441-022
City Center Access Project 26 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Refine Architectural Inventory—Once the architectural APE has been approved by WSDOT and DAHP, HRA's
architectural historian will commence the inventory and evaluation of the buildings within the APE. At this time, it
appears that the APE may include up to a total of 14 buildings over 4S years of age. Recordation will consist of
photographing and documenting each building on a Washington state historic properties inventory form (HPI).
The buildings will be evaluated for their eligibility to the National Register of Historic Places(NRHP) at a
reconnaissance level according to DAHP guidelines.
Prepare Cultural Resources Technical Report—The Consultant will prepare a Cultural Resources Technical Report
summarizing the results of the project.The report will reflect professional standards for format and content as
expressed in DAHP guidelines.The Consultant will submit a draft of the report in PDF format to Parametrix for
comment.The Consultant will make revisions to the draft report in response to those comments and will submit a
revised draft for submittal to the City. Once the City has commented on the report,the Consultant will make any
necessary revisions and submit an electronic version of the final report for submittal to WSDOT and DAHP.The
report will include:
• A description of the project and applicable laws and regulations.
• A summary of the results of the background literature and records research.
• The methods used during the fieldwork and the result.
• A description of any cultural resources found.
• An evaluation of architectural resources over 45 years of age.
• A summary assessment of potential effects to any identified historically significant resources and the
extent to which the proposed project may affect the resource.
• Recommendations for completion of any additional cultural resources compliance obligations stemming
from the results of our study.
• A summary of project procedures that should be followed in the event of an unanticipated discovery of
buried cultural materials or human remains during construction.
• References cited.
The report will include such tables, maps, photographs, and other graphics as are needed to depict the scope of
the study and results. Forms for any recorded resources will be included in an appendix to the report.
Assumptions
• Consultation with DAHP and the affected tribes will be led by the Federal Highway Administration.The
Consultant will provide support.
• The City will provide ROE for the project.All ROE will be in place prior to commencement of fieldwork.
• Background research and a cultural resource inventory for only one alternative will be conducted.
• The Consultant will not be responsible for marking the project area prior to utility locate requests.The
Consultant will not begin subsurface fieldwork until an Excavation Confirmation Code is obtained from
the locate service and all known utilities are marked, or the Consultant has received direct confirmation
from each utility that no facilities are in the project area. Once the Consultant's fieldwork is completed,
the Consultant will not be responsible for maintaining the location survey markings.
City of Federal Way
554-2441-022
City Center Access Project 27 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• The scope provides for up to 90 probes to be excavated in 5 field days by four archaeologists
• The scope includes recording up to one archaeological site and/or isolated find.
• Up to 10 buildings will be recorded and evaluated for the NRHP at a reconnaissance level.
• Only one draft and one final copy of the DCE sections will be prepared.
• The APE for the project has not been approved by WSDOT or DAHP. Fieldwork cannot be conducted until
the APE has received these approvals.
• Teleconferences with the lead agency, DAHP, or the tribes will not exceed 2 hours over the term of the
project.
• The Consultant will provide a text description of the proposed project to use in the Cultural Resources
Technical Report.
• The Consultant will provide maps (GIS shapefiles are preferred) of the project area and design plans of
the proposed project to HRA in a format that can be adapted for use in its report.
• Reporting will not include the preparation of agreement documents (e.g., Memoranda of Agreement).
Deliverables
• Draft Cultural Resources Technical Report
• Final Cultural Resources Technical Report
Task 35 —Access Revision Report (ARR)
It is assumed all eight policy points will be addressed generally in the ARR as described below.This work effort will
be used to document the technical analysis;complete technical reviews by the study support team, including
routing the policy points for review and comments; and finalize the packaged ARR.Amendment 4 removed some
of these funds, and these funds are replaced in this task. Budget remains in Task 15 to support this work.
Subtask 35.1 — Policy Point 3 — Operational and Collision Analyses
As described under Task 3, operations analysis will be conducted as agreed upon in the methods and assumption
document.The results of local intersection and freeway operational analysis and collision analysis will be
documented.
Subtask 35.2— Policy Point 4—Access Connections and Design
Documentation will be prepared of the geometric design of the proposed improvements, conceptual horizontal
and vertical alignments, and conceptual signing and striping plans. Applicable design criteria, including right-of-
way and access impacts,will also be discussed.
Subtask 35.3— Policy Point 5— Land Use and Transportation Plans
Current land use assumptions in the travel demand model will be documented.A discussion of consistency of the
proposed improvements with local, regional, and statewide transportation plans will also be prepared.The effort
to research and document current plans will occur under this task.
City of Federal Way 554-2441-022
City Center Access Project 28 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Task 36 — injunction Culverts (Fish Passage)
There are three injunction culverts within the project limits. One crosses 1-5 at the south end of the S 320th
interchange ramps,one is located under the northbound on-ramp, and one is under the northbound off-ramp.
The Consultant shall develop a Preliminary Hydraulic Design (PHD)for each culvert per the tasks below.
Assumptions
7C Final Hydraulic Design (FHD) Report for the three culverts will not be provided under this scope.This would be
provided at a later phase of design.
Subtask 36.1 — Project Initiation and Field Review
The purpose of this task is to conduct project start-up and background field review of the three crossings.
Work breakdown:
Meet with project design team to discuss project site and kick off project.
Conduct site field review, including:
• Prepare site and general condition assessment for the crossings.
• Prepare a photographic record of the crossings and related stream analyses.
• Collect measurable field data, including channel bank-full widths,woody debris recruitment potential,
sediment size characterization, and fish resources and habitat assessment.
• Locate and document reference reach(es)when applicable.
• Prepare a summary of field data collected to be provided in applicable PHD report appendices.
Assumptions
• One field trip will be made jointly to all locations(four field days assumed).
• The Hydraulics Field Report Form will be used to document findings.
• Project kickoff meeting will be coordinated with fieldwork.
• The City will provide permission to access project areas, if needed.
Deliverables
There are no deliverables for this task.The results of the field reviews and field form will be included in the PHDs.
Subtask 36.2—Survey to Support the PHD Report and Preliminary Design — 1-5 NB Off-Ramp
(995299), NB 1-5 On-Ramp (995300), and 1-5 Mainline (992364)
The purpose of this task is to complete site surveying and prepare the base map for the refenced crossing.
Work breakdown:
Prepare a 1 inch=20 feet planimetric base map with 1-foot contours from the survey and mapping information
based on fieldwork also collected by Parametrix.
City of Federal Way 554-2441-022
City Center Access Project 29 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Collect field survey data, InRoads files with break lines, DTM files, and 2D MicroStation DGN files.
Prepare a base map showing the existing ground topography for each culvert crossing.The base map will be
prepared using WSDOT standard symbology and formatted for preparing plan drawings.
The base map development will include the following work:
Descriptive features and notes will be added as necessary to complete the base map.Such features and notes
include the following:
• Detailed planimetric mapping will be prepared delineating and providing notations of roadway surfaces,
striping,walkways, landscape areas,surface and overhead utilities,fences, drainage structures, ditches,
utility boxes and valves,signs, property corner monuments, and trees 12-inches diameter at breast height
and larger within the surveyed limits.
• Street features,such as curbing, sidewalks,striping, etc. (Striping not surveyed in the center of the
roadway due to safety or access concerns will be field-measured if possible. Otherwise, it will be
established by referencing aerial photography.)
• Review and notation of drainage features;flow lines; ditches; material; length; and diameter of culverts,
inlets, and outlets.
• Collection of underground utility paint marks by others will be surveyed if visible.
• The mapping information will be compiled and prepared in MicroStation to provide a base map for
engineering, modeling, and the preparation of plan drawings.
Assumptions
The centerline (thalweg—deepest part of the creek)for each area listed above will be surveyed to a point to
connect to the upstream survey for the southbound crossing, about 500 feet upstream and 500 feet downstream.
The fieldwork will be completed in 3 days or less.The City will be responsible for providing or securing site access.
Deliverables
1 inch =20 feet planimetric base map with 1-foot contours in Microstation 2D DGN format for each of the sites
listed above.
InRoads data files of all points surveyed for each site, including right-of-way centerline alignment"ALG,"surface
"DTM," and drawing"DGN"files.
Subtask 36.3— InRoads/CAD Preliminary Design— 1-5 NB Off-Ramp at S 320th Street Culvert (995299)
The purpose of this task is to prepare preliminary design, including size and location,for the referenced crossing
replacement structures.
Work breakdown:
Prepare preliminary drawings for the proposed crossing design. Generally,the type,size, and location of the
proposed structure will be selected by the State for the drawings.The preliminary design drawings will be
included as an appendix of the PHD and have the following four sheets:
City of Federal Way 554-2441-022
City Center Access Project 30 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• Existing Plan View, including location, legend, existing structure,topography, roadway key vegetation,
aboveground utilities and related structure, and other relevant information.
• Proposed Plan View, including proposed channel alignment,grading, channel footprint, key stream
structures, proposed crossing structure, and general roadway location.
• Proposed Channel Profile, including thalweg profile elevation and slope, streambed thickness, connection
to existing channel,structure opening size and low chord, and top of road elevation.
• Stream sections and related details, including section width,streambed depth,slopes, and key habitat
features (excluding wood).
Draft drawings will be prepared.
Final draft drawings for inclusion in the PHD will be prepared addressing the consolidated comments.
Assumptions
• The Design sheets will be prepared using Bentley MicroStation and InRoads Design software-provided
configuration,templates, and standards.
• The Final Draft drawings will be delivered as an attachment to the PHD; a separate drawing set will not be
provided.
Deliverables
• Draft four-sheet drawing set for review.
Subtask 36.4— Preliminary Hydraulic Design (PHD) Report 1-5 NB Off-Ramp at S 320th Street Culvert
(995299)
The purpose of this task is to prepare the PHD reports, including preliminary design,for the referenced crossing.
The PHD provides preliminary information needed to determine the preliminary size and location of the proposed
replacement structures.
Work breakdown:
Prepare the following analyses to provide results to support the PHDs:
• Watershed assessment, including site hydrology peak flows using USGS regression analysis (using
Stream5tats or equivalent). Peak flows will also be evaluated by a basin model to confirm range of
possible results.
• Mapped floodplains and potential for change.
• Geomorphic assessment; expected to require a minimal analysis for this channel.
• Prepare fish resources and site habitat assessment for approximately 500 feet upstream and downstream
of the crossing; assess in context of system habitat improvements.
• Reference reach analysis (using results of the Task 1 evaluation).
• Prepare a hydraulic model using SRH-2D modeling software for the channel reaches using the same
segments as described for the habitat assessment, approximately 500 feet upstream and downstream of
the crossing.
City of Federal Way 554-2441-022March 2020
City Center Access Project 31
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• Fish passage design methodology and selection.
• Stream alignment, channel and structure section, profile, material analysis, habitat feature, and
preliminary design.
• Prepare preliminary wood recruitment and requirement analysis.
• Collect and evaluate floodplain impacts and storage, as applicable.
• Review climate resiliency using WDFW Climate Change tool and 2040 and 2080 scenarios.
Prepare draft PHD report that includes the following analyses:
• Prepare preliminary channel alignment, profile, reconstruction,stream and structure section detail,
minimum hydraulic opening, and streambed design.
• Prepare LWM concept placement schematic design as a figure in the PHD.
• Prepare climate change section as provided in the PHD template or update.
• Include and report items prepared in Task 1.
• Prepare review draft PHD report.
• Prepare draft PHD.
Assumptions
• Summary of field data collected will be provided in report appendices.
• Existing floodplain analyses and modeling will be used for floodplain evaluation.The FEMA HEC-RAS
model for the stream system will be used, if available.
• Fish resources and habitat assessment will use available data collected and reported by WDFW for this
crossing and reach,supplemented by observations during field review.The U.S. Bureau of Reclamation
SRH-2D model will be used for hydraulic analysis. No model calibration will be prepared.
• Fish passage methodology will apply the 2013 WDFW Water Crossing Design Guidelines(WCDG).
• The 8_SA_Agragate analysis will be used for streambed design.
• The H_HD template provided by the State, or updates received before intuition of the draft, will be used.
• The WDFW climate resiliency method and presentation methods will be used.
• The State Hydraulics Section will identify the preferred structure.
• Scour analysis will not be prepared for the PHD.
• LWM calculations will not be completed for PHD.
• One draft PHD will be provided for review. Consolidated review comments will be provided for
completion of the draft PHD report.
Deliverables
• Review draft PHD report for Culvert I-S NB off-ramp at S 320th Street culvert(995299).
is Draft PHD report for Culvert 1-5 NB off-ramp at S 320th Street culvert(995299).
City of Federal Way 554-2441-022March 2020
City Center Access Project 32
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Subtask 36.5 — InRoads/CAD Preliminary Design— 1-5 NB On-Ramp at S 320th Street Culvert (995300)
The purpose of this task is to prepare preliminary design, including size and location,for the referenced crossing
replacement structures.
Work breakdown:
Prepare preliminary drawings for the proposed crossing design.Generally,the type,size, and location of the
proposed structure will be selected by the State for the drawings.The preliminary design drawings will be
included as an appendix of the PHD and have the following four sheets:
• Existing Plan View, including location, legend, existing structure,topography, roadway key vegetation,
aboveground utilities and related structure, and other relevant information.
• Proposed Plan View, including proposed channel alignment,grading, channel footprint, key stream
structures, proposed crossing structure, and general roadway location.
• Proposed Channel Profile, including thalweg profile elevation and slope, streambed thickness, connection
to existing channel, structure opening size and low chord, and top of road elevation.
• Stream sections and related details, including section width,streambed depth,slopes, and key habitat
features(excluding wood).
Draft drawings for review will be prepared.
Final draft drawings for inclusion in the PHD will be prepared addressing the consolidated comments.
Assumptions
• The Design sheets will be prepared using Bentley MicroStation and InRoads Design software-provided
configuration,templates, and standards.
• The Final Draft drawings will be delivered as an attachment to the PHD; a separate drawing set will not be
provided.
Deliverables
• Draft four-sheet drawing set for review.
Subtask 36.6— Preliminary Hydraulic Design (PHD) Report 1-5 NB On-Ramp at S 320th Street Culvert
(995300)
The purpose of this task is to prepare the PHD reports, including preliminary design,for the referenced crossing.
The PHD provides preliminary information needed to determine the preliminary size and location of the proposed
replacement structures.
Work breakdown:
Prepare the following analyses to provide results to support the PHDs:
• Watershed assessment, including site hydrology peak flows using USGS regression analysis (using
StreamStats or equivalent). Peak flows will also be evaluated by a basin model to confirm range of
possible results.
City of Federal Way
554-2441-022
City Center Access Project 33 March 2020
Scope of Work Exhibit As
SCOPE OF WORK (continued)
• Mapped floodplains and potential for change.
• Geomorphic assessment; expected to require a minimal analysis for this channel.
• Prepare fish resources and site habitat assessment for approximately 500 feet upstream and downstream
of the crossing; assess in context of system habitat improvements.
• Reference reach analysis (using results of the Task 1 evaluation).
• Prepare a hydraulic model using SRH-2D modeling software for the channel reaches using the same
segments as described for the habitat assessment, approximately 500 feet upstream and downstream of
the crossing.
• Fish passage design methodology and selection.
• Stream alignment, channel and structure section, profile, material analysis, habitat feature,and
preliminary design.
• Prepare preliminary wood recruitment and requirement analysis.
• Collect and evaluate floodplain impacts and storage, as applicable.
• Review climate resiliency using WDFW Climate Change tool and 2040 and 2080 scenarios.
Prepare draft PHD report that includes the following analyses:
■ Prepare preliminary channel alignment, profile, reconstruction,stream and structure section detail,
minimum hydraulic opening, and streambed design.
• Prepare LWM concept placement schematic design as a figure in the PHD.
• Prepare climate change section as provided in the PHD template or update.
• Include and report items prepared in Task 1.
• Prepare review draft PHD report.
• Prepare draft PHD.
Assumptions
• Summary of field data collected will be provided in report appendices.
• Existing floodplain analyses and modeling will be used for floodplain evaluation.The FEMA HEC-RAS
model for the stream system will be used, if available.
• Fish resources and habitat assessment will use available data collected and reported by WDFW for this
crossing and reach,supplemented by observations during field review.The U.S. Bureau of Reclamation
SRH-2D model will be used for hydraulic analysis. No model calibration will be prepared.
• Fish passage methodology will apply the 2013 WDFW Water Crossing Design Guidelines (WCDG).
• The 8_SA_Agragate analysis will be used for streambed design
• The H_HD template provided by the State, or updates received before intuition of the draft,will be used.
• The WDFW climate resiliency method and presentation methods will be used.
• The State Hydraulics Section will identify the preferred structure.
City of Federal Way
554-2441-022
City Center Access Project 34 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• Scour analysis will not be prepared for the PHD.
• LWM calculations will not be completed for PHD.
• One draft PHD will be provided for review. Consolidated review comments will be provided for
completion of the draft PHD report.
Deliverables
• Review draft PHD report for Culvert 1-5 NB on-ramp at S 320th Street culvert(995300).
• Draft PHD report for Culvert 1-5 NB on-ramp at S 320th Street culvert(995300).
Subtask 36.7— InRoads/CAD Preliminary Design — 1-5 Mainline South of S 320th Street Culvert
(992364)
The purpose of this task is to prepare preliminary design, including size and location,for the referenced crossing
replacement structure.
Work breakdown:
Prepare preliminary drawings for the proposed crossing design. Generally,the type,size, and location of the
proposed structure will be selected by the State for the drawings.The preliminary design drawings will be
included as an appendix of the PHD and have two sets, one for each lane crossing,for a total of 10 sheets:
• Existing Plan View, including location, legend, existing structure,topography, roadway key vegetation,
aboveground utilities and related structure, and other relevant information.
• Proposed Plan View, including proposed channel alignment, grading, channel footprint, key stream
structures, proposed crossing structure, and general roadway location.
• Proposed Channel Profile, including thalweg profile elevation and slope, streambed thickness, connection
to existing channel,structure opening size and low chord, and top of road elevation.
• Stream sections and related details (two sheets), including section width,streambed depth,slopes, and
key habitat features(excluding wood).
Draft drawings for review will be prepared.
Final draft drawings for inclusion in the PHD will be prepared addressing the consolidated comments.
Assumptions
The Design sheets will be prepared using Bentley MicroStation and InRoads Design software with
provided configuration,templates, and standards.
• The Final Draft drawings will be delivered as an attachment to the PHD; a separate drawing set will not be
provided.
Deliverables
• Draft 10-sheet drawing set for review.
City of Federal Way 554-2441-022
City Center Access Project 35 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
Subtask 36.8— Preliminary Hydraulic Design (PHD) Report— 1-5 Mainline South of S 320th Street
Culvert (992364)
The purpose of this task is to prepare the PHD reports, including preliminary design,for the referenced crossing.
The PHD provides preliminary information needed to determine the preliminary size and location of the proposed
replacement structures.
Work breakdown:
Prepare the following analyses to provide results to support the PHDs:
• Watershed assessment, including site hydrology peak flows using USGS regression analysis (using
StreamStats or equivalent). Peak flows will also be evaluated by a basin model to confirm range of
possible results.
• Mapped floodplains and potential for change.
• Geomorphic assessment; expected to require a minimal analysis for this channel.
• Prepare fish resources and site habitat assessment for approximately 500 feet upstream and downstream
of the crossing; assess in context of system habitat improvements.
• Reference reach analysis (using results of the Task 1 evaluation).
• Prepare a hydraulic model using SRH-2D modeling software for the channel reaches using the same
segments as described for the habitat assessment, approximately 500 feet upstream and downstream of
the crossing.
• Fish passage design methodology and selection.
• Stream alignment, channel and structure section, profile, material analysis, habitat feature, and
preliminary design.
• Prepare preliminary wood recruitment and requirement analysis.
• Collect and evaluate floodplain impacts and storage, as applicable.
• Review climate resiliency using WDFW Climate Change tool and 2040 and 2080 scenarios.
Prepare draft PHD report that includes the following analyses:
• Prepare preliminary channel alignment, profile, reconstruction,stream and structure section detail,
minimum hydraulic opening, and streambed design.
• Prepare LWM concept placement schematic design as a figure in the PHD.
• Prepare climate change section as provided in the PHD template or update.
• Prepare review draft PHD report.
• Prepare draft PHD.
Assumptions
• Summary of field data collected will be provided in report appendices.
City of Federal Way 554-2441-022
City Center Access Project 36 March 2020
Scope of Work Exhibit A6
SCOPE OF WORK (continued)
• Existing floodplain analyses and modeling will be used for floodplain evaluation.The FEMA HEC-RAS
model for the stream system will be used, if available.
• Fish resources and habitat assessment will use available data collected and reported by WDFW for this
crossing and reach, supplemented by observations during field review.
• The U.S. Bureau of Reclamation SRH-21D model will be used for hydraulic analysis. No model calibration
will be prepared.
• Fish passage methodology will apply the 2013 WDFW Water Crossing Design Guidelines(WCDG).
• The 8_SA_Agragate analysis will be used for streambed design.
• The H_HD template provided by the State, or updates received before intuition of the draft,will be used.
• The WDFW climate resiliency method and presentation methods will be used.
• The State Hydraulics Section will identify the preferred structure.
• Scour analysis will not be prepared for the PHD.
• LWM calculations will not be completed for PHD.
• One draft PHD will be provided for review.Consolidated review comments will be provided for
completion of the draft PHD report.
Deliverables
■ Review draft PHD report for Culvert 1-5 NB mainline south of S 320th Street culvert(992364).
• Draft PHD report for 1-5 NB mainline south of S 320th Street culvert(992364).
City of Federal Way 554-2441-022
City Center Access Project 37 March 2020
Scope of Work Exhibit A6
EXHIBIT D6
� Washington State Development Division
WI/ De artment of Trans rtation Contract Services Office
R Po Po sox 4740e
Olympia,WA 98504-7408
7345 Underson Way SW
Tumwater,WA 98501-6504
TTY:1-800-833-6388
www.wsdot.wa.gov
April 27, 2020
Parametrix, Inc.
10193 91h Avenue SE, Suite 100
Puyallup, WA 98374-2215
Subject: Acceptance FYE 2019 ICR—Cognizant Review
Dear Holli Moeini:
We have accepted your firms FYE 2019 Indirect Cost Rate (ICR) of 179.16%
Combined/Corporate (rate includes 0.47% Facilities Capital Cost of Money) based on
the"Cognizant Review" from the WSDOT Audit Office. This rate will be applicable for
WSDOT Agreements and Local Agency Contracts in Washington only. This rate may
be subject to additional review if considered necessary by WSDOT. Your ICR must be
updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
Any other entity contracting with your firm is responsible for determining the
acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
consultautrates(a yvsdot.kra.go�.
Regards;
Jonson, Erik
.+ - Apr 28 2020 8:08 AM
cosi8n
ERIK K. JONSON
Contract Services Manager
EKJ:ah
EXHIBIT D6
AIN11►
Washington State Transportation Building
Department of Trans P.O
Transportation Maple Park Avenue S.E.
P.O.Box 47300
Olympia,WA 98504-7300
360-705-7000
TTY:1-800-833-6388
www.wsdot.wa.gov
April 20,2020
Holli Moeini,CFO
Parametrix,Inc.
1019 39`h Ave. SE, Suite 100
Puyallup,WA 98374-2215
Dear Ms.Moeini:
We have performed a cognizant review of the audit, and supporting workpapers,of the Parametrix,Inc.
Statement of Direct Labor,Fringe Benefits,and General Overhead for the year ended 1/3/2020 in
accordance with our role as Cognizant Agency as defined in 23 U.S.C. 112(b)(2)(c)and 23 CFR 172.3
and 172.7. Clark Nuber P.S.performed the audit. The CPA represented that the audit was conducted in
accordance with the Government Auditing Standards, as promulgated by the Comptroller General of the
United States of America, and the audit was designed to determine that the indirect cost rate was
established in accordance with Cost Principles contained in the Federal Acquisition Regulation,48 CFR
Part31. We performed our cognizant review in accordance with the AASHTO Review Program for CPA
Audits of Consulting Engineers'Indirect Cost Rates.
In connection with our cognizant review,nothing came to our attention that caused us to believe that the
audit,and supporting workpapers for the Statement of Direct Labor,Fringe Benefits,and General
Overhead,and the related Auditor's Reports,we reviewed did not conform in all material respects to the
aforementioned regulations and auditing standards. Accordingly,we recommend acceptance of the
following rates:
Combined/Corporate: 178.68%
Facilities Capital Cost of Money(FCCM): 0.47%
Sincerely,
Schatzie Harvey, CPA
Agreement Compliance Audit Manager
cc: Steve McKerney,Director of Internal Audit
Jeff Tawney,Acting Assistant Director of Internal Audit
Erik Jonson, Contracting Services Manager
File
EXHIBIT D6
PARAMETRIX,INC.
Statement of Direct Labor,Fringe Benefits and General Overhead
For the Fiscal Year Ended January 3,2020
General Ledger
Balance for the
Fiscal Year Ended Unallowable Proposed
Description January 3,2020 Expenses Ref. Amount Percent
Direct Labor $ 27,865,749 $ - $ 27,865,749 100.00%
Fringe Benefits:
Vacation,sick leave,holidays 6,343,174 6,343,174 22.76%
Payroll taxes 3,858,193 (52,137) E 3,806,056 13.66%
Medical insurance 4,672,957 4,672,957 16.77%
ESOP retirement plan 4,349,000 4,349,000 15.61%
Total Fringe Benefits 19,223,324 (52,137) 19,171,187 68.80%
General Overhead:
Administrative salaries 9,322,620 (111,865) A 9,210,755 3305%
Training salaries 686,122 686,122 2.46%
Bonuses/misc.salaries 4,293,044 (604,258) B 3,688,786 13.24%
Direct selling salaries 1,077,675 1,077,675 3.87%
Bid and proposal salaries 3,404,816 3,404,816 12.22%
Advertising expense 246,725 (246,725) C 0.00%
Direct selling expenses 206,197 (75,364) D 130,833 0.47%
Excise taxes 1,144,232 1,144,232 4.11%
Insurance 750,OG4 75G,OG4 2.7196
Office rent 3,687,464 (490) F 3,686,974 13.23%
Office expenses and supplies 251,890 (54,318) G 197,572 0,71%
Staff appreciation/awards 319,927 (305,560) H 14,367 0.05%
Printing,copier/printer supplies 86,201 86,201 0.31%
Telephone 442,368 442,368 1.59%
Depreciation(including gain/loss on disposal) 1,675,644 1,675,644 6.01%
Amortization 1,389 (1,389) 1 0.00%
Business meals 55,856 (55,856) J 0.00%
Auto expense 485,910 (21,634) K 464,276 1.67%
Billed in-house autos (358,584) (358,584) -1.29%
Office travel 649,502 (122,845) L 526,657 1.89%
Subscriptions,library material 59,560 59,560 011%
Dues 127,086 (17,328) M 109,758 0.39%
Donations 78,930 (78,930) N 0.00%
Professional licenses 26,921 26,921 010%
Postage,couriers,freight 34,849 34,849 0.13%
Training/education 572,040 (34,797) 0 537,243 1.93%
Field equipment/supplies 31,003 31,003 0.11%
Survey equipment/supplies 118,602 118,602 0.43%
Health and safety equipment/supplies 17,202 17,202 0.06%
Billed in-house equipment (299,998) (2990998) -1.08%
Office furniture 33,492 33,492 0.12%
Office equipment 221,201 (680) P 220,521 0.79%
Computer supplies,circuits 240,185 240,185 0.86%
Software/maintenance 1,712,864 1,712,864 6.15%
Recruiting costs 124,246 (38) Q 124,208 0.45%
Payroll,legal&audit 399,321 (229,243) R 170,078 0.61%
Consulting services 536,726 (70,000) S 466,726 1.67%
Bad debts 69,500 (69,500) T 0.00%
Office moving/remodeling 15,041 15,041 0.05%
Personal property taxes 41,449 41,449 0.15%
Utilities/building maintenance 93,361 93,361 0.34%
Finance,bank charges 36,059 (3,768) U 32,291 0.12%
Total General Overhead 32,724,702 (2,104,588) 30,620,114 109.88%
Total Indirect Costs $ 51,948,026 $ (2,156,725) $ 49,791,301 178.68%
Percentage of Direct Labor(Less FCC) 186.42% 178.68%
Facilities cost of capital(FCC) 132,356 V 132,356 0.47%
$ 49,923,657
Percentage of Direct Labor(Includes FCC) 179.16%
See accompanying notes.
3
EXHIBIT D6
PARAMETRIX,INC.
Statement of Direct Labor,Fringe Benefits and General Overhead(Continued)
For the Fiscal Year Ended January 3,2020
References
A. Labor costs incurred in defense of contract performance issues per 48 CFR 31.205-47(f)(5)(A);Collection costs
unallowable per 48 CFR 31.205-3;Organizational cost pertaining to acquisition per 31.205-27.
B. Share value based bonuses unallowable per 48 CFR 31.205-6(i); Limitation on allowability of senior executives
compensation per 48 CFR 31.205-6(p).Personal vehicle use unallowable per 48 CFR 31.205-6(m)(2).Gifts unallowable
per 48 CFR 31.205-13(b).
C. Nonallowable public relations and advertising costs per 31.205-1; Promotional materials unallowable per 48 CFR
31.205-1(f)(5).
D. Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per 48 CFR 31.205-51;Excess lodging and per
diem unallowable per 48 CFR 31.205-46.
E. Fringe benefits associated with labor deemed unallowable per 48 CFR 31.201-6(a).
F. Prior period cost unallowable per 31.203(g).
G. Gift unallowable per 48 CFR 31.205-13(b).
H. Entertainment unallowable per 48 CFR 31.205-14;Gifts unallowable per 48 CFR 31.205-13(b);Alcohol unallowable per
48 CFR 31.205-51.
I. Amortization unallowable per 48 CFR 31-205.49.
J. Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per 48 CFR 31.205-51.
K. Personal vehicle use unallowable per 48 CFR 31.205-6(m)(2).
L. Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per 48 CFR 31.205-51;Excess lodging and per
diem unallowable per 48 CFR 31.205-46.
M. Dues to social clubs unallowable per 48 CFR 31.205-1(f)(7),31.205-14; Lobbying unallowable per 48 CFR 31.205-22(c).
N. Donations unallowable per 48 CFR 31.205-8.
O. Entertainment unallowable per 48 CFR 31.205-14;Alcohol unallowable per 48 CFR 31.205-51;Excess lodging and per
diem unallowable per 48 CFR 31.205-46.
P. Prior period cost unallowable per 31.203(g).
Q. Excess lodging and per diem unallowable per 48 CFR 31.205-46; Entertainment unallowable per 48 CFR 31.205-14.
R. Legal costs incurred in defense of contract performance issues per 48 CFR 31.205-47(f)(5)(A);Organizational Cost
pertaining to acquisition per 31.205-27.
S. Nonallowable public relations and advertising costs per 31.205-1.
T. Bad debt unallowable per 48 CFR 31.205-3.
U. Interest, late fees unallowable per 48 CFR 31.205-20.
V. Cost of money adjustments per 48 CFR 31.205-10(a).
See accompanying notes.
-4-
EXHIBIT D6
PARAMETRIX,INC.
Notes to Financial Statement
For the Fiscal Year Ended January 3,2020
Note 7-Continued
The ESOP Plan provides for cash payments on the appraised value of the stock held by the ESOP for the employee upon
termination of employment through a repurchase of shares by the plan or by the Company.The Company obtains
valuations of the Company's stock from a qualified independent valuation consultant at year end,and on intervening dates
coincident with significant issuances or redemptions of shares.The ESOP plan complies with the applicable requirements of
FAR 31.205-6(q).
Note 8-Description of Depreciation and Leasing Policies
Certain assets are purchased or acquired under capitalized leases and depreciated.Other assets are under operating leases
and are considered lease expenses. Both costs are included in the indirect cost pool.The straight-line depreciation method
reflected on the Company's financial statement is also used for the indirect cost rate schedule.Since the financial statement
amounts included in the indirect cost pool are lower than the amounts used for Federal tax purposes,the amounts included
in the indirect cost rate schedule are allowable under FAR 31.205-11(e).
Note 9-Description of Related Party Transactions
Certain employees have personal usage of company vehicles.The value of personal use of vehicles is determined based on
Internal Revenue Code guidelines and included in the employee's taxable wages.Amounts attributable to the personal
usage of company vehicles,excluding executives,totaled$11,702 for the year ended January 3,2020 and were disallowed
in compliance with FAR 31.205-6(m)(2).
Prior to 2018,the Company assumed a lease as part of an acquisition.The associated building is owned by an employee;
however,the employee has no direct financial interest in the Company.
Note 10-Facilities Capital Cost of Money(FCCM)
The cost of money rate has been calculated in accordance with FAR 31.205-10, using average net book values of equipment
and facilities multiplied by the average treasury rate for the applicable period. Equipment and facilities include furniture
and fixtures,computer equipment,software,vehicles and leasehold improvements.The calculation was made as follows:
Average net book value of corporate assets $ 4,235,384
Average treasury rate 3.1250%
Computed Facilities Capital $ 132,356
Direct labor base $ 27,865,749
Cost of money rate 0.47%
-7-
EXHIBIT D6
Certification of Final Indirect Costs
Firm Name: Parametrix, Inc.
Indirect Cost Rate Proposal: 179.16%
Date of Proposal Preparation (mm/dd/yyyy): 03/27/2020
Fiscal Period Covered (mm/dd/yyyy to mm/dd/yyyy): FY 2019(1/5/2019-01/03/2020)
1, the undersigned, certify that I have reviewed the proposal to establish final indirect cost rates
for the fiscal period as specified above and to the best of my knowledge and belief.
1.)All costs included in this proposal to establish final indirect cost rates are allowable in
accordance with the cost principles of the Federal Acquisition Regulations (FAR) of title 48,
Code of Federal Regulations(CFR), part 31.
2.) This proposal does not include any costs which are expressly unallowable under the cost
principles of the FAR of 48 CFR 31.
All known material transactions or events that have occurred affecting the firm's ownership,
organization and indirect cost rates have been disclosed.
n
Signature.
Name of Certifying Official* (Print): Holli Moeini
Title: Executive Vice President,Chief Financial Officer
Date of Certification (mm/dd/yyyy): 03/27/2020
*The"Certifying Official"must be an individual executive or financial officer of the firm at a level
no lower than a Vice President or Chief Financial Officer, or equivalent,who has the authority to
represent the financial information utilized to establish the indirect cost rate for use under Agency
contracts.
Ref. FHWA Directive 4470.1A available on line at:
(IL' fi ea ,;Di. 4VfIE SrE _:1,•.,Ci 1ii� iitl
041 Certification;Nov 2010
Client:City of Federal Way Exhibit D6
Project:City Center Access
Project no:554-2441-022
Parametrix HRA Michael Mi nor Miller Creek PRR Total
Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours
$98,737.42 504 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $98,737.42 504
S4,415-92 24 50.00 0 54,415.92 24
$5,491.05 36 $0.00 0 $5,49105 36
$42,718.49 196 $0.00 0 542.718.49 196
$7,783.91 48 $0.00 0 S7.783.91 48
$38,328.05 200 SO.00 0 $38.328.05 200
$63,715.16 348 $0.00 10 $0.00 1 0 $0.00 1 0 $90,912.17 763 5154,627.32 1111
S3252.12 12 $11,671.59 77 $14,9?371 89
$14,736.54 88 $9,698.54 84 $24,435.08 172
$19,12810 88 $31,367.46 265 $50,495.56 353
S2-168.08 8 54,190.56 37 $6,358.63 4S
S10,72785 92 $18.961.53 158 $29,689.39 250
57.376.06 32 57,789.95 69 $15,166.02 101
SS.242 36 24 $1,793.72 21 $7.036.08 45
$1,084.04 4 $5,438.82 52 $6,522.86 56
$128,024.61 584 $0.00 0 $0.00 0 50.00 0 50.00 0 $128,024.61 S94
537.332 40 178 $37,33240 178
58.172.77 42 58,172,77 42
S16.33280 74 $16,33280 74
S21.46096 98 $21,46096 98
S16.01968 72 $16,019.68 72
520.981.82 80 $20,981.82 80
57.724.18 40 $7,724.18 40
$41,747.98 248 S0.0o 0 $0.00 0 $0.00 0 $0.00 0 $41,747.98 248
511,71617 72 531.716.17 72
$30,031.80 176 $30.031.80 176
$360,204.17 2260 $0.00 0 $0.00 0 $51,293.00 0 50.00 0 5411.497.17 2260
5162.752.64 914 5162,752.64 914
556.894.34 322 $56,894.34 327
586.347.21 626 $86,347 21 626
516,479.09 108 $16,479.09 108
S6.338.15 42 $6,338.15 42
S26.78958 220 $51,293.00 $78,082.S8 220
54,603.15 28 $4,603.15 28
$158,223.39 1034 $21,226.15 244 561.209.79 514 $0.00 0 $0.00 0 $240,659.33 1792
50.00 0 50.00 0
$122,305.98 820 $61,209-79 514 5183.515.78 1334
532.298.01 200 $32,298.01 201)
$3,619.40 14 $21,226.15 244 $24,845.55 258
$18,433.67 90 $0.00 0 $0.00 1 0 $0,00 0 $0.00 0 $18,433.67 90
511.06:x.20 54 511,060.20 54
54.096-37 20 54.096.37 20
$3,277.10 16 S3.27710 16
$869,086.38 5066 $21.226.15 244 561.209.79 514 551.293.00 0 $90,91217 763 51,093.72749 6589
$10,000.00 $650.00 $29,59200 $39,232.00
$879,086.38 5068 $21,876.15 244 $61,209.79 514 $51,293.00 5119,494.17 763 51,132,959.49 6589
SO.00
Total With Management Reserve $1.132,959.49
Client,City of Federal Way Exhibit D6
Project-city Center AtcL%
Project no:554-2441-022.
Parametrix HRA Michael Minor Miller Creek PRR Tatal
fast Henn C= Hours Cost Houm Cost Hours Co.S. 1•lnwc "bit +1nur.
$199,762.13 1410 0 0 0 0 0 6 0 0 5178,762.13 1410
511;380.47 BA:. 511-378..47 8;
513;936.81112 513,93x.81 112
525.255:52. 152 152
532,057.67 246 53,1.p57.77 ;16
525,256.52 Z2 525-?56.52 152
532.057.67 246 532.057.67 146
S25.BO.52 15;
534,.751.97 206
51.99,762.13 - 0 n 1; 0 0 0 0 5103.71;'.13
SO.W iL'AO 0
$199.762-13 1410 0 0 0 0 D 0 0 5199.762-13 1410
6 c-311 cc3tlon from Previou;To=t. -$133,000.00
Project Total: $1,199,72L62
G,y al feEml Wry FaM1M�
m:Cily Cenle X<n
Parametrix-Labor z N '
> >
,:-:.•.:-:.... .. ..0 as :+r.. sss.s ss.9] �,. ,,, <,,..
r
1Y Centn a�Wna ���
n1:554]N1.0]1
Parametrix-Labor
tN1 fl,.S�ti $w3lsvw .. $1],]9399 5511]391 5651]3 Sr JSo 39 513,04151 551906 5]6]391 m66031 $19,722M SIO 453]]$5,29740 539,15111 S16,136]5 5,,56150
W far io- Am-
-1
-
-1 S1.m113$14.91430 551,119w$U,MS.31 5,.14144 34$14.11139
lam sam ra.s4 sam san 53un ,am
37436% s11s,;i ,•.l w10 wm Sow Som som woo sow wm sow so. so. A wW
,. ,.,. 3o>e 5193/434 pa, 5141 s4 woo solo so. Sam som Som >1m wm Som som 50m so. woo
e.4e f]p,M.11 &l.4tl fkmy. mm ja]n Ws 1M f+W ,aDO fpm $a.m yaw 1CA0 sfi� lam
wn�.Cw w�]moi u[ww fMar 44
' i no:5513u1013 '
Parametrix-Labor - a i 1 68
su
32
3
Oim,:[rry of ilEenl Way E—,ob
2 T T 2
Parametrix-Labor a= r a 3 - A
3+1
o,•r.1 WN �.9C..5159 stl3ae.6 50m wm a1,16104 SCm '.!,n 50m ....0 .].. >JW wm 53.wem all,;6310 rH,s3331 $]004ew
W, 31916% 5503 osom 510151=0 5107114 s31e7411 S7131155 516.111
1151.• 1.k 3a,o r
.. ,.w-7 a6 $u.774 el $nm Sa.m Sa,399 s9 w m w m $O m w+: w m w m w m $19,2— Sn,917 09 $13-3N S11-7
C
4�1 11
a
fvw 3,-uln 34.1u.m 5s l,.a+.1.w s m.tn 4e ua31 50++1
ylti. �r 50m 519.79170 51,91511 $3440309 $3616 ee wm S9,S41m S5,94539 56161..1 5445465 $0m wm $1149019 wm wm
pa�y.n. 11010 ,5,160 15 sm5u A $41574 5995 s4 �1,6136 514596 .eW wm 59,On e0 Som wm
iral, .ts4 .. .a�. ,a,1.13, .us[HJ9 {c3,n4.4i 4iaal.3a 19.m U,Mlb 4AM4e $4k1ri 11 %P. WO *M 39f1YlI9 Yaw P6w
G
?s �
Parametrix-Labor
77
,1 ....:..............n.:...,....r....�._...y.. ...i.i�... ::: lu.: as :U .. ., ii ii ii .__
I
I -
"1•f"
9 � -
Parametrix-Labor
- -
BJI..uW... $2.'8259 im.e0 53,>e3a $654. 5175831 $193120 S1,96BW 5000 53_.936 559122 5.316 516210 $i.W3e1
1111, 12916% $503 o50W Al. 5126366$1,531 J6 51,69591 5523321 $S31343 $0W 553633 S105923 $63105 5-28 $1,3981]
r.1J.,.1±•3'aJll $a.... ,,1B X33,1 .' .,.'.." :.:_>3) .: ':.;2 Som $f2550 wYu 51,u .. ::-I.- ..:.�
$O W So W 5-97 $2,61B W $2,658.33 5.132 $1:0635 x1915 82 ,62305 W W SO W
..•.I... 'h 51583+ YJe 16 .411. $119x1
r.:�� :lr •'1.11 -i- SB-615x1 Ilmr /f�6f1.H 13,�1f i1 fE:4+.�2 1l 1. 1,: •1 +.n•
"I
Client:City of Federal Way Exhibit D6
Project:City Center Access
Project no:554-2441-022
v
Y
(0
U
O
J
Parametrix - Expense
Cost Rates'' $10,000.00
Task Subtask Description Expense Total
33 Prelim Engineering for the Preferred Alternative $10,000.00 1
33.1 Preliminary Design �—O
33.3 Design Verification $0.00
33.4 Stormwater Design and Report S0.00
33.5 113reliminary Right of Way Estimate 50.00
33.6 IStructural design S0.00
33.7 Utility Location S10,000.00 1
33.8 Base Map Update for Preliminary Design $0.00
33.9 Rights of Entry $0.00
Total: $10,000.00 1
EXHIBIT E6
AIMIL
Washington State Transportation Building
Department of Transportation 3'0 Maple Park Avenue S.E.
P.O.Box 47300
Oiympia,WA 98504-7300
360-705-7000
TTY:1-800-833-6388
www.wsdot.wa.gov
August 12, 2019
SCJ Alliance
8730 Tallon Lane NE, Suite 200
Lacey, WA 98516
Subject: Acceptance Sub-Consultant's Annual ANTE Rate Table
Historical Research Associates, Inc.
Dear Scott Sawyer:
Washington State Department of Transportation(WSDOT) has reviewed and accepted
your sub-consultant's proposed Annual ANTE rate table for Agreement Number
Y-12164 effective July 1,2019. This acceptance is in accordance with the terms of your
agreement with WSDOT.
This Annual ANTE rate table may be subject to additional review if considered
necessary by WSDOT.
If you have any questions, feel free to contact our office at(360)705-7019 or via email
consultantrates(az'wsdot.wa.gnv.
Regards,
ERIK K. JONSON
Contract Services Manager
EKJ:ah
Enclosure: Sub-Consultant's Accepted Annual ANTE Rate Table
Cc: Bill Elloitt
Accepted Sub-Consultant's Annual ANTE Rate Table
EXHIBIT E6
2019 ACTUALS NOT TO EXCEED TABLE(ANTE)
Historical Research Associates,Inc.
PO Box 7086
Missoula MT 59807-7086
All Inrausive Hourly
Job Direct Labor Rate Overhead 150.99% Fixed Fee 26.55% 3l1ine Rate
uassificaliuna NTE NTE NTE NTE
34-rninr Ar{.hrrenlogist 543.39 $65.51 $11.52 $126.47.
Senior Historian $43.41 $65.54 $11.53 $120.48
Senior Architectural Historian $32.94 $49.74 $8.75 $91.42
Architectural Historian $30.72 $4638 $8.16 $85.26
Project Archaeologist $32.25 $4869 A.5b $89.51
Project Historian $32.43 $48.97 :;8 C1 $90.01
GIS Coordinator/Specialist $33.16 $50.07 $880 $92.03
Research Archaeologist $27.57 $41.63 37 32 $76.52
Research Historian $24.35 $36.77 $6.46 $67.58
Editor/Production Assistant $26.55 $40.09 57.05 $73.69
Project Administrator $29.07 $43.139 $7.72 $80.68
Computer Systems Specialist $39.16 $59.13 y10 40 $108.68
WSDOT Agreement Y-12164
Exhibit E
Page 1 of 1
EXHIBIT E6
AML
Washington State Transportation Building
Department of TNansportation 310 Maple Park Avenue S.E.
P.O.Box 47300
Olympia,WA 48504-7300
360-705-7000
TT1".1-800-833-6388
www.wsdot.wa.gov
February 7,2019 >
Michael Minor,Owner
Michael Minor&Associates,Inc.
4923 SE 36"'Ave
Portland OR, 97202-4126
Re: Michael Minor&Associates, Inc.
Safe Harbor Indirect Cost Rate Extension
Dear Mr.Minor:
Washington State has received approval from our local Federal Highway Administration(FHWA)
Division to continue administering the"safe harbor" indirect cost rate program on engineering and design
related service contracts,as well as for Local Public Agency projects.
We completed our risk assessment for Michael Minor&Associates,Inc. in September 2016. Our
assessment was conducted based on the documentation provided by the firm. The reviewed data included,
but was not limited to, a description of the company,basis of accounting,accounting system and the basis
of indirect costs. Based on our review,we found the firm eligible to use the Safe Harbor rate. Michael
Minor&Associates opted to use the Safe Harbor rate,rather than provide a FAR-compliant rate.
Based on further review and discussion with the fine, we are issuing an extension of the Safe Harbor
Indirect Cost Rate of 110%of direct labor with a field rate, where applicable,of 80%of direct labor for
Michael Minor&Associates.
Michael Minor&Associates has agreed to improve Internal Controls and timekeeping processes in order
to be able to develop an Indirect Cost Rate Schedule in the future in accordance with the Federal
Acquisition Regulations(FAR), Subpart 31. The WSDOT Internal Audit Office has provided guidance
and information related to FARs and the AASHTO Audit Guide. You may use the Safe Harbor Rate of
110%,or 80%for field office situations, for agreements entered into prior to June 30,2020. For
agreements entered into after this date,please contact the WSDOT Consultant Services Office(CSO)or
our office for guidance.
The Safe Harbor Rate will not be subject to audit. Please coordinate with CSO or your Local Programs
contact if you have questions about when to apply the Safe Harbor rate to your agreement.
If you have any questions,please contact me,Jeri Sivertson,or Steve McKerney at(360)705-7003.
---�..TSincerel
Schatzie Harvey~
Agreement Compliance Audit Manager
cc: Steve McKerney,Director of Internal Audit
Jeri Sivertson,Assistant Director of Internal Audit
Larry Schofield,MS 47323
File
EXHIBIT E6
Washington State Transportation Building
artment of Transportation Maple p3rkAvenue S.E.
•� �R P.O P.O.Box 47300
O ympia,WA 98504-7200
360-705-7000
TTY:1-800-833-6388
wwm.wsdot.wa.gov
January 6, 2020
PRR, Inc.
1501 Fourth Avenue, Suite 550
Seattle, WA 98101
Subject: Acceptance FYE 2018 ICR—CPA Report
Dear BJ Foster:
We have accepted your firms FYE 2018 Indirect Cost Rate (ICR) of 172.12% of direct
labor(rate includes 0.30%Facilities Capital Cost of Money)based on the"Independent
CPA Report," prepared by Smith Bunday Berman Britton, P.S. This rate will be
applicable for WSDOT Agreements and Local Agency Contracts in Washington only.
This rate may be subject to additional review if considered necessary by WSDOT. Your
ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with the firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
consultantrates(a%)-sdot.%va.gor.
Regards;
ERIK K. JONSON
Contract Services Manager
EKJ:ah
Acceptance ICR CPA Report
EXHIBIT E6
PRR, Inc.
2020 Actuals Not To Exceed (ANTE) Table
15014th Avenue
Seattle, WA 98101
Direct Labor Overhead NTE* Fixed Fee NTE y
Job Classifications Rate NTE* 172.12 30.00% Hourly Biling Rate
%
r E
Intern $33.65 $57.92 $10.10 $101.66
Junior Administrator $55.00 $94.67 $16.50 $166.17
Consultant 1 $86.52 $148.93 $25.96 $261.41
Senior Administrator $60.10 $103.44 $18.03 $151.56
Consultant II $89.49 $154.02 $26.85 $270.36
Ma,iager $45.91 $79.03 $13.77 $138.71
Senior Consultant $89.49 $154.02 $26.85 $270.36
Associate Director $84.74 $145.85 $25.42 $256.00
Director $44.95 $77.37 $13.49 $135.81
Senior Director $57.69 $99.30 $17.31 $174.30
Confidential PRR, Inc. 2020 ANTE TABLE 2/25/2020 Page 1
EXHIBIT E6
� Washington State Transportation Building
310 M
V// Department of Transportation P.O.Booxxl4 300 ParkAvenue S.E.
Olympia,VVA 98504-7'00
360-705-7000
TTY:1-800-833-6388
wwrvr.wsdot.wa.gov
June 5, 2019
Shannon&Wilson, Inc.
P.O.Box 300303
Seattle, WA 98103
Subject: Acceptance FYE 2018 ICR—Cognizant Review
Dear Noelani Bevill:
We have accepted your firms FYE 2018 Indirect Cost Rate (ICR) of 185.28% of
Combined/Corporate (includes Facilities Capital Cost of Money 0.27%) based on the
"Cognizant Review" from the WSDOT Audit Office. This rate will be applicable for
WSDOT Agreements and Local Agency Contracts in Washington only. This rate may
be subject to additional review if considered necessary by WSDOT. Your ICR must be
updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
Any other entity contracting with your firm is responsible for determining the
acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
consultantrates ri wsdot.wa.gov.
Regards;
ERIK K. JONSON
Contract Services Manager
EKJ:ah
Acceptance ICR Cognizant Review
EXHIBIT E6
ACTUALS NOT TO EXCEED TABLE(ANTE)
City of Federal Way
City Center Access Project(#17-134)
SHANNON &WILSON, INC.
.Ippl�jcrd Burdened Rafe
Classification Class Code Direct Overhead Fee Billing Rate
Salary Cost 185.28%DSC 30%DSC Range
NTE NTE NTE NTE
Sr.Vice President/President T27/T28/T29 $90.29 $167.29 $27.09 $284.67
Vice President T25 $80.29 $148.76 $24.09 $253.14
Sr.Associate/Associate T22/T23/T24 $67.14 $124.40 $20.14 $211.68
Sr.Professional II/III T19/T20 $54.00 $100.05 $16.20 $170.25
Senior Professional I T18 $42.31 $78.39 $12.69 $133.39
Professional III/IV T16/T17 $43.44 $80.49 $13.03 $136.96
Professional 1/11 T14/T15 $32.21 $59.68 $9.66 $101.55
Senior Drafter/Technician S17/S19 $41.50 $76.89 $12.45 $130.84
Drafter/Technician S09/S10/S11/S13/S15 $27.64 $51.21 $8.29 $87.14
Administration A15/A17/A19 $39.90 $73.93 $11.97 $125.80
Clerical A07/A09/A10/A11 /A13 $29.03 $53.79 $8.71 $91.53
Invoiced costs may not exceed the NTE rate per classification
Billing Multiplier = 1.0 x direct salary cost+1.8528 x direct salary cost+0.3 x direct salary cost=3.1528 x direct salary cost
Federal Way#17-134_S&W Page 1 of 1 2/24/2020
Client:City of Federal Way Exhibit E6
Project:City Center Access
Project no:554-2441-022
— eu E
a a a
HRA Labor
I1ir ll :.i•1:R.,1, 54339 $434'..
Sunta.N Oc•.crrpnor. l-i E9r Onl.l sr-:l.rYrlr Mfru1:
33 E-is, en;�i r,—, am.rli— 57,64:Sri ?-1 Til 4 30 24 l:3ir is G 51:,5.17.65 52.030.53 S21.226.15
ri-
SO-00
V c,..•' .r. -.r.., r- S7.647.96 244 ?, 4 741-ri ,I..-4 ';t•:13.053 $21226.15
I,J4 <d:w'I". Affj flo 50.00 50.00
[.�niir•Vo.ns "51`.'54 2-1 30 4 3!1 24 130 16 6 2 2 •]�'•;-"7L Hours
Gircct Labor Totals $7.,54191. S1,3n:70 $173..64 $088.20 4774 uu 53,41A fa 5530.56 4159.30 459.14 $9!!.52 :4141
OH%:150.99% $11,547.65 $1,96544 $262.18 $1,492.08 $1,168.66 $5,41163 $8010: ::54053 $8779 $1,D
Fixed Fee:26.55% $2,03053 $34560 $4610 $262.37 $205 SO $95158 $140 8E 54229 $1544 S20 G
Total: '$27,2.46.15 53,612.74 $481.92 $2,742.45 52,148.15 $9,9•:�1- SS--17..52 5412.12 5161.36 +:
Client:City of Federal Way Exhibit E6
Project:City Center Access
Project no:554-2441-022
m
v
T u
y t C
d
o > E
w lJ n
HRA- Expense X v
CostRatesl $0.58 S0.20 $80.00 $20.00
cask Subtask Description Expense Tote I
34 Environmental Documentation 5650.00 200 175 5 5
$0..00
Total: 1 $650.00 1 200
$CS110 i;i °,115.00 cA5 Vii- $40000
Client:City of Federal Way Exhibit E6
Project:City Center Access
Project no:554-2441-022
v
41
I
0
z u
Michael Minor&Associates- Labor a a
Direct Labor Rates 562.22 S48 00 S3800 533.00 11000% Total
Task Subtask Description Labor Dollars U
34 Enviromental Documentation �_ 525.504.08 514 164 238 36 76 $28.,054.49 57.651.22 561.209.79
3.1.2 Documented Categorical Exclusion 525..' _ _ 16 238 � - 36 ! 76 $28,054.49 SX.65S."N2 561.209.79
Project Introduction/Preparation 5440.88 a 4 4 5484.97 5:`332_25 $1,05811
Noise Monitoring $1,963.52 42 16 2 16 52.159..87 S58906 S4.71245
Noise Imoact Ar!c..'p.cis $8.257.28 172 24 120 16 12 39.083-01 $2,47719 519.817 47
Noise Abatern—I 4cslvs,i 53.961.28 80 24 40 4 12 $4.357.41 $1,188.38 $9,50707
Desipn A ,yss54,67280 88 40 40 0 8 73: ,[.1C:-94
'� �'..`�'"`
$3,05328 64 24 16 0 24 S7.32787
' v -ce 1c,-,; 51.892.4036 20 8 0 8
$56772 54,541 76
I ,Kea --ico 5-k.ro:9 $1,262.64 27 12 fl 4 5378.79 $3,03034
Labor Hours 514 164 238 36 76 CiVIXC-l+o�r�
Direct Labor Totals $25,504.08 510.204.08 511.424.00 51,368.00 52,508.00
OH%:11000% $28,054.49 $11,224.49 $12,566,40 $1,504.80 $2,758.80 •a:;!ty:" :in
SO c!:'
Fixed Fee:30% $7,651.22 $3,061.22 $3,427.20 $410.40 $752.40 "'CC. F-
5000
Total: $61,209.79 1$24,489.79 $27,417.60 53,283.20 56,019.20
Sii !0
Client:City of Federal Way Exhibit E6
Project:City Center Access
Project no:554-2441-022
Miller Creek Associates - Labor
Rate: 551,293.00 Total
Task Subtask Description Total Cost Hours
33 Prelim Engineering for the Preferred Alternative $51,293.00 1 $51,293.00
33.7 J
33.8 Base Map Updd r Preliminary Design $51,293.00
33.9 Rights of Entry $0.00
Total $51,293.00 1 1 $51,293.00
Cli—City ofFederal Way ahibil E6
P"j:d..Citv Cen[er Access
Pr 554-2"1-022
rR 2
15
is
PRR-LABOR E
Y
Il_r r w p.0 IAI L-il 2a Li W 15 W
•
..........
1: 70 23 M 2M 19 101 6 m 38 34 U 12 U
L,,,,l L,bw T,,t,,, ',a 23 v -n.Jd ifrf!;u 51.31,9 L•"HOM S1.570.08 51,151)2 ;1.7229: SP65.33 rv,n 5 as
$aw
7 7:L. WQC-OH
F-c•d sr
1. GVQC.F-
A -A 53 471 M16 t!i 2..-t ;•1.32'„2 73,7a9
Client:City of Federal Way Exhibit E6
Project:City Center Access
Project no:554-2441-022
0
`o
v is
c
mCU
c > a u
ro
PRR Expense
c v
Cost: 0.575 1.001 1.00 100.00
Task Subtask Description Cost Total
30.00 Public Involvement and Communications Plan
30.1 Public Involvement Oversight and Project Management 0.00
30.2 Stakeholder Engagement(Design Workshop) $0.00
30.3 Community Events and Engagement 524.032.00 403 2600.00 20000.00 12
30.4 Su000rt Citv Website 50.00
30.5 Public Inforrnabon Materials and Special Graphics-Additional $4,200.00 4000.00 2
30.6 Environmental Justice Outreach $350.00 4
30.7 Comment Management $0.00
30.8 Strategic Assistance 50.00
Total Expensesl$28,582.00 1 $232.00 $6,600,007 $20,000.00 $1,750.00
Exhibit E6
Date 5/15/20
Company Name Michael Minor&Associates,Inc ProposedlCFM Proposed
Address: 4923 SE 36th Avenue Fixed Fee
-- -
Clty/State/Zip (Portland,OR 97202 0.8000 0.3000
Subject:Proposed Hourly Rate Statement
Attention:Manager,Consultant Services Office
Below are the highest anticipated hourly billing rates for the identified labor classifications.
Michael Minor&Associates,Inc certifies they have an accounting system that contains separate accounts
or sub-accounts for unallowable costs in accordance with FAR(48 CFR Part 31),and the capacity to track direct costs that are
allocable directly to projects.
Michael Minor&Associates,Inc also certifies they have a labor-charging/time keeping system that is
complete and sufficiently detailed to allow for a proper determination of dlrect and indirect labor costs.
Labor Classification® Labor Rate Indirect Fixed Fee® NTE Rate
Cost Rate Add Row
Principal $62.22 $49.78 $18.67 $130.66 raplQieRrwM
Traffic Technical $38.00 $30.40 $11.40 $79.80
CAD-Graphics-Editing $33.00 $26.40 $9.90 $69.30
Respectfully,
Signature
Title
5/27/2020 Corporations and Charities System
Mr t �as-and Charities Filing System =
it les
BUSINESS INFORMATION
Business Name:
PARAMETRIX, INC.
UBI Number:
600135 349
Business Type:
WA PROFIT CORPORATION
Business Status:
ACTIVE
Principal Office Street Address;
1019 39TH AVE SE,SUITE 100, PUYALLUP,WA,98374-2115, UNITED STATES
Principal Office Mailing Address:
1019 39TH AVE SE,SUITE 100,PUYALLUP,WA,98374-2115,UNITED STATES
Expiration Date:
04/30/2021
Jurisdiction:
UNITED STATES,WASHINGTON
Formation/Registration Date:
04/26/1974
Period of Duration:
PERPETUAL
Inactive Date:
Nature of Business:
PROFESSIONAL,SCIENTIFIC&TECHNICAL SERVICES
REGISTERED AGENT INFORMATION
https://ccfs.sos_wa.gov/#/BusinessSearch/Businessinformation 1/2
5/27/2020 Corporations and Charities System
Registered Agent Name:
C T CORPORATION SYSTEM
Street Address:
711 CAPITOL WAY S,SUITE 204, OLYMPIA,WA,98501-1267, UNITED STATES
MailingAddress:
GOVERNORS
Title Governors Type Entity Name First Name Last Name
GOVERNOR INDIVIDUAL JEFFREY PEACOCK
GOVERNOR INDIVIDUAL HOLLI MOEINI
Back
Filing History Name History Print Return to Business Search
https://ccfs.sos.wa.gov/#/BusinessSearch/Businesslnformadon 2/2
CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY)
10/16/2019
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
NAME:
Dealey, Renton&Associates PHONE FAX
P.O.Box 12675 (A/C,No Ft)!510-465-3090 a'c 11a;510-452-2193
tDl?DRE ertificatesia7dPaEe rentDn.cun:
Oakland, CA 94604-2675 _apgcss:
License#0020739 INSURER(S)AFFORDING COVERAGE NAIC#
INSURER A:National Fire Insurance Co of Hartford 20478
INSURED PARAINC-01 INSURER B:Continental Insurance Company 35289
Parametrix, Inc.
1019 39th Ave. SE Suite 100 INSURER C:American Casualty Company of Reading_PA 20427
Puyallup,WA 98374 INSURER D:XL Specialty Insurance Co. 37885
(253)604-6600 INSURER E:Valley Fore Insurance Company. 20508
INSURER F
COVERAGES CERTIFICATE NUMBER:1487386517 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
-
INSR ADUL SUf3n POLICY EFF POL[C!EXP
LTR TYPE OF INSURANCE L. Wt[O POLICY NUMBER AMM/DD/YYYV 'Cd PA:DDyYYY LIMITS
A X COMMERCIAL GENERAL LIABILITY Y Y 6050531366 11/1/2019 11/1/2020 EACH OCCURRENCE $1,000,000
f-IAMA(=_ U REN I EL
CLAIMS-MADE X OCCUR PRrf•.4kSF3'Eaaccu••uncu) $1,000,0.00
X Contractual Liab MED EXP(Anyone person) __$10,000
X XCU Included -MED
&ADV INJURY $1.000.000
G 'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2.000,000
.I-G
POLICY X PRO- F LOC
rx-,
PRODUCTS-COMP/OPAGG $2,000.000
T —_.. _ _..
i'1-HEF 'AA--ant'�.� !EL WA Stop Gap $1,000,000
- j 6050531352 11/1/2019 11/112020 :'`�1 Iv[r1r5ING[.P urAIT $1,000,000
E AUTOMOBILE LIABILITY Y Y
X ANY AUTO BODILY INJURY(Per person) $
OWNED SCHEDULED BODILY INJURY(Per accident) $
AUTOS ONLY AUTOS I
X HIRED LX
NON-OWNED PF, 1 EI?'. 'DA $
AUTOS ONLY AUTOS ONLY Pe eccicpPs�___... _._
B X UMBRELLALIAB OCCUR 6050531433 11/1/2019 11/1/2020 EACH OCCURRENCE $15,000,000
EXCESS LIAB H. CLAIMS-MADE AGGREGATE $15,000,000
DED X , RETENTION$ $
C WORKERS COMPENSATION Y 6050531383 11/1/2019 11/1/2020 X I PER EORTH-
WA STOP GAP
C AND EMPLOYERS'LIABILITY YIN 6050531402 11/1/2019 11/1/2020
ANYPROPRIETOR/PARTNER/EXECUTIVE ❑ E..L EACH ACCIDENT $1,000,000
OFFICER/MEMBER EXCLUDED? N/A
(Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000
If as,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000
D Professional Liability DPR9932956 11/1/2019 11/1/2020 Per Claim $1,000,000
Claims Made Annual Aggregate $1,000,000
Pollution Liability Included Retroactive Date: 01/01/1969
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required)
Umbrella Liability policy is a follow-form to underlying General Liability/Auto Liability/Employers Liability.
Project Name/Number:City Center Access ProjecV554-2441-022
City of Federal Way and Washington State are named as Additional Insured as respects General and Auto Liability as required per written contract or
agreement.General Liability is Primary/Non-Contributory per policy form wording.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Federal Way ACCORDANCE WITH THE POLICY PROVISIONS.
Attn: Naveen Chandra
33325 8th Avenue South AUTHORIZED REPRESENTATIVE
Federal Way WA 98003 ' 1
©1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD
CNA CNA PARAMOUNT
Blanket Additional Insured - Owners, Lessees or
Contractors - with Products-Completed
Operations Coverage Endorsement
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
It is understood and agreed as follows:
I. The WHO IS AN INSURED section is amended to add as an Insured any person or organization whom the Named
Insured is required by written contract to add as an additional insured on this coverage part, including any such
person or organization, if any, specifically set forth on the Schedule attachment to this endorsement. However, such
person or organization is an Insured only with respect to such person or organization's liability for:
A. unless paragraph B.below applies,
1. bodily injury,property damage,or personal and advertising injury caused in whole or in part by the acts
or omissions by or on behalf of the Named Insured and in the performance of such Named Insured's
ongoing operations as specified in such written contract;or
2. bodily injury or property damage caused in whole or in part by your work and included in the products-
completed operations hazard,and only if
a. the written contract requires the Named Insured to provide the additional insured such coverage;and
b. this coverage part provides such coverage.
B. bodily injury, property damage,or personal and advertising injury arising out of your work described in such
written contract, but only if:
1. this coverage part provides coverage for bodily injury or property damage included within the products
completed operations hazard;and
2. the written contract specifically requires the Named Insured to provide additional insured coverage under
the 11-85 or 10-01 edition of CG2010 or the 10-01 edition of CG2037.
II. Subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide
such additional insured with:
A. coverage broader than required by the written contract;or
B. a higher limit of insurance than required by the written contract.
III. The insurance granted by this endorsement to the additional insured does not apply to bodily injury, property
damage, or personal and advertising injury arising out of:
A. the rendering of, or the failure to render, any professional architectural, engineering, or surveying services,
including:
1. the preparing, approving, or failing to prepare or approve maps, shop drawings, opinions, reports, surveys,
field orders,change orders or drawings and specifications;and
2. supervisory, inspection, architectural or engineering activities;or
B. any premises or work for which the additional insured is specifically listed as an additional insured on another
endorsement attached to this coverage part.
IV. Notwithstanding anything to the contrary in the section entitled COMMERCIAL GENERAL LIABILITY CONDITIONS,
the Condition entitled Other Insurance, this insurance is excess of all other insurance available to the additional
insured whether on a primary, excess, contingent or any other basis. However, if this insurance is required by written
CNA75079XX (1-15) Policy No: 6050531,
Page 1 of 2 Endorsement No: 5
Nat'l Fire Ins Co of Hartford
Insured Name:PARAMETRIX, INC.
Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission.
CNA CNA PARAMOUNT
Blanket Additional Insured - Owners, Lessees or
Contractors - with Products-Completed
Operations Coverage Endorsement
contract to be primary and non-contributory, this insurance will be primary and non-contributory relative solely to
insurance on which the additional insured is a named insured.
V. Solely with respect to the insurance granted by this endorsement, the section entitled COMMERCIAL GENERAL
LIABILITY CONDITIONS is amended as follows:
The Condition entitled Duties In The Event of Occurrence, Offense, Claim or Suit is amended with the addition
of the following:
Any additional insured pursuant to this endorsement will as soon as practicable:
1. give the Insurer written notice of any claim, or any occurrence or offense which may result in a claim;
2. except as provided in Paragraph IV. of this endorsement, agree to make available any other insurance the
additional insured has for any loss covered under this coverage part;
3. send the Insurer copies of all legal papers received, and otherwise cooperate with the Insurer in the
investigation, defense, or settlement of the claim;and
4. tender the defense and indemnity of any claim to any other insurer or self insurer whose policy or program
applies to a loss that the Insurer covers under this coverage part. However, if the written contract requires
this insurance to be primary and non-contributory, this paragraph (4) does not apply to insurance on which
the additional insured is a named insured.
The Insurer has no duty to defend or indemnify an additional insured under this endorsement until the Insurer
receives written notice of a claim from the additional insured.
VI. Solely with respect to the insurance granted by this endorsement, the section entitled DEFINITIONS is amended to
add the following definition:
Written contract means a written contract or written agreement that requires the Named Insured to make a person
or organization an additional insured on this coverage part,provided the contract or agreement:
A. is currently in effect or becomes effective during the term of this policy;and
B. was executed prior to:
1. the bodily injury or property damage;or
2. the offense that caused the personal and advertising injury
for which the additional insured seeks coverage.
Any coverage granted by this endorsement shall apply solely to the extent permissible by law.
All other terms and conditions of the Policy remain unchanged.
This endorsement,which forms a part of and is for attachment to the Policy issued by the designated Insurers,takes effect
on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and
expires concurremly with said Policy.
CNA75079XX (1-15) Policy No: 6050531366
Page 2 of 2 Endorsement No: 5
Nat'l Fire Ins Co of Hartford
Insured Name: PARAMETRIX, INC.
Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission.
CNA CNA PARAMOUNT
Waiver of Transfer of Rights of Recovery Against
Others to the Insurer Endorsement
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
SCHEDULE
Name Of Person Or Organization:
-NY PERSON OR ORGANIZATION WHOM THE NAMED INSURED HAS AGREED IN WRITING IN A
CONTRACT OR AGREEMENT TO WAIVE SUCH RIGHTS OF RECOVERY, BUT ONLY IF SUCH
CONTRACT OR AGREEMENT:
1. IS IN EFFECT OR BECOMES EFFECTIVE DURING THE TERM OF THIS COVERAGE PART; AND
2. WAS EXECUTED PRIOR TO THE BODILY INJURY, PROPERTY DAMAGE OR PERSONAL AND
ADVERTISING INJURY GIVING RISE TO THE CLAIM.
Information required to complete this Schedule, if not shown above,will be shown in the Declarations.
It is understood and agreed that the condition entitled Transfer Of Rights Of Recovery Against Others To The Insurer
is amended by the addition of the following:
Solely with respect to the person or organization shown in the Schedule above, the Insurer waives any right of recovery
the Insurer may have against such person or organization because of payments the Insurer makes for injury or damage
arising out of the Named Insured's ongoing operations or your work done under a contract with that person or
organization and included in the products-completed operations hazard.
All other terms and conditions of the Policy remain unchanged.
This endorsement,which forms a part of and is for attachment to the Policy issued by the designated Insurers,takes effect
on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and
expires concurrently with said Policy.
CNA75008XX(1-15) Policy No: 6050531366
Page 1 of 1 Endorsement No: 7
Nat'l Fire Ins Co of Hartford
Insured Name:PARAMETRIX, INC.
Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission.
CNA Business Auto Policy
POIaC-,/ 11�d17
CONTRACTORS EXTENDED COVERAGE ENDORSEMENT - BUSINESS AUTO PLUS
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
I. LIABILITY COVERAGE
A. Who Is An Insured
The following is added to Section 11, Paragraph A.1., Who Is An Insured:
1. a. Any incorporated entity of which the Named Insured owns a majority of the voting stock on the
date of inception of this Coverage Form; provided that,
b. The insurance afforded by this provision A.1. does not apply to any such entity that is an
insured under any other liability "policy" providing auto coverage.
2. Any organization you newly acquire or form, other than a limited liability company, partnership or
joint venture, and over which you maintain majority ownership interest.
The insurance afforded by this provision A.2.:
a. Is effective on the acquisition or formation date, and is afforded only until the end of the policy
period of this Coverage Form, or the next anniversary of its inception date, whichever is earlier.
b. Does not apply to:
(1) Bodily injury or property damage caused by an accident that occurred before you acquired or
formed the organization; or
(2) Any such organization that is an insured under any other liability "policy" providing auto
coverage.
3. Any person or organization that you are required by a written contract to name as an additional
insured is an insured but only with respect to their legal liability for acts or omissions of a person,
who qualifies as an insured under SECTION II — WHO IS AN INSURED and for whom Liability
Coverage is afforded under this policy. If required by written contract, this insurance will be primary
and non-contributory to insurance on which the additional insured is a Named Insured.
4. An employee of yours is an insured while operating an auto hired or rented under a contract or
agreement in that employee's name, with your permission, while performing duties related to the
conduct of your business.
"Policy", as used in this provision A. Who Is An Insured, includes those policies that were in force on
the inception date of this Coverage Form but:
1. Which are no longer in force; or
2. Whose limits have been exhausted.
B. Bail Bonds and Loss of Earnings
Section 11, Paragraphs A.2. (2) and A.2. (4) are revised as follows:
1. In a.(2), the limit for the cost of bail bonds is changed from $2,000 to $5,000; and
2. In a.(4), the limit for the loss of earnings is changed from $250 to $500 a day.
Form No: CNA63359XX (04-2012) Policy No: 6050531352
Page: 1 of 4 Policy Effective Date:
11/01/2019
Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606
Copyright CNA All Rights Reserved. Includes copyrighted material of the
Insurance Services Office, Inc., used with its permission.
CNA Business Auto Policy
Policy Endorsement
C. Fellow Employee
Section II, Paragraph B.5 does not apply.
Such coverage as is afforded by this provision C. is excess over any other collectible insurance.
II. PHYSICAL DAMAGE COVERAGE
A. Glass Breakage — Hitting A Bird Or Animal — Falling Objects Or Missiles
The following is added to Section III, Paragraph A.3.:
With respect to any covered auto, any deductible shown in the Declarations will not apply to glass
breakage if such glass is repaired, in a manner acceptable to us, rather than replaced.
B. Transportation Expenses
Section III, Paragraph A.4.a. is revised, with respect to transportation expense incurred by you, to
provide:
a. $60 per day, in lieu of $20; subject to
b. $1,800 maximum, in lieu of $600.
C. Loss of Use Expenses
Section III, Paragraph A.4.b. is revised, with respect to loss of use expenses incurred by you, to
provide:
a. $1,000 maximum, in lieu of $600.
D. Hired "Autos"
The following is added to Section III. Paragraph A.:
5. Hired "Autos"
If Physical Damage coverage is provided under this policy, and such coverage does not extend to Hired
Autos, then Physical Damage coverage is extended to:
a. Any covered auto you lease, hire, rent or borrow without a driver; and
b. Any covered auto hired or rented by your employee without a driver, under a contract in that
individual employee's name, with your permission, while performing duties related to the
conduct of your business.
c. The most we will pay for any one accident or loss is the actual cash value, cost of repair, cost
of replacement or $75,000, whichever is less, minus a $500 deductible for each covered auto.
No deductible applies to loss caused by fire or lightning.
d. The physical damage coverage as is provided by this provision is equal to the physical damage
coverage(s) provided on your owned autos.
e. Such physical damage coverage for hired autos will:
(1) Include loss of use, provided it is the consequence of an accident for which the Named
Insured is legally liable, and as a result of which a monetary loss is sustained by the leasing
or rental concern.
(2) Such coverage as is provided by this provision will be subject to a limit of $750 per
accident.
E. Airbag Coverage
The following is added to Section III, Paragraph B.3.:
The accidental discharge of an airbag shall not be considered mechanical breakdown.
Form No: CNA63359XX (04-2012) Policy No: 6050531352
Page: 2 of 4 Policy Effective Date:
11/01/2019
Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606
®Copyright CNA All Rights Reserved. Includes copyrighted material of the
Insurance Services Office, Inc.,used with its permission.
CNABusiness Auto Policy
Policy Endorsement
F. Electronic Equipment
Section III, Paragraphs B.4.c and B.4.d. are deleted and replaced by the following:
c. Physical Damage Coverage on a covered auto also applies to loss to any permanently installed
electronic equipment including its antennas and other accessories
d. A $100 per occurrence deductible applies to the coverage provided by this provision.
G. Diminution In Value
The following is added to Section III, Paragraph B.6.:
Subject to the following, the diminution in value exclusion does not apply to:
a. Any covered auto of the private passenger type you lease, hire, rent or borrow, without a driver
for a period of 30 days or less, while performing duties related to the conduct of your business;
and
b. Any covered auto of the private passenger type hired or rented by your employee without a
driver for a period of 30 days or less, under a contract in that individual employee's name, with
your permission, while performing duties related to the conduct of your business.
c. Such coverage as is provided by this provision is limited to a diminution in value loss arising
directly out of accidental damage and not as a result of the failure to make repairs; faulty or
incomplete maintenance or repairs; or the installation of substandard parts.
d. The most we will pay for loss to a covered auto in any one accident is the lesser of:
(1) $5,000; or
(2) 20% of the auto's actual cash value (ACV).
Ill. Drive Other Car Coverage — Executive Officers
The following is added to Sections II and III:
1. Any auto you don't own, hire or borrow is a covered auto for Liability Coverage while being used by,
and for Physical Damage Coverage while in the care, custody or control of, any of your "executive
officers", except:
a. An auto owned by that "executive officer" or a member of that person's household; or
b. An auto used by that "executive officer" while working in a business of selling, servicing, repairing
or parking autos.
Such Liability and/or Physical Damage Coverage as is afforded by this provision.
(1) Equal to the greatest of those coverages afforded any covered auto; and
(2) Excess over any other collectible insurance.
2. For purposes of this provision, "executive officer" means a person holding any of the officer positions
created by your charter, constitution, by-laws or any other similar governing document, and, while a
resident of the same household, includes that person's spouse.
Such "executive officers" are insureds while using a covered auto described in this provision.
IV. BUSINESS AUTO CONDITIONS
A. Duties In The Event Of Accident, Claim, Suit Or Loss
The following is added to Section IV, Paragraph A.2.a.:
Form No: CNA63359XX (04-2012) Policy No:6050531352
Page: 3 of 4 Policy Effective Date:
11/01/2019
Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606
®Copyright CNA All Rights Reserved. Includes copyrighted material of the
Insurance Services Office, Inc., used with its permission.
Business Auto Policy
Policy Endorsement
(4) Your employees may know of an accident or loss. This will not mean that you have such
knowledge, unless such accident or loss is known to you or if you are not an individual, to any
of your executive officers or partners or your insurance manager.
The following is added to Section IV, Paragraph A.2.b.:
(6) Your employees may know of documents received concerning a claim or suit. This will not mean
that you have such knowledge, unless receipt of such documents is known to you or if you are
not an individual, to any of your executive officers or partners or your insurance manager.
B. Transfer Of Rights Of Recovery Against Others To Us
The following is added to Section IV, Paragraph A.5. Transfer Of Rights Of Recovery Against Others To
Us:
We waive any right of recovery we may have, because of payments we make for injury or damage,
against any person or organization for whom or which you are required by written contract or
agreement to obtain this waiver from us.
This injury or damage must arise out of your activities under a contract with that person or
organization.
You must agree to that requirement prior to an accident or loss.
C. Concealment, Misrepresentation or Fraud
The following is added to Section IV, Paragraph B.2.:
Your failure to disclose all hazards existing on the date of inception of this Coverage Form shall not
prejudice you with respect to the coverage afforded provided such failure or omission is not intentional.
D. Other Insurance
The following is added to Section IV, Paragraph B.5.:
Regardless of the provisions of Paragraphs 5.a. and 5.d. above, the coverage provided by this policy
shall be on a primary non-contributory basis. This provision is applicable only when required by a
written contract.
That written contract must have been entered into prior to Accident or Loss.
E. Policy Period, Coverage Territory
Section IV, Paragraph B. 7.(5).(a). is revised to provide:
a. 45 days of coverage in lieu of 30 days.
V. DEFINITIONS
Section V. paragraph C. is deleted and replaced by the following:
Bodily injury means bodily injury, sickness or disease sustained by a person, including mental anguish,
mental injury or death resulting from any of these.
Form No: CNA63359XX (04-2012) Policy No: 6050531352
Page:4 of 4 Policy Effective Date:
11/01/2019
Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606
m Copyright CNA All Rights Reserved. Includes copyrighted material of the
Insurance Services Office, Inc.,used with its permission.
CNA Workers Compensation And Employers Liability Insurance
Policy Endorsement
WAIVER OF OUR RIGHT TO RECOVER FROM OT HER S EN D 0 R SEMENT
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not
enforce our right against the person or organization named in the Schedule.
This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule.
Schedule
Any Person or Organization on whose behalf you are required to obtain this waiver of our right to recover
from under a written contract or agreement.
The premium charge for the endorsement is reflected in the Schedule of Operations.
All other terms and conditions of the policy remain unchanged.
This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, '
takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another
effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy
unless another expiration date is shown below.
Form No: WC 00 03 13 (04-1984) Policy No:6 50531402
Endorsement No:3; Page: 1 of 1
Underwriting Company: American Casualty Company of Reading, Pennsylvania, 333 S Wabash Ave,
Chicago, IL 60604
Copyright 1983 National Council on Compensation Insurance.
:0
§
k §
LL
k
B
2 \ \ \
§
LI? / k
0660
v0 § CD
« § o §
C?
» ale
kU) Lf) �
000a LO
2 U)
�
R
. 0
� E (L \
�
$
2 z ? /
i ( - k )
a a
6Z n\ ,
� �
2 \ }
� % % 2
E E \ \
G q &
33f \ ( [
) ) 3 ® 2 ¥
\
cy \ % 5
\ $
�
t &
k _J
2 k @k
\ !S
gy
\ _
7 )
/ / § §{
k \ \ 7 �
LU Mn
a 2 CO,
k \ )
\ f \ 2
� � � f = )
bars
CITY OF FEDERAL WAY
U.S BANCORP SERVICE CENTER
P.O.Box 6343
Fargo,ND 58125-6343 ACCOUNT NUMBER 4246-0446-5117-1609
STATEMENT DATE 05-25-20
TOTAL ACTIVITY $161.19
"MEMO STATEMENT ONLY"
000005796 01 SP 0.560 106481186870879 P DO NOT REMIT PAYMENT
SARA D GILCHRIST
CITY OF FEDERAL WAY
33325 8TH AVE S
FEDERAL WAY WA 98003-6325
NEW ACCOUNT ACTIVITY
POST TRAN
DATE DATE TRANSACTION DESCRIPTION REFERENCE NUMBER MCC AMOUNT
05-05 05-04 WWW.VISTA-TRAINING.COM HTTPSWWW.VIST WI24492150125637634936840 5734 116.10
PUR ID:IN-I GF9WDA1 6AOB5XCPNKCHKH TAX:0.00
05-13 05-13 AMZN MKTP US'MC9XC1SS1 AMZN.COM/BILL WA24692160134100516053388 5942 45.09
PUR ID:114-7696447-17370 TAX:4.10
Default Accounting Code:
ACCOUNT NUMBER ACCOUNT SUMMARY
CUSTOMER SERVICE CALL 4246-0446-5117-1609
PREVIOUS BALANCE $nn
800-344-5696 STATEMENT DATE DISPUTED AMOUNT
PURCHASES&
05-25-20 $.00 OTHER CHARGES $161 19
CASH ADVANCES 00
SEND BILLING INQUIRIES TO: AMOUNT DUE
$0.00 CASH ADVANrE FEE $. n
C/O U.S.BANCORP SERVICE CENTER,INC
U.S BANK NATIONAL ASSOCIATION DO NOT REMIT
P.O.BOX 6335 CREDITS $.00
FARGO,ND 58125-6335
TOTAL ACTIVITY $161.19
COPYRIGHT 2005 U.S.BANK NATIONAL ASSOCIATION PAGE 1 OF 1
Sara Gilchrist
From: Desiree Winkler
Sent: Monday, May 4, 2020 SAO PM
To: Sara Gilchrist
Subject: FW:Your receipt from VISTA Training, Inc. 7076-2331#
From: VISTA Training, Inc. [mailto:receipts+OaAsaOk00s]NbxGcAILD@stripe.com]
Sent: Monday, May 04, 2020 1:01 PM
To: Desiree Winkler
Subject: Your receipt from VISTA Training, Inc. #2331-7076
[EXTERNAL EMAIL WARNING]
This email originated from outside of the City of Federal Way and may not be trustworthy. Please use caution
when clicking links, opening attachments, or replying to requests for information. If you have any doubts about
the validity of this email please contact IT Help Desk at x2555.
Receipt from VISTA Training, Inc.
Invoice #41D9824CD-0004
Receipt #2331-7076
AMOUNT PAID DATE PAID PAYMENT METHOD
$116.10 May 4, 2020 1609
SUMMARY
MAY 4, 2020-JUN 4, 2020
E-commerce Subscription for apwavidlib-vistatraining.
$116.10
talentlms.com x 1
Amount paid $116.10
i
Sara Gilchrist
From: Amazon.com <auto-confirm@amazon.com>
Sent: Friday, May 8, 2020 3:24 PM
To: PW-ADMIN
Subject: Your Amazon.com order of"havit HV-F2056 15.6"-17..."
This email originated from outside of the City of Federal Way and may not be trustworthy. Please use caution
when clicking links, opening attachments, or replying to requests for information. If you have any doubts about
the validity of this email please contact IT Help Desk at x2555.
Your Account Amazon.com
Order Confirmation
Order#114-7696447-1737060
Thank you for shopping with us.We'll send a confirmation once your item has shipped.Your order details are
indicated below.The payment details of your transaction can be found on the order invoice. If you would like to
view the status of your order or make any changes to it,please visit Your Orders on Amazon.com.
This order is placed on behalf of City of Federal Way
Your guaranteed delivery date is: Your order will be sent to
Tuesday, May 19 PW Admin
Your shipping speed Federal Way,WA
EIUnited States
REE Shipping
Order Details
Order Details
Order#114-7696447-1737060
P aced on Friday, May 8, 2020
havit HV-F2056 15.6"-17"Laptop Cooler Cooling $40.99
Pad-Slim Portable USB Powered (3 Fans),
Black/Blue
Personal Computers
Sold by HavitDirect
Condition: New
1
Item Subtotal: $40.99
Shipping &Handling: $7.86
Promotion Applied: -$7.86
Total Before Tax: $40.99
Estimated Tax: $4.10
Order Total: $45.09
To learn more about ordering,go to Ordering from Amazon.com.
If you want more information or need more assistance,go to Help.
Thank you for shopping with us.
Amazon.com
The payment for your invoice is processed by Amazon Payments,Inc.P.O.Box 81226 Seattle,Washington 98108-1226.If you need
more information,please contact(866)216-1075
By placing your order,you agree to Amazon com's Privacy Notice and Conditions of Use.Unless otherwise noted,items sold by
Amazon.com are subject to sales tax in select states in accordance with the applicable laws of that state If your order contains one or
more items from a seller other than Amazon.com,it may be subject to state and local sales tax,depending upon the seller's business
policies and the location of their operations.Learn more about tax and seller information.
This email was sent from a notification-only address that cannot accept incoming email.Please do not reply to this message
2 i
` Page 1 /1
33325 8th Ave.South
CITY of Federal Way,WA 98003 DATE PO NUMBER
Federal I 5/21/2020 068633
VENDOR: 001856 SHIP TO: FEDERAL WAY CITY HALL
ACTION SERVICES CORPORATION 33325 BTH AVE SOUTH
P 0 BOX 4339 FEDERAL WAY, WA 98003
BREMERTON, WA 98312-4339
FOB Point: Req.No.:
Terms: Due Upon Receipt Dept.:
Req.Del.Date: Contact: THERESA THURLOW
Confirming? Yes
Special Inst: SWM-AG20-056 2020/2021 SWM VACTOR SVC & DI MAINT
tduo"M Unit Description Unit Price Ext.Price
SWM-AG20-056 2020/2021 SWM VACTOR SVC & 247,752.50
DI MAINT
01/14/2020 - 12/31/2020
SUBTOTAL 247,752.50
BILLTO: CITY OF FEDERAL WAY TAX 0.00
33325 8TH AVE SOUTH FREIGHT 0.00
FEDERAL WAY, WA 98003 TOTAL 247,752.50
Account Number Amount Account Number Amount
E 401-3100-640-542-45-480 247x752.50
Authorized Signature VENDOR COPY Authorized Signature(over$1,000)
RETURN TO: PW ADMIN EXT: 2700 ID#:
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIv: PUBLIC WORKS/STREETS
!. ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:RUSH
TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
❑ CONTRACT AMENDMENT(AG#):17-134 ❑ INTERLOCAL
❑ OTHER SUPPLEMENT#5
I. PROJECT NAME:CITY CENTER ACCESS
i, NAME OF CONTRACTOR:PARAMETRIX.INC
ADDRESS:719 2"D AVENUE SUITE 200 SEATTLE WA 98104 TELEPHONE:(206)394-3664
E-MAIL:SGLOVER QJPARAMETRIX.COM FAX: 855 542-6353
SIGNATURE NAME:JEFFERY PEACOCK TITLE:CHIEF EXECUTIVE OFFICER
i, EXHIBITS AND ATTACHMENTS: ❑ SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 101843 000 00 BL,EXP. 12/31/19 UBI#600135349 EXP.
TERM: COMMENCEMENT DATE:AUGUST 23,2017 COMPLETION DATE:JUNE 30,2020
i. TOTAL COMPENSATION:$2,334.{)$2.75(UNCHANGED) (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $65.098.61
IS SALES TAX OWED: ❑YES ❑NO IF YES,$ PAID BY. ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PRQVIDED
❑ PURCHASING: PLEASE CHARGE To:306-4400-208-595-63
�. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED.
ePROJECT MANAGER
z'DIVISION MANAGER IQ cl
DEPUTY DIRECTOR G
[DIRECTOR I 1-- o I lot
❑ RISK MANAGEMENT (IF APPLICABLE)
vLAW DEPT a
0. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: PS COMMITTEE APPROVAL DATE:
SCHEDULED COUNCIL DATE: 1 r` COUNCIL APPROVAL DATE: 1y I
1. CONTRACT SIGNATURE ROUTING
g"SENTTO VENDOR/CONTRACTOR DATE SENT: l WO-U DATE REC'D:
/ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑ FINANCE DEPARTMENT
�IGNA,CJ LAW DEPT X�ci
TORY(MAYOR OR DPREC"I)I7) LlCITYCLERK,KASSIGNEDAG#
� SIGNED COPY RETURNED DATE SENT: O �3 Q "9=
❑RETURN ONE ORIGINAL
;OMMENTS:
=XFC '2"ORIGINALS
SIL 10.�•lh 1f�C'l� �n114�t�
X411 � � t[� ►� �`t
inmR
SUPPLEMENT NO. 5
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc. effective the 23rd day of August 2017, identified as
Agreement No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018,
Supplement No. 2 dated May 10, 2018, Supplement No. 3 dated August 14, 2018 and
Supplement No. 4 dated July 11, 2019. All provisions in the Agreement remain in effect
except as expressly modified by this supplement, "Supplement No. 5."
The changes to the Agreement are described as follows:
I
Section V, Payment Provisions,
A. Hourly Rates:The direct(raw) labor rates and classifications and indirect cost rate as
shown on Exhibits "D-5" and "E-5" are attached hereto and incorporated by this
reference.
Signed this day of 2019.
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
J eacock Ji Ferrel
Its: Chief Executive Officer `t s: Mayor
719 2"d Avenue, Suite 200 33325 8th Ave S
Seattle, WA 98104 Federal Way, WA 98003
(206) 394-3664 (253)835-2401
APPROVED AS T FORM:
TCJ/ . Ryan Call, City Attorney
K:\TRAFFIC\Greets&Projects\Project.\City Center Access\2017\Consultant Agreement-PMX 2017\Amendment#5\AG 17-134 CCA Supplement No S.d—
Exhibit "D-5"
Actuals Not To Exceed Table(ANTE)
WSDOT Agreement:
Parametrix,Inc.
719 2nd Avenue,Suite 200
Seattle,WA 98104
Direct Labor Hourly Overhead Fixed All Inclusive
Job Classifications Biling Rate NTE NTE" Fee NTE Hourly Biling
179.52% 30.06911 Rate NTE
ADM N[S-RATIV„A55.51 ANT) ?; T.3b $717 Sill 65
ADM INIS-RATIVF ASSISTANTS SN1 =1• c13. 0 51,}1.3.1
AUDIT 5f,Sf,IA,IST•DOT 1
BRIDGE FNGINEER 1 - _ $� 711 54 y1aJ
(3RICJGE FINGINEER 3 S13 2$ S136-71
13RIDGEENGINEER 5 tir4F..3= S16.14
BRIDGE F.UdNICIAN 2 5:'?e r 439 c" ':6 n,. S68.0
BUDGET ANALYST 3 61 .17 15 30
ETT ENGINEER 2 14
CIVIL ENGINEER 4 SSS.nn 5170 SA 578.'-o $.�'4 e.
COMMUNIC:AT CNS CONSUL i A'JT 5 Sw4 74 $50.32
COWALJNICAT+CNS COr�SUL-'ANT 5 Sj;l Uia 589.`6 S i:.01: 5154 71,,
ONSTRIUC,TION PRCiJECT CCOR'DaNATOR 2 k5%3 582 09 `'.1;3.; 514154
CONSTRUCTION PROJECT i :,�OROINA.TOR 3 5=5 on 595.71 v'- .`.:E? 5170 2•t
Cpr,STRUCTIOV PR0.,JFC1 COORDINATOR 38235 5147.:59 S`a.71 5?5r.15
CONTRACTS SPECIALIST 2 SH,9E :'GG.aS ;11 0'! 5114 40
GC]N'C4RAC TS SPEC IA1..15 T:? 7$lli} $13 1 6-: Si]
DEPUTY I 1I-I no S 4 5:a-:
DIRECTOR .i.U1 i •5.11 3 5 3:f
DRAFTING Z EGHNICIAN 2 ;- 3 Si 1 9.05 S 7.1•ti
DRArr ING TECHNICIAN 3
ENGINEER 5,5.J2 <t-,p,I r7,yY, S:'in.SS
ENGINEER;NG AIDE 2 `2:•I;,' h.f'❑ �•S.C79
ENG11%FFRING.AIDE A ---- 1?-.33
ENGINEERING ASSISTANT Qa4.=2 E1.: S;[!..b 5106.
ENGINE 1 RINC:TFCHNIC,AN 341 27 I ,17 38 W7?il
ENGII.EERING TEC HI IC.IP N 1 EA.D _ _ cSC 3, 1_ +.2 51,i,`-?j 515 72
EN61NCCRINC ILCHNICIANSUPERViSOR 5,7 20 5 0269' 1F, S177 n5
ENViRDNMENTAL ErJC31NCER.2 $ s 3, SS7.Gn 413 81 r. •34
FNViRC?NMEN t Al ENGINEER 4 S69 n: +' ` o ;•1
ENVIRONMEN-AL[LANKET;2 ,,,. `r nl..t<_ :1^C.!7I X11.3 g,
ENVIR 7NIVEW-AL PLANNER }63.86 S11 r• S•_I 115 11 kj!sC,
CNVIRONI,rLNTAI. SP'_CIALIST 3 SM)Uti
ENVIRONVC NTAL SPECIALIST 5 S 1.5, n2 r„ 5 5
FACILiTIE..kNISINT-EF,1 55 r.9'� S10•Gr9 5_8116 c n t9
FAC11.111FS ENGINEER 595 ep 5t o.5a 8°C ? l Is
FA7A-11'IES PLANNER 1 _� S2�:4 531A? 58-1) 3C
FAC-1-11iUu PLANNER 2 s44 T,7 it 05
IT SPECIALIST 3 SIT,`t0 512"02; w .1;"6 S 1 L
LANDSURI'rY 2 .e 7SAF1 '.
LAND?SURVEY3 SG360 5_15.1, Si5•.C]g' S19i:.S
A9EGf1A~:IUAL E,iGII\:EE'P, 533 uU 559? S!+.jo
NIECHANICA_ENGINEP SUPERVISOR 595 OC 5:7v 1 S.'.r,5r1 Si.3d.Od
SENIOR GRAPHIC DESIGNiER S'vI r.2 X72 92 X11 19 (12r;.73
TRANSPORTATION E','GINEER 2 533.00 3 2: E.'1 d: S LC-JA
TRANISF'[)RTATION EU(;INFFR:; 531,.•16 551 p„ 5't.Sn 51_9 0A
TRANSPORTATION F NOINL FP 4 544 17 S74.21;• S':3 25 513E 71
TRANSPORTATION EWri11LFR E4,1' n 51-
NSDC.'RTA.Tfr) FNE,I EEV INTERN ti,;rl+ c66I, [S
TRANSPORTATION PLANNIN&SP-CIALiST 1 S<< :'h 5.2 a l 1.21 C ;
T'RANS;m1_1RTATi1JN PL7,•NN NG-SPECIALIST 3 5. 57 zUJ 21,1 5,011?
TRAW-POI;I All ON 'I_AI I1rN4;SPEUAL ST S 566 66 n lx; , C
TRAhJSPORTATION -1.ANrJ NG TECHNICIAN 1 51 ,>r, 2'1 +`�•ti "-
TRANSPORTATION I'LANt fl NG TECI IN IC IAN Z 29 2: 3 4q r ! 50
TI'cANSPORTAI ION PLANNING TECHNICIAN 3 5_ar.c+:, S li Si 1 Si;:i;i 5123 57
T RANSPORTATIGN `E CI iNICAL ENGINEER :,94 49 514.3 6, r"
TRANSPORTATIOT` "ECHNIC;AN 1 53'..':7 S70 951 511.915 512:.32
TRA',[S�ORTATION TECHNICIAN a
Exhibit"D-5"
rn
C)
N
O
N
00 Ln m w Ln N W -t O Ln m N
a) N M r-i m Ln a) --* ai C oo
x 00 m 00 ri 00 6 -ti N LD 6 O
3 M N N N r-4N 1-4 ri r-i rmi
O w
2 �
C In V1 V} i/} V} V} VF V). V} VY V}
y 00
3 C Ln C M w w 00 r4 N LD I- 00
U = -t M O LD a1 ri Ln v, ri 00 V1
C CO C � M4 4 M O r4 O a1 N LD
N m N rm-L r4 O m w w W Ln
a �
V� in in +n in in in v� v► in in
n LD I� ri O a1 LD m M N l0
x cj m N N r6-I r�-I .m-I r4-1 rNi
N
Ol
LL � V1 i/? VF V} V} V} V► Vl V} V1 V}
O
x 0 ri r- O N r, n to ri M m
LL M N N Ln N n LD 1- 0 m M
C r-I 00 Ln N O a1 OO Ln LO Ln Ln
N ri ri a-I ri
00 n 00 al O M W f� a1 a0 lD
O N LD n It It OO Ln LD N N
x l0 n LD 00 M N n RT N 00 N
Q m ON -t
rr-I-L m 00 LD Ln m 00 I,
LM u
tAN
GJ w
00
4 w w n m O w C m -:Tm N
7 t w ri o0 Ln m ri o LD 00 .-+ at
0 Q C N a Lo rn r� ai --i L/i o r�: m
Q3 O m LD Ln Ln m v m m
Q ti
YC V+ n Vi. i^ 4A. in in -tn � in V} Vf
N
N
o o N Ln ry LD o o m o0 0
On a1N N M O a1 N e-I CF O N
a1 m 00 m m m LC m m r 14
cu m o 0o n LD Ln -cr m N -o, v v
o 1-1
+/� {n i/} V? VT V} V} vl- V? V} 14
O _
al a1 LD ri m Ln N M W o N
LD 00 LD ct O0 V1 00 O 1l 00 00
` C rl 00 m r-I m N
cc n l0 In M M N -4 N -4 e1
0 G
V} V} V} V1• in in VF V} VF V} in
N
C
O
0 u m
fN0 03 d V
C C C
U c '00 'pp `p uw
O LLlil as T
V ` OJ i+ N i+
10 d y � C O. V vt
CL o ar c .o O a c
'c 'p 'm Ln in +, }; c C v
L.
LA S LL Q Q LU C 6 1 tD I Q
Exhibit "E- "
2019 ACTUALS NOT TO EXCEED TABLE(ANTE)
Historical Research Associates,Inc.
PO Box 7086
Missoula MT 59807-7086
All Inclusive Hourly
Job Direct Labor Rate Overhead 150.99% Fixed Fee 26.55% Billing Rate
Classifications NTE NTE NTE NTE
Senior Archaeologist 543.39 $65.51 $11.52 $120.42
Senior Historian $43.41 $65.54 $11.53 $120.48
SenlorArchltectural Historian $32.94 $49.74 $8.75 $91.42
Architectural Historian $30.72 $46.38 $8.16 $85.26
Project Archaeologist $32.25 $48.69 $8.56 $89.51
Project Historian $32.43 $48.97 $8.61 $90.01
GIS CoordinatoriSpecialist $33.16 $50.07 $8.80 $92.03
Research Archaeologist $27.57 $41.63 $7.32 $76.52
Research Historian $24.35 $36.77 $6.46 $67.58
Editor/Production Assistant $26.55 $40.09 $7.05 $73.69
Project Administrator $29.07 $43.89 $7.72 $80.68
Computer Systems Specialist $39.16 $59.13 $10.40 $108.68
WSDOT Agreement Y-12164
Exhibit E
Page 1 of 1
Exhibit "E-5"
Y-11873
1-405/SR 167 Corridor GEC
Actuals Not to Exceed Rate Table
PRR, Inc
2018-2019
Job Classifications Direct Labor Overhead Fee(Profit) All Inclusive Hourly
Rate 177.24% 30% Billing Rate
NTE NTE NTE NTE
Chief Executive Officer $ 97.00 $ 171.92 $ 29.10 $ 298.02
Senior Director $ 97.00 $ 171.92 $ 29.10 $ 298.02
Director $ 80.17 $ 142.09 $ 24.05 $ 246.31
Associate Director $ 72.12 S 127.83 5 21.64 $ 221.59
Senior Consultant $ 60.00 S 106.34 5 18.00 $ 184.34
Consultant II $ 41.00 S 72.67 $ 12.30 $ 125.97
Consultant 1 $ 26.48 S 46.93 $ 7.94 $ 81.35
Manager $ 39.52 S 70.05 $ 11.86 $ 121.43
Senior Administrator $ 35.31 $ 62.58 $ 10.59 $ 108.48
Junior Administrator $ 24.89 $ 44.12 $ 7.47 $ 76.48
Intern $ 20.00 $ 35.45 S 6.00 $ 61.45
WSDOT Agreement: Y-11873
Exhibit E
t3
a
m It 0 M w w F- l� N N M rn
y � 011lJ � M cD p
DI C F- O O r t` 6 4 M � CO O N
M M
C W Z O M �_ _M Cl) M O
dCIJ N9 � 61) 64 de) �} 64 69 N
m a0
m LuM O O O N r N N
M co O 't N O r CD M cD
m e CO N O .4 r CV -,t t` O ..
LL Z N N r r r r d9 r fe to
p d3 d9 603 64 H3 d9 d9 d3 U)
Ch U
c9
CD
co
U
to CD
Q
_ e W (D Cl) � Q? N � CD N ti COO, N x
w = OD CLD 0 r rl vi N
�r � N Z Jf- 69 HF} 601} d09 OEC} 6�4 d�4 d�9 T-
Z �F ao M
Q M %- II
w
m Z U
Q � v
~ V Z ++ N M M M O N O N Cp co
O m V W v ca Cp Cn M O r- r` r r r
w •� N Z CO r` CD le M dM' N "-;TN M N r
W I� J 6c)- E9 619 69 cfl 69 64 EA 64 ER 69
W Li obi N M rn
Q
O c 0 +
0 Z LC) M U
Z Q Q Z
J V N V o
0 co
Q m FN- H Q Q co x
T 00
co M O r` to _O _O ti M U N
F- H H Q Q a) 09
CL ,-
r,-
r1 Ln N _O M ED 'Itr-- M _M r` CD +
F- F- F- F- F- (n cn Q Q cr
W v
Z Z`
L Co
I +' cn
(D U
Q)
(DcaC �p C �I
p to m D x
r
UO
M
_ -C C r r
v n 0 = c L m I i
E
�- _
U c
c > a) m
� a� U) g = —
� Q � 'cn _ C � •V N
R C C W — — C C - 3.
V CU Q) O 4? (p Ca = C O N d
d to U ycn `O c c m N V f0
N O 'a-) a .fn W 0 t N -0
d En o o rn N o a) ° °i v) li
) o o m m
EE
ay °1 > _
cn > cn u) cn rL a cn 0 Q U m
C. DATE(MM/DD/YYYY)
A<7"l?" CERTIFICATE OF LIABILITY INSURANCEF
��- 10/16/2019
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
NAME_
Dealey, Renton&Associates PHONE FAX
P. O. Box 12675 Afc No,ExtS: 510-465-3090 (A/c,No):510-452-2193
Oakland, CA 94604-2675 ADDRIESS, certificates@dealeyrenton.com
License#0020739 INSURER(S)AFFORDING COVERAGE NAIC#
_ INSURERA:National Fire Insurance Co of Hartford 20478
INSURED PARAINC-01 INSURER B:Continental Insurance Company 35289
Parametrix, Inc. INSURER American Casualtv Company of Reading PA 20427
1019 39th Ave. SE Suite 100 — -
Puyallup,WA 98374 INSURER D:XL SDecialty Insurance Co. 37885
(253)604-6600 INSURER E:Valley Forge Insurance Com22ny 20508
INSURER F:
COVERAGES CERTIFICATE NUMBER:1487386517 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS-
INSR I ADDL$U9R POLICY EFF POLICY EXP
LTR TYPE OF INSURANCE q n' POLICY NUMBER fMMIDD/YYYYI MMIDD/YYWI LIMITS
A X COMMERCIAL GENERAL LIABILITY Y Y 6050531366 11/1/2019 11/1/2020 ! EACH OCCURRENCE $1.000.000
CLAIMS-MADE L I OCCUR tir L1 ILvL IrL
$1,000,000
X Contractual Liab MED EXP(Any oneperson) $10.000
X XCU Included PERSONAL BADV INJURY $1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERALAGGREGATE $2,000,000
FPOLICY F—x I.PE� F1 LOC PRODUCTS-COMP/OP AGG $2,000,000
X IOTHM WA Sto Ga IEL WA Stop Gap $1,000,000
E AUTOMOBILE LIABILITY Y Y 6050531352 11/1/2019 11/1/2020 CORSBINEDSINGLE LIMIT $1,000,000
jEa accideru].
X ANY AUTO BODILY INJURY(Per person) $
OWNED SCHEDULED BODILY INJURY(Per accident) $
AUTOS ONLY AUTOS
X HIRED X NON-OWNED PROPERTY DAMAGE $
AUTOS ONLY AUTOS ONLY Per cadent
I $
B X UMBRELLA LIAB OCCUR 6050531433 11/1/2019 11/1/2020 EACH OCCURRENCE $15,000,000
EXCESS LIAB CLAIMS-MADE AGGREGATE $15,000,000
DED l X I RETENTION$n $
C WORKERS COMPENSATION Y 6050531383 11/1/2019 11/1/2020 X
C AND EMPLOYERS'LIABILITY Y/N 6050531402 11/1/2019 11/1/2020 STATUTE ER WA STOP GAP
ANYPROPRIETOR/PARTNER/EXECUTIVEE.L.EACH ACCIDENT $1,000.000
OFFICER/MEMBEREXCLUDED? ❑ N/A
(Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1.000,000
D Professional Liability DPR9932956 11/1/2019 11/1/2020 Per Claim $1,000,000
Claims Made Annual Aggregate $1,000,000
Pollution Liability Included Retroactive Date: 01/01/1969
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required)
Umbrella Liability policy is a follow-form to underlying General Liability/Auto Liability/Employers Liability.
Project Name/Number:City Center Access Project/554-2441-022
City of Federal Way and Washington State are named as Additional Insured as respects General and Auto Liability as required per written contract or
agreement.General Liability is Primary/Non-Contributory per policy form wording.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Federal Way ACCORDANCE WITH THE POLICY PROVISIONS.
Attn: Naveen Chandra
33325 8th Avenue South AUTHORIZED REPRESENTATIVE
Federal Way WA 98003
©1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD
RETURN TO: PW ADMIN EXT: 2700 ID#: t 5
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIV: PUBLIC WORKS/STREETS
ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:RUSH
TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
_etONTRACT AM ENDM ENT(AG#):17-134 ❑ INTERLOCAL
,2'OTHER SUPPLEMENT#4
G. PROJECT NAME:CITY CENTER ACCESS
�. NAME OF CONTRACTOR:PARAMETRIX,INC
ADDRESS:719 2ND AVENUE SUITE 200,SEATTLE,WA 98104 TELEPHONE:(206)394-3664
E-MAIUSGLOVERiLL:PARAMETRIX.COM FAx:(855)542-6353
SIGNATURE NAME:JEFFERY PEACOCK TITLE:CHIEF EXECUTIVE OFFICER
�. EXHIBITS AND ATTACHMENTS: ❑ SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 101843 000 00 BL,EXP. 12/31/19 UBI#600135349 ,EXP.
TERM: COMMENCEMENT DATE:AUGUST 23,2017 COMPLETION DATE:JUNE 30,2020
I. TOTAL COMPENSATION:$2,334,082.75(UNCHANGED) (INCLUDE EXPENSES AND SALES TAX,IF ANY
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $65,048.61
IS SALES TAX OWED: ❑YES ❑NO IF YES,$ PAID BY: ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR o RETAINAGE BOND PROVIDED
❑ PURCHASING: PLEASE CHARGE TO:306-4400-20595-6�&D 4 ki
I. DOCUMENT/CONTRACT REVIEW INITIAL DATE REVIEWED INITIAL/DATEAPPROVED
ET PROJECT MANAGER � L' -"i -I
e'DIVISION MANAGER Caci
IIDEPUTY DIRECTOR
.Ir DIRECTOR
❑ RISK MANAGEMENT (IF APPLICABLE) t
.B'LAW DEPT
0. COUNCILAPPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: COMMITTEE APPROVAL DATE:
SCHEDULED COUNCIL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING A ��
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: DATE REC'D: �"�
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LIC NSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCILAPPROVAL IS NEEDED.)
I; TIAL/DATE SIGNED
❑ FINANCE DEPARTMENT w 7/(0 41
LAW DEPT
3�SIGNATORY(MAYOR OR DIRECTOR) `7
C ITY C LERKep� IQ�1
ASSIGNED AG# AG,
SIGNED COPY RETURNED DATE SENT: 7. 1�.
ETURN ONE ORIGINAL
:OMMENTS:
:XECUTE u 2"ORIGINALS
inmR
SUPPLEMENT NO.4
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc. effective the 23rd day of August 2017, identified as
Agreement No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018,
Supplement No. 2 dated May 10, 2018 and Supplement No. 3 dated August 14, 2018.
All provisions in the Agreement remain in effect except as expressly modified by this
supplement, "Supplement No. 4."
The changes to the Agreement are described as follows:
I
Section II, scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-4" attached hereto and incorporated by this
reference (Additional Services).
II
Section V, Payment Provisions._The maximum amount payable under this Supplement No. 4
inclusive of all fees and other costs is Zero and 00/100 Dollars ($0.00) for a total amount
payable to the Consultant pursuant to the Agreement, Supplement No. 1, Supplement No. 2,
Supplement No. 3 and this Supplement No. 4, inclusive of all fees and other costs, to be an
amount not to exceed Two Million Three Hundred Thirty-Four Thousand Eighty-Two and
75/100 Dollars ($2,334,082.75). The attached Exhibit "D-4" and "E-4,"which describes the
payment for work to be performed under this Supplement No. 4, is hereby made a part of the
Supplemental Agreement.
Signed this day of , 2019.
PARAMETRIX, INC.- CITY OF FEDERAL WAY:
f
By: By:
Je r eacock Jim Ferrell
Its: Chief Executive Officer Its: Mayor
719 2nd Avenue, Suite 200 33325 81h Ave S
Seattle, WA 98104 Federal Way, WA 98003
(206) 394-3664 (253)835-2401
APPROVED AS TDF RM:
-k�j J. Ryan Call, City Attorney
K:\IR\I RIC\Grant,&Vrojccts\Projras\Ctty Crn[cr.\cccss\2U I7\Consull.;uit.e\�Tccment P\IX 21117\,\InendTnl:nt#4\ltnal\,1U 17-
134 CC.\SUPPlcmcnt No 4-6-24-2019.docx
Parametrix
ENGINEERING PLANNING ENVIRONMENTAL SCIENCES I�
Exhibit A- 4
SCOPE OF WORK
City of Federal Way
City Center Access Project
Amendment 4
PROJECT UNDERSTANDING
The City Center Access Project proposes to modify an existing or build a new interchange in Federal Way on
Interstate 5 (1-5). Parametrix is under contract to complete the Access Revision Report(ARR) (formerly referred to
as the IJR), Environmental Documentation (DCE) and Preliminary Engineering.Amendments 1, 2 and 3 provided
for a local only access alternative identification, analysis and evaluation; and additional study team meetings. The
effort has expanded through request of the Executive Team including FHWA and WSDOT.The expansion incudes
the study of all possible local elements to ensure that a local only solution does not exist. Additionally,Additional
access alternatives have been determined, more than the two that were assumed in the original contract and
previous amendments.This Amendment 4 addresses additional local improvement elements and interchange
alternatives development, evaluation,screening and documentation; public involvement and communication;
additional Study Support Team (SST) meetings; meetings and coordination with Tribes; additional Executive Team
meetings; and additional project management to select a preferred alternative.This amendment covers this
additional work through2019. Out of scope work identified herein is offset with funds available for previously
scoped work, and an additional amendment will be required to replenish these funds and to address out of scope
work in 2020 and beyond.
Additional assumptions include:
• Documented Categorical Exclusion is assumed per the original scope. If an EA is required an
additional contract amendment will be required.
v A de minimis impact on Section 4(f) properties is assumed per the original scope. If a more rigorous
4(f)evaluation is required, an additional amendment will be required.
➢ The original scope provided for the development of an 8-policy point Interchange Justification Report
(IJR).WSDOT has updated their design manual since this project was initiated. In this update, WSDOT
has replaced the IJR with two documents which include a Non-Access Feasibility Report, and an
Access Revision Report(ARR).The project team has agreed to follow current WSDOT process,to
streamline WSDOT and FHWA reviews.
Period of performance increases from 21 months to 42 months
To fund the needs for this year,the following items were removed:
Task 3—Public Involvement
Task 3.4- Deduct$6,346.90 from existing task budget.
Task 13—Preliminary Engineering Preferred Alternative
City of Federal Way
City Center Access Project 1 April 29,2019
Exhibit A
SCOPE OF WORK (continued)
Task 13- Deduct$300,021.59 from existing task budget.
Task 13.2—Deduct$37,992.08 from DKS existing task budget.
Task 14—Environmental Documentation
Task 14- Deduct$149,955.82 from existing task budget.
Task 15—IJR
Task 15.9 - Deduct$18,363.93 from existing task budget.
The following tasks are added:
Task 17 -- Additional Project Management
Task 17.1 Project Management Plan—Additional for 2019
The Consultant will revise the Project Management Plan outlining additional scope of work identified in this
scope of work.This includes schedule updates, budget updates, change management, communication
protocol and quality assurance required for this additional work through 2019.This task also includes scoping
activities for additional work orders.
Task 17.2 Monthly Progress Reports and Invoices—Additional for 2019
The Consultant will continue to provide a monthly progress report with monthly invoices to the City of
Federal Way that will describe work performed by the Consultant Team members during the current
reporting period.This work covers the review and processing of the additional subconsultant invoices for PRR
and DKS for the work provided in this task by Parametrix, and the development of new invoices and progress
reports by DKS.This effort also includes developing additional contract supplements for DKS and PRR, and
invoicing by DKS.
Task 17.3 Weekly Progress Meetings and Other Communication—Additional for 2019
The original scope of work(dated August 15, 2017) assumed monthly meetings with the City, and task 1.3
included bi-weekly check in meetings. It has been found that weekly meetings are very effective and this
scope includes additional weekly meetings through 2019 and the tracking of action items for 26 additional
meetings through 2019.
The original scope did not include separate meetings WSDOTTraffic and Design outside of the Study Support
team meetings.Therefore,this task includes bi-weekly meetings through 2019 with WSDOT up to 12
(assuming some will overlap with the Executive Team) monthly meetings (up to 12) with the Executive team,
12 additional meetings with individual SST members to present findings and resolve comments, and 6
meetings with the environmental focus team to ensure coordination items are resolved.SST meetings are
covered under Task 20.
This task also includes phone calls and emails with the study support team members and the city to relay
information and general communication for the additional work outlined in this amendment. DKS costs for
additional coordination is included in this task.
The total effort for 2019 for weekly progress meetings and other communication as of March 2, 2019 is
$78,828.The remaining budget at the writing of this scope for task 0103 is$69,540 therefore an additional
$9,288 is requested.This task will need to be replenished for 2020 and beyond.
City of Federal Way April 30,2019
City Center Access Project 2 Exhibit A
SCOPE OF WORK (continued)
Task 17.4 Subconsultant Coordination - Additional
The Consultant Team will continue to maintain subcontracts with all subcontractors and coordinate progress
reporting and billing through the Consultant project manager. Additional meetings with subconsultants is
required to coordinate work product. Additional effort is based work for 2019 only.Additional effort will be
scoped for 2020 and beyond.
Task 17.5 Tribal Meetings
The Consultant Team will participate in two tribal meetings.This includes setting up the meetings and
preparing meeting minutes. If additional meetings are necessary, an additional amendment will be required.
Assumptions
This Amendment 4 assumes signing of the AAR in April of 2021, a contract total of 42 months.The original
scope assumed 21 months and Task 16 added an additional 18 months for a total of 39 months, however
the additional fee requested herein provides additional work through 2019 and expends existing scoped
budget for 2020 and beyond
Deliverables
• Additional Subconsultant Agreements (maintained in Consultant's files)
• Additional Monthly progress reports and monthly invoices
• Additional risk management tracking list for monthly progress meetings
• Additional updates to the Project Management Plan
• Additional meeting agendas and minutes
Task 18 -- Re-initiation - .Additional
Task 18.1 Team Chartering - Additional
The Consultant will revise the team charter based on changes from a feasibility study back to an ARR,
This work also includes updating outlook invite and distribution lists as Study Support Team members
are added and deleted
Task 18.2 Purpose and Need - Additional
The Consultant will make additional Purpose and Need Statement revisions for the City of Federal Way and
ARR study support team review, addressing comments including the development of a comment response
matrix.This effort is more than originally anticipated.The original scope assumed an update of the original
Purpose and Need but a complete rewrite was required, and is not yet complete. Further development and
reviews are assumed.
City of Federal Way April 30,2019
City Center Access Project 3 Exhibit A
SCOPE OF WORK (continued)
Task 18.3 Validation of Previous Alternatives Screening Process-Additional
The previous study screened 47 alternatives before deciding on two build alternatives.The original scope
included analysis of the previous alternatives screening evaluation and preparation of a memorandum and
presentation for evaluation by the City and the I1R support team to validate the previous work resulting in
two build alternatives and variations of those two alternatives.This effort was larger than anticipated,
culminating in a feasibility study for the local only alternative. While the feasibility study work is under
another task,this task provides for the review of previous interchange alternatives outside of the assumed
two final alternatives, review of evaluation criteria, analysis and screening, and documentation. Development
of additional alternatives are covered under different tasks_
Task 18.4 Development of a Coordination Plan (new)
The Consultant will develop a brief technical memorandum documenting coordination efforts with the group
including the tribes and other SST members.This is expected to be an expansion of the team charter, and not
a full coordination plan.
Assumptions
• The coordination plan will address the process and roles and responsibilities for determining the
appropriate level of environmental documentation.
Deliverables
• Team Charter-updated
• Revised Purpose and Need
• Coordination plan - New
Task 19 - Additional Public, Involvement and Communi,:;aholl
Task 19.1 Public Involvement Oversight- New
The original scope of work included a Public Involvement and Communications Plan Task 3.1 that was completed.
This scope includes an updated public outreach schedule based on the revised project schedule.
. PRR will continue to provide monthly progress reports with monthly invoices to the City of Federal Way that will
describe work performed by the Consultant Team members during the current reporting period.This format will
include the following:
a, A listing of activities by work element performed during the reporting period, including meetings held
and deliverables.
b. A listing of problems and issues encountered during the reporting period and their resolution.
c. A listing of activities to be accomplished during the next reporting period.
The original scope of work included bi-weekly check-in calls, which has been completed. It has been found that
weekly meetings are effective during the course of the main public involvement activities and this scope includes
weekly meetings between the Consultant and the City of Federal Way from May through October 2019.
City of Federal Way April 30,2019
City Center Access Project 4 Exhibit A
SCOPE OF WORK ;continued)
Table 19-1.Summary of Public Outreach and Communications
Task Assumptions Deliverables
Public outreach N PRR will develop schedule for deliverables in this scope • Deliverables schedule for
schedule based on agreed-upon schedule 2019
Public n Assumes weekly one-hour meetings by phone between p Action Items identified
involvement May-October 2019
check-in
meetings
• Consulting team • Assumes weekly one-hour meetings by phone between • Action items identified
check-in calls March-November 2019
o Monthly a Assumes twelve progress reports • Twelve (12) progress reports
progress reports • Twelve (12) invoices
Task 19.2 Stakeholder Engagement—Additional
The original scope of work included up to 10 stakeholder interviews and nine were completed.The Consultant will
conduct an additional nine stakeholder interviews with the same individuals to reassess community context and
sentiments in preparation for broader outreach.
The original scope of work included three neighborhood stakeholder meetings and four were held (two
neighborhood briefings and two business briefings).The Consultant will coordinate up to one additional business
briefings and two neighborhood briefings (three meetings total)to supplement the stakeholder interviews.The
Consultant will plan and implement logistics, staffing, and facilitation, and provide note-taking support for these
meetings.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task, one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 19-2 summarizes the stakeholder engagement activities for this project.
City of Federal Way April 30,2019
City Center Access Project Exhibit A
SCOPE OF WORK (continued)
Table 19-2.Summary of Stakeholder Activities
Task Assumptions(if applicable) Deliverables
■ PRR will develop interview questions ■ Up to nine(9)
Individual a PRR will invite only stakeholders previously interviewed (up to 9 stakeholder interview
stakeholder interviews) notes
interviews • Logistics, interviews, note-taking and summaries by one(1) PRR , One(1)stakeholder
staff member interview summary
• Interviews will be conducted by phone
Business briefing • Logistics,staffing and note-taking support for up to one(1) public • List of businesses
meeting for up to two hours • One(1)email invitation
• Includes email invitation to business list
• One day of d • One(1) businessoor-to-door outreach in business target area. g
briefin
Assumes two PRR staff members for up to 10 hours, including . One in outreach
initial planning,travel,day of preparation,and summary draft summary
work. • One(1)briefing
• Assumes one PRR staff member for planning,travel,day of summary
preparation,and summary draft work,and two Parametrix staff a See Advertising for
members each meeting to prepare and attend.Assumes City staff additional materials
person is present at the meeting. related to business
briefings
Includes email invitations to neighborhood lists 0 List of neighborhood
Neighborhood . Door-to-door events up to three(3)times in target contacts,segmented
briefings into three
neighborhoods.Assumes two PRR staff members for up to 10
hours per door-to-door event,including initial planning,travel, neighborhood areas
day of preparation,and summary draft work. • Up to three(3)email
invitations to
• Assumes one PRR staff member for each meeting,including neighborhood list(one
planning,travel,day of preparation,and summary draft work, invitation per
and two Parametrix staff members for each meeting to prepare neighborhood)
and attend.Assumes City staff person is present at the meeting. • See Advertising for
additional materials
related to
neighborhood briefings
Task 19.3 Community Events and Engagement—Additional
The Consultant will continue to support City communication with the general public in the project area.The
original scope of work included informational tables at two fairs and festivals, up to three public meetings.The
Consultant completed one public meeting, one online open house, and used the remaining funds in Task 3.3 for
an additional informational table,the additional stakeholder meeting from Task 3.2, and more planning time for
all outreach events due to project redirection.The original scope included tasks to support engagement with City
Council, which the City did not require.The remaining hours from the City Council Task 3.4 is applied to the hours
in this additional Task 19.3.
City of Federal Way April 30,2019
City Center Access Project 6 Exhibit A
SCOPE OF WORK (continued)
The Consultant, in coordination with City staff, will coordinate two additional tabling events and one additional
public meeting.The Consultant will plan and implement logistics,staffing, and facilitation, and provide note-
taking support for these events.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task, one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
The Consultant, in coordination with City staff, will coordinate and host one additional online public meeting.
Table 19-3 summarizes the community engagement activities.
City of Federal Way April 30,2019
City Center Access Project 7 Exhibit A
SCOPE OF WORK (continued)
Table 19-3.Summary of Community Engagement Activities
Deliverables/work
Task Assumptions(if applicable) products
• Logistics,staffing and note-taking support from one(1) • Two(2)event plans
Informational tables at PRR staff member for up to 12 hours per event • Two(2)sign-in sheets
fairs and festivals . Assumes each tabling event is four(4)to six(6) hours of • One(1)tabletop map
tabling
• Two(2)informational
• Assumes participation of at least one representative from table events
• Two(2)event summaries
City of Federal Way and one representative from
Parametrix at each event
• City of Federal Way to cover cost of giveaways or other
promotional items
• Assumes no additional boards or handouts(use open
house boards and updated fact sheets)
• Two(2) PRR staff persons to attend,and take notes, • One(1)in-person open
In-person open house including travel,set-up,tear-down house
• PRR to plan meeting and coordinate logistics • One(1)event plan
• One(1)participant guide
• PRR provides all interpreting services . One(1)event summary
• Interpreting in Spanish
and Korean
• See Advertising for
additional materials
related to the open house
Online open house • PRR will use open house board content to develop draft, • One(1)online open
revised,and final content for the online open house house content update
• PRR will provide up to five(5)additional graphics • Up to five(5)additional
formatted for the online open house graphics
Twelve(12) months site
• PRR will host the site and provide basic site maintenance hosting and basic
and hosting for twelve(12)months maintenance
• PRR will take down and send files to City of Federal Way as • Zip file of website files
a zip file and database of
■ PRR will use the existing online open house wireframe and federalwaycitycenter.org
design
Task 19.4 Support City Website—Additional
The original scope of work assumed 12 updates to the website, all of which were not required.The remaining
hours in Support City Website Task 3.5 are applied to this additional Task 19.4.
The Consultant will continue to provide City staff with content and updates for a project website.This task
assumes the City will provide back-end IT support for the website.Table 19-4 summarizes the support activities
for the City website.
City of Federal Way April 30,2019
City Center Access Project 8 Exhibit A
SCOPE OF WORK (continued)
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task, one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 19-4.Summary of Support Activities for the City Website
Deliverables/work
Task Assumptions(if applicable) products
Content updates for City PRR will use email update content to develop draft, revised, Up to three(3)
Center Access informational and final content for up to three(3)website updates website content
webpage on City of Federal . PRR will provide up to three(3)additional graphics formatted updates consistent
Way website for the website with email updates
and public events
• Up to three(3)
web-ready graphics
Task 19.5 Public Information Materials and Special Graphics—Additional
The original scope of work included materials development to support the scoped outreach activities.Additional
informational materials are needed to support the activities added in this scope of work.The Consultant will
develop additional materials and conduct additional activities to support public outreach efforts.Tasks may
include developing graphics, drafting written materials, and performing other miscellaneous activities.
This task assumes up to three rounds of review for all public information materials, one round with the Prime, one
round for substantive feedback from the City,and one for minor feedback or final approval from the City.This
task assumes all feedback comes as consolidated feedback with clear direction from the reviewer.
Table 19-5 summarizes the support activities for developing public information materials and special graphics.
Table 3-6. Summary of Support for Public Information Materials and Special Graphics
City of Federal Way April 30,2019
City Center Access Project 9 Exhibit A
SCOPE OF WORK (continued)
Task Assumptions(if applicable) Deliverables
• Up to 15 informational boards ■ Printer-ready artwork for
Project materials ■ All graphics work for completed by the Parametrix up to one project update
graphic designer fact sheet and 15
• Parametrix graphic designer follows outreach lead informational boards
• Up to one comment form
direction on open house and briefing boards • Up to one fact sheet
• Direction on boards for up to one comment form
• Up to one project update fact sheet
Outreach flyers a To be used during door-to-door outreach for business ■ One(1)flyer for business
briefings, neighborhood briefings,and environmental outreach
justice briefings • Three(3)flyers for
neighborhood outreach
(one for each
neighborhood)
■ One(1)flyer for
environmental justice
outreach
• One(1)flyer translated
into Spanish and Korean
for environmental justice
outreach
Email updates • Assumes the same email update goes to all lists . Up to five(5)email
• Assumes no translations updates
■ Assumes the schedule and content for email updates
roughly follows:
o February
■ Update on local-only alternatives study
o June/July
• Update on work to date
■ Announce tabling events,open house and
schedule
• Introduce very high level information about
what will happen at open house
o Early September
■ Link to online open house
• Open house invitation
o October
■ Open house summary
• Next steps
o November
■ Share City Council decision and next steps
Final outreach report At the conclusion of this phase, PRR will draft and One(1)final outreach
format a report that will summarize and document all report
public outreach activities
City of Federal Way April 30,2019
City Center Access Project 10 Exhibit A
SCOPE OF WORK (continued)
Task 19.6 Advertising—Additional
The original scope of work included advertising materials to support the scoped public meetings.The Consultant
will coordinate and prepare new materials to advertise the additional in-person and online public meetings.This
amount is covered with funds in Advertising task 3.7.
This task assumes up to three rounds of review for all advertising materials, one round with the Prime,one round
for substantive feedback from the City, and one for minor feedback or final approval from the City.This task
assumes all feedback comes as consolidated feedback with clear direction from the reviewer.
Table 3-7 summarizes the support activities for advertising the in-person and online public meetings.
Table 3-7.Summary of Support Activities for Advertising Public Meetings
Task Assumptions(if applicable) Deliverables
Postcards + City of Federal Way to pay for postage within agreed-upon + One(1)postcard
geographic area delivered to target
+ The Consultant will cover all printing costs geographic area
+ Assumes same geographic area for mailing as prior open
house postcard mailing
+ To advertise in-person and online open houses
Display advertisements + Poster will be translated into Spanish and Korean • One(1)poster,
+ Includes posters at social service providers and retail translated into
establishments to advertise the in-person and online open Spanish and Korean
houses + One(1)newspaper
+ Includes legal notice in Federal Way Mirrorto advertise in-
legal notice
person open house
Task 19.7 Environmental Justice Outreach—Additional
The original scope of work included up to eight service provider briefings and eight environmental justice group
briefings.This additional Task 19.7 uses the remaining hours from Environmental Justice Outreach Task 3.8.
The Consultant will continue to plan, schedule, and support project briefings with environmental justice groups
and service providers, such as English as a Second Language (ESL) class presentations.The Consultant will develop
summaries of each briefing.
The Consultant will provide interpretation at community and business meetings with limited English-proficiency
attendees.The Consultant will translate project handouts into Korean and Spanish.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task, one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
City of Federal Way April 30,2019
City Center Access Project 11 Exhibit A
SCOPE OF WORK (continued)
Table 19-7 summarizes the support activities for environmental justice outreach,
Table 3-8.Summary of Environmental Justice Outreach
Task Assumptions (if applicable) Deliverables/work
products
Briefing for environmental • Assumes one PRR staff member for each briefing, • List of local
justice advocates and service including planning,travel,day of preparation,and environmental justice
providers summary draft work. Assumes on Parametrix staff advocates
member is present at each briefing. • List of social service
oviders
• Service provider briefing summaries will list all providers providers
* Up vi four(4)event
in attendance,summarize their comments, identify the plans
communities each provider serves,estimate the number • Up to four(4)email
of community members each provider/agency serves, invitations to
and if low-income, people of color,and limited-English advocates and social
proficiency populations are served. service providers
a Assumes up to four(4)briefings • Up to four(4)Spanish-
language or Korean-
language email
invitations
• Up to four(4) briefing
meetings
• Spanish-or Korean-
language interpreting
at two(2)meetings
Task 19.8 Comment Management—Additional
The original scope of work included listsery management, public correspondence and database maintenance.At
the direction of the City,the Consultant did not expend all the hours necessary to develop a full database.The
remaining hours from Comment Management Task 3.9 is applied to the additional activities described in
Comment Management Task 19.8.
The Consultant will continue to manage public correspondence and track comments.
This assumes up to three rounds of review for all deliverables or work products needed to fulfill each task, one
round with the Prime, one round for substantive feedback from the City, and one for minor feedback or final
approval from the City.This task assumes all feedback comes as consolidated feedback with clear direction from
the reviewer.
Table 19-8 summarizes the database management of correspondence and comments.Table 3-9.Summary of
Comment Management
SCOPE OF WORK (continued)
Task Assumptions(if applicable) Deliverables
Correspondence 9 PRR will provide hotline message script and translations into a Up to twenty-seven
Spanish and Korean (27) public
• PRR will record Hotline message in English,Spanish and correspondence
Korean reports
■ PRR will check hotline once every business day from May- ' Record of public
November 2019 correspondence
• PRR will report on public correspondence weekly by email
from May-October 2019
Continue to maintain project • PRR will add new contacts and comments on a monthly basis , Up to twelve(12)
email distribution list list updates
• PRR will update the database with contacts and comments • Up to twelve(12)
Maintain comment database following briefings and other public meeting database updates
and summarize comments • Two(2)comment
after public events + PRR will provide a summary of comments after open house,
including online open house summaries
Task 19.9 Strategic Assistance—Additional
The original scope of work included hours for strategic assistance related to public involvement and stakeholder
engagement.The Consultant will continue to be available for special projects and strategy sessions, applying the
remaining hours from Strategic Assistance Task 3.10 to this additional Strategic Assistance Task 19.9.
As directed by the City,the Consultant will address community concerns and other issues that arise.The
Consultant may participate in strategy sessions, impromptu meetings, correspondence,and telephone calls with
City staff.The Consultant will document those activities through action item lists,track follow-through activities,
and identify the next-steps in the process.
Special projects may be assigned as identified by City, such as conducting additional community outreach and
preparing project information and graphics.Table 19-9summarizes the strategic assistance required by the City.
Table 3-10, Summary of Strategic Assistance
Deliverables/work
Task Assumptions(if applicable) products
Strategic Assistance • Assumes up to 10 additional hours of Consultant support for • Memorandum
strategic assistance and special projects as assigned by the documenting
City. direction from the
City
Assumptions
• As indicated in above tables
City of Federal Way April 30,2019
City Center Access Project 13 Exhibit A
SCOPE OF WORK (continued)
Deliverables
As indicated in above tables
Task 20 — ARR Support Team Meetings - Additional
Task 20.1 ARR Support Team Meetings -Additional
The original scope assumed 14 Study Support Team Meetings. Amendment 3 provided for 3 additional Study
Support Team meetings for a total of 17. 10 ARR meetings have been completed to date thorough January
16, 2019.This task assumes that 5 meetings will be necessary in 2019 for a total of 16 meetings by the end
of 2019. The current budget available in task 4 will be sufficient for this effort through 2019, and a future
amendment will address SST meetings for 2020 and beyond.
■ April 2019 screen and refine alternatives-based on Purpose and Need
• May 2019 Screen and Refine- Purpose and need and environmental
• June 2019 Screen and Refine—Draft alternatives evaluation review
■ July 2019 Screen and Refine—Outreach messaging review
August 2019—Public Outreach messaging—review outreach materials
• October 2019—Review Outreach Summary, refine identify preferred
1-ask 21 - Travel Dernand Model Forecasts - Additional
The original scope of work included development of a travel demand forecast based on Federal Way's Emme
model. Amendments 1, 2 and 3 provided for additional select link analyses to determine origin and destination
information,travel demand modeling, and turn movement forecasts for a true no-build alternative.Additional
effort is required for the following subtasks.
Task 21.1 Travel Demand Model Sensitivity Analyses
The Consultant will provide sensitivity analyses for different local improvement projects to identify the effects of
each sensitivity analysis scenario,Travel demand models will be created for each scenario. Each scenario will add
projects to the future no-build travel demand model. Models will be run for each scenario as listed below and one
(1) PM peak hour plots will be created for each scenario.
Sensitivity Analysis Scenarios:
• Scenario 1:
o S312 Ih St Overcrossing
• Scenario 2:
o S324 Ih St Overcrossing
• Scenario 3:
o S 3201h St HOV Lanes
• Scenario 4:
o Military Road Widening
City of Federal Way April 30,2019
City Center Access Project 14 Exhibit A
SCOPE OF WORK (continued)
• Scenario 5:
o S312 th St Overcrossing
o S317 Ih St Overcrossing
• Scenario 6:
o S312 Ih St Overcrossing
o Potential Annexation Area projects
• Scenario 7:
o S324 Ih St Overcrossing
o Potential Annexation Area projects
• Scenario 8:
o S 320th St HOV Lanes
o S312 th St Overcrossing
o S317 th St Overcrossing
o S324 th St Overcrossing extended east to Military Road
o Potential Annexation Area Projects
Scenario 9:
o S3 20th St HOV Lanes
o S 312th St Overcrossing
o S317 th St Overcrossing
o S324 th St Overcrossing extended east to Peasely Canyon
o Potential Annexation Area Projects
• Scenario 10:
o S 3201h St HOV Lanes
o S312 th St Overcrossing
o S317 th St Overcrossing
o S324 th St Overcrossing extended east to Peasely Canyon
o Potential Annexation Area Projects
o Extension of 23rd Avenue S through Belmor Park to S 336th St
o Extension of S 3301h St east to S 336th St/Weyerhaeuser Way S
Deliverables
® One (1) PM peak hour plot for each sensitivity analysis scenario for up to ten (10)total PM peak
hour scenario plots.
Task 21.2 Travel Demand Model Alternatives Screening
The Consultant will provide screening level travel demand modeling for up to four(4) interchange modification
alternatives. PM peak hour plots will be created for each screening alternative. Post processed turning movement
forecasts will be developed for up to six (6) intersections that will be post processed for the PM peak hour to
support the screening level operations analysis,for each of the four(4) alternatives.
City of Federal Way April 30,2019
City Center Access Project Exhibit A
SCOPE OF WORK (continued)
Assumptions
• Up to four(4) interchange concepts will be assumed for travel demand modeling.
• Each travel demand model will include all projects identified within the Local Alternative Elements
graphic as well as the chosen interchange concept.
Deliverables
• Up to four(4) PM peak hour plots will be created for the four screening alternatives.
• Turning movement volumes will be developed for up to six(6) intersections for each screening
alternative for a total of up to twenty-four(24)total intersections of turning movement volumes.
Task 22 — Traffic Forecasts and Operations Analysis - Additional
The original scope of work included development of traffic forecasts and operations for existing, No Build, and
two Build Alternatives.Amendments 1, 2 and 3 provided for Simtraffic analysis to determine the local impacts on
1-5 operations, and analysis and evaluation of Local Only Solution elements.Additional effort is required to screen
and analyze additional local only elements and interchange alternatives.
This scope includes the following analysis scenarios:
- Additional local only elements including the Potential Annexation Area projects and all City
Comprehensive Plan roadway capacity projects
- Additional connection with S 330`"Street extension under 1-5 and 23rd Avenue S to 5 336th Street
- Additional local only connections including extending S 324th Street from Military to Peasley Canyon
Road
- Interchange alternative screening
o S 312th/S 3201h Street modified access
o S 324t"/S 3201h Street modified access
o New half diamond at S 312th and new half diamond at S 324th Street with S 320th Street access
o S 324t"/S 320"Street modified access with one-way arterial couple
- Indirect or cumulative effects of potential land use changes
Task 22.1 Detailed Traffic Forecasts -Additional
The original scope included developing detailed traffic forecasts for an existing condition, No Build, and two Build
alternatives.This level of effort was larger than anticipated due to issues with the existing conditions travel
demand model calibration and forecasting(multiple iterations were completed to obtain final No Build volumes),
and to develop forecasts for several local improvement alternatives.
Additional scope includes developing detailed traffic forecasts to support interchange alternative screening.This
includes developing forecasts for up to 6 intersections and 1-5 mainline and ramps at the study interchanges (3
existing and one new) for up to four alternatives, and to model indirect or cumulative effects and post process
traffic volumes for S 320th Street and S 324th Street in the vicinity of 1-5.
Task 22.2 Screening Level Traffic Operations Analysis - Additional
The original scope included screening level traffic operations analysis to support selection of a Preferred
interchange alternative, with the expectation that the interchange would be located at S 312th or S 324"Street.
The screening analysis would use Synchro or Sidra and analyze intersection control types.
City of Federal Way April 30,2019
City Center Access Project 16 Exhibit A
SCOPE OF WORK (continued)
Direction from the SST and the interchange alternative workshop have identified interchange configurations
beyond the modified access at S 312th and S 324th Street previously studied.These include one-way couplets with
S324 th and S 320th Street with a modified access at S 324th Street;split diamond interchange with S 312th and S
324th with full access at S 320th Street; and other variations. Additional screening will need to occur to support
alternative selection.This includes analysis of 1-5 operations and arterials between Pacific Highway and Military
Road. It is assumed that Synchro, Sidra, and HCS can be used to analyze these conditions to support alternative
screening. It is assumed the SimTraffic model will not be used.
Deliverables
• Traffic operations models and summary results of the traffic operations analysis
Task 22.3 Indirect or Cumulative Effects
This task includes the development of traffic forecasts and operations for one (1) indirect or cumulative
effect scenario. It is assumed the indirect or cumulative effect scenario will be a change in land use.
The travel demand model will be updated with the new land use and trip generation numbers provided by
the City. Detailed PM peak hour traffic volumes will be forecasted for the vicinity of S 3201h Street and S 324th
Street(see Assumptions below).This includes intersection turn movement volumes, and freeway ramp and
mainline volumes. Daily and PM peak hour screenlines will be forecasted for up to eight(8) locations.
Traffic operations analysis will include a Synchro analysis for the intersections and a VISSIM analysis for the
freeway mainline, ramp, and intersections within the vicinity of the interstate. Output will include
Synchro intersection delay and LOS, and VISSIM travel times and descriptions of queues.
Assumptions
• The CLIENT will provide land use adjustments to PSRC for the updated trip generation by zone for use in
the travel demand model. PSRC will provide trips ends to CONSULTANT to use in travel demand model.
• The analysis study area will include S 3201h Street from Pacific Highway to Military Road,S 324th Street
from Pacific Highway to the eastern terminus
• PM peak hour intersection turn movement volumes will be forecasted for up to sixteen (16)
intersections per build alternative
• 1-5 in the vicinity of S 320th Street and any new access points with two Build Alternatives will be
evaluated.
• Analysis will be completed for the year 2045 PM peak hour.
• SimTraffic will not be utilized. VISSIM videos will not be developed.
Deliverables
0 Traffic models and summary results of the indirect/cumulative effects analysis
Task "Il") -- N/Ie(hods and Assu ir_Airans Acid illona,1 - Additional
The original scope of work included provided for the development of Methods and Assumptions for the Project.
The Methods and Assumptions were developed and were revised for a Non-access Feasibility Study.This
Amendment 4 provides for the development of Methods and Assumptions for the Access Revision Report, and to
address comments from the Study Support Team.
City of Federal Way April 30,2019
City Center Access Project 17 Exhibit A
SCOPE OF WORK (continued)
Task 23.1 Methods and Assumptions Document- Additional
The Consultant will update the Methods and Assumptions for the ARR and work to address comments from the
Study Support Team.
Assumptions
• Two updates to the M&A to address comments from the Study Support Team.
Deliverables
• Final,signed Methods and Assumptions
Task 24 — Environmental Evaluation for Alternatives Screening - Additional
The original scope assumed that this task would provide environmental analyses in support of the City's
evaluation of two alternative locations for the new interchange and just one design configuration for each
location.The scope assumed that the study area corresponding to the alternatives would be similar to that for the
environmental analysis completed in 2008,allowing the use of prior work as a starting point.
This Amendment provides for three changed conditions: (1)the need to provide ongoing environmental strategy
at a higher level; (2)the potential for an expanded study area for authorized scope items; and (3) additional scope
items.
Task 24.1 Environmental Strategy and Methodology
The Consultant will monitor the development and evaluation of alternatives to identify opportunities to avoid and
minimize impacts, adapt and help apply environmental criteria as needed through the screening process, and
participate in two meetings or conference calls with agency environmental leads to confirm process.
Recommended methodologies for applying environmental criteria will be documented in a brief memo or report
to share with the agency environmental leads.
Assumptions
0 None
Deliverables
• Environmental methodology report or memo
Task 24.2 Expanded Study Area
The Consultant will help develop the strategy and methodology for considering potential impacts to a broader
area than originally intended.The Consultant will then execute the additional evaluations.
Assumptions
• The study area is expanding in two ways:
o The area of potential physical improvements is expanding but will be limited to those
necessary to accommodate local only improvements and interchange access.
City of Federal Way April 30,2019
City Center Access Project 18 Exhibit A
SCOPE OF WORK (continued)
o The area of indirect effects due to changes in travel patterns(e.g.,traffic volumes,traffic
noise, and community character) is also broadening.
® Environmental analyses during screening will address the same discipline areas and generally apply
the same methodologies. Implications for each discipline are shown in the table below.
Discipline Methodology Expanded Area of Expanded Area of Indirect
Physicallmr)rovements Effects
Cultural Resources Database research/ Both database and Windshield survey only
Windshield survey windshield survevs
Ecological Resources Windshield survey/ Windshield survey where Literature search only
literature search/ possible. Reconnaissance
reconnaissance to confirm where rights of entry are
identified features received. Otherwise
literature and GIS.
Noise Identification of sensitive Yes At neighborhood level
receptors;general number only
and proximity
Hazardous Waste Database research within Yes No
certain distance
Parks and Recreation Location and use; with Yes Yes
impacts portrayed broad
brush, mostly if not entirely
qualitative
Social and Community Demographic analysis;with Yes Yes
impacts portrayed broad
brush, mostly if not entirely
qualitative
Deliverables
0 Results from expanded study area will be incorporated in previously approved deliverables.
Task 24.3 Rights of Entry
The Consultant will identify parcels for which rights of entry are needed, a description of the work to be
completed, and timing for the work.
Assumptions
The City will secure the Rights of Entry
Deliverables
Spreadsheet with parcel numbers, addresses, owners, submitted electronically
Description of work, submitted electronically
City of Federal Way April 30,2019
City Center Access Project Exhibit A
SCOPE OF WORK (continued)
Task 24.4 Indirect/Cumulative Effects
There are several potential future developments that have not yet been approved by the City and are not
accounted for in the land use projections used for traffic modeling.The Consultant will help develop the strategy
and methodology for considering the indirect or cumulative effects of the future developments on the
effectiveness of the alternatives under consideration in meeting the project purpose and need.
Assumptions
• The City will provide develop traffic information and roadway connection elements
Deliverables
• Technical memorandum proposing a methodology for evaluating these effects
Task 25 Alternatives Development -- Additional
The original scope provided for a conceptual design workshop to update the conceptual designs for two final
build alternatives and develop conceptual channelization plans for the two build alternatives.Amendment 4
provides for additional design of local alternatives to determine their feasibility and for further evaluation,for the
conceptual design and refinement of additional access alternatives, and for additional design layout required to
analyze indirect effects.
Task 25.1 Additional Design:
The Consultant will conduct additional design to analyze local alternatives.Additional design will be completed for
the following
Assumptions
• Develop Local only connection for 324th from Military Road to Peasely Canyon
• Develop Local only connection for 330"under freeway into Weyerhauser, and 23rd to 336th
• Obtain and include Gateway auxiliary lane to determine feasibility of options
• Additional effort to make a 3121h interchange solution work by resolving Sound Transit light rail conflicts
■ Additional access alternatives and potential impact boundary for four additional alternatives and 10-12
types(up to three different types per location)
• Credit$5,000 back to Task 11.02 for a conceptual workshop that did not occur in the previous scope
• Develop Context and Modal Accommodation Report
Deliverables
• Design layouts in Microstation
• Identification of design impact area for alternatives evaluation.
City of Federal Way April 30,2019
City Center Access Project 20 Exhibit A
SCOPE OF WORK (continued)
Task 25.2 Additional Cost Estimating:
The Consultant will develop a planning-level cost estimate for all local only elements.This information will be
utilized for the local only feasibility study and the one page documentation for the Study Support Team.The
consultant will also develop additional cost estimates for Access Alternatives—the original scope assumed two
alternative estimates—this amendment provides for four additional and 10-12 types (up to 3 types at each new
access alternative location).
Assumptions
• Cost estimates for all local only alternatives will include a planning-level per lane cost
Deliverables
• Cost Estimate for all Local only elements
• Cost estimate for four additional Access Alternatives and 10-12 types per interchange
Task 25.3 Alternatives Considered but Rejected
The Consultant will develop documentation for the Alternatives considered but rejected, including all developed
by workshops and outreach
Assumptions
• Two City review cycles
• One WSDOT review cycle
• Two FHWA and SST review cycles
Deliverables
• Draft documents for City, WSDOT, Executive Team and Study Support Team Meetings
• Executive Team Meetings
• Final in .pdf Format
Task 26 — Alternatives Evaluation and Screening
The original scope provided for Alternatives Evaluation and Screening for two alternatives,
Assumptions
Evaluation and screening for high level screening for nine additional alternatives (fatal flaw) and a more detailed
screening for four additional alternatives.
Deliverables
Q screening matrices
City of Federal Way April 30,2019
City Center Access Project 21 Exhibit A
SCOPE OF WORK (continued)
Deliverables
The previous scope deliverables will be replaced with:
• Draft and Final Non-Access Feasibility Report
® Draft and Final Access Revision Report
Task 28 — 2025 Travel Demand Modeling Support
The Consultant will provide up to eight(8) hours of support to City staff for the 2025 travel demand modeling of
the City's Transportation Improvement Plan (TIP).
Deliverables
G 2025 model support
City of Federal Way April 30,2019
City Center Access Project 22 Exhibit A
ZL 7,rl
Tl
7: g5
al 1a
a al o a s H I- -
f i
sly
� I -
w
h ISI iI F I
i. i � � s �j F 1= .�•, i i i rs
I
- I
H
-
a a �
4
_ b
C
X � �
L� Pi g� iQ an Lfill a1TL
a 3Y s a` 3 r .4 ti }v c w k F I
� «\ � \ \ \\\\\\\\\\\\�\\���§����//�\}\\\\\\\�j\\ \\ \\\\\\\fl\\
a 2
-————— - —————
- - - � *\ = §fl;F {if{ : \ : \ ( : }{{\ \ ;\ \
\j\\� � `\ \\}\ � - - -
71
v
CL
x
w
X
a
X
X
V
W
d
Lx
W
Ol
e-I
O
N
N
N
C O
C �
O g D O
u 0 p 0 0 0 0 O O D O O O O 0 0 0 0 O �'7• �? Q
ho
O �
O QmQ
A N p P
p 0 0 0it
w N �
O
U
« ci
c
> " 8
Z Ea ~i+ o 0 o Do 00o eee a 0000 0
'c .4x
Q
m
m vii G p�p�� n
N p 00 0 m O D ,O coo 144 0000 :9 12 P+
M N N
N
O
. o0 000
0 0 ^0
oommo m0 Vn
N N NU VIN m• N 14N NN Vo
N M
a
0
m
X � C
W G
C
a 'v
c
'a
N 9
to
Ln 1O w .cc, 5
0 m
X w a E m o v Q N
LU E u° c eoc - a
o > c
.X Q m D o t c .a m '°
C t y a v ¢ Z Q c b v a 9 C C
� asp � oGm � ba 9 zs
c ,
fC a L° m qty o w ac , C « w o c o c v ¢ Q
'L�'....m m d u. 6 � "« G
2 E a E E; t a« o ti
Ea �' NU � mm w,2 '° > ; ma9 � C
E m$ a m w EN ° c E d b J Qyg wR � a?i 10 e e
W cC O p�+ G y d ~ O I R y C �+ C , 2 j
C m C w c m C d b w 0 N N N N
e °a m w f w P a e ° m a vii o r " o E
c e _ y
u O Y! ?7 C N m E u D z u O L O 'C m L001 C E E mu� N O
E mooa+ � aE h ��� � Lw Sa NN
za�mmwg w3So,',E d ,u � 9 a
—
R
g T T O 1fl n W m O rl N T a N b P 00
O
Y
O
a
w
N ' a
WX
d al 6,d +4i 0 h N N o
N N �7 N Nl•J'.YF N I N�� o
— ff pp p p p m
N N lC N N N N N N N N „4 A
S � � aoIRaSB � Sp � oo
m c N {l��e�l pp pp ^ o o o D o o N
pap N n N N v0F N N N N N N N
V
W
m N —
o a o o a a 0 0 0 0 0 I a . 0 0 0 0
C ry Y
E '^
a
m W O O O N ,y m O D O O O m W m irn a
w '^
' D o D .Ni a m o 0 o ti pel a D 0 D D o
N
a N O
N
O O O o O N O
a
mO --I ary s 4
O O
a 0 O a •q O pN N G y r� O G ti G {:a. C O G G c m
Ln
49
1 a
J
d
c �
o
c o
0
¢ vy
c Q
� u — Ip •_
� dqa a E � a •p5a �� �
°-„° c
nc 'c� cQi&
o d G 0 0
,y u c E o _ c £ '� � ❑ a � � g f � � '� « E � -' o m n�o
E d m m
E W ICu $ .o " .i+ 3 Ep e c E
' e E E�o o " ry a w o ❑ n e m F=
`u E In N
d .a .WC w 4F�, 0. Q � N• c ILY Q
uY� N 01 O ey N N N N
L'O N N N rl N N N N N N N N N N
o. �
a
v
a
x
w
vl
Y
X
X
V
W
L
W
H
N
N
p � N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 6ri
ih a
E
a
a
0 0I0 0 0 0 0 0 0 0 0 0 0 0 e o a m
I v
II! u
G
F O
V
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O d
.Jr C1
m 0 p ,•-
p�i
n w
N
uj
4
Q o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o
F
m
88 8 -.c;
S 0 8 8 8 a p8p OO8 8 8 S o
oN N N N 4R 1011'N 0 1AA 40/1 N 40A•4A N N N VOf N
u
w
L
t
w
A
O
Q� Q
Ln
C:CL) eC
0
Q pC L d
X W y
lJJ 7 m Q F
SS in
1 c = 6 w
N y -a- A m
V Z a ° v a v s or
0. '�' N � •` C �pp y�y � C C N Q
C -c d d 1L d d
e E .6. y p> w a 0 a E c 'D
m aCi a o c E = u 1e n e
d M o E m a m f
N O m b E m
o c' c o o E m m d d
E c w �' e a m o M E a > w >
D lr v to
a - E c w E " '�^ dr,� r e c N
gr 'o z m Te a 'S w ;; N m
a a W o a` r a Q H H w Q 4 4 N
Y
N
V
y M M 7 of n w m O rl N M Q N w n W
y, O N N N N rl N N N N N N N N N N
N
L
a
_ 1---- _
aC II x g
i_
r�
�—LLt
® --
CL
cr
J t
Ji Li.M
W
N
Z
w
a
X
w
s
a
x
z
V
w
L
X
W
Ol
N
0
N
N
N
c3 m <
C C o
m W G o
0 0 0 0 0 0 0 0 0 Co 0 0 0 Cl G 0 0 0 0 ao
� c 4
r - w
— v
m
C o p Q
0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 O Q Q O V
o
o_
0
u
CCO � O C
o Co Cl 0 0 0 0 0 0 0 0 0 0 0 0 o a p o
- n a0n
a
to ca o 0
N O O O o 0 Cl 0 0 0 o o 0 0 o 0 0 0 R 4
'A o
O
" ~ 8 o e8e 8 pSp p8 p8p 8 p8p 8 pSp g 8 a o op S
ON 10/1 N N
u
0
w
a
r
w
m
O
L
'a
N c
� o 'r
cc
X m v N
W c
m
e 9 a a ° a o d e or-
Q`
a = a ±fa a d
o v
Q` io c o c p y c c < a
c ° a y a 1L O" c E ° Y Y
w
u dor a c E o ; $' 0 0
E E m w w
C X m y W > K K
W e ImoG v r m m O W O o
c o t e m C o o E n 'El v > m
c
a N 2 .t d d
g m a a v
e E t c ap W v
u u E c m E Z '.^ y L o i
Go N N r
d m
w e err
O a a w = a N a Q H H w ¢ ¢ ¢ Q
Y
A
r
y mr11 a ul n ao a+ o .+ N T a u+ 10 n a
y� O rl �-1 14 N N N N N N N N N
R
t
a
4
2
X
pp
Op N
A oOOO S.S SSOSNO NoOS8S8 W
O 0 0 0 0 0 0 00 pp O O yNj O . O O O C O pp ✓
F V) Vl Vi N N W ih .N.N N N N N V}N N
z
N
0 0 0 0 0 0 pp O O O O O O S
0 0 0 0 0 O o C O O O �D O W O O O O O O
VI V1 N V1 N N n uF YF N.4 N N N V1 Vf V! N 1h N
N N
O O g
0 o S "d o 0 0 8 8 8 o o p Sp o 8 p 8p O SO a
ry O O O O oo oow iO/! N N M W M 1Oif ✓F N�?N N d
N VI ut Vl N N �••� bD
N V) m
QD
m
C U
•� ON
O 0 0 0 0 0 0 0 0 6 0 0 0 O O O O O C] C) ci O
O = N N N a
O
U
m 10
r
'O wO O O O 0 0 0 0 0 0 0 0 00 W 0 0 0 0 m O m ryj N
VI N
4
m
« C
8 o
r •O mO 0 0 0 0 0 o o 0 0 0 0 00 0 0 0 0 O
u = VI N 44 VF v1
4
O N n N N
y C 0 0 0 cc o o 0 0 0 o w oo O O O O . N V r.: A
'eo
O O O n
O O N O u N
0 0 0 0 0 0 0 0 0 0 0 a0 0 0 0 0 00 N
4
0
N a r O IRK O
= O O O O O O O O O O O N O N ry
W � d m � N
W Q A
C 0 0 O N m
8 8 8 8 8 0 co! o c 8 O m 8 m o 0 8 8 a o m o
C O C C of 0 0 0 0 0 N N N N 10/1 o N N N v0 �•.+ M
p V!N N N V!N VI 1Nn VV 1I VV f!
A
J
mH
Y Y im
N ro
S F V r
O p x
� 1p 4L
J
T,
d
N
°_
V
V
L a
O m
c C
fu ti C d
J > 9 O yW
Q
2 `
01 y v m m c
o m 9 a ¢ d ° c Ta a
`y In
V
w o a m r m g a ¢ M v,c
o a —y
a` Y
m e 'L_ -o a°P w E o
c E e -a ° v v ° ;? > a ° o
F
E ° A E
E o m e E a �' M ° d �° ° w
d W d C N 9 C C j G W C
0 o Z c m ti o �6 E 1°o w E
w > r c x °p a 1n
a "7 o°Cc w w a - c
a H H A ¢ Q Q N
4;t NNN N N
d
N M M a w h w m O N N M O In L Nw h co O N N N N N ••I N N N N N N N N N
d
o
kfq ) -o
� 0000 � 0000 � _ � � � _
C
tw
oma § e amm §
x _ _ . . . . 00 � _ _ fa _
o
cL
o
/ �
. 00000000coo § o2s
fq
_ . ■ « § �
2 � � o � - 4 Gi
� k@@@s@mms ■ « m § 8m88888 #
laaa#aaa # aaawai6a6a2 7 \
3 �
$
L ) 7 )
Ln ] % ak
ca
w ■ , I ; ) \ � - - -
« f � � § « #, 'o ll
ƒ ! ) ■ ) Zr e � ) § %
cc
o : ! § ! % Xlc # § � ko !
■ ■ 2 � m
a ■ ! � § k $ k i3M2
■ Ia -k ■ = < - = � £ 7 ■ u • �
; ' 2 � § e � IRS r
21 tet - B ■ " E - w «4 ■ i - =
! � | § - © ® ■ _ � ot : , - |
) k © Sae � g § $ ■ : ° # E
■ ; . ; ■ cw E § _
k � 2 � s £ � �,■ £ 3I1 � 12 . )
a k \ k \
RETURN TO: PW ADMIN EXT: 2700 ID#: 3 ss U
CITY OF FEDER. WAY LAW DEPARTMEN' OUTING FORM
ORIGINATING DEPT/DIV: PUBLIC WORKS/STREETS
ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:RUSH
;. TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
o PUBLIC WORKS CONTRACT 0 SMALL OR LIMITED PUBLIC WORKS CONTRACT
O PROFESSIONAL SERVICE AGREEMENT o MAINTENANCE AGREEMENT
o GOODS AND SERVICE AGREEMENT 0 HUMAN SERVICES/CDBG
o REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
o ORDINANCE o RESOLUTION
'CONTRACT AMENDMENT(AG#):17-134 ❑ INTERLOCAL
/OTHER SUPPLEMENT NO.3
L PROJECT NAME:CITY CENTER ACCESS S CA N N E D
i. NAME OF CONTRACTOR:PARAMETRIX,INC
ADDRESS:719 2ND AVENUE SUITE 200,SEATTLE, WA 98104 TELEPHONE(206)394-3664
E-MAIL:SGLOVER@PARAMETRIX.COM FAx:(855)542-6353
SIGNATURE NAME:JEFFREY PEACOCK TITLE:CHIEF EXECUTIVE OFFICER
r. EXHIBITS AND ATTACHMENTS:o SCOPE,WORK OR SERVICES o COMPENSATION o INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES 0 PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 101843 000 00 BL,EXP. 12/31/17 UBI#600 135 349 ,EXP. 9 /30/ aOl R
'. TERM: COMMENCEMENT DATE:AUGUST 23, 2017 COMPLETION DATE:DEermiThirlITZUrg Mk o(2-4)20
:. TOTAL COMPENSATION:$2,334,082.75(UNCHANGED) (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES 0 NO IF YES,MAXIMUM DOLLAR AMOUNT: $60,641.61
IS SALES TAX OWED: o YES ❑NO IF YES,$ PAID BY: o CONTRACTOR o CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR o RETAINAGE BOND PROVIDED
o PURCHASING: PLEASE CHARGE To:306-4400-208-595-63 ! IA l 1
1. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED
I' PROJECT MANAGER j\IG/ !(-227 /c-
DIVISION MANAGER
,.e(DEPUTY DIRECTOR , ,4t CU—ILPIREcToR �w' 6` \ t&
0 RISK MANAGEMENT (IF APPLICABLE)
Ar/LAW DEPT
0. COUNCIL APPROVAL(IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING a
El SENT TO VENDOR/CONTRACTOR ( DATE SENT: cl ec4ToRital(y$a-t8 DATE REC'D:g-‘.S—lO
o ATTACH: SIGNATURE AUTHORIT'4 INSURANCE CERTIFICATE,LICENSES,EXHIBITS
o CREATE ELECTRONIC REMINDER/NOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
\ INITIAL/DATE SIGNED
AIL
LAW DEPT1:�7�f��� (Il� Ii
SIGNATORY0R DIRECTOR) `VOf.r 7
CITY CLERK 7 Intim ► .i% ►.
ASSIGNED AG# AG• 1112Vo GI I
❑ SIGNED COPY RETURNED DATE SENT: Y (VM a
❑RETURN ONE ORIGINAL
;OMMENTS:
XECUTE"2 ORIGINALS.THIS SUPPLEMENT AUTHORIZES ADDITIONAL SERVICES UNDER THE MANAGEMENT RESERVE OF THE ORIGINAL
;ONTRACT.THEREFORE,THERE IS NO CHANGE TO THE TOTAL COMPENSATION OF THE CONTRACT UNDER THIS SUPPLEMENT.THIS SUPPLEMENT
IMPLY AUTHORIZES THE WORK AND FUNDS TO BE PAID UNDER MANAGEMENT RESERVE OF THE ORIGINAL CONTRACT.
4/2017
r RETURN TO: PW ADMIN EXT: 2700 ID#: 3 3 9
J
(p
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIV: PUBLIC WORKS/STREETS
ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:RUSH
TYPE OF DOCUMENT(CHECK ONE):
o CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
o PUBLIC WORKS CONTRACT o SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT o MAINTENANCE AGREEMENT
o GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑
ORDNANCE ❑ RESOLUTION
"CONTRACT AMENDMENT(AG#):17-134 ❑ INTERLOCAL
/OTHER SUPPLEMENT NO.3
PROJECT NAME:CITY CENTER ACCESS
i, NAME OF CONTRACTOR:PARAMETRIX,INC
ADDRESS:719 2'•'°AVENUE SUITE 200,SEATTLE, WA 98104 TELEPHONE(206)394-3664
E-MAIL:SGLOVER(Ci/PARAMETRIX.COM FAX:(855)542-6353
SIGNATURE NAME:JEFFREY PEACOCK TITLE:CHIEF EXECUTIVE OFFICER
P. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES o COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 101843 000 00 BL,EXP. 12/31/17 Usi#600 135 349 ,EXP. 4 /30/ aot'1
'. TERM: COMMENCEMENT DATE:AUGUST 23, 2017 COMPLETION DATE:DECEMBER 30,2018
�. TOTAL COMPENSATION:$2,334,082.75(UNCHANGED) (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES 0 NO IF YES,MAXIMUM DOLLAR AMOUNT: $60,641.61
IS SALES TAX OWED: ❑YES ❑NO IF YES,$ PAID BY: o CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR o RETAINAGE BOND PROVIDED
O PURCHASING: PLEASE CHARGE TO:306-4400-208-595-63
'. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED
'PROJECT MANAGER JNIGf J�
VDIVISION MANAGER
,.DEPUTY DIRECTOR / (A.7 7
DIRECTOR
o RISK MANAGEMENT (IF APPLICABLE)
LAW DEPT
0. COUNCIL APPROVAL(IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING 1 p
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: GI CLATORitglIy a'L$ DATE REC'D:%i '` l0
3'
❑ ATTACH: SIGNATURE AUTHORIT , INSURANCE CERTIFICATE,LICENSES,EXHIBITS
0 CREATE ELECTRONIC REMINDE' OTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESS 'Y AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
LAW DEPT � >:*Y J71f d 1" Lt
SIGNATORY AYO' •R DIRECTOR) 41W4g' r/l
CITY CLERK V /nirein:2 ► .i. ►_
ASSIGNED AG# AG• �UVg Ci I I
o SIGNED COPY RETURNED DATE SENT:
FM ,
0 RETURN ONE ORIGINAL
:OMMENTS:
XECUTE"2 ORIGINALS.THIS SUPPLEMENT AUTHORIZES ADDITIONAL SERVICES UNDER THE MANAGEMENT RESERVE OF THE ORIGINAL
'ONTRACT.THEREFORE,THERE IS NO CHANGE TO THE TOTAL COMPENSATION OF THE CONTRACT UNDER THIS SUPPLEMENT.THIS SUPPLEMENT
IMPLY AUTHORIZES THE WORK AND FUNDS TO BE PAID UNDER MANAGEMENT RESERVE OF THE ORIGINAL CONTRACT.
4/2017
SUPPLEMENT NO. 3
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc. effective the 23rd day of August 2017, identified as
Agreement No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018
and Supplement No. 2 dated May 10, 2018. All provisions in the Agreement remain in
effect except as expressly modified by this supplement, "Supplement No. 3."
The changes to the Agreement are described as follows:
•
Section II, Scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-3" attached hereto and incorporated by this
reference(Additional Services).
II
Section IV, Time for Beainnina and Completion, shall be amended to extend the
completion date to June 30, 2020.
p
Section V, Payment Provisions,
A. Hourly Rates: The negotiated hourly rates changed as a result of change in the direct
(raw) labor rates and classifications and indirect cost rates as shown on Exhibits "D-
3"and "E-3,"which are attached hereto and incorporated by this reference.
C. The maximum amount payable under this Supplement No. 3 inclusive of all fees and
other costs is Ninety-Four Thousand Eighty-Six and 47/100 Dollars ($94,086.47) for
a total amount payable to the Consultant pursuant to the Agreement, Supplement
No. 1, Supplement No. 2, and this Supplement No. 3, inclusive of all fees and other
costs, to be an amount not to exceed Two Million Three Hundred Thirty-Four
Thousand Eighty-Two and 75/100 Dollars ($2,334,082.75). The attached Exhibits "D-
3" and "E-3," which describes the payment for work to be performed under this
Supplement No. 3, are hereby made a part of the Supplemental Agreement.
Signed this 1L( day of (,(qUS* , 2018.
K\TR\IIIc\Grants&Projects\Projects\Cory Center\Lees\2017\Consultant%greement-I'MM\2017\\mendment 0 3\1.cgz1 Review\Past Review\-\G 17-134 CCA Supplemenr
\o 3-8-2-2018-110,d docx
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
By: BY:
-Roger Flint Ferrell
Its: Chief Operating Officer Its: Mayor
719 2"d Avenue, Suite 200 33325 8th Ave S
Seattle,WA 98104 Federal Way,WA 98003
(206)394-3664 (253)835-2401
APP DASTi • -
-Pot J. Ryan Call, City Attorney
1,\TR.\Ff1C\Gnnrs&Proieets\protects\City Cm,1,cess\2017\Consul.mt.\geemenr•PMX 2017\3mentIment ft 1\Lmil I4.8w1Rost R...ew\.1C 17-134 CCA iupplem.m
Vu 38 2 2018-final Jots
Parametrix Exhibit "A-3"
ENGINEERING PLANNING ENVIRONMENTAL SCIENCES
SCOPE OF WORK
City of Federal Way
City Center Access Project
Amendment 3
PROJECT UNDERSTANDING
The City Center Access Project proposes to modify an existing or build a new interchange in Federal Way on
Interstate 5 (1-5). Parametrix is under contract to complete the IJR, Environmental Documentation, and
Preliminary Engineering.
This amendment addresses the following changes in project assumptions.
• The original scope of work assumed two interchange build alternatives would be developed, analyzed and
evaluated.WSDOT and FHWA are requiring a review of local only improvements prior to analyzing
interchange modifications. If the Local only improvement alternative does not meet the Need,additional
interchange alternatives may be reviewed.
This amendment addresses additional work identified to complete the analysis and evaluation of the local only
solutions, including:
• Updates to the Project Management Plan including schedule revisions,deliverables tracking, budget
tracking, purpose and need revisions.
• Additional Study Support Team meetings,WSDOT Traffic meetings and Project Management Team
Meetings(PMT) and team charter updates.
• Travel demand model and turn movement forecasts for a true no-build alternative.
• Travel forecasts,operations analysis and evaluation of Local Only Solution elements.
• Additional outreach required for this effort is not included and, if needed, will be requested when
identified.
Task 16. 5 Project Management Plan Additional
The Consultant shall update the Project Management Plan based on the changes including schedule revisions,
deliverables tracking, budget tracking and invoicing, purpose and need revision.
Assumptions
• Approximately 18 months of additional project time are considered for project management and
invoicing.
Deliverables
• Revised Schedule updates.
• Invoices and progress reports.
City of Federal Way
City Center Access Project 1 July,2018
SCOPE OF WORK(continued)
Exhibit "A-3"
• Purpose and need updated.
Task 16.6 Study Support Team Meetings -Additional
The Consultant shall coordinate and participate in additional Study Support Team meetings,WSDOT Traffic
meetings and PMT meetings to work through the development of the Local Only option elements,solutions,
evaluation criteria, qualitative and quantitative analysis, and evaluation.Team charter updates will be required
through the process.
Assumptions
• Three additional Study Support Team meetings.
• Four additional PMT meetings,two in person and two via Skype or similar.
• Eight additional WSDOT Traffic Focused meetings, six by Skype and two in person meetings.
• Updates to the Team Charter will be ongoing.This Is a useful tool regarding Study Support Team
members, roles and responsibilities, signed or not..
Deliverables
• Materials for IJR support team review.
• Agendas and meeting minutes.
• Team Charter updates.
Task 16.7 Travel Demand Modeling — Future No Build Model and Select Link Analysis
The Consultant will provide travel demand modeling for the future no build option to supplement the future local
improvements option previously completed that replaced the future no build modeling option in task 5.3.The
2040 travel demand will be updated to reflect the no build condition within the study area.
• The future no build roadway network will be adjusted as agreed upon with the City.
• The future no build transit will be updated to reflect the changes made to the updated the recent
PSRC Regional Transportation Plan (RTP) update 4.01K.Transit coding will only be updated within
the study area.
• The future no build model will assume the same land use that was agreed upon with the City for the
use of the future local improvements travel demand model. No changes to land use are assumed
within this task.
• Traffic forecasts in the form of turn movements, ramp, and 1-5 mainline traffic volumes will be
developed for the No Build for the AM and PM peak hours. Daily traffic volumes will be developed
for the freeway mainline and ramps and key locations along the arterials.This will be consistent with
methodology developed in task 6.2.
• Perform up to three OD analyses, each based on a Select Link analysis of one bi-directional link.The
analysis will be conducted for the PM peak period only in Federal Way's Base Year and Future No
City of Federal Way August 2018
City Center Access Project 2
SCOPE OF WORK (continued)
Exhibit "A-3"
Build models. Maps will be created to show the number of Origins for each zone within Federal Way
and the number of Destinations for each zone within Federal Way for both Base Year and Future No
Build.
• Include findings in technical memorandum included in Task 5.
Assumptions
• Updates to the travel demand technical memorandum are included in Task 5.
• Select Link analyses will be conducted using Federal Way's Updated Base Year and Future No Build
models.
• Select Link analyses will be conducted for a bi-directional link for PM period only.
Deliverables
• True No Build traffic demand modeling and forecasts
• Origin-Destination maps by zone(12).
Task 16.8 Evaluation of Local Only Solutions
The Consultant shall conduct operational analysis for existing and future year for local only solutions identified in
coordination with the Study Support Team.This will include:
• Hand redistribution of volumes and Synchro or SimTraffic analysis of up to 12 local only solution
elements.Solutions may include elements such as dedicated HOV/Transit lanes, impact of removing or
reducing pedestrian crossing times, prohibited left turns,or other changes in channelization or
intersection control.The analysis may include reporting queue, delay, LOS,or v/c ratios.
• SimTraffic videos for up to two options.
• A qualitative evaluation of up to 12 non-motorized improvements including pedestrian/bicycle Level of
Traffic Stress factor, if applicable.
• A quantitative evaluation of transit delay at study intersections within the study area for up to four
solution elements.
• An update to the Methods and Assumptions memo to document the evaluation process.
Deliverables
• Synchro or SimTraffic files.
City of Federal Way August 2018
City Center Access Project 3
Exhibit D-3
Actuals Not to Exceed Table(ANTE)
Paramolrtx,Inc.
1019 39th Avenue NE,Suite 100
Puyallup.WA 98314
Overhead Fixed Fcc All Inclusive Dourly
Job ClasslRcatlons Dlrect Labor 181.48% 30.00% Billing Rate
NTE NTE NTE Nil
AdmmAssistant 21.60 39,211 6.48 67,28
Butiness Mgr 48.08 87.26 14.42 149.76
CA DI)Operator l 23.00 41.74 6,90 71.64
CARD Operator 11 26.00 47.18 7.80 00.98
CADD Operator Ill 38.00 68.96 11.40 11836
G1DD Services Manager 55.29 10034 16.59 172.22
Chief Operative Officer 1 112,79 204.69 33.84 35132
Communications Specialist 25.00 4537 7.50 77.87
Community Budding Division Manager 78.46 14239 2354 244.39
C'ousuuclion Manager I 55.00 99.81 16.50 17131
Cultural Resource Specialist I 22.00 39.93 6.60 6853
Cultural Resource Specialist Il 26.27 47.67 7.88 81.83
Cultural Resource Specialist[[I 2539 46.08 7.62 79.08
Cultural Resources Specialist IV 33.00 59.89 9.90 102,79
Designer I 32.25 583.3 9.68 100,45
Designer fI 32.511 50.98 9,75 10113
Designer III 39.30 71.32 11.79 122.41
Designee IV 49.63 90.07 14.39 15459
Dir.of Risk Management 99.97 181.43 29.99 31139
Electrical Dcsi nrr II 4058 73.64 12.17 126.40
Electrical Designer III 40.96 74.33 12.29 127.58
Electrical Designer IV 47.83 86.80 14.35 148.98
Electrical Engineer II 3730 67.69 11.19 116.18
Element lingrnecr III 43.28 78.54 12.98 134.81
Electrical Engineer IV 60.10 109.07 18.03 187.20
Engineer I 33.65 61.07 10.10 104.81
Engineer II 37.00 67.15 11.10 115.25
Ene iect III 41133 87.71 14.511 150154
Engineer IV 52.37 95.04 15.71 163.12
Environmental Tech I 30.011 54.44 9.00 93.44
EP&C Division&tanager 69.71 12651 20.91 217.13
Finance Assistant .4. 20.00 36.30 6.00 62.30
GIS Analyst 3030 54.99 9.09 94.38
GIS Technician 29.07 52.76 8.72 90.55
Nyiliogcologisl[11 37.21 67.53 11.16 115.90
Inspector 40,00 7259 12.110 124.59
IT Manager 67.50 122.50 20.25 210.25
Ir Engineer 20.00 3630 6,00 6230
Marketing Coordinator 26.44 4798 7,93 8236
Offlee.Administrator 25.49 46.26 7.65 79.40
t)permtions,sianager 93.03 168.83 27.91 289.77
Owner's Representative 87.01 157.91 26.10 271.02
Planner 1 29.81 04.111 8.94 92.85
Planner II 38.00 68.96 11.40 118.36
Planner t❑ 41.23 74.82 12.37 128.42
Planner IV 46.90 115.11 14.07 146.08
Ti,mural t'onsn0unt 120.00 217.78 36.110 373.78
Protect Accountant 27.95 50.72 8,39 87.06
Project Controls Specialist 36.44 66.13 10.93 113.50
Propel Coordinator 27.00 49.00 8.10 84.10
Pro)))pel Delivery Officer 75.00 136.11 22.50 233.61
Publications Specialist II 26.13 47.42 7.84 8139
PuhlrcuUo1M Supervisor 38.42 69.72 11.53 119.67
Resident Engineer 43.04 78,11 12.91 134.06
Scientist I 28.56 51.83 11.57 88.96
Scientist II 26.68 48.42 8.00 83.10
Sciemis III 50,00 90.74 15.00 155.74
Scicnlist 1V 49.00 88.93 14.70 152.63
Sr Admin Assistant 25.00 4537 7.50 77.87
Sr Conslru.hon Mgr 85.00 154.26 25.50 264.76
Sr Consultant 160.00 290.37 48.00 498.37
Sr Contract Administrator 42.45 77.04 12.74 132.22
Sr Cultural Resource Specialist 40.00 72.59 12.00 124.59
Sr Designer 55.811 99,81 16.511 17131
Sr Electrical Designer 57.68 104.68 1730 179.66
SrBleetts:al Enguteer 7211 131.05 21.66 224.92
Sr Fnginccr 95.00 172.41 28.50 295.91
Sr Graph,e,Designer 36.85 66.88 11.06 114.78
Sr IIydm Ivo logrsr 61.41 111.45 18.42 191.28
Sr Inspector 60.00 108.89 18.00 186.89
Sr Markctj C oordinutor 45.00 81.67 13.50 140.17
Sr Planner 6535 118.60 10.61 20335
Sr Pro0.na Accuunlam 39.59 7155 11.88 12331
Sr Pinned C,mlnd Specialist 45.02 81.70 13.51 140.23 1
Exhibit D-3
I Overhead Fixed Fee All inclusive Hourly
Job Clusa111cntions Direct Labor I81.48.7/, 30.00% Billing Rate
NTE NTE NTE NTE
Sr Protect Coordinator 2938 53.68 8.87 92.14
Sr Publications Specialist 30.87 56.02 9.26 96.15
Sr Scientist 63.00 11433 18.90 196.23
Sr Surveyor 41.90 76.04 12.57 130.51
Sr Systema Administrator 50.75 92.10 15.23 158.08
SrTern Aide 25.00 4537 7.50 77.87
Sr Vice President 11538 209.39 34.61 35939
Survey Supervisor 60.57 109.92 18.17 18846
Surveyor 1 24.96 45-10 7.49 77.75
Surveyor I1 33.00 59.89 9.90 102.79
Surveyor III .12.11(1 76.22 1240 1311.82
recti Arde 24.00 43.56 7.20 74.76
Technical Editor 3627 65.02 10.88 112.97
Teclusical Lead 43,02 78.07 12.91 I34.00
UAV I'ilol 50.00 90.74 15.00 155.74
Vice President 93 50 169.68 28.05 291.23
Water Solutions Div higr 7938 144.42 23.87 247.88
z
E
E
5
$ R #11. 81$1
I
II
3
:wii: :ii
11.1
11 1I '',1.';im;li i
44 4i
S 8 11111111
M i 1"':5 4
s
�
I
3�i
I I
I
13
Ii1
82-4! I i '8
11 ' .-
40.
V
o I z a
T.-, aa`
R
i
1
3
E
R
E
3
8. - oI n f Y
1
��nv�ir. �a.Aisa0�l400i.�. s '
c
41
�..><I✓y ItlflJrllellll inew4
o l
l
Al
41
,.w.b,. 2
i
111"I iiiomiiiii `"
wax.4�ru1. 4 lin11111 n.. IIIOHOIIII a 1 a
h
m000� immi II �x
:1
k a Y
. .-._ 7:::- ;111 1
. -LI
,...0..., _I '
upr.w>.n,.,,..100111H1 Oil lIiIHhl .0 X
un"e.4ue.' .. iiii:io iiiuiuuiii 118
MI --- 11111 III IIIIIIII 1 I iM11IDlHihili151
10 { ....:11 5...in p i1, 1 - i a -I i
4, 1
a1 :11 :i
i ',:' ii :
lt
ll
ll II
Qat a � ��E�ñT
S ' �tc �
ii g 1 T I 1
tii I ] 11111N11111111 11
2
Ur-
0
)
t
C
� )
*08 #
_oD_!. • a
z21038 8
' a
~ n •a
!
^! ■®
■ %
§5ikst
a
\ a
)
■
/ -g %
}|
X �
• } \
}$
k
!!f«
X |}2,
,|!!C
ro / / {)k
f ih1
kfS �
7 ) § ; ;,
ƒ/ ° I -
/
\ \a | �
Exhibit"E-3"
6/26/2018
DKS Associates
719 2nd Ave,Suit*1250
Seattle,WA 98104
I I I I I I I
I I I T I I I I
Rates Effective 1 July 2017-30 June 2019
Overhead(ICRI Fixed Fee All inclusive Hourly
Job Direct Labor Rates 175.54% 30.00% Sit Orly Rate
Classifications Min Max Min Max Min Max Min Max
7-Principal $ 71.40 $ 99.91 $ 125.34 $ 175.38 $ 21.42 $ 29.97 $ 218.16 $ 305 27
8-Senior Project Manager $ 61.51 $ 81,10 $ 107.97 $ 142.35 $ 18.45 $ 24.33 $ 187.94 $ 247 78
5-Project Manager $ 52 18 $ 71 11 $ 91 60 $ 124.83 $ 15.65 $ 21.33 $ 159.43 $ 217 28
4- Engineer $ 42.84 $ 57.59 $ 75 20 $ 101.09 $ 12.85 $ 17 28 5 130.69 5 175 95
3-Associate Engineer $ 36.25 $ 48.19 $ 63.63 $ 84.60 $ 10,88 $ 14.46 $ 110.76 $ 14725
2-Assistant Engineer $ 31.86 $ 39.96 $ 55.93 $ 70.15 $ 9.56 $ 11.99 $ 97 35 $ 122 11
1-Entry $ 29.11 $ 32.91 $ 51.10 $ 57.78 $ 8.73 $ 9.87 $ 88.94 $ 100.56
Intern $ 19.22 $ 26.45 $ 33.74 $ 46.43 $ 5.77 $ 794 $ 58,72 5 8082
CAD Operator $ 22.00 $ 44.94 $ 38.82 $ 78.89 $ 6.60 $ 13.48 $ 67 22 $ 137.31
Graphics Designer $ 20.00 $ 42.80 $ 35.11 $ 75.13 $ 6.00 $ 12,84 $ 61.11 $ 130,77
Administrative 5 18.00 $ 37.45 $ 31 60 $ 65,74 $ 5.40 $ 11,24 $ 55.00 $ 114.42
Exhibit"E-3"
2017 ACTUALS NOT TO EXCEED TABLE(ANTE)
Y-11310
Historical Research Associates,Inc,
PO Box 7086
Missoula MT 59807-7086
All Inclusive Hourly
Job Direct Labor Rate Overhead 152.33% Fixed Fee 30% Billing Rate
Classifications NTE NTE NTE NTE
Senior Archaeologist $40.50 $61.69 $12.15 $114.34
Senior Historian $40.52 $61.72 $12.16 $114.40
Architectural Historian $30.90 $47.07 $9.27 $87.24
Project Archaeologist $30.67 $46.72 $9.20 $86.59
Project Historian $30 56 $46.55 $9.17 $86.28
Research Archaeologist $25.74 $39.21 $7.72 $72.67
Research Historian $22.83 $34.78 $6.85 $64.46
Production Specialist $29.58 $45.06 $8.87 $83.51
Editor/Production Assistant $24.88 $37.90 $7.46 $70.24
Project Administrator $27.38 $41.71 $8.21 $77.30
Computer Systems Specialist $36.88 $56.18 $11.06 $104.12
Exhibit"E-3"
Y-11891
On Call Communications and Public Involvement
Actuals Not to Exceed Rate Table
PRR, Inc
2017-2018
Job Classifications Direct Labor Overhead Fee(Profit) All Inclusive Hourly
Rate 165.00% 30% Billing Rate
NTE NTE NTE NTE
Chief Executive Officer $ 93.22 $ 153.81 $ 27.97 $ 275.00
Consultant I $ 26.48 $ 43.69 $ 7.94 $ 78.11
Consultant II $ 40.01 $ 66.02 $ 12.00 $ 118.03
Director $ 84.00 $ 138.60 $ 25.20 $ 247.80
Junior Administrator $ 24.24 $ 40.00 $ 7.27 $ 71.51
Manager $ 52.64 $ 86.86 $ 15.79 $ 155.29
Senior Administrator $ 35.00 $ 57.75 $ 10.50 $ 103.25
Senior Consultant $ 59.32 $ 97.88 $ 17.80 $ 175.00
Senior Director $ 93.22 $ 153.81 $ 27.97 $ 275.00
Vice President $ 93.22 $ 153.81 $ 27.97 $ 275.00
Intern $ 20.00 $ 33.00 $ 6.00 $ 59.00
Exhibit"E•3"
ACTUALS NOT TO EXCEED TABLE(ANTE)
City of Federal Way
City Center Access Project(#16-0760)
SHANNON&WILSON,INC.
.i ploted Mortimer!x,u.•
Classification Class Code Direct Overhead Fee Billing Rate
Salary Cost 192.131%DSC 30%DSC Range
NTE NTE NTE NTE
Sr.Vice President/President 127/T28/129 $86.82 $166.81 $26.05 $279.67
T4
Vice President 125 $73.43 $141.08 $22.03 $236.54
Sr.Associate/Associate T22 I T23/T24 $61.78 $118.70 $18.53 $199.01
Sr.Professional II/Ill T19 i 120 $46.59 $89 51 $13.98 5150.08
Senior Professional I 118 $36.30 $69.74 $10.89 $116.93
Professionallll/IV 716/717 $41.77 $80.25 $12.53 $134.55
Professional MI 114/115 $23.02 $44.23 $6.91 $74.15
Senior Drafter/Technician 517/519 $47.29 $90.86 $14.19 $152.34
Drafter/Technician_ S09/510/511 1 513/515 $25.04 $48.11 $7.51 $80.66
Administration A15/A17/A19 $38.62 $70.36 $10.99 $117.96
Clerical A07/A09/At0/A11/A13 $27,91 $53.62 $8.37 $89.91
Invoiced costs may not exceed the NTE rate per classification
Billing Multiplier = 1.0 x direct salary cost+1.92131 x direct salary cost+0.3 x direct salary cost=3.22131 x direct salary cost
Federal Way 616-0760_85W Page 1 of 1 8/26/2018
x
1
0
0
0
0
V
1
8,
6
ft
5
s
h4Uen3v$ io)eipslulwpo m
loop. n o 8
o 2
a1 wok Jaauiaux m
C.§ +4
1ue)sos V r w M r.7 m 7 N $w
,e111W eueyol(f, 1aau09u)e
My./JoluaS
r r m r nr rr X
N
I .
uosuiy»ep OOeueyl Ise}8
p.0111 9uroau19u7 rn E
'dei) c o
u d C2 al
g ::::::::
' 4
ilPRr
3 l
2
c
I
x i
2 t
a .
gg $ s
3
S r 3 1
L° aY
o p 9
LL d
F V o ,
U Z
a S o
V a a0.
RETURN TO: PW ADMIN EXT: 2700 ID#: .3 2.0
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIV: PUBLIC WORKS/STREETS
ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:RUSH
L. TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT o MAINTENANCE AGREEMENT
o GOODS AND SERVICE AGREEMENT o HUMAN SERVICES/CDBG
o REAL ESTATE DOCUMENT o SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
o ORDINANCE o RESOLUTION
[-CONTRACT AMENDMENT(AG#):17-134 ❑ INTERLOCAL
VOTHER SUPPLEMENT NO.2
G. PROJECT NAME:CITY CENTER ACCESS
;. NAME OF CONTRACTOR:PARAMETRIX,INC
ADDRESS:719 2ND AVENUE SUITE 200,SEATTLE, WA 98104 TELEPHONE(206)394-3664
E-MAIL:SGLOVER@PARAMETRIX.COM FAx:(855)542-6353
SIGNATURE NAME:JEFFREY PEACOCK TITLE:CHIEF EXECUTIVE OFFICER
1. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES o COMPENSATION o INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#90 101843 000 00 BL,EXP. 12/31/19 UBI#600 135 349 ,EXP.q t /19
'. TERM: COMMENCEMENT DATE:AUGUST 23, 2017 COMPLETION DATE:DECEMBER 30,2018
TOTAL COMPENSATION:$2,334,082.75(UNCHANGED) (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $60,534.61 (UNCHANGED)
IS SALES TAX OWED: o YES ❑NO IF YES,$ PAID BY: o CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
o PURCHASING: PLEASE CHARGE To:
P. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED
PROJECT MANAGER (: � {-2G -/cs-
0,15IVISION MANAGER
.VT)EPUTY DIRECTOR it-71)42
- ZQ
DIRECTOR 1 ua I I g
o RISK MANAGEMENT (IF APPLICABLE)
1AW DEPT G/ (.{46/I$
0. COUNCIL APPROVAL(IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING /- ' -^ f )
27ItA ��
i..,SENTTO VENDOR/CONTRACTOR DATE SENT: C DATE REC'D: J •r-
❑ A TACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
o CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑I FINANCE DEPARTMENT
I LAW DEPT efa9r:
SIGNATOR' iviti r v
o CITY CLERK LJ�f1110Trilk `
Ass IGNED AG# AG• .-' SN'
An
a%
COPY RETURNED DATE SENT: r
❑RETURN ONE ORIGINAL
2OMMENTS:
EXECUTE"2"ORIGINALS.THIS SUPPLEMENT AUTHORIZES ADDITIONAL SERVICES UNDER THE MANAGEMENT RESERVE OF THE ORIGINAL
:ONTRACT.THEREFORE,THERE IS NO CHANGE TO THE TOTAL COMPENSATION OF THE CONTRACT UNDER THIS SUPPLEMENT.THIS SUPPLEMENT
IMPLY AUTHORIZES THE WORK AND FUNDS TO BE PAID UNDER MANAGEMENT RESERVE OF THE ORIGINAL CONTRACT.
4/2017
SUPPLEMENT NO. 2
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc. effective the 23rd day of August 2017, identified as
Agreement No. 17-134 as supplemented by Supplement No. 1 dated January 18, 2018.
All provisions in the Agreement remain in effect except as expressly modified by this
supplement, "Supplement No. 2."
The changes to the Agreement are described as follows:
Section II, Scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-2" attached hereto and incorporated by this
reference(Additional Services).
II
Section V, Payment,the maximum amount payable under this Supplement No. 2 inclusive of
all fees and other costs is Twenty-Three Thousand Four Hundred Six and 26/100 Dollars
($23,406.26) for a total amount payable to the Consultant pursuant to the Agreement,
Supplement No. 1 and this Supplement No. 2, inclusive of all fees and other costs, to be an
amount not to exceed Two Million Three Hundred Thirty-Four Thousand Eighty-Two and
75/100 Dollars($2,334,082.75). The attached Exhibit"D-2,"which describes the payment for
work to be performed under this Supplement No. 2, is hereby made a part of the
Supplemental Agreement.
Signed this 0 day of S , 2018.
PARAMETRIX, INC.: CITY OF FEDERAL WAY:
By: By:
/rev 'eacock
fm Ferrell
Its: Chief Executive Officer Its: Mayor
719 2nd Avenue, Suite 200 33325 8th Ave S
Seattle,WA 98104 Federal Way, WA 98003
(206)394-3664 (253) 835-2401
APPROVED AS TO FO'
O "Air
lie ;%7
le J. Ryan Call, City Attorney
K:\TRAFFIC\Grants&Projects\ProjectslCity Center Access\2017\Consultant Agreement-PMX 2017\Amendment#2VAG 17-134 CCA Supplement No 2.docx
Parar»etrx EXHIBIT"A-2"
ENGINEERING PLANNING:ENVIRONMENTAL SCIENCES
ainv :511/111/1111//411111111111111111111=
SCOPE OF WORK
City of Federal Way
City Center Access Project
PROJECT UNDERSTANDING
The City Center Access Project proposes to modify an existing or build a new interchange in Federal Way on
Interstate 5 (1-5). Parametrix is under contract to complete the UR, Environmental Documentation and
Preliminary Engineering.
This amendment addresses the following changes in project assumptions.
• Original scope assumed previous alternative development and screening which resulted in two
interchange alternatives in the S 320th Street vicinity, would be adopted.Amendment 1 added effort to
validate previous alternatives screening process and additional travel demand model analyses.
This amendment addresses additional work identified to date which includes:
• SimTraffic operational analyses and documentation needed to communicate the City Center development
plans, project need, and preliminary travel demand model analyses of interchange modifications.
Task 16 — Management Reserve Fee
Task 16. 3 SimTraffic
The Consultant shall develop a SimTraffic model for the existing and year 2045 Local Improvements Option for
use in establishing the project purpose and need and developing the range of alternatives.
Assumptions
•
• The limits of the SimTraffic model will include S 320th Street from Pacific Highway to Military Road.The
model will include the following intersections:
• S 320th Street/Pacific Highway
• S 320th Street/20th Avenue S
r S 320th Street/23rd Avenue S
• S 320th Street/25th Avenue S
• I/5 Southbound Ramps/S 320th Street
• 1/5 Northbound Ramps/S 320th Street
• S 320th Street/Weyerhaeuser Way S
• S 320th Street/Military Road S
City of Federal Way
City Center Access Project 1 April 18,2018
SCOPE OF WORK (continued)
• The SimTraffic model will be developed from the Synchro model and will be calibrated based on the
following model parameters compared to field data:
> Queues(compared to field with observations during or as indicated by the City)
• Vehicle throughput(compared to count data)
• The model will represent a single hour and be calibrated to existing PM peak hour conditions.
• The analysis will include Existing conditions and the year 2045 Local Improvements Option.The 2045
Local Improvements Option will be consistent with the alternative presented in the March 2018 Study
Support Team meeting.
• Output for the two scenarios modeled include:
> Queues for intersection approaches including on the interstate off ramps
A Volume throughput at three screenlines along S 320th
• Video
• The calibration methodology will be documented in a technical memorandum.
Deliverables
• Calibration Technical Memorandum
• Videos
Task 16.4 Project Need and Preliminary Findings Technical Memorandum
The Consultant shall prepare a technical memorandum describing the project need and preliminary modified
access findings,for use in discussions with decision makers and WSDOT, FHWA, and other agencies.
Assumptions
• Existing data and preliminary travel demand modeling analysis available from Tasks 5 and 6 of the original
scope will be utilized.
• Planning level forecasts will be developed for a sensitivity analysis scenario using the travel demand
model.The scenario includes modified access at the S 324th Street interchange and will be in addition to
improvements in the Local Improvements Option (consistent with the alternative presented in the March
2018 Study Support Team meeting.Volume plots will be produced comparing the sensitivity analysis
scenario to the Local Improvements Option only scenario. The City will review the forecast volume prior
to starting the analysis.
• A technical memorandum will be developed which may include the following:
> Description of documented City Center Core future land use per the City of Federal Way
Comprehensive Plan and PSRC
• Description of project history
• Description of changes in the Regional system since the previous study.This includes elements such
as LRT to Tacoma, Metro Connects, and changes to the PSRC travel demand modeling process.
City of Federal Way April 18,2018
City Center Access Project 2
•
SCOPE OF WORK(continued)
✓ Description of changes in the Federal Way transportation system to support the land use changes in
the City Center Core.This includes updates to plans or actions.
• Description of project need, including current and future traffic conditions based on updated travel
demand modeling, existing data collected, and the SimTraffic analysis.
• Description of changes in traffic volumes with modified interchange access.
Deliverables
• Draft and Final Project Need and Preliminary Findings Technical Memorandum
City of Federal Way April 18,2018
City Center Access Project 3
Ayi...lej3W JoleJlsiulwpy N c c $
Asla9 fri n
00
al woJ JaaUISu3 d 0
op
lUelS!Ssy mo g
.-1
IlaulveV1 peLD Jaau0U3 a c S
13a[old ‘,C..vex
a l wol Jaaul,u3�v 2 9 2 2
luelSlssy mo .
ri
Y1
Jam euelutM Jaaul8u3 8 N N N
3eiiliioluag al,
°,
uosuly3lnil iageuew>lsel N N N 03
00
p.ieyply 8ulaaau!Su3 c Na
R
o
C =
01 ap
'' d J
O I? pp
obi O. cTi,+
m c m
m m m +Qh n' 1,4 m
m
= c 00 00
.-i •ri ri
w u of ut
L
0
a
9
E
0
c
0
E
a
2
a
c
c g
tr. m
A
e W
tu A
ani i 9
O c
o- CO c l EN
T N —J F u..z & u
To Q C o 'vEE a ~ c,
CJ 4J to ni V: eV:
C
i0 U3
O t 1
D
go
u U Z to
v
c a WO Siw
Np' `q d
V a C'i.
,eflco0 HAS. 1u8031e*.P.L ga e e 8
SP1/10q1 ueW III+aau0,01$ $,S r $S.
i
asmo,da1 uehy ,aauli1u3.4: 'g m f V$
""
wimp Apu) lsilet'adS g G ' 0 p
Mo 4UOD pa(ad m 2
Vi
hallex'N le4luuat ,auuetd,5 o4 o e
a
auHIO'a uane;5 aaaultk,3 A N c °$
a
9I113 uu11) Al,aeeele t,e, gt A AIR
4
zalezuO'I elsa,3 ,auue{d,i m v?g A$
2
In Ir.0
C ,anoig e,puexaN ,aaugliu3,5 A 2 2 2 ,m'7,
1
olpad'N u4.1 luaplsa,d.IA,S ti ur no", m 4,
vR
red'
o f
II
1i'
I
P
1jj ilei I
• d n II 3
vv2
t
G 4 N
?1 O O it i
u a` a`
&+eDo q ,p7@9& rn. 0 \ 0 8
mW2
oo
ewJ Jaaupu3 0 0
w § : a
m@mwpw mum/q ° ° 8
wd& a
m_I JaawBug 1731 « gip R
wels my$ §
K
qiw me m Jaaw9u3 ~ �es'
AEJI qua § *
®mpq eue�>Is sew
a `~2 & 14
m®@> &9&43d k
Disyeii ® a
gse - s
0ei » �
-0 o
Ili i ) » /
a rƒ77 .4 m
( •20 c ■
x 0/©:' /
3 . \
E
MI
C
o
d <»
Ii
t c a
of 0
Ru ' £� » t
TO
I- 2 k ƒƒ\ 2
/ C 0 °�
0 kVI
« / $U . . >.
c » 2■
a o fp
Q
1
RETURN TO: PW ADMIN EXT: 2700 ID #:
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIV: PUBLIC WORKS / STREETS
ORIGINATING STAFF PERSON: NAVEEN CHANDRA
TYPE OF DOCUMENT (CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT (E.G., RFB, RFP, RFQ)
o PUBLIC WORKS CONTRACT
o PROFESSIONAL SERVICE AGREEMENT
o GOODS AND SERVICE AGREEMENT
❑ REAL ESTATE DOCUMENT
o ORDINANCE
O"CONTRACT AMENDMENT (AG#):17-134
OTHER SUPPLEMENT NO. 1
ExT: 2729 3. DATE REQ. BY:RUSH
o SMALL OR LIMITED PUBLIC WORKS CONTRACT
o MAINTENANCE AGREEMENT
❑ HUMAN SERVICES / CDBG
o SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS)
o RESOLUTION
❑ INTERLOCAL
I. PROJECT NAME: CITY CENTER ACCESS
;. NAME OF CONTRACTOR: PARAMETRIX, INC
1.
ADDRESS: 719 2ND AVENUE SUITE 200, SEATTLE, WA 98104
E-MAIL: S G LO V ER@PARAMETRIX.COM
SIGNATURE NAME:
TELEPHONE(206)394-3664
FAx:(855) 542-6353
TITLE:
EXHIBITS AND ATTACHMENTS: o SCOPE, WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/ ENDMENTS
UBI # 600 135 349 , EXP. '/3D l( $
CFW LICENSE #90 101843 000 00 BL, EXP. 12/31/17
TERM: COMMENCEMENT DATE: 'Au Ll.S t 23, 2011 COMPLETION DATE: DECEMBER 30, 2018
t 1C)'''
TOTAL COMPENSATION: $2,334, 5101 CHANGED)
❑ ALL OTHER
(INCLUDE EXPENSES AND SALES TAX, IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE - ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: 0 YES 0 NO IF YES, MAXIMUM DOLLAR AMOUNT: $61,14 (UNCHANGED)
IS SALES TAX OWED: ❑ YES 0 NO IF YES, $ CP 15.' ' •' J PAID BY: 0 CONTRACTOR ❑ CITY
RETAINAGE: RETAINAGE AMOUNT: ❑ RETAINAGE AGREEMENT (SEE CONTRACT) OR ❑ RETAINAGE BOND PROVIDED
o PURCHASING: PLEASE CHARGE To:
DOCUMENT / CONTRACT REVIEW
Et/PROJECT MANAGER
p'DIVISION MANAGER
i 4iEPUTY DIRECTOR
c�BIRECTOR
o RISK MANAGEMENT (IF APPLICABLE)
,AW DEPT
0. COUNCIL APPROVAL (IF APPLICABLE)
INITIAL / DATE REVIEWED INITIAL / DATE APPROVED
NL I (2-27-1+
k/3/IS
COMMITTEE APPROVAL DATE:
COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING -' ' `}
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: (1.7 �1 DATE REC'D: 1 1 W t
o ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE, LI ENSES, EXHIBITS
o CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT. SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
.._o. -F -1:14A NCE -DEPARTMENT
ii-Q)LAWDEPT
SIGNATORY (MAYOR OR
CITY CLERK
INITIAL / DATE SIGNED
X ASSIGNED AG # AG#
A SIGNED COPY RETURNED DATE SENT:
❑ RETURN ONE ORIGINAL
:OMMENTS: I y� %(.kap1c --- / w
XECUTE " 2 " ORIGINALS. THIS SUPPLEMENT AUTHORIZES ADDITIONAL SER ICES UNDER THE MANAGEMENT RESERVE OF THE ORIGINAL
:ONTRACT. THEREFORE, THERE IS NO CHANGE TO THE TOTAL COMPENSATION OF THE CONTRACT UNDER THIS SUPPLEMENT. THIS SUPPLEMENT
IMPLY AUTHORIZES THE WORK AND War BEP D UNDER MANAGEMENT RESERVE OF THE ORIGINAL CONTRACT.
kktlyr (move,
Aft
4/2017
SUPPLEMENT NO. 1
CITY OF FEDERAL WAY
LOCAL AGENCY STANDARD CONSULTANT AGREEMENT
FOR
CITY CENTER ACCESS PROJECT
DESIGN SERVICES
The local agency of the City of Federal Way desires to supplement the agreement
entered into with Parametrix, Inc effective the 23rd day of August 2017, identified as
Agreement No. 17-134. All provisions in the Agreement remain in effect except as
expressly modified by this supplement, "Supplement No. 1."
The changes to the Agreement are described as follows:
Section II, Scope of Services, shall be amended to include those additional services
more particularly described in Exhibit "A-1" attached hereto and incorporated by this
reference (Additional Services).
II
Section V, Payment, the maximum amount payable under this Supplement No. 1 inclusive of
all fees and other costs is Sixty -Seven Thousand Five Hundred Seven and 28/100 Dollars
($67,507.28) for a total amount payable to the Consultant pursuant to the Agreement, and
this Supplement No. 1, inclusive of all fees and other costs, to be an amount not to exceed
Two Million Three Hundred Thirty -Four Thousand Eighty -Two and 75/100 Dollars
($2,334,082.75). The attached Exhibit "D-1," which describes the payment for work to be
performed under this Supplement No. 1, is hereby made a part of the Supplemental
Agreement.
Signed this/ day of-j;;7i.: , 2018.
PARAMETRIX, INC
By:
y cock,
Its:
Chief Executive Officer
719 2nd Avenue, Suite 200
Seattle, WA 98104
(206) 394-3664
CITY OF FEDERAL WAY
By:
rm Ferrell
Its: Mayor
33325 8t Ave S
Federal Way, WA 98003
(253) 835-2401
APPROVED AS TO ORM.
4)/J. Ryan CaII, City Attorney
K:TRAFFIC\Grants & Projects \Projects\City Center Access\2017\Consultant Agreement -PMX 2017\Amendment # 1\AG 17-134 CCA Supplement No 1 -Legal
2 docx
Parametrix
ENGINEERING PLANNING . ENVIRONMENTAL SCIENCES
PROJECT UNDERSTANDING
EXHIBIT "A-1"
SCOPE OF WORK
City of Federal Way
City Center Access Project
The City Center Access Project proposes to modify an existing or build a new interchange in Federal Way on
Interstate 5 (1-5). Parametrix is under contract to complete the IJR,. Environmental Documentation and
Preliminary Engineering.
This amendment addresses the following changes in project assumptions.
• Original scope assumed previous alternative development and screening which resulted in two
interchange alternatives in the S 320th Street vicinity, would be adopted.
This amendment addresses additional work identified to date which includes:
• Additional re-initiation effort to support the IJR team understanding of the project area issues and need,
• Develop additional alternatives and review or revise screening criteria, and
• Complete a qualitative screening analysis of additional interchange locations.
Task 16 — Management Reserve Fee
Task 16.1 Validation of Previous Alternatives Screening Process
The original contract scope assumed that two build alternatives (modified interchanges with improvements at
312th and 324th) would be adopted by the IJR team based on the previous work conducted from 2004 — 2009,
and sub designs identified at those locations would be identified in design workshops, then evaluated and
screened.
Per discussion at the IJR kickoff meeting, additional review, alternatives identification, screening, evaluation
and presentation will be required to verify what will be studied in the NEPA Environmental Documentation.
Added work includes:
• Develop a methodology to validate and update past alternatives screening. The revised methodology will
incorporate WSDOT's Practical Solutions requirements into the Purpose and Need, and alternatives
development and screening.
• Prepare materials which depict the project study area issues and need. These may include:
• Depict planned city growth (short and long term) and land use zoning.
• Summarize/depict origin and destination information as produced from the travel demand model
(see Task 5) and existing count data.
• Summarize horizon year traffic operations issues (based on previous work).
City of Federal Way
City Center Access Project 1 August 15, 2017
SCOPE OF WORK (continued)
• Prepare a comparison of the prior No Build alternative and the current 2045 No Build alternative
forecasts. This comparison may be used to validate previous quantitative traffic analysis used in the prior
alternatives development and screening. This comparison may also be used to validate the prior
screening of a local only improvement option.
• With the IJR team, identify additional alternatives to address Purpose and Need if it is determined with
the new data that the existing alternatives set is not complete to meet environmental and WSDOT
requirements.
• Develop evaluation criteria for mufti -level screening including identifying metrics and targets per
WSDOT's Practical Solutions approach.
• Conduct screening to identify two alternatives for further evaluation. It is assumed further evaluation will
be conducted per original scope of work.
• Prepare a technical memorandum to document the alternatives, evaluation and screening. This technical
memorandum will be incorporated into Policy Point 2 of the IJR.
Assumptions
• The result of this effort will be two build alternatives.
• Alternative screening criteria will be qualitative, or will rely on past quantitative data.
• No additional scenarios will be modeled with the travel demand model.
• Screening the local only improvements alternative will occur using past work and the comparison of the
past work No Build alternative forecasts and updated year 2045 No Build alternative forecasts.
Deliverables
• Alternatives development and screening technical memorandum in draft and final format.
Task 16.2 Travel Demand Model Forecasts
The Consultant shall use the existing Federal Way EMME models to conduct Select Link analyses for each on- and
off -ramp at the I -5/S 320th St Interchange. The analysis will be conducted for the PM period only in Federal Way's
2012 and 2040A models. Maps will be created to show the number of origins for each zone within Federal Way
for each on-ramp and the number of destinations for each zone within Federal Way for each off -ramp for the
Base Year and Horizon Year. A total of ten maps are planned.
Assumptions
• A Select Link analysis will be conducted in EMME for each of the five ramps at the I -5/S 320th Street
Interchange. This does not include the HOV direct access ramps at S 317th Street.
• Select Link analyses will be conducted for Base Year and Horizon Year using the existing Federal Way 2012
and 2040A EMME models.
The analysis will be conducted for the PM period only.
Deliverables
• Origin -Destination maps by zone (10)
City of Federal Way August 15, 2017
City Center Access Project 2
yd
V
0
`
f9 • QJ
_ V
Q O
D • - n
LI -
O V
Y v o
5 z
U V
C N 0J
O
u Q a
cc
4
C
f
0
0
x
3
3
F,
O
CO
Yl
N
OC
N
co
N
b
O
0
3
N
pP
N
ea.
Vl
G
N
N
N
M
x
8
3
h
0'
N
8
0
6
F
2
Indirect Expenses (milea
N
s
E
1
ag 17-134 CCA Exhibit 0-1; Summary
Exhibit "D-1'
Je(loog I!gAS
Jo1IP3 leD!uyDal
S
v>
N
o0
00
uingpoom •u uepy
ill Jaaupu3
ts,
vt
H
g
g
wno ApuD
asIIePadS
s!oJauoj PafoJd
(.4
m
an
0
Aal!eg 'y Ja}iuuaf
Jauueld JS
Cr,
rri
N
N
N
N
coN
9uA10 'd uana4S
JaauIHu3 Js
rj
N
N
i/1
201
Q
H!113 uuu3
Al Jauueld
ua
ai
+n
S
S
zalezuoo IN elsaJlJauueld
is
m
CO
H
N
N
Jano19 eipuexaly
laaupu3 JS
M
m
m
N
N
gi
m
N
D!lJad 'N uyor
auap!saJd aoIA JS
o
0
N
N
N
;?
;a
Parametrix Labor
Burdened Rates:
!Labor Hours
332
CO
N
m
K
tabor Dollars
NN
N
i
n
FA
N
rpKt
N
c
0
r
Management Reserve Fee
C
00
dR
i0
>
m
C
•C
y
d
Travel Demand Model Forecasts
01
lD
t0
Set
a
V)
00
0
CO
0
N
,0
N
m
Labor Totals:
$7,866.24 523,357.88
ag 17-134 CCA Exhibit D-1; PMX-Labor
Exhibit "0-1"
u
Ga
.0
ra
U
L.)
Ta Q co
w N 10
V .-- N
C
U-
4 -
1O u 1O
1-4O
• U
U
c N N
0 0
✓ a 0.
AgUeDaw
Aslag
aolealslulwpy
m
o
a -i wol
aaaul2u3
luelslssy
m
g
0
Ilaul1 eW peyD
.iaaul2u3
laafoJd
m
0
al wol
aaeul2u3
luelslssy
e70.
g
3
v
aallIW eueluiM
aaa4u3
a(}}eajaoluaS
.ti
f,..1
;21,
uosulyalnH
paeyala
Ja2eueyp lsel
2uuaaul8u3
awea j
g
N
N
N
Burdened Rates:
Labor Hours
N
o
N
8k
3
N
N
H
DKS Labor
.`28
i76
Li
C
Management Reserve Fee
Prev Alts Screening Validation
19
6
N
O
W
N
b
0
�p
f
Ef0
m
F
-N
..0
.i
40
ti
9
10
ti
0
0
0
a
a
N
CO
CO
44
0
0
44
0
0
44
S
44
3
som
0
N
N
400
a
an
ag 17-134 CCA Exhibit 0-1; DK5-Labor
m
m
/- 1 ®
A`WREP CERTIFICATE OF LIABILITY INSURANCE
DATE (MMIDDIYYYY)
10/19/2017
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Dealey, Renton & Associates
P. O. Box 12675
Oakland CA 94604-2675
CONTACT Alison Muller
NAME:
PHONEFAx 510-452-2193
(AIC_No (A/C. No:
_Fyn).510-465-3090
E-MAILDSS: Insurance.Certificates@dealeyrenton.com
INSURER(S) AFFORDING COVERAGE
NAIC #
INSURER A :National Fire Insurance Co of Hartford
20478
INSURED PARAMETRI
Parametrix, Inc.
1019 39th Ave. SE
Puyallup WA 98374-6502
INSURER B :Valley Forge Insurance Company
20508
INSURER C :Continental Insurance Company
35289
INSURER D :American Casualty Company of Reading PA
20427
INSURERE:XL Specialty Insurance Co.
37885
INSURER F :
•485609088
VISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
INSR
LTRINSD
TYPE OF INSURANCE
ADDL
SUBR
WVD
POLICY NUMBER
POLICY EFF
(MMIDDIYYYY)
POLICY EXP
(MMIDD/YYYY)
LIMITS
A
X
COMMERCIAL GENERAL UABIUTY
Y
Y
6050531366
11/1/2017
11/1/2018
EACH OCCURRENCE
$1,000,000
DAMAGE TO
PREMISES (EaENTED occurrence)
$1,000,000
CLAIMS -MADE
X
OCCUR
MED EXP (Any one person)
$10,000
X
WA Stop Gap/EL
PERSONAL Si AIN INJURY
$1,000,000
GENERAL AGGREGATE
$2,000,000
GEN'L
AGGREGATE
POUCY
OTHER:
LIMIT APPLIES
X JECOT
PER:
LOC
PRODUCTS - COMP/OP AGG
$2,000,000
WA Stop Gap
$1,000,000
B
AUTOMOBILE
X
LIABILITY
ANY AUTO
OWNED
AUTOS ONLY
HIRED
AUTOS ONLY
X
SCHEDULED
AUTOS
NON -OWNED
AUTOS ONLY
Y
Y
6050531352
11/1/2017
11/1/2018
COMFaBINaccident) SINGLE LIMIT
$1 000,000
BODILY INJURY (Per person)
$
BODILY INJURY (Per accident)
$
PROPERTY DAMAGE
(Per accident)
$
$
C
X
UMBRELLA LIAB
EXCESS LIAB
X
OCCUR
CLAIMS -MADE
6050531433
11/1/2017
1111/2018
EACH OCCURRENCE
$10,000,000
AGGREGATE
$10,000,000
$
DED X RETENTION$0
D
D
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITYYIN
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
NIA
y
6050531383
6050531402
11/1/2017
11/1/2017
11/1/2018
11/1/2018
X STATUTE
OTETH
E.L. EACH ACCIDENT
$1,000,000
E.L DISEASE - EA EMPLOYEE
$1,000,000
E.L. DISEASE - POLICY LIMIT
$1,000,000
E
Professional Liability
Claims Made
Pollution Liability Included
DPR9918654
11/1/2017
11/1/2018
$1,000,000 per Claim
$1,000,000 Annual Aggregate
Retroactive Date: 01/01/1969
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached If more space is required)
Project Name/Number: City Center Access Project/554-2441-831
City of Federal Way and Washington State are named as Additional Insured as respects General and Auto Liability as required per written
contract or agreement. General Liability is Primary/Non-Contributory per policy form wording.
CERTIFICATE HOLDER
CANCELLATION
City of Federal Way
Attn: Naveen Chandra
33325 8th Avenue South
Federal Way WA 98003
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
CNA
Blanket Additional Insured - Owners, Lessees or
Contractors - with Products -Completed
Operations Coverage Endorsement
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
It is understood and agreed as follows:
I. The WHO IS AN INSURED section is amended to add as an Insured any person or organization whom the
Named Insured is required by written contract to add as an additional insured on this coverage part, including
any such person or organization, if any, specifically set forth on the Schedule attachment to this endorsement.
However, such person or organization is an Insured only with respect to such person or organization's liability
for:
A. unless paragraph B. below applies,
1. bodily injury, property damage, or personal and advertising injury caused in whole or in part by the
acts or omissions by or on behalf of the Named Insured and in the performance of such Named
Insured's ongoing operations as specified in such written contract; or
2. bodily injury or property damage caused in whole or in part by your work and included in the
products -completed operations hazard, and only if
a. the written contract requires the Named Insured to provide the additional insured such coverage;
and
b. this coverage part provides such coverage.
B. bodily injury, property damage, or personal and advertising injury arising out of your work described in
such written contract, but only if:
1. this coverage part provides coverage for bodily injury or property damage included within the
products completed operations hazard; and
2. the written contract specifically requires the Named Insured to provide additional insured coverage
under the 11-85 or 10-01 edition of CG2010 or the 10-01 edition of CG2037.
11. Subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not
provide such additional insured with:
A. coverage broader than required by the written contract; or
B. a higher limit of insurance than required by the written contract.
III. The insurance granted by this endorsement to the additional insured does not apply to bodily injury, property
damage, or personal and advertising injury arising out of:
A. the rendering of, or the failure to render, any professional architectural, engineering, or surveying services,
thcluding:
1. the preparing, approving, or failing to prepare or approve maps, shop drawings, opinions, reports,
surveys, field orders, change orders or drawings and specifications; and
2. supervisory, inspection, architectural or engineering activities; or
B. any premises or work for which the additional insured is specifically listed as an additional insured on another
endorsement attached to this coverage part.
IV. Notwithstanding anything to the contrary in the section entitled COMMERCIAL GENERAL LIABILITY
CONDITIONS, the Condition entitled Other Insurance, this insurance is excess of all other insurance available
to the additional insured whether on a primary, excess, contingent or any other basis. However, if this insurance
CNA75079XX (1-15)
Page 1 of 2
Policy No: 6050531366
Endorsement No:
Effective Date: 11/01/2017
Insured Name: Parametrix, Inc.
Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission.
CNA
Blanket Additional Insured - Owners, Lessees or
Contractors - with Products -Completed
Operations Coverage Endorsement
is required by written contract to be primary and non-contributory, this insurance will be primary and non-
contributory relative solely to insurance on which the additional insured is a named insured.
V. Solely with respect to the insurance granted by this endorsement, the section entitled COMMERCIAL GENERAL
LIABILITY CONDITIONS is amended as follows:
The Condition entitled Duties In The Event of Occurrence, Offense, Claim or Suit is amended with the
addition of the following:
Any additional insured pursuant to this endorsement will as soon as practicable:
1. give the Insurer written notice of any claim, or any occurrence or offense which may result in a claim;
2. except as provided in Paragraph IV. of this endorsement, agree to make available any other insurance
the additional insured has for any loss covered under this coverage part;
3. send the Insurer copies of all legal papers received, and otherwise cooperate with the Insurer in the
investigation, defense, or settlement of the claim; and
4. tender the defense and indemnity of any claim to any other insurer or self insurer whose policy or
program applies to a loss that the Insurer covers under this coverage part. However, if the written
contract requires this insurance to be primary and non-contributory, this paragraph (4) does not apply to
insurance on which the additional insured is a named insured.
The Insurer has no duty to defend or indemnify an additional insured under this endorsement until the Insurer
receives written notice of a claim from the additional insured.
VI. Solely with respect to the insurance granted by this endorsement, the section entitled DEFINITIONS is amended
to add the following definition:
Written contract means a written contract or written agreement that requires the Named Insured to make a
person or organization an additional insured on this coverage part, provided the contract or agreement:
A. is currently in effect or becomes effective during the term of this policy; and
B. was executed prior to:
1. the bodily injury or property damage; or
2. the offense that caused the personal and advertising injury
for which the additional insured seeks coverage.
My coverage granted by this endorsement shall apply solely to the extent permissible by law.
All other terms and conditions of the Policy remain unchanged.
This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes
effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown
below, and expires concurrently with said Policy.
CNA75079XX (1-15)
Page 2of2
Policy No: 6050531366
Endorsement No:
Effective Date: 11/01/2017
Insured Name: Parametrix, Inc.
Copyright CNA All Rights Reserved Includes copyrighted material of Insurance Services Office, Inc., with its permission.
C'NA
CNA63359XX
(Ed. 04/12)
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
CONTRACTORS EXTENDED COVERAGE ENDORSEMENT
- BUSINESS AUTO PLUS -
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
I. UABILITY COVERAGE
A. Who Is An Insured
The following is added to Section II, Paragraph
A.1., Who Is An Insured:
1. a. Any incorporated entity of which the
Named Insured owns a majority of the
voting stock on the date of inception of
this Coverage Form; provided that,
b. The insurance afforded by this provision
Al. does not apply to any such entity
that is an "insured" under any other
liability "policy' providing "auto"
coverage.
2. Any organization you newly acquire or form,
other than a limited liability company.
partnership or joint venture, and over which
you maintain majority ownership interest.
The insurance afforded by this provision
A2.:
a. Is effective on the acquisition or
formation date, and is afforded only until
the end of the policy period of this
Coverage Form, or the next anniversary
of its inception date, whichever is
earlier.
b. Does not apply to:
(1) "Bodily injury" or "property damage"
caused by an "accident" that
occurred before you acquired or
formed the organization; or
(2) Any such organization that is an
'Insured" under any other liability
"policy" providing "auto" coverage.
3. Any person or organization that you are
required by a written contract to name as an
additional insured is an "insured" but only
with respect to their legal liability for acts or
omissions of a person, who qualifies as an
"insured" under Section II — Who Is An
Insured and for whom Liability Coverage is
afforded under this policy. If required by
written contract, this insurance will be
primary and non-contributory to insurance
on which the additional insured is a Named
Insured.
4. An "employee" of yours is an "insured" while
operating an "auto" hired or rented under a
contract or agreement in that "employee's'
name, with your permission, while
performing duties related to the conduct of
your business.
"Policy," as used in this provision A. Who Is An
Insured, includes those policies that were in
force on the inception date of this Coverage
Form but:
1. Which are no longer in force; or
2. Whose limits have been exhausted.
B. Bail Bonds and Loss of Earnings
Section Il, Paragraphs A.2. (2) and A.2. (4)
are revised as follows:
1. In a.(2), the limit for the cost of bail bonds is
changed from $2,000 to $5,000; and
2. In a.(4), the limit for the loss of earnings is
changed from $250 to $500 a day.
C. Fellow Employee
Section II, Paragraph B.5 does not apply.
Such coverage as is afforded by this provision
C. is excess over any other collectible
insurance.
II. PHYSICAL DAMAGE COVERAGE
A. Glass Breakage — Hitting A Bird Or Animal —
Falling Objects Or Missiles
The following is added to Section III,
Paragraph A.3.:
With respect to any covered "auto," any
deductible shown in the Declarations will not
apply to glass breakage if such glass is
repaired, in a manner acceptable to us, rather
than replaced.
B. Transportation Expenses
Section Ili, Paragraph A.4.a. is revised, with
respect to transportation expense incurred by
you, to provide:
a. $60 per day. in lieu of $20; subject to
b. $1.800 maximum, in lieu of $600.
CNA63359XX Copynght, CNA Corporation, 2000.
(Ed. 04/12) Includes copyrighted material of the Insurance Services Office used with its permission.
Page 1 of 3
CNA
C. Loss of Use Expenses
Section HI, Paragraph A.4.b. is revised, with
respect to loss of use expenses incurred by you,
to provide:
a. $1,000 maximum, in lieu of $600.
D. Hired "Autos"
The following is added to Section
Paragraph A.:
5. Hired "Autos"
If Physical Damage coverage is provided under
this policy, and such coverage does not extend
to Hired Autos, then Physical Damage coverage
is extended to:
a. Any covered "auto" you lease, hire, rent
or borrow without a driver; and
b. Any covered "auto" hired or rented by
your "employee" without a driver, under
a contract in that individual
"employee's" name, with your
permission, while performing duties
related to the conduct of your business.
c. The most we will pay for any one
"accident" or "loss" is the actual cash
value. cost of repair, cost of
replacement or $75,000, whichever is
less, minus a $500 deductible for each
covered auto. No deductible applies to
'loss" caused by fire or lightning.
d. The physical damage coverage as is
provided by this provision is equal to the
physical damage coverage(s) provided
on your owned "autos."
e. Such physical damage coverage for
hired "autos" will:
(1) Include loss of use, provided it is
the consequence of an "accident"
for which the Named Insured is
legally liable, and as a result of
which a monetary loss is sustained
by the leasing or rental concern.
(2) Such coverage as is provided by
this provision will be subject to a
limit of $750 per "accident."
E. Airbag Coverage
The following is added to Section III,
Paragraph B.3.:
The accidental discharge of an airbag shall not
be considered mechanical breakdown.
F. Electronic Equipment
CNA63359XX
(Ed. 04/12)
Section III, Paragraphs B.4.c and B.4.d. are
deleted and replaced by the following:
c. Physical Damage Coverage on a covered
"auto" also applies to "loss" to any
permanently installed electronic equipment
including its antennas and other
accessories.
d. A $100 per occurrence deductible applies to
the coverage provided by this provision.
G. Diminution In Value
The following is added to Section III,
Paragraph B.6.:
Subject to the following, the "diminution in
value" exclusion does not apply to:
a. Any covered "auto" of the private
passenger type you lease, hire, rent or
borrow, without a driver for a period of
30 days or less, while performing duties
related to the conduct of your business;
and
b. Any covered "auto" of the private
passenger type hired or rented by your
"employee" without a driver for a period
of 30 days or less, under a contract in
that individual "employee's" name, with
your permission, while performing
duties related to the conduct of your
business.
c. Such coverage as is provided by this
provision is limited to a "diminution in
value" loss arising directly out of
accidental damage and not as a result
of the failure to make repairs; faulty or
incomplete maintenance or repairs; or
the installation of substandard parts.
d. The most we will pay for "loss" to a
covered "auto" in any one accident is
the lesser of:
(1) $5,000; or
(2) 20% of the "auto's" actual cash
value (ACV).
III. Drive Other Car Coverage — Executive Officers
The following is added to Sections II and III:
1. Any "auto" you don't own, hire or borrow is a
covered "auto" for Liability Coverage while being
used by, and for Physical Damage Coverage
while in the care, custody or control of, any of
your "executive officers," except:
a. An "auto" owned by that "executive officer"
or a member of that person's household; or
CNA63359XX Copyright, CNA Corporation, 2000.
(Ed. 04/12) Includes copyrighted material of the Insurance Services Office used with its permission.
Page 2 of 3
CWA
b. An "auto" used by that "executive officer"
while working in a business of selling,
servicing, repairing or parking "autos."
Such Liability and/or Physical Damage
Coverage as is afforded by this provision.
(1)
Equal to the greatest of those
coverages afforded any covered "auto";
and
(2) Excess over any other collectible
insurance.
2. For purposes of this provision, "executive
officer" means a person holding any of the
officer positions created by your charter,
constitution, by-laws or any other similar
governing document, and, while a resident of
the same household, includes that person's
spouse.
Such "executive officers" are "insureds" while
using a covered "auto" described in this
provision.
IV. BUSINESS AUTO CONDITIONS
A. Duties In The Event Of Accident, Claim, Suit
Or Loss
The following is added to Section IV,
Paragraph A.2.a.:
(4) Your "employees" may know of an
"accident" or "loss." This will not mean
that you have such knowledge, unless
such "accident" or "loss" is known to
you or if you are not an individual, to
any of your executive officers or
partners or your insurance manager.
The following is added to Section IV,
Paragraph A.2.b.:
(6) Your "employees" may know of
documents received concerning a claim
or "suit." This will not mean that you
have such knowledge, unless receipt of
such documents is known to you or if
you are not an individual, to any of your
executive officers or partners or your
insurance manager.
B. Transfer Of Rights Of Recovery Against
Others To Us
CNA63359XX
(Ed. 04/12)
The following is added to Section IV,
Paragraph A.5. Transfer Of Rights Of
Recovery Against Others To Us:
We waive any right of recovery we may have,
because of payments we make for injury or
damage, against any person or organization for
whom or which you are required by written
contract or agreement to obtain this waiver from
us.
This injury or damage must arise out of your
activities under a contract with that person or
organization.
You must agree to that requirement prior to an
"accident" or "loss."
C. Concealment, Misrepresentation or Fraud
The following is added to Section IV,
Paragraph B.2.:
Your failure to disclose all hazards existing on the
date of inception of this Coverage Form shall not
prejudice you with respect to the coverage afforded
provided such failure or omission is not intentional.
D. Other Insurance
The following is added to Section IV,
Paragraph 8.5.:
Regardless of the provisions of Paragraphs 5.a.
and 5.d. above, the coverage provided by this
policy shall be on a primary non-contributory
basis. This provision is applicable only when
required by a written contract. That written
contract must have been entered into prior to
"Accident" or "Loss."
E. Policy Period, Coverage Territory
Section IV, Paragraph B. 7.(5).(a). is revised to
provide:
a. 45 days of coverage in lieu of 30 days.
V. DEFINITIONS
Section V. Paragraph C. is deleted and replaced
by the following:
"Bodily injury' means bodily injury, sickness or
disease sustained by a person, including mental
anguish, mental injury or death resulting from any of
these.
CNA63359XX Copyright, CNA Corporation, 2000. Page 3 of 3
(Ed. 04/12) Includes copyrighted material of the Insurance Services Office used with its permission.
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY
WC 00 03 13
(Ed. 4-84)
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce
our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you
perform work under a written contract that requires you to obtain this agreement from us.)
This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule.
Schedule
This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated.
(The information below is required only when this endorsement is issued subsequent to preparation of the policy.)
Endorsement Effective Policy No. Endorsement No.
Insured Premium $
Insurance Company Countersigned by
WC 00 03 13
(Ed. 4-84)
Copyright 1983 National Council on Compensation Insurance.
RETURN TO: PW ADMIN
EXT: 2700 ID #: 01
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIV: PUBLIC WORKS / STREETS
ORIGINATING STAFF PERSON: NAVEEN CHANDRA
TYPE OF DOCUMENT (CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT (E.G., RFB, RFP, RFQ)
❑ P BLIC WORKS CONTRACT
PROFESSIONAL SERVICE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT
❑ REAL ESTATE DOCUMENT
❑ ORDINANCE
❑ CONTRACT AMENDMENT (AG #):
❑ OTHER
EXT: 2729 3. DATE REQ. BY:RUSH
❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ MAINTENANCE AGREEMENT
❑ HUMAN SERVICES / CDBG
❑ SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS)
❑ RESOLUTION
❑ INTERLOCAL
G, PROJECT NAME: CITY CENTER ACCESS
NAME OF CONTRACTOR: PARAMETRIX, INC
ADDRESS: 719 2ND AVENUE SUITE 200, SEATTLE, WA 98104 TELEPHONE(206)394 -3664
E- MAIL:SGLOVER @PARAMETRIX.COM FAx:(855) 542 -6353
SIGNATURE NAME: TITLE:
EXHIBITS AND ATTACHMENTS: ❑ SCOPE, WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS /CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT /AMENDMENTS
CFW LICENSE #90 101843 000 00 BL, EXP. 12/31/17 UBI # 600 135 349 , EXP.4- '/ L'
TERM: COMMENCEMENT DATE: _ l 25/_1.7_
COMPLETION DATE: DECEMBER 30, 2018
TOTAL COMPENSATION: VI!, O8'2, 75 (INCLUDE EXPENSES AND SALES TAX, IF ANY)
(IF CALCULATED ON HOURLY LABOR CHANGE - ATTACH SCHEDULES OF EMPLOYEES TITLES AND_HOLIDAY RATES)
REIMBURSABLE EXPENSE: OAS ❑ NO IF YES, MAXIMUM DOLLAR AMOUNT: $'(2O, 34 ,(P j
IS SALES TAX OWED: ❑ YES ❑ NO IF YES, $ PAID BY: ❑ CONTRACTOR ❑ CITY
RETAINAGE: RETAINAGE AMOUNT: /�/�� • �L ��'�/`❑�RETAIINNAAGE AGREEMENT (?e;. EE CONTRACT) OR ❑ RETAINAGE BOND PROVIDED
JURCHASING: PLEASE CHARGE To: O • tc • 0w - { 6 - ' 1
0. DOCUM NT / CONTRACT a/PROJECT MANAGER
ISION EPUTY DIRECTOR
RECTOR
❑ RSSK MANAGEMENT (IF APPLICABLE)
AW DEPT
INITIAL / DATE REVIEWED INITIAL / DATE APPROVED
gi ?i l 7
0. COUNCIL APPROVAL (IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING
*SENT TO VENDOR/CONTRACTOR DATE SENT: �f
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE, LICENSES, EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT. SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
DATEREC'D: 5111117
❑ FINANCE DEPARTMENT
AW DEPT
SIGNATORY (■R OR DIRECTOR)
❑ CITY CLERK ��
ASSIGNED AG #
SIGNED COPY RETURNED
❑ RETURN ONE ORIGINAL
;OMMENTS:
:XECUTE " " ORIGINALS
INITIAL / DATE SIGNED
Local Agency A &E Professional Services
Negotiated Hourly Rate Consultant Agreement
Agreement Number: 17- ) S
Firm /Organization Legal Name (do not use dba's):
Parametrix, Inc.
Address
719 2nd Avenue, Suite 200, Seattle, WA 98104
Federal Aid Number
UBI Number
600 135 349
Federal TIN or SSN Number
91- 0914810
Execution Date
Iasi- 23, 2L)17
Completion Date
December 30, 2018
1099 Form Required
Federal Participation
❑Yes If No
❑Yes i No
Project Title
City Center Access Project
Description of Work
The City Center Access Project proposes to build a new interchange in Federal Way on I -5, and construct
improvements at the existing So. 320th St. interchange. City Center Access Project includes a study and
evaluation of alternatives, the identification of a preferred alternative, environmental documentation, an
Interchange Justification Report (IJR), and preliminary engineering for the preferred alternative.
Maximum Amount Payable: $2,334,082.75
❑ Yes i No DBE Participation
❑ Yes i No MBE Participation
❑ Yes i No WBE Participation
❑ Yes i No SBE Participation
Index of Exhibits
Exhibit A
Exhibit B
Exhibit C
Exhibit D
Exhibit E
Exhibit F
Exhibit G
LAilibit I1
Exhibit I
Exhibit J
Scope of Work
DBE Participation (Not Applicable)
Preparation and Delivery of Electronic Engineering and Other Data
Prime Consultant Cost Computations
Sub - consultant Cost Computations
Title VI Assurances
Certification Documents
Liability xra icc increase (Not Applicable)
Alleged Consultant Design Error Procedures
Consultant Claim Procedures
Agreement Number: 17 -'
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 1 of 14
Revised 4/10/2015
THIS AGREEMENT, made and entered into as shown in the "Execution Date" box on page one (1) of this
AGREEMENT, between the City of Federal Way, WA
hereinafter called the "AGENCY," and the "Firm / Organization Name" referenced on page one (1) of this
AGREEMENT, hereinafter called the "CONSULTANT."
WHEREAS, the AGENCY desires to accomplish the work referenced in "Description of Work" on page one (1)
of this AGREEMENT and hereafter called the "SERVICES;" and does not have sufficient staff to meet the required
commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide
the necessary SERVICES; and
WHEREAS, the CONSULTANT represents that they comply with the Washington State Statutes relating
to professional registration, if applicable, and has signified a willingness to furnish consulting services to
the AGENCY.
NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein,
or attached and incorporated and made a part hereof, the parties hereto agree as follows:
1. General Description of Work
The work under this AGREEMENT shall consist of the above - described SERVICES as herein defined, and
necessary to accomplish the completed work for this project. The CONSULTANT shall furnish all services, labor,
and related equipment and, if applicable, sub - consultants and subcontractors necessary to conduct and complete the
SERVICES as designated elsewhere in this AGREEMENT.
11. General Scope of Work
The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit "A" attached
hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed
utilizing performance based contracting methodologies.
111. General Requirements
All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall
receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and /or
individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress,
and presentation meetings with the AGENCY and/or such State, Federal, Community, City, or County officials,
groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT
sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days'
notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit "A."
The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will
outline in written and graphical form the various phases and the order of performance of the SERVICES in
sufficient detail so that the progress of the SERVICES can easily be evaluated.
The CONSULTANT, any sub - consultants, and the AGENCY shall comply with all Federal, State, and local laws,
rules, codes, regulations, and all AGENCY policies and directives, applicable to the work to be performed under
this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State
of Washington.
Agreement Number: 17- 164
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 2 of 14
Revised 4/10/2015
Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE), if required,
per 49 CFR Part 26, shall be shown on the heading of this AGREEMENT. If DBE firms are utilized at the
commencement of this AGREEMENT, the amounts authorized to each firm and their certification number will
be shown on Exhibit `B" attached hereto and by this reference made part of this AGREEMENT. If the Prime
CONSULTANT is a DBE certified firm they must comply with the Commercial Useful Function (CUF) regulation
outlined in the AGENCY's "DBE Program Participation Plan" and perform a minimum of 30% of the total amount
of this AGREEMENT. It is recommended, but not required, that non -DBE Prime CONSULTANTS perform
a minimum of 30% of the total amount of this AGREEMENT.
The CONSULTANT, on a monthly basis, is required to submit DBE Participation of the amounts paid to all DBE
firms invoiced for this AGREEMENT.
All Reports, PS &E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned.
All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit "C —
Preparation and Delivery of Electronic Engineering and other Data."
All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared
by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for
these SERVICES, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or
on behalf of the AGENCY of any such instruments of service, not occurring as a part of this SERVICE, shall be
without liability or legal exposure to the CONSULTANT.
Any and all notices or requests required under this AGREEMENT shall be made in writing and sent to the other
party by (i) certified mail, return receipt requested, or (ii) by email or facsimile, to the address set forth below:
If to AGENCY:
Name: Naveen Chandra
Agency: City of Federal Way
Address: 33325 8th Avenue South
City: Federal Way State: WA Zip: 98003
Email: Naveen .Chandra @cityoffederalway.com
Phone: 253/835 -2729
Facsimile: 253/835 -2709
If to CONSULTANT:
Name: Sandy Glover
Agency: Parametrix, Inc.
Address: 719 2nd Avenue, Suite 200
City: Seattle State: WA Zip: 98104
Email: sglover @parametrix.com
Phone: 206/394 -3664
Facsimile: 855/542 -6353
IV. Time for Beginning and Completion
The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing
by the AGENCY. All work under this AGREEMENT shall conform to the criteria agreed upon detailed in the
AGREEMENT documents. These SERVICES must be completed by the date shown in the heading of this
AGREEMENT titled "Completion Date."
The established completion time shall not be extended because of any delays attributable to the CONSULTANT,
but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of
unavoidable delays caused by an act of GOD, governmental actions, or other conditions beyond the control of the
CONSULTANT. A prior supplemental AGREEMENT issued by the AGENCY is required to extend the established
completion time.
Agreement Number: 17- I
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 3 of 14
Revised 4/10/2015
V. Payment Provisions
The CONSULTANT shall be paid by the AGENCY for completed SERVICES rendered under this AGREEMENT
as provided hereinafter. Such payment shall be full compensation for SERVICES performed or SERVICES
rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete SERVICES.
The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31 (www.ecfr.gov).
A. Hourly Rates: Hourly rates are comprised of the following elements - Direct (Raw) Labor, Indirect Cost Rate,
and Fixed Fee (Profit). The CONSULTANT shall be paid by the AGENCY for work done, based upon the
negotiated hourly rates shown in Exhibits "D" and "E" attached hereto and by reference made part of this
AGREEMENT. These negotiated hourly rates will be accepted based on a review of the CONSULTANT's
direct labor rates and indirect cost rate computations and agreed upon fixed fee. The accepted negotiated
rates shall be memorialized in a final written acknowledgement between the parties. Such final written
acknowledgement shall be incorporated into, and become a part of, this AGREEMENT. The initially accepted
negotiated rates shall be applicable from the approval date, as memorialized in a final written acknowledgement,
to 180 days following the CONSULTANT's fiscal year end (FYE) date.
The direct (raw) labor rates and classifications, as shown on Exhibits "D" and "E" shall be subject to
renegotiations for each subsequent twelve (12) month period (180 days following FYE date to 180 days
following FYE date) upon written request of the CONSULTANT or the AGENCY. The written request must
be made to the other party within ninety (90) days following the CONSULTANT's FYE date. If no such written
request is made, the current direct (raw) labor rates and classifications as shown on Exhibits "D" and "E ",
will remain in effect for the twelve (12) month period.
Conversely, if a timely request is made in the manner set forth above, the parties will commence negotiations
to determine the new direct (raw) labor rates and classifications that will be applicable for the twelve (12)
month period. Any agreed to renegotiated rates shall be memorialized in a final written acknowledgement
between the parties. Such final written acknowledgement shall be incorporated into, and become a part of, this
AGREEMENT. If requested, the CONSULTANT shall provide current payroll register and classifications to aid
in negotiations. If the parties cannot reach an agreement on the direct (raw) labor rates and classifications, the
AGENCY shall perform an audit of the CONSULTANT's books and records to determine the CONSULTANT's
actual costs. The audit findings will establish the direct (raw) labor rates and classifications that will be
applicable for the twelve (12) month period.
The fixed fee as identified in Exhibits "D" and "E" shall represent a value to be applied throughout the life
of the AGREEMENT.
The CONSULTANT shall submit annually to the AGENCY an updated indirect cost rate within 180 days of the
close of its fiscal year. An approved updated indirect cost rate shall be included in the current fiscal year rates
under this AGREEMENT, even if /when other components of the hourly rate are not renegotiated. These rates
will be applicable for the twelve (12) month period. At the AGENCY's option, a provisional and/or conditional
indirect cost rate may be negotiated. This provisional or conditional indirect rate shall remain in effect until the
updated indirect cost rate is completed and approved. Indirect cost rate costs incurred during the provisional
or conditional period will not be adjusted. The CONSULTANT may request an extension of the last approved
indirect cost rate for the twelve (12) month period. These requests for provisional indirect cost rate and/or
extension will be considered on a case -by -case basis, and if granted, will be memorialized in a final written
acknowledgement.
The CONSULTANT shall maintain and have accessible support data for verification of the components of the
hourly rates, i.e., direct (raw) labor, indirect cost rate, and fixed fee (profit) percentage. The CONSULTANT
shall bill each employee's actual classification, and actual salary plus indirect cost rate plus fixed fee.
Agreement Number: 17- (
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 4 of 14
Revised 4/10/2015
B. Direct Non - Salary Costs: Direct Non - Salary Costs will be reimbursed at the actual cost to the CONSULTANT.
These charges may include, but are not limited to, the following items: travel, printing, long distance telephone,
supplies, computer charges and fees of sub - consultants. Air or train travel will be reimbursed only to lowest
price available, unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the
rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with the
WSDOT's Accounting Manual M 13 -82, Chapter 10 — Travel Rules and Procedures, and all revisions thereto.
Air, train and rental card costs shall be reimbursed in accordance with 48 Code of Federal Regulations (CFR)
Part 31.205 -46 "Travel Costs." The billing for Direct Non - salary Costs shall include an itemized listing of the
charges directly identifiable with these SERVICES. The CONSULTANT shall maintain the original supporting
documents in their office. Copies of the original supporting documents shall be supplied to the STATE upon
request. All above charges must be necessary for the SERVICES provided under this AGREEMENT.
C. Maximum Amount Payable: The Maximum Amount Payable by the AGENCY to the CONSULTANT under
this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT on page one (1.)
The Maximum Amount Payable does not include payment for extra work as stipulated in section XIII, "Extra
Work." No minimum amount payable is guaranteed under this AGREEMENT.
D. Monthly Progress Payments: Progress payments may be claimed on a monthly basis for all costs authorized in
A and B above. The monthly billings shall be supported by detailed statements for hours expended at the rates
established in Exhibit "D," including names and classifications of all employees, and billings for all direct non -
salary expenses. To provide a means of verifying the billed salary costs for the CONSULTANT's employees,
the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles,
salary rates, and present duties of those employees performing work on the SERVICES at the time of the
interview.
E. Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be
made promptly upon its verification by the AGENCY after the completion of the SERVICES under this
AGREEMENT, contingent upon receipt of all PS &E, plans, maps, notes, reports, electronic data, and other
related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final
Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT
may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the
AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to
any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may
pursue with respect to such claims.
The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time
of final audit all required adjustments will be made and reflected in a final payment. In the event that such
final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment
to the AGENCY within thirty (30) calendar days of notice of the overpayment. Such refund shall not
constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY
of overpayment. Per WSDOT's "Audit Guide for Consultants," Chapter 23 "Resolution Procedures," the
CONSULTANT has twenty (20) working days after receipt of the final Post Audit to begin the appeal process to
the AGENCY for audit findings.
F. Inspection of Cost Records: The CONSULTANT and their sub - consultants shall keep available for inspection
by representatives of the AGENCY and the United States, for a period of six (6) years after receipt of final
payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon
these records with the following exception: if any litigation, claim or audit arising out of, in connection with,
or related to this AGREEMENT is initiated before the expiration of the six (6) year period, the cost records and
accounts shall be retained until such litigation, claim, or audit involving the records is completed.
An interim or post audit may be performed on this AGREEMENT. The audit, if any, will be performed by the
State Auditor, WSDOT's Internal Audit Office and /or at the request of the AGENCY's Project Manager.
Agreement Number: 17- I
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 5 of 14
Revised 4/10/2015
VI. Sub - Contracting
The AGENCY permits subcontracts for those items of SERVICES as shown in Exhibit "A" attached hereto and by
this reference made part of this'AGREEMENT.
The CONSULTANT shall not subcontract for the performance of any SERVICE under this AGREEMENT without
prior written permission of the AGENCY. No permission for subcontracting shall create, between the AGENCY
and sub - consultant, any contract or any other relationship.
Compensation for this sub - consultant SERVICES shall be based on the cost factors shown on Exhibit "E" attached
hereto and by this reference made part of this AGREEMENT.
The SERVICES of the sub - consultant shall not exceed its maximum amount payable identified in each sub -
consultant cost estimate unless a prior written approval has been issued by the AGENCY.
All reimbursable direct labor, indirect cost rate, direct non - salary costs and fixed fee costs for the sub - consultant
shall be negotiated and substantiated in accordance with section V "Payment Provisions" herein and shall be
memorialized in a final written acknowledgement between the parties.
All subcontracts shall contain all applicable provisions of this AGREEMENT, and the CONSULTANT shall require
each sub - consultant or subcontractor, of any tier, to abide by the terms and conditions of this AGREEMENT. With
respect to sub - consultant payment, the CONSULTANT shall comply with all applicable sections of the STATE's
Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011.
The CONSULTANT, sub - recipient, or sub - consultant shall not discriminate on the basis of race, color, national
origin, or sex in the performance of this AGREEMENT. The CONSULTANT shall carry out applicable
requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the
CONSULTANT to carry out these requirements is a material breach of this AGREEMENT, which may result in the
termination of this AGREEMENT or such other remedy as the recipient deems appropriate.
VII. Employment and Organizational Conflict of Interest
The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona
fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or
agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any
fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the
award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul
this AGREEMENT without liability or, in its discretion, to deduct from this AGREEMENT price or consideration
or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee.
Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work
or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the
CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's
Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made
by a third party as a consequence of any act or omission on the part of the CONSULTANT's employees or other
persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation
and responsibility of the CONSULTANT.
The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of this
AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this
AGREEMENT, in the employ of the United States Department of Transportation or the AGENCY, except regularly
retired employees, without written consent of the public employer of such person if he /she will be working on this
AGREEMENT for the CONSULTANT.
Agreement Number: 17- I
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 6 of 14
Revised 4/10/2015
VIII. Nondiscrimination
During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, sub - consultants,
subcontractors and successors in interest, agrees to comply with the following laws and regulations:
• Title VI of the Civil Rights Act of 1964
(42 U.S.C. Chapter 21 Subchapter V § 2000d
through 2000d -4a)
• Federal -aid Highway Act of 1973
(23 U.S.C. Chapter 3 § 324)
• Rehabilitation Act of 1973
(29 U.S.C. Chapter 16 Subchapter V § 794)
• Age Discrimination Act of 1975
(42 U.S.C. Chapter 76 § 6101 et. seq.)
• Civil Rights Restoration Act of 1987
(Public Law 100 -259)
• American with Disabilities Act of 1990
(42 U.S.C. Chapter 126 § 12101 et. seq.)
• 23 CFR Part 200
• 49 CFR Part 21
• 49 CFR Part 26
• RCW 49.60.180
In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit "F"
attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit "F" in
every sub - contract, including procurement of materials and leases of equipment, unless exempt by the Regulations
or directives issued pursuant thereto.
IX. Termination of Agreement
The right is reserved by the AGENCY to terminate this AGREEMENT at any time with or without cause upon ten
(10) days written notice to the CONSULTANT.
In the event this AGREEMENT is terminated by the AGENCY, other than for default on the part of the
CONSULTANT, a final payment shall be made to the CONSULTANT for actual hours charged at the time of
termination of this AGREEMENT, plus any direct non - salary costs incurred up to the time of termination of this
AGREEMENT.
No payment shall be made for any SERVICES completed after ten (10) days following receipt by the
CONSULTANT of the notice to terminate. If the accumulated payment made to the CONSULTANT prior to Notice
of Termination exceeds the total amount that would be due when computed as set forth in paragraph two (2) of this
section, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for
any excess paid.
If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT,
the above formula for payment shall not apply.
In the event of a termination for default, the amount to be paid to the CONSULTANT shall be determined by the
AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing SERVICES
to the date of termination, the amount of SERVICES originally required which was satisfactorily completed to
date of termination, whether that SERVICE is in a form or a type which is usable to the AGENCY at the time of
termination, the cost to the AGENCY of employing another firm to complete the SERVICES required and the
time which may be required to do so, and other factors which affect the value to the AGENCY of the SERVICES
performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the
amount, which would have been made using the formula set forth in paragraph two (2) of this section.
If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT's failure to
perform is without the CONSULTANT's or its employee's fault or negligence, the termination shall be deemed to
be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed
for actual costs in accordance with the termination for other than default clauses listed previously.
Agreement Number: 17- 1
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 7 of 14
Revised 4/10/2015
The CONSULTANT shall, within 15 days, notify the AGENCY in writing, in the event of the death of any member,
partner, or officer of the CONSULTANT or the death or change of any of the CONSULTANT's supervisory and/or
other key personnel assigned to the project or disaffiliation of any principally involved CONSULTANT employee.
The CONSULTANT shall also notify the AGENCY, in writing, in the event of the sale or transfer of 50% or
more of the beneficial ownership of the CONSULTANT within 15 days of such sale or transfer occurring. The
CONSULTANT shall continue to be obligated to complete the SERVICES under the terms of this AGREEMENT
unless the AGENCY chooses to terminate this AGREEMENT for convenience or chooses to renegotiate any term(s)
of this AGREEMENT. If termination for convenience occurs, final payment will be made to the CONSULTANT as
set forth in the second and third paragraphs of this section.
Payment for any part of the SERVICES by the AGENCY shall not constitute a waiver by the AGENCY of
any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the
CONSULTANT, or for failure of the CONSULTANT to perform SERVICES required of it by the AGENCY.
Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights
with respect to any future act or omission by the CONSULTANT.
X. Changes of Work
The CONSULTANT shall make such changes and revisions in the completed work of this AGREEMENT as
necessary to correct errors appearing therein, without additional compensation thereof. Should the AGENCY
find it desirable for its own purposes to have previously satisfactorily completed SERVICES or parts thereof
changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be
considered as Extra Work and will be paid for as herein provided under section XIII "Extra Work."
XI. Disputes
Any disputed issue not resolved pursuant to the terms of this AGREEMENT shall be submitted in writing within
10 days to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and
binding on the parties of this AGREEMENT; provided however, that if an action is brought challenging the
Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to judicial review. If the
parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under
the procedures found in Exhibit "J ". In the event that either party deem it necessary to institute legal action or
proceeding to enforce any right or obligation under this AGREEMENT, this action shall be initiated in the Superior
Court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto
agree that all questions shall be resolved by application of Washington law and that the parties have the right of
appeal from such decisions of the Superior Court in accordance with the laws of the State of Washington. The
CONSULTANT hereby consents to the personal jurisdiction of the Superior Court of the State of Washington,
situated in the county in which the AGENCY is located.
XII. Legal Relations
The CONSULTANT, any sub - consultants, and the AGENCY shall comply with all Federal, State, and local laws,
rules, codes, regulations and all AGENCY policies and directives, applicable to the work to be performed under this
AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of
Washington.
The CONSULTANT shall defend, indemnify, and hold the State of Washington (STATE) and the AGENCY and
their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part
from the negligence of, or the breach of any obligation under this AGREEMENT by, the CONSULTANT or the
CONSULTANT's agents, employees, sub consultants, subcontractors or vendors, of any tier, or any other persons
for whom the CONSULTANT may be legally liable; provided that nothing herein shall require a CONSULTANT
Agreement Number: 17- I
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 8 of 14
Revised 4/10/2015
to defend or indemnify the STATE and the AGENCY and their officers and employees against and hold harmless
the STATE and the AGENCY and their officers and employees from claims, demands or suits based solely upon
the negligence of, or breach of any obligation under this AGREEMENT by the STATE and the AGENCY, their
agents, officers, employees, sub - consultants, subcontractors or vendors, of any tier, or any other persons for whom
the STATE and /or the AGENCY may be legally liable; and provided further that if the claims or suits are caused
by or result from the concurrent negligence of (a) the CONSULTANT or the CONSULTANT's agents, employees,
sub - consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT is legally
liable, and (b) the STATE and/or AGENCY, their agents, officers, employees, sub - consultants, subcontractors and or
vendors, of any tier, or any other persons for whom the STATE and/or AGENCY may be legally liable, the defense
and indemnity obligation shall be valid and enforceable only to the extent of the CONSULTANT's negligence or
the negligence of the CONSULTANT's agents, employees, sub - consultants, subcontractors or vendors, of any tier,
or any other persons for whom the CONSULTANT may be legally liable. This provision shall be included in any
AGREEMENT between CONSULTANT and any sub - consultant, subcontractor and vendor, of any tier.
The CONSULTANT shall also defend, indemnify, and hold the STATE and the AGENCY and their officers
and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the
alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents,
proprietary information, know -how, copyright rights or inventions by the CONSULTANT or the CONSULTANT's
agents, employees, sub - consultants, subcontractors or vendors, of any tier, or any other persons for whom the
CONSULTANT may be legally liable, in performance of the Work under this AGREEMENT or arising out of any
use in connection with the AGREEMENT of methods, processes, designs, information or other items furnished or
communicated to STATE and/or the AGENCY, their agents, officers and employees pursuant to the AGREEMENT;
provided that this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly
improper appropriation or use of trade secrets, patents, proprietary information, know -how, copyright rights or
inventions resulting from STATE and/or AGENCY's, their agents', officers' and employees' failure to comply
with specific written instructions regarding use provided to STATE and/or AGENCY, their agents, officers and
employees by the CONSULTANT, its agents, employees, sub - consultants, subcontractors or vendors, of any tier,
or any other persons for whom the CONSULTANT may be legally liable.
The CONSULTANT's relation to the AGENCY shall be at all times as an independent contractor.
Notwithstanding any determination by the Executive Ethics Board or other tribunal, the AGENCY may, in its sole
discretion, by written notice to the CONSULTANT terminate this AGREEMENT if it is found after due notice and
examination by the AGENCY that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or
any similar statute involving the CONSULTANT in the procurement of, or performance under, this AGREEMENT.
The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT's own
employees or its agents against the STATE and /or the AGENCY and, solely for the purpose of this indemnification
and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51
RCW. This waiver has been mutually negotiated by the Parties.
Unless otherwise specified in this AGREEMENT, the AGENCY shall be responsible for administration of
construction contracts, if any, on the project. Subject to the processing of a new sole source, or an acceptable
supplemental AGREEMENT, the CONSULTANT shall provide On -Call assistance to the AGENCY during contract
administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper
construction techniques, job site safety, or any construction contractor's failure to perform its work in accordance
with the contract documents.
The CONSULTANT shall obtain and keep in force during the terms of this AGREEMENT, or as otherwise
required, the following insurance with companies or through sources approved by the State Insurance
Commissioner pursuant to Title 48 RCW.
Agreement Number: 17- I"
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 9 of 14
Revised 4/10/2015
Insurance Coverage
A. Worker's compensation and employer's liability insurance as required by the STATE.
B. Commercial general liability insurance written under ISO Form CG 00 01 12 04 or its equivalent with minimum
limits of one million dollars ($1,000,000.00) per occurrence and two million dollars ($2,000,000.00) in the
aggregate for each policy period.
C. Business auto liability insurance written under ISO Form CG 00 01 10 01 or equivalent providing coverage for
any "Auto" (Symbol 1) used in an amount not less than a one million dollar ($1,000,000.00) combined single
limit for each occurrence.
Excepting the Worker's Compensation Insurance and any Professional Liability Insurance, the STATE and
AGENCY, their officers, employees, and.agents will be named on all policies of CONSULTANT and any sub -
consultant and/or subcontractor as an additional insured (the "AIs "), with no restrictions or limitations concerning
products and completed operations coverage. This coverage shall be primary coverage and non - contributory and
any coverage maintained by the AIs shall be excess over, and shall not contribute with, the additional insured
coverage required hereunder. The CONSULTANT's and the sub - consultant's and/or subcontractor's insurer shall
waive any and all rights of subrogation against the AIs. The CONSULTANT shall furnish the AGENCY with
verification of insurance and endorsements required by this AGREEMENT. The AGENCY reserves the right to
require complete, certified copies of all required insurance policies at any time.
All insurance shall be obtained from an insurance company authorized to do business in the State of Washington.
The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the
execution of this AGREEMENT to:
Name: Naveen Chandra
Agency: City of Federal Way
Address: 33325 8th Avenue South
City: Federal Way State: WA Zip: 98003
Email: Naveen .Chandra @cityoffederalway.com
Phone: 253/835 -2729
Facsimile: 253/835 -2709
No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY.
The CONSULTANT's professional liability to the AGENCY, including that which may arise in reference to
section IX "Termination of Agreement" of this AGREEMENT, shall be limited to the accumulative amount of the
authorized AGREEMENT or one million dollars ($1,000,000.00), whichever is greater, unless the limit of liability
is increased by the AGENCY pursuant to Exhibit H. In no case shall the CONSULTANT's professional liability to
third parties be limited in any way.
The parties enter into this AGREEMENT for the sole benefit of the parties, and to the exclusion of any third party,
and no third party beneficiary is intended or created by the execution of this AGREEMENT.
The AGENCY will pay no progress payments under section V "Payment Provisions" until the CONSULTANT has
fully complied with this section. This remedy is not exclusive; and the AGENCY may take such other action as is
available to it under other provisions of this AGREEMENT, or otherwise in law.
Agreement Number: 17- I
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 10 of 14
Revised 4/10/2015
XIII. Extra Work
A. The AGENCY may at any time, by written order, make changes within the general scope of this AGREEMENT
in the SERVICES to be performed.
B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance
of any part of the SERVICES under this AGREEMENT, whether or not changed by the order, or otherwise
affects any other terms and conditions of this AGREEMENT, the AGENCY shall make an equitable adjustment
in the: (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms
and shall modify this AGREEMENT accordingly.
C. The CONSULTANT must submit any "request for equitable adjustment," hereafter referred to as "CLAIM,"
under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY
decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final
payment of this AGREEMENT.
D. Failure to agree to any adjustment shall be a dispute under the section XI "Disputes" clause. However, nothing
in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed.
E. Notwithstanding the terms and conditions of paragraphs (A.) and (B.) above, the maximum amount payable for
this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement
to this AGREEMENT.
XIV. Endorsement of Plans
If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering
data furnished by them.
XV. Federal Review
The Federal Highway Administration shall have the right to participate in the review or examination of the
SERVICES in progress.
XVI. Certification of the Consultant and the Agency
Attached hereto as Exhibit "G -1(a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit
"G -2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered
Transactions, Exhibit "G -3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying
and Exhibit "G -4" Certificate of Current Cost or Pricing Data. Exhibit "G -3" is required only in AGREEMENT's
over one hundred thousand dollars ($100,000.00) and Exhibit "G -4" is required only in AGREEMENT's over
five hundred thousand dollars ($500,000.00.) These Exhibits must be executed by the CONSULTANT, and
submitted with the master AGREEMENT, and returned to the AGENCY at the address listed in section III "General
Requirements" prior to its performance of any SERVICES under this AGREEMENT.
XVII. Complete Agreement
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the
parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or
be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or
modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as a supplement
to this AGREEMENT.
Agreement Number: 17- tail.
Local AgencyA &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 11 of 14
Revised 4/10/2015
XVIII. Execution and Acceptance
This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed
to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements,
representations, warranties, covenants, and AGREEMENT's contained in the proposal, and the supporting material
submitted by the CONSULTANT, and does hereby accept this AGREEMENT and agrees to all of the terms and
conditions thereof.
XIX. Protection of Confidential Information
The CONSULTANT acknowledges that some of the material and information that may come into its possession
or knowledge in connection with this AGREEMENT or its performance may consist of information that is exempt
from disclosure to the public or other unauthorized persons under either chapter 42.56 RCW or other local, state
or federal statutes ( "State's Confidential Information "). The "State's Confidential Information" includes, but is
not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles,
credit card information, driver's license numbers, medical data, law enforcement records (or any other information
identifiable to an individual), STATE and AGENCY source code or object code, STATE and AGENCY security
data, non - public Specifications, STATE and AGENCY non - publicly available data, proprietary software, STATE
and AGENCY security data, or information which may jeopardize any part of the project that relates to any of
these types of information. The CONSULTANT agrees to hold the State's Confidential Information in strictest
confidence and not to make use of the State's Confidential Information for any purpose other than the performance
of this AGREEMENT, to release it only to authorized employees, sub - consultants or subcontractors requiring such
information for the purposes of carrying out this AGREEMENT, and not to release, divulge, publish, transfer,
sell, disclose, or otherwise make it known to any other party without the AGENCY's express written consent
or as provided by law. The CONSULTANT agrees to release such information or material only to employees,
sub - consultants or subcontractors who have signed a nondisclosure AGREEMENT, the terms of which have
been previously approved by the AGENCY. The CONSULTANT agrees to implement physical, electronic, and
managerial safeguards to prevent unauthorized access to the State's Confidential Information.
Immediately upon expiration or termination of this AGREEMENT, the CONSULTANT shall, at the AGENCY's
option: (i) certify to the AGENCY that the CONSULTANT has destroyed all of the State's Confidential
Information; or (ii) returned all of the State's Confidential Information to the AGENCY; or (iii) take whatever other
steps the AGENCY requires of the CONSULTANT to protect the State's Confidential Information.
As required under Executive Order 00 -03, the CONSULTANT shall maintain a log documenting the following:
the State's Confidential Information received in the performance of this AGREEMENT; the purpose(s) for which
the State's Confidential Information was received; who received, maintained and used the State's Confidential
Information; and the final disposition of the State's Confidential Information. The CONSULTANT's records shall
be subject to inspection, review, or audit upon reasonable notice from the AGENCY.
The AGENCY reserves the right to monitor, audit, or investigate the use of the State's Confidential Information
collected, used, or acquired by the CONSULTANT through this AGREEMENT. The monitoring, auditing, or
investigating may include, but is not limited to, salting databases.
Violation of this section by the CONSULTANT or its sub - consultants or subcontractors may result in termination of
this AGREEMENT and demand for return of all State's Confidential Information, monetary damages, or penalties.
It is understood and acknowledged that the CONSULTANT may provide the AGENCY with information which
is proprietary and/or confidential during the term of this AGREEMENT. The parties agree to maintain the
confidentiality of such information during the term of this AGREEMENT and afterwards. All materials containing
such proprietary and /or confidential information shall be clearly identified and marked as "Confidential" and shall
be returned to the disclosing party at the conclusion of the SERVICES under this AGREEMENT.
Agreement Number: 17-
1 54
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 12 of 14
Revised 4/10/2015
The CONSULTANT shall provide the AGENCY with a list of all information and materials it considers confidential
and /or proprietary in nature: (a) at the commencement of the term of this AGREEMENT; or (b) as soon as such
confidential or proprietary material is developed. "Proprietary and/or confidential information" is not meant to
include any information which, at the time of its disclosure: (i) is already known to the other party; (ii) is rightfully
disclosed to one of the parties by a third party that is not acting as an agent or representative for the other party;
(iii) is independently developed by or for the other party; (iv) is publicly known; or (v) is generally utilized by
unaffiliated third parties engaged in the same business or businesses as the CONSULTANT.
The parties also acknowledge that the AGENCY is subject to Washington State and federal public disclosure
laws. As such, the AGENCY shall maintain the confidentiality of all such information marked proprietary and/
or confidential or otherwise exempt, unless such disclosure is required under applicable state or federal law. If a
public disclosure request is made to view materials identified as "Proprietary and/or confidential information" or
otherwise exempt information, the AGENCY will notify the CONSULTANT of the request and of the date that such
records will be released to the requester unless the CONSULTANT obtains a court order from a court of competent
jurisdiction enjoining that disclosure. If the CONSULTANT fails to obtain the court order enjoining disclosure, the
AGENCY will release the requested information on the date specified.
The CONSULTANT agrees to notify the sub - consultant of any AGENCY communication regarding disclosure that
may include a sub - consultant's proprietary and/or confidential information. The CONSULTANT notification to the
sub - consultant will include the date that such records will be released by the AGENCY to the requester and state
that unless the sub - consultant obtains a court order from a court of competent jurisdiction enjoining that disclosure
the AGENCY will release the requested information. If the CONSULTANT and/or sub - consultant fail to obtain
a court order or other judicial relief enjoining the AGENCY by the release date, the CONSULTANT shall waive
and release and shall hold harmless and indemnify the AGENCY from all claims of actual or alleged damages,
liabilities, or costs associated with the AGENCY's said disclosure of sub - consultants' information.
XX. Records Maintenance
During the progress of the Work and SERVICES provided hereunder and for a period of not less than six (6) years
from the date of final payment to the CONSULTANT, the CONSULTANT shall keep, retain and maintain all
"documents" pertaining to the SERVICES provided pursuant to this AGREEMENT. Copies of all "documents"
pertaining to the SERVICES provided hereunder shall be made available for review at the CONSULTANT's place
of business during normal working hours. If any litigation, claim or audit is commenced, the CONSULTANT shall
cooperate with AGENCY and assist in the production of all such documents. "Documents" shall be retained until
all litigation, claims or audit findings have been resolved even though such litigation, claim or audit continues past
the six (6) year retention period.
For purposes of this AGREEMENT, "documents" means every writing or record of every type and description,
including electronically stored information ( "ESI "), that is in the possession, control, or custody of the
CONSULTANT, including, without limitation, any and all correspondences, contracts, AGREEMENTs, appraisals,
plans, designs, data, surveys, maps, spreadsheets, memoranda, stenographic or handwritten notes, reports, records,
telegrams, schedules, diaries, notebooks, logbooks, invoices, accounting records, work sheets, charts, notes, drafts,
scribblings, recordings, visual displays, photographs, minutes of meetings, tabulations, computations, summaries,
inventories, and writings regarding conferences, conversations or telephone conversations, and any and all other
taped, recorded, written, printed or typed matters of any kind or description; every copy of the foregoing whether
or not the original is in the possession, custody, or control of the CONSULTANT, and every copy of any of the
foregoing, whether or not such copy is a copy identical to an original, or whether or not such copy contains any
commentary or notation whatsoever that does not appear on the original.
Agreement Number: 17- I
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 13 of 14
Revised 4/10/2015
For purposes of this AGREEMENT, "ESI" means any and all computer data or electronic recorded media of any
kind, including "Native Files ", that are stored in any medium from which it can be retrieved and examined, either
directly or after translation into a reasonably useable form. ESI may include information and/or documentation
stored in various software programs such as: Email, Outlook, Word, Excel, Access, Publisher, PowerPoint, Adobe
Acrobat, SQL databases, or any other software or electronic communication programs or databases that the
CONSULTANT may use in the performance of its operations. ESI may be located on network servers, backup
tapes, smart phones, thumb drives, CDs, DVDs, floppy disks, work computers, cell phones, laptops or any other
electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any
personal devices used by the CONSULTANT or any sub - consultant at home.
"Native files" are a subset of ESI and refer to the electronic format of the application in which such ES1 is normally
created, viewed, and /or modified.
The CONSULTANT shall include this section XX "Records Maintenance" in every subcontract it enters into in
relation to this AGREEMENT and bind the sub - consultant to its terms, unless expressly agreed to otherwise in
writing by the AGENCY prior to the execution of such subcontract.
In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the
"Execution Date" box on page one (1) of this AGREEMENT.
Signature Je
Ch f Executive Officer (CEO)
Jim Ferrell, Mayor
City of Federal Way
Approved As to Form:
jo/ J. Ryan Call, City Attorney
Date
g-A3/-7
Date
Agreement Number: 17- I SA-
Local Agency A &E Professional Services Negotiated Hourly Rate Consultant Agreement Page 14 of 14
Revised 4/10/2015
Exhibit A
Scope of Work
PLEASE SEE ATTACHED SCOPE OF WORK.
Project No.
Agreement Number: 17-
WSDOT Form 140 -089 EF Exhibit A Page 1 of 1
Revised 10/30/2014
Parametrix
ENGINEERING . PLANNING . ENVIRONMENTAL SCIENCES
SCOPE OF WORK
City of Federal Way
City Center Access Project
PROJECT UNDERSTANDING
The City Center Access Project proposes to build a new interchange in Federal Way on Interstate 5 (1 -5), and
construct improvements at the existing S 320th Street interchange. This work includes a study and evaluation of
alternatives, the identification of a preferred alternative, environmental documentation, an Interchange
Justification Report (IJR), and preliminary engineering for the preferred alternative. Specifically, this project will
address the current conditions, future needs, and environmental impacts associated with enhancing traffic
operations, safety, and efficiency along the 1 -5 mainline in the vicinity of the City Center in Federal Way.
The Consultant, Parametrix, will work closely and collaboratively with the City of Federal Way (City) staff, an IJR
support team, and project stakeholders in initiating this study and fostering input and acceptance of project
decisions, methods, and outcomes in the analysis of traffic studies, as well as during the completion of the IJR and
environmental documentation.
The Consultant will prepare a specific Public Involvement and Communications Plan that will help guide the
process and communication protocols. This will include the preparation of a Chartering Agreement to align
project expectations, stakeholder involvement, and meeting protocols with the overall objectives of the project.
Task 01 - Project Management
Task 1.1 Project Management Plan
The Consultant will prepare a Project Management Plan outlining the scope of work, schedule, budget,
change management process, communication protocol, and quality assurance and control procedures. The
Project Management Plan will be updated periodically during the life of the project and will be shared with
team members and City of Federal Way staff. This task also includes scoping activities for subsequent work
orders.
Task 1.2 Monthly Progress Reports and Invoices
The Consultant will provide a monthly progress report with monthly invoices to the City of Federal Way that
will describe work performed by the Consultant Team members during the current reporting period. The
progress reports will be prepared in a format approved by the City's Project Manager. This format will include
the following:
a. A listing of activities by work element performed during the reporting period, including meetings held
and deliverables.
b. A listing of problems and issues encountered during the reporting period and their resolution.
c. A listing of activities to be accomplished during the next reporting period.
City of Federal Way
City Center Access Project 1 August 15, 2017
SCOPE OF WORK (continued)
Task 1.3 Monthly Progress Meetings and Other Communication
The Consultant Team will conduct monthly progress review meetings with the City's core management to
review the scope, schedule, and budget status; risk matrix tracking list; upcoming project meetings,
communication, and work items; and, project strategy to resolve issues or barriers to success.
Communication will also occur via e -mail and telephone. This task will also include a regular bi- weekly call
scheduled approximately 2 weeks before /after the monthly progress meetings.
Task 1.4 Subconsultant Coordination
The Consultant Team will develop and maintain subcontracts with all subcontractors and coordinate progress
reporting and billing through the Consultant project manager.
Task 1.5 Consultant Team Meetings
The Consultant will hold bi- weekly Consultant Team check -in meetings to communicate and coordinate work
progress and upcoming activities. These meetings will be attended by project leads and other key staff. Half
of the meetings will be in person, and the other half will be conference calls.
Assumptions
• This project will be completed in 21 months.
Deliverables
• Subconsultant Agreements (maintained in Consultant's files)
• Monthly progress reports and monthly invoices
• Risk management tracking list for monthly progress meetings
• Draft and final Project Management Plan including Quality Assurance/ Quality Control Plan
• Updates to the Project Management Plan
Task 02 — Re- initiation
Task 2.1 Team Chartering
The Consultant will develop a team charter for the IJR support team identified in Task 4. A draft project
charter will be developed for the first meeting and will include roles and responsibilities of project team
participants, a draft project description, a proposed decision- making process, project work elements,
schedule, and IJR support team's structure, roles, responsibilities, and ongoing involvement.
Task 2.2 Purpose and Need
The Consultant will revise the existing draft Purpose and Need Statement for the City of Federal Way and IJR
support team review.
Task 2.3 Validation of Previous Alternatives Screening Process
The previous study screened 47 alternatives before deciding on two build alternatives. The Consultant will
analyze the previous screening and prepare a memorandum and presentation for evaluation by the City and
the IJR support team to validate the previous work resulting in two build alternatives.
City of Federal Way August 15, 2017
City Center Access Project 2
SCOPE OF WORK (continued)
Task 2.4 Documented Categorical Exclusion (DCE) Verification
The Consultant will develop a brief technical memorandum with an overview of the key environmental
elements that will be considered to facilitate a conversation with the IJR support team regarding the
appropriate level of environmental documentation.
Assumptions
• The previous screening process arriving at the two alternatives will be validated. These two alternatives
are: 1) new interchanges at 1 -5 and S 312th Street, and 2) 1 -5 and S 324th Street. The Consultant will
develop variations of these two build alternatives as detailed in the tasks below.
Deliverables
• Team Charter
• Revised Purpose and Need
• Screening Validation Memorandum
• Environmental Overview Memorandum
Task 03 — Public Involvement and Communication
Task 3.1 Public Involvement and Communications Plan
The Consultant, in coordination with City of Federal Way staff, will draft a Public Involvement and
Communications Plan for work through the IJR. The document will describe the methods and tools (both
traditional and non - traditional) to be used for engaging the community and stakeholders during this phase. This
document also will address environmental justice outreach. The plan will include a community profile, as well as a
demographic analysis identifying the population by race and ethnicity, and determining the presence and
inclusion of low- income and limited English- proficiency populations. This information will assist in developing
appropriate outreach techniques to ensure that the public involvement process is inclusive of those populations
who may have been traditionally under - represented in the public interaction process. The plan will include all
communication strategies.
Prior to drafting the plan, the Consultant will schedule, plan, and facilitate one 2 -hour Public Involvement and
Communications Planning Workshop with the City of Federal Way and prime task leads, as appropriate. The
purpose of the workshop is to:
• Identify public input opportunities connected to project milestones and decision points
• Identify key issues and messages
• Identify communication risks and mitigation strategies, including communication and outreach goals and
objectives
Based on outcomes from this workshop, the Consultant will develop a draft, revised, and final Public Involvement
and Communications Plan. Table 3 -1 summarizes the efforts comprising public outreach and communications for
the project.
City of Federal Way August 15, 2017
City Center Access Project 3
SCOPE OF WORK (continued)
Table 3 -1. Summary of Public Outreach and Communications
Task
Assumptions (if applicable)
Deliverables
Public Involvement
and
Communications
planning workshops
Draft, revised, and
final Public
Involvement and
Communications
Memorandum
• Consultant facilitates one 2 -hour planning workshop in
the first month of this project. Two Pacific Rim Resources
(PRR) and two Parametrix Consultant staff members will
attend the workshop. The workshop will focus on
outreach planning and inform messaging. The goals of
the workshops will be to:
1. Prioritize issues
2. Plan messaging
3. Identify specific neighborhood needs
• Assumes three rounds of review for the Public
Involvement and Communications memorandum.
• Public Involvement and Communications memorandum
will include a plan for community briefings and tabling
opportunities.
• Public Involvement and Communications memorandum
will include an updated environmental justice outreach
plan based on information collected during prior project
phases.
• Agenda
• Planning and facilitation of
one 2 -hour outreach
planning workshop
• One outreach planning
workshop summary
memorandum
• Messaging memorandum
• One draft, revised, and final
Public Involvement and
Communications
memorandum
Monthly public
involvement and
communications
implementation
reporting
• Monthly public involvement implementation reports will
track overall public involvement progress. The reports
will include:
• A list of all public events held throughout the month
• An outreach tracking matrix listing the purpose and
outcome of each event
• Estimates of the number of community members
reached (including low- income, minority, and limited -
English proficiency populations, as appropriate)
• Nineteen monthly public involvement and
communications implementation reports
• Nineteen monthly public
involvement and
communications
implementation reports
Task 3.2 Stakeholder Engagement
The Consultant will conduct up to ten stakeholder interviews.
The Consultant will coordinate up to three stakeholder meetings to supplement the stakeholder interviews. The
Consultant will plan and implement logistics, staffing, and facilitation, and provide note - taking support for these
meetings.
The City will approve the list of stakeholders the Consultant will interview. Table 3 -2 summarizes the stakeholder
engagement activities for this project.
City of Federal Way August 15, 2017
City Center Access Project 4
SCOPE OF WORK (continued)
Table 3 -2. Summary of Stakeholder Activities
Task
Stakeholder
interviews
Assumptions (if applicable)
• The City will provide input on key stakeholders.
• The Consultant will develop a draft and final list of stakeholders
to interview.
• The Consultant will develop a draft and final list of interview
questions.
• The Consultant will conduct up to 10 stakeholder interviews.
Assumes one PRR staff member for up to 1 hour per telephone
interview, including setup and summary draft work.
• The Consultant will provide a summary of all the stakeholder
interviews.
Deliverables /work products
• Draft and final list of
stakeholders to
interview
• Draft and final list of
interview questions
• Up to 10 stakeholder
interview notes
• Summary of
stakeholder interviews
Stakeholder
meetings
• The Consultant will coordinate up to three 2 -hour stakeholder
meetings, including preparation, travel, facilitation, attendance,
and note - taking. Assumes two PRR and three Parametrix staff
members.
• Materials for the meeting will be prepared as part of Task 3.6.
• Up to three event
plans
• Up to three
stakeholder meeting
summaries
•
Task 3.3 Community Events and Engagement
The Consultant will support City communication with residents, property owners, and business owners in the
project area.
The Consultant, in coordination with City staff, will coordinate up to three public meetings. Table 3 -3 summarizes
the community engagement activities.
Table 3 -3. Summary of Community Engagement Activities
Task
Assumptions (if applicable)
Deliverables /work
products
Support communication • Up to four neighborhood briefings. Assumes one staff
with residents along project person for up to 10 hours for each meeting, including
alignment planning, travel, day of preparation, and summary draft
work.
• Attend up to four
neighborhood
briefings
• Up to four
neighborhood
briefing summaries
City of Federal Way
August 15, 2017
City Center Access Project 5
SCOPE OF WORK (continued)
Deliverables /work
Task Assumptions (if applicable) products
Tabling events and • Direct outreach at up to two outreach tabling events at • Up to four tabling
informational tables at fairs libraries, shopping centers, food banks, and transit centers. summaries
and festivals Assumes up to 10 hours of planning for PRR and six for
Parametrix. Assumes one staff member for up to 7 hours
per event, including travel, setup, take -down, and summary
draft work.
• Direct outreach support for up to 2 days of pre - scheduled
community events, such as farmers markets, summer
concerts, or community fairs and festivals. Assumes two
PRR staff persons at each event.
• Event summaries will include the purpose and outcome of
each event; estimates of the number of community
members reached; low- income, and limited - English
proficiency populations reached; and a summary of
comments.
Public meetings
• Logistics, staffing, and note - taking support for up to three
public meetings. Assumes 2 -hour events. Assumes one PRR
staff person for up to 40 hours to plan each meeting to
coordinate logistics. Assumes two PRR staff persons to
attend and take notes, including travel, set -up, tear -down,
and draft summary work, and 40 hours Parametrix staff
time for attendance and review of meeting summaries.
• Support the City in creating an online open house through
the City's website, with meeting materials from the open
house and an online comment form.
Business outreach
• Up to three event
plans
• Up to three public
meetings
• One online open
house
• Up to three
meeting summaries
• Up to three business block meetings. Assumes one PRR
staff person for up to 20 hours for each meeting, including
planning, travel, day of preparation, and summary draft
work, and one Parametrix staff person for up to 8 hours per
each meeting to prepare and attend. Assumes City staff
person is present at the meeting.
• Door -to -door events up to three times at businesses in the
project area. Assumes two staff persons for up to 10 hours
per door -to -door event, including initial planning, travel,
day of preparation, and summary draft work.
• Up to three event
plans
• Up to three
business block
meeting summaries
• Up to three
business door -to-
door summaries
Task 3.4 City Council Meetings
The Consultant will support City staff to provide project updates and briefings to the City Council. Table 3 -4
summarizes the project updates and briefings for the City Council.
City of Federal Way August 15, 2017
City Center Access Project 6
SCOPE OF WORK (continued)
Table 3 -4. City Council Updates and Briefings
Task Assumptions (if applicable)
City Council meetings
presentations
• Parametrix will develop a draft and final slide deck for up
to six City Council meetings. Assumes up to 10 slides per
deck. Assumes 20 hours Parametrix staff hours per deck.
Assumes City provides City Council slide deck template
and coordinates time on the agenda.
• Parametrix will attend up to six Council Meetings.
Deliverables /work products
• Up to six slide decks
• Up to six talking points
• Up to six briefing
summaries
• The Consultant will develop up to three, 1 -page handouts,
and three sets of talking points for up to 21 one -hour
briefings with City Council staff.
• Assumes one PRR staff person to attend and draft notes
and one PMX staff.
• Assumes City staff will schedule briefings and participate in
meetings.
• Up to three handouts
• Up to three talking
points
• Up to 21 briefing
summaries
Task 3.5 Support City Website
The Consultant will support City staff to provide content and updates for a project website. This task assumes the
City will provide back -end IT support for the website. Table 3 -5 summarizes the support activities for the City
website.
Table 3 -5. Summary of Support Activities for the City Website
Task
Assumptions (if applicable)
Deliverables /work
products
Content for project website
• The Consultant will develop a draft, revised, and final
outline for the project website.
• The Consultant will develop draft, revised, and final content
for the project website.
• The Consultant will provide up to 10 graphics formatted for
the website.
Website updates
• Content outline
• Website content
• Up to 10 graphics
for website
• The Consultant will provide up to 12 updates to the website
to share project news, upcoming meetings, and outreach
summaries.
• Up to 12 website
updates
Task 3.6 Public Information Materials and Special Graphics
The Consultant will develop materials and conduct other activities to support public outreach efforts. Tasks may
include developing graphics, drafting written materials, and performing other miscellaneous activities. This task
assumes up to three rounds of review for all public information materials. Table 3 -6 summarizes the support
activities for developing public information materials and special graphics.
City of Federal Way August 15, 2017
City Center Access Project 7
SCOPE OF WORK (continued)
Table 3 -6. Summary of Support for Public Information Materials and Special Graphics
Task
Assumptions (if applicable)
Deliverables
Project materials
• Up to three project update folios or fact sheets.
• Up to 30 display boards for public meetings and
outreach events. Assumes up to 3 hours per display
board.
• Up to 6 online project newsletters distributed to
project listserv. Assumes up to 6 hours per
newsletter.
• Up to three comment forms.
• Up to three additional 1 -page handouts.
• Printer -ready artwork for
up to three project
update materials
• Printer -ready artwork for
up to 30 display boards
• Up to 6 online project
newsletters
• Up to three comment
forms
• Up to three additional
1 -page handouts
Final outreach report
• At the conclusion of this phase, the Consultant will
draft and format a report that will summarize and
document all public outreach activities. The report
will be distributed to the City Council, key
stakeholders, and posted to the project website.
• Final outreach report
Task 3.7 Advertising
The Consultant will coordinate and prepare materials to advertise public meetings. This task assumes up to three
rounds of review for all advertising materials. Table 3 -7 summarizes the support activities for advertising public
meetings.
Table 3 -7. Summary of Support Activities for Advertising Public Meetings
Task
Assumptions (if applicable)
Deliverables
Postcards
• The Consultant will coordinate with the City staff to
determine the mailing list for postcards.
• Assumes up to three postcards to advertise public
meetings, within mailing radius approved by City staff. The
Consultant will coordinate with the printer and City staff to
print and distribute postcards.
• Assumes postcard will include language block with
translated information (in languages as determined in
Public Involvement and Communications Plan).
• Mailing list
• Printer -ready
artwork for up to
three postcards
Display advertisements
• The Consultant will prepare up to three advertising plans to
be reviewed and approved by City staff, and will traffic the
advertisements.
• Up to three display advertisements (available in online and
print versions) to post in local publications to advertise
public meetings.
• Up to three draft
and final
advertising plans
• Up to three
advertisements
•
City of Federal Way August 15, 2017
City Center Access Project 8
SCOPE OF WORK (continued)
Task 3.8 Environmental Justice Outreach
The Consultant will plan, schedule, and support consultations with social service providers in the project corridor.
These will keep the providers engaged in the project and seek ways of engaging their audiences. The Consultant
will develop summaries of each session.
The Consultant will plan, schedule, and support project consultations with environmental justice groups, such as
English as a Second Language (ESL) class presentations. The Consultant will develop summaries of each briefing.
The Consultant will provide interpretation at community and business meetings with limited English- proficiency
attendees. The Consultant will translate project handouts into Korean, Russian, Vietnamese, and Spanish (if
confirmed through initial demographic analysis in Task 3.1). Table 3 -8 summarizes the support activities for
environmental justice outreach.
Table 3 -8. Summary of Environmental Justice Outreach
Task
Assumptions (if applicable)
Deliverables /work
products
Service provider
consultations
• Service provider consultation summaries will list all
providers in attendance, summarize their comments,
identify the communities each provider serves, estimate
the number of community members each
provider /agency serves, and if low- income, people of
color, and limited - English proficiency populations are
served.
• Assumes 8 service provider consultations lasting 1 hour
each.
• Assumes one PRR staff person for up to 10 hours for
each meeting, including initial planning, travel, day of
preparation, and summary draft work.
Environmental justice group • Assumes 8 environmental justice group briefings lasting
briefings 1 hour each.
• Assumes one PRR staff person for up to 11 hours for
each meeting, including initial planning, travel, day of
preparation, and summary draft work.
• Consultation outline
and plan
• Up to eight service
provider briefing
summaries
• Up to eight
environmental justice
group briefing
summaries
Task 3.9 Comment Management
The Consultant will manage public correspondence and track comments through a database. Table 3 -9
summarizes the database management of correspondence and comments.
City of Federal Way August 15, 2017
City Center Access Project 9
SCOPE OF WORK (continued)
Table 3 -9. Summary of Comment Management
Task
Assumptions (if applicable)
Deliverables
Set up database and • City staff will provide preferences on how to manage public
comment management comments and protocols. The Consultant will outline
protocols direction in comment management plan.
• Based on direction from the City, the Consultant will set up
a database.
• Comment
management plan
• Database
Correspondence
Database maintenance
• The Consultant will draft replies to e -mails and telephone
inquiries that require a response. City staff will review all
responses.
• Assumes up to 8 hours a month for correspondence.
• Record of public
correspondence
• The Consultant will add new contacts and comments each • Database updates
month. (16)
• The Consultant will update the database with contacts and
comments following briefings and other public meetings.
• Assumes up to 10 hours per month for updates.
Task 3.10 Strategic Assistance
As directed by the City, the Consultant will address community concerns and other issues that arise. The
Consultant may participate in strategy sessions, impromptu meetings, correspondence, and telephone calls with
City staff. The Consultant will document those activities through action item lists, track follow- through activities,
and identify the next -steps in the process. Special projects may be assigned as identified by City, such as
conducting additional community outreach and preparing project information and graphics. Table 3 -9
summarizes the strategic assistance required by the City.
Table 3 -10. Summary of Strategic Assistance
Deliverables /work
Task Assumptions (if applicable) products
Strategic Assistance • Assumes up to 20 hours of Consultant support for strategic • Memorandum
assistance and special projects as assigned by the City. documenting
direction from the
City
Assumptions
• As indicated in above tables
Deliverables
• As indicated in above tables
City of Federal Way August 15, 2017
City Center Access Project 10
SCOPE OF WORK (continued)
Task 04 — IJR Support Team Meetings
Task 4.1 IJR Support Team Meetings
The Consultant Team will organize and lead monthly meetings of the IJR support team. The invitation list for
this meeting will include staff from:
a. City of Federal Way
b. Washington State Department of Transportation (WSDOT) Northwest Region
c. WSDOT Headquarters
d. Federal Highway Administration (FHWA)
e. Puget Sound Regional Council (PSRC)
f. King County Metro Transit
g. King County Roads
h. Puget Sound Regional Transit Authority (Sound Transit)
i. Pierce Transit
j. Puyallup Tribe
k. Muckleshoot Tribe
I. Consultant Team
The Consultant Team will prepare agendas, provide information prior to the meetings, develop
presentations, and prepare meeting minutes. Outreach to the IJR support team is included in this task as
required to communicate goals, information, meeting attendance, and answer questions about
information provided.
Up to 14 meetings will be held and likely include the following_
• Meeting #1 and #2, Project Re- initiation (team charter, project Purpose and Need, DCE, and build
alternatives validation)
• Meeting #3, Methods and Assumptions Document
• Meeting #4, Existing and No Build Transportation Conditions
• Meeting #5, Develop Sub - Alternatives
• Meeting #6, Refine Alternatives and First Level Screening
• Meeting #7 - #8, Second Level Screening and Select a Preferred Alternative (includes presentation of
technical materials)
• Meeting #9, Review Policy Points 1, 2, 5, 6, and 7
• Meeting #10, Review Policy Points 3, 4, and 8
• Meeting #11, Draft IJR
• Meeting #12, Finalize IJR Review Comment /Responses
• Meeting #13, Sign Final IJR
• Meeting #14, (extra meeting if needed)
City of Federal Way August 15, 2017
City Center Access Project 11
SCOPE OF WORK (continued)
Assumptions
• Meetings will be 2 hours in length and held in Federal Way.
Deliverables
• Materials for IJR support team review
• Agendas and meeting minutes
Task 05 — Travel Demand Model Forecasts
PSRC maintains a travel demand model that incorporates all the Puget Sound area. Federal Way's model is based
on PSRC's Regional EMME 4K Model and includes detailed representation of the study area. The traffic modeling
for the City Center Access IJR will utilize previous traffic model data as much as possible, but given the time
duration between the previous analyses and this new work, it is expected that model refinement will be required.
Model updates and refinement will be focused on the existing conditions and 2040 future conditions models.
Task 5.1 Review Existing Information:
The Consultant will collect and review the available traffic volume, forecast, and operational analysis information
prepared previously for the study area. Data sources will include reports and documentation prepared for other
relevant studies. The Consultant will also collect the most current operations and demand model data files from
the City.
Task 5.2 Confirm Traffic Analysis Zone (TAZ) Land Use Assumptions
It is assumed the City will provide the existing and future lane use assumptions by TAZ in the City and PAA. Land
use assumptions for TAZ outside the city will be provided by the Consultant. The Consultant will work with the
City to coordinate the lane use assumptions with PSRC.
Task 5.3 Travel Demand Model Forecasts
The City's existing and forecast travel demand model will be used to develop traffic forecasts for the study area.
a. The existing models will be updated by the Consultant to reflect current land use
assumptions and changes to the roadway network as agreed upon with the City. The model
will be validated by comparing link level forecasts with current traffic count data for up to
eight north /south and east /west screenlines within the City of Federal Way with additional
refinement at intersections within the project area. Model calibration will focus on
link /node, turn penalty, speeds, capacities, and volume delay functions. Methods from
NCHRP Report 716 will be employed, along with Consultant's standard internal practices for
model validation.
b. The 2040 forecast conditions model will also be updated by the Consultant and verified for
reasonableness to reflect updated land use assumptions and incorporate any other network
changes necessary to reflect future conditions. The analysis will include a No Build
alternative and up to two Build alternatives reflecting new 1 -5 interchange scenarios. It is
assumed that the model updated required for the two Build models will focus on roadway
network updates.
City of Federal Way August 15, 2017
City Center Access Project 12
SCOPE OF WORK (continued)
Approach will include:
Due to the inability to examine base year employment data at the Transportation Analysis Zone
(TAZ) level (because of confidentiality issues), it will be necessary to have the trip generation
process of the Federal Way travel demand model be completed in two steps.
The first step involves running the trip generation model for the 251 TAZ's (1000 — 1251) located
in Federal Way. This process will be performed by Federal Way staff with tables, spreadsheet
provided by consultant. The regional trip generation model will be modified to produce
"unbalanced" trip productions and attractions for the six trip purposes used in the travel demand
model. Unbalanced productions and attractions are required to properly account for commuting
patterns in the City.
The second step will require obtaining the "unbalanced" trip productions and attractions from
the Puget Sound Regional Council. The productions and attractions will be developed using
PSRC's 4,000 zone system.
Upon receipt of the PSRC data, the data reflecting productions and attractions for TAZ5 in Federal
Way will be replaced with the City production and attractions created by City staff. The revised
regional trip productions and attractions will then be aggregated for Federal Way Travel Model
TAZs that represent more than one PSRC TAZ.
The new Federal Way trip production and attraction data will then be balanced in a manner
consistent with what is done in the PSRC regional travel demand model.
The approach outlined above complies with the confidentiality requirements of data obtained
from employment summaries derived from the Quarterly Census of Employment and Wages
(QCEW) submitted to the Washington State Employment Security Department.
5.4. Technical Memorandums
Technical memorandums will be prepared that document the forecast methodologies, assumptions, coordination
with jurisdictions, and findings.
Assumptions:
• If requested by WSDOT, the consultant will straight -line volumes from the 2040 model for year 2045
analysis in lieu of 2040 analysis.
• Consultant will perform network (auto, transit, light rail networks, etc.) editing for Base and 2040 Model.
• Consultant will provide tables for conversion between Federal Way and PSRC TAZs
• Consultant will coordinate and secure input trip tables from PSRC and land use outside of Federal Way
• City will provide most recent Federal Way EMME models and all available traffic count data
• Latest PSRC model will reflect recent change in tolling assumptions and transit and light rail networks.
Consultant shall review various pricing strategies implemented in the latest PSRC model and work with
staff to determine if such strategies should be reasonable in the City Center model.
City of Federal Way August 15, 2017
City Center Access Project 13
SCOPE OF WORK (continued)
Deliverables
• Validated Base Year and 2040 PM Peak hour Travel Demand Forecast Model.
• Draft and final travel demand modeling technical memorandum
Task 06 — Traffic Forecasts and Operations Analysis
Task 6.1 Data Collection:
a. The Consultant will coordinate with the City to obtain any readily available traffic count data
from the past 5 years. The Consultant will arrange for the collection of weekday AM and PM
new turning movement count data for up to 30 intersections and up to eight weekday and
three weekend 24 -hour tube counts. Current traffic volumes for freeway mainline and
ramps will also be collected from WSDOT by the Consultant with assistance from City staff if
needed due to WSDOT process. The counts will be collected for morning and evening peak
periods, and weekends including daily totals. The current intersection, freeway ramp, and
mainline traffic volumes will be checked and compiled and graphically displayed on roadway
network maps.
b. The Consultant will also collect available signal timing plans from the City and WSDOT for the
study intersections for Vissim model calibration..
c. The Consultant will collect travel time for up to 10 origin- destination pairs and queue data
for the freeway limits within the study area and the study intersections for use in the VISSIM
model calibration.
d. The Consultant will observe AM and PM peak hour field conditions for 3 separate days. This
information will be used in the VISSIM model calibration and in confirming the project
purpose and need.
Task 6.2 Detailed Traffic Forecasts:
The updated travel demand model analysis will be used in developing detailed traffic forecasts. The Consultant
will complete the following tasks.
a. The Consultant will review weekday and weekend traffic count data collected to determine
the peak analysis period. Conclusions of this review will support the Methods and
Assumptions document prepared for the IJR.
b. A methodology will be created to develop intersection turn movement, ramp, and 1 -5
mainline traffic volumes from the updated travel demand model effort. The method will be
agreed upon by the City and IJR support team, and will be consistent with WSDOT and
National Cooperative Highway Research Program (NCHRP) methodologies. The traffic
forecast methodology will be documented in the IJR methods and assumptions document.
c. Turn movements, ramp, and 1 -5 mainline traffic volumes will be developed for the existing,
No Build, and up to two Build alternatives for the AM and PM peak hours. Daily traffic
volumes will be developed for the freeway mainline and ramps and key locations along the
arterials.
City of Federal Way August 15, 2017
City Center Access Project 14
SCOPE OF WORK (continued)
Task 6.3 Screening Level Traffic Operations Analysis
The following analyses will be completed by the Consultant to support alternatives development and screening. It is
assumed the analyses will be conducted for the AM and PM peaks for existing and horizon year only.
a. Operations analysis will be conducted for the study intersections using Synchro or Sidra for
up to 30 individual locations to support the alternative screening, including analysis of
intersection control options such as signals, roundabouts, or a diverging diamond.
b. Freeway Operations Analysis: HCS software analysis will be conducted for ramp merge,
diverge, and mainline locations within the study area, as necessary, to support the selection
of alternatives.
c. Safety Analysis: The Highway Safety Manual crash modification factors and /or calculation of
conflict points will be used to screen intersection control and alternative configurations.
Task 6.4 Policy Point 3 and Environmental Document Traffic Operations Analysis
A more detailed traffic operations analysis will be completed to support the IJR and environmental document
requirements. It is assumed this will be completed for the existing conditions, the No Build alternative, and two
Build Alternative, and will supplement the screening level analysis with an AM and PM peak hour opening year
analysis.
a. VISSIM operations analysis: An existing VISSIM model will be built and calibrated according
to WSDOT VISSIM protocol requirements. A No Build Alternative model will be developed
from the existing model, including changes in roadway network as shown on current plans.
The Build Alternative model will reflect one Build Alternative. It is assumed the VISSIM
model study limits will include 1 -5 and its interchanges, including the ramp termini
intersections.
b. Local operations analysis: The local operations analysis conducted in the screening analyses
will be used to document the final existing, No Build, and one Build Alternative condition for
the study time periods and years.
c. Safety Analysis: The safety analysis will be completed consistent with WSDOT procedures.
This includes collecting historic collision data (previous 5 years), and predicting existing and
future collisions using the Highway Safety Manual and the Enhanced Interchange Safety
Analysis Tool (ISATe).
Assumptions
• The traffic forecasting and operations analysis study area is assumed to include two existing and two new
freeway interchanges and up to 30 intersections.
• Detailed AM and PM weekday peak hour and daily total traffic volumes will be forecasted for
documentation in the IJR.
• Operations analysis will be conducted for one peak hour condition. The critical peak hour will be
determined and agreed during the development of the Methods and Assumptions document.
• Technical memorandums will be prepared for this task according to the WSDOT VISSIM protocol, and to
document assumptions, as needed, that are not a requirement of the IJR. Any traffic operations analysis
City of Federal Way August 15, 2017
City Center Access Project 15
SCOPE OF WORK (continued)
and documentation that are a requirement of the IJR will be prepared under this task and included in the
IJR.
Deliverables
• Traffic operations models
• WSDOT VISSIM protocol technical memorandums
Task 07 — Interchange Justification Report (IJR) Methods and Assumptions
The Consultant will prepare an IJR in compliance with the WSDOT Design Manual.
Task 7.1 Methods and Assumptions Document.
The Consultant will prepare a draft and final methods and assumptions document to include the following:
a. Tools and methods to be used in completing the travel demand modeling.
b. Methods and software to be used in the operations model, and simulation tools for
predicting traffic behavior and operational metrics.
c. Study area, including graphics depicting the limits.
d. Base year, opening year, and design year for the operational analyses and travel demand
modeling outputs.
The Consultant will also perform the following:
• Draft methods and assumptions document submitted to the IJR support team and review assumptions at
an IJR support team meeting.
• Review comments following meeting (1 week to submit comments) and finalize the methods and
assumptions document for signature approval.
• Incorporate draft review comments and prepare final methods and assumptions document for signature
at an IJR support team meeting.
Deliverables
• Methods and Assumptions Memorandum, Draft and Final
Task 08 — Environmental Evaluation for Alternatives Screening
The purpose of this task is to provide environmental analyses in support of the City's evaluation of two alternative
locations for the new interchange and selection of a preferred alternative. To meet this objective, environmental
analyses will be focused on disciplines for which (1) there are important distinctions between alternatives that
could inform the decision; (2) the public and stakeholders have expressed interest or concern; and (3) due
diligence is appropriate to ensure there are not any fatal flaws. The environmental screening will address the
preferred configuration for each alternative interchange location.
The disciplines included in this task are cultural resources, ecological resources, noise, hazardous waste, parks and
recreation resources, and social and community effects. (Traffic analysis is included elsewhere.) The level of
analysis for each discipline will be appropriate to inform decision - making. For most disciplines, detailed analyses
will be deferred until after the preferred alternative is selected.
City of Federal Way August 15, 2017
City Center Access Project 16
SCOPE OF WORK (continued)
Task 8.1 Cultural Resources
The Section 106 process will be deferred until a preferred alternative is selected. Because the Area of Potential
Effects (APE) for the project has not been defined or approved by WSDOT and the Department of Archaeology
and Historic Preservation (DAHP), the Consultant will apply a study area that includes archaeological sites within
200 feet of the alternative alignments, and architectural resources within one parcel of the alternative
alignments.
The Consultant will conduct a records search using the DAHP Washington Information System for Architectural
and Archaeological Records Data (WISAARD) website to determine the presence or absence of cultural resource
studies and recorded cultural resources. The Consultant will conduct additional background research in its
cultural resource reference library and other online resources. Information obtained from these repositories will
help to establish the context for potential resources in the vicinity. The Consultant will conduct a 'windshield'
survey of each build alternative as part of the alternatives screening process.
Task 8.2 Ecological Resources
Ecosystem resources are defined as wetlands, streams, aquatic species and habitats, wildlife species and habitats,
vegetation, and threatened and endangered species. To support the evaluation of alternatives, the Consultant
will:
• Review literature and databases that identify the occurrence or potential occurrence of ecological
resources in the project vicinity.
• Perform field reconnaissance of the two alternative interchange locations to (1) confirm that there are no
visible changes to previously delineated wetlands and streams since 2009; and (2) confirm the absence of
any additional resources in the project vicinity.
• Review local, state, and federal regulations to determine if wetland categories, stream classifications, and
associated buffer widths have changed since 2009.
• Update potential impacts to wetlands, streams, and associated buffers based on changes to the
preliminary designs for the two Build alternatives.
Task 8.3 Noise
The Consultant will identify sensitive noise receptors in the vicinity of the new roadway alignments or existing
alignments expected to experience substantial increases in traffic volumes. Specifically, the Consultant will
identify receptors (homes) within 500 feet of the roadway construction limits in these areas. The Consultant will
prepare a map showing the proximity of these receptors to the project area to inform the screening of
alternatives.
Task 8.4 Hazardous Waste
The Consultant will review the hazardous material layer of the WSDOT GIS Workbench and Washington State
Department of Ecology Facility Site Atlas /ISIS database, and /or conduct an environmental regulatory database
search. The database report will include a map depicting identified sites within 1/2 mile of the project area and
confirm the absence of concerns that would render an alternative infeasible.
Task 8.5 Parks and Recreation Resources
City of Federal Way August 15, 2017
City Center Access Project 17
SCOPE OF WORK (continued)
The Consultant will confirm the location and proximity of parks and recreation resources, and identify how the
resources are used and by whom. The Consultant will re- evaluate direct impacts on these resources (i.e., right -of-
way acquisition), as well as how these resources may be indirectly affected by increases in traffic, traffic noise,
and changes in access.
Task 8.6 Social and Community Effects
For the purpose of alternative screening, social and community effects of concern pertain to changes in
community character and the potential for disproportionately high and adverse impacts on minority and low -
income populations in the study area.
The Consultant will evaluate the project's potential impacts on social and community resources, including
displacements; community cohesion; changes in travel patterns, travel times, and accessibility; impacts on social
services and community resources such as parks; impacts from traffic noise; project benefits to the community;
and project effects on the disabled, elderly, and transit - dependent. Most of these topics are addressed in other
discipline- specific analyses and will be summarized here and qualitatively assessed in terms of implications on
community character.
The Consultant will determine the potential presence of minority and low- income populations in the study area
by reviewing 2010 Census data and school lunch program data. If present, the potential effects on these
populations will be evaluated. Public outreach in Task 3 is already intended to address the need to include
persons with limited English proficiency.
Assumptions
• Assumptions applicable to all disciplines include: (1) Existing conditions have not substantially changed;
and (2) any design changes to the two alternative interchange locations will not substantially change the
study area.
Deliverables
• The deliverable for each discipline will be a brief screening paper (preliminary draft, revised draft, and
final) describing the affected environment and potential impacts. A comment - response table will be
provided with the revised draft and final document, showing how comments have been addressed.
Task 09 — Preliminary Hydraulics Evaluation
Task 9.1 Preliminary Hydraulics Evaluation
The Consultant shall identify and evaluate stormwater mitigation requirements and associated best management
practices (BMPs) based on jurisdictional boundaries, potential sensitive area or downstream impacts, existing
outfall locations, construction cost, long -term maintenance, roadway geometric design, and right -of -way
requirements. The evaluation shall cover the 2 build alternatives for the alternatives screening process. The
evaluation shall then proceed in further detail for the preferred alternative.
City of Federal Way August 15, 2017
City Center Access Project 18
SCOPE OF WORK (continued)
Approach:
• Coordinate with the City and King County to determine if there are any applicable sites that have
unmitigated stormwater impacts that are associated with projects after January 8, 2001.
• Review current sensitive area mapping, current basin plans, and current community plans for applicability
to stormwater requirements.
• Coordinate with WSDOT regarding the existing stormwater management facility in the southeast
quadrant of the I -5/5. 320th Street interchange for any modifications since 2008.
• Prepare a draft Stormwater Design Criteria Technical Memorandum that identifies stormwater
management requirements for water quality treatment, flow mitigation, and on -site flow control /Low
Impact Development (LID) BMPs. The draft memorandum shall include stormwater requirements of the
City, King County, and WSDOT for redevelopment projects, new impervious and pervious surfaces, levels
of treatment, level of flow control, and retrofit requirements. Meet with the City after review of the draft
Stormwater Design Criteria Technical Memorandum.
• Prepare the final Stormwater Design Criteria Technical Memorandum after draft review by the City, King
County, and WSDOT.
• Review previous delineation of preliminary on -site Threshold Discharge Areas (TDAs) based on roadway
designs of the two Build alternatives and existing contours, and update as necessary.
• Review previous delineation of off -site sub - basins that contribute stormwater to the TDAs and update as
necessary.
• Provide draft plots to the City of on -site TDAs and off -site tributary area delineation for the two Build
alternatives for review. There will be one plot for each alternative. Meet with the City after review of the
draft plots. Prepare final plots after review comments have been received by the City.
• Prepare area calculations for the amount of existing impervious surfaces, proposed impervious surfaces,
and existing impervious surfaces to be replaced within the overall project footprint of both Build
alternatives based on changes in aerial mapping and project changes.
• Calculate approximate water quality treatment and flow mitigation BMP facility sizes for up to 25 percent
of the TDAs for both Build alternatives. The results will then be pro -rated to the remaining TDAs for the
alternatives screening process.
• Evaluate the applicability of on -site flow control /LID BMPs for up to 25 percent of the TDA5 for
Alternatives 1 and 2. The results will then be applied to the remainder of the TDAs for the alternatives
screening process.
• Review previously identified potential water quality treatment and flow mitigation sites for applicability.
Identify and review potential additional sites if required.
• Develop conceptual pipe sizing for stormwater conveyance. The rational method will be used to estimate
a peak 25 -year mean recurrence interval flow rate for up to 25 percent of the TDA5 for both Build
alternatives to develop a per acre flow rate. The results will then be applied to the remaining TDAs for the
alternatives screening process.
• Perform a hydrologic and hydraulic analysis for modifying the existing stormwater management facility in
the southeast quadrant of the I -5 /S. 320th Street interchange.
City of Federal Way August 15, 2017
City Center Access Project 19
SCOPE OF WORK (continued)
• Coordinate water quality treatment, flow mitigation, and on- site /LID BMP design constraints with
roadway design and right -of -way.
• Prepare a draft Stormwater Screening Technical Memorandum that summarizes the results of the
stormwater analyses for both Build alternatives based on the approach items above. Include exhibits
showing TDA delineation, MGSFIood calculations, location of potential water quality treatment, flow
mitigation, and on- site /LID BMPs, right -of -way needs, and project footprint for conveyance and
stormwater treatment facilities. Meet with City to discuss the draft Stormwater Screening Technical
Memorandum and to receive City comments. The draft Stormwater Screening Technical Memorandum
will be finalized after receiving comments from the City, King County, and WSDOT.
Deliverables:
• Draft and Final Stormwater Design Criteria Technical Memorandum
• Draft and Final Stormwater Delineation Plots
• Draft and Final Stormwater Screening Technical Memorandum
Assumptions:
• Stormwater analyses for areas within City jurisdiction will be based on the 2016 King County Surface
Water Design Manual and errata, and the 2016 Federal Way Addendum to the King County Surface Water
Design Manual.
• Stormwater analyses for areas within King County jurisdiction will be based on the 2016 King County
Surface Water Design Manual and errata.
• Stormwater analyses for areas within WSDOT right -of -way will be based on the 2014 Highway Runoff
Manual and the February 2016 Supplement.
• For reviewing applicability to stormwater requirements, sensitive areas include the following and if
stormwater facilities can be included in buffers:
• Erosion hazard areas
• Steep slopes
• Landslide hazard areas
• Wetlands
• Streams
• Wellhead protection zones
• Groundwater and aquifer recharge areas
• Basin conditions
• Shoreline condition
• Seismic hazard
• A base map will be needed to reflect existing stormwater systems to assist with TDA delineation and
review of potential impacts. The base map will be prepared by the Consultant as part of Task 11.
• Geotechnical considerations for BMP selection during the alternatives screening process will be based on
information available through the Natural Resources Conservation Service (NRCS) website and
City of Federal Way August 15, 2017
City Center Access Project 20
SCOPE OF WORK (continued)
geotechnical information obtained previously for the project. The Consultant will use any other
geotechnical information, such as borings performed in the area since 2008, obtained by Shannon &
Wilson as part of Task 10 to assist in the BMP design for the alternatives screening process.
• Detailed geotechnical site investigation will be performed by Shannon & Wilson after selection of the
preferred alternative to support the BMPs designed for the Preferred Alternative Stormwater Report.
• Areas within King County are within King County's Urban Growth Area and will be considered a "Small
Road Improvement and Urban Road Improvement Project."
• HI -RUN v. 2.1 software will be used.
• The Stormwater Design Technical Memorandum will be up to 10 pages without exhibits or appendices.
• The Stormwater Screening Technical Memorandum will be up to 100 pages including exhibits and
appendices.
Task 10 Geotechnical
Task 10.1 Geology, Soils, and Topography Technical Memorandum
Shannon & Wilson will perform a geology and soils review of the project area. The results of the review will be
incorporated into Task 15.9 (Draft and Final IJR Report Preparation). The geology and soils review will include the
following elements:
• Coordination and quality control of geotechnical approach, including attendance of bi- weekly team
meetings, invoice and progress report preparation, response to team e -mail and telephone
communication, and managing scope, schedule, and budget, and any changes.
• Literature Review: Shannon & Wilson will collect review readily available geotechnical reports,
geotechnical exploration logs, well logs, as -built structure plans, and geologic maps within the project
area. Sources for the historical records will include research from Shannon & Wilson's in -house files, the
Washington State Department of Natural Resources Interactive Geologic Website, the U.S. Geological
Survey Fault and Folds database, King County Critical /Sensitive area and geologic hazard maps, and
information provided by WSDOT. Shannon & Wilson will attempt to retrieve published geotechnical
project reports from known projects completed by the City of Federal Way and Sound Transit within the
study area.
• Field Reconnaissance: Shannon & Wilson will perform one windshield survey field reconnaissance to
observe the site and surficial evidence of past geologic hazards. Vegetation clearing and subsurface
explorations will not be performed as part of Task 10.1. Soil, rock, and water samples will not be
collected.
• Existing Site Geology: Shannon & Wilson will evaluate the existing site geology and subsurface conditions
from the literature review and field reconnaissance.
• Geologic Hazards: Shannon & Wilson will evaluate potential geologic hazards that could affect the project
area. Potential hazards at the site may include seismic, volcanic, landslide, and erosion. Geologic Hazard
Maps for these hazards will not be developed.
• Coordination: Shannon & Wilson will coordinate with federal, state, and local agencies and tribes
regarding known geologic hazards within the project area.
• Existing and Potential Construction Materials: Shannon & Wilson will identify existing and potential
construction materials within the study area.
City of Federal Way August 15, 2017
City Center Access Project 21
SCOPE OF WORK (continued)
Conceptual layouts, including roadway alignments, bridges, earth retention walls, and noise walls will be made
available to Shannon & Wilson at the time of the study. If layouts and /or structures change, or are added or
removed from the study after the geology and soils review has begun, additional scope and fee may be necessary.
A stand -alone Geology /Soils Discipline Report will not be produced.
Based on the above analysis, Shannon & Wilson will prepare a Technical Memorandum summary of the geology
and soils findings. The Technical Memorandum will be prepared for inclusion as a section in the IJR.
The scope of work for Task 10.1 does not include a study of the alternative- specific impacts or mitigation options.
These scope items are included in Task 10.2 (Conceptual Engineering for the Preferred Alternative).
Assumptions:
• Geologic hazards often extend beyond the project's impact boundary. For this reason, the study area is
defined as any ground within a 2 -mile radius of the impact boundaries shown on the Alternative 1 and
Alternative 2 plan sheets. The Geology, Soils, and Topography Technical Memorandum study area,
results, and conclusions are applicable to both Alternative 1 and Alternative 2.
• Shannon & Wilson representatives will attend 3 Consultant coordination meetings (2 hours each) via
teleconference, and 2 Consultant coordination meetings (2 hours each) in person. We assume the
meetings will be held in Federal Way, Washington.
• Project duration for soils and geotechnical evaluations is anticipated to be 6 months.
• Three cycles of review will be required for the Geology, Soils, and Topography Technical Memorandum.
• No field explorations will be performed.
Deliverables:
• Draft and Final Geology, Soils, and Topography Technical Memorandum
Task 10.2 Conceptual Engineering for the Preferred Alternative
Shannon & Wilson will perform a conceptual geotechnical engineering analysis of the preferred alternative and
prepare a Conceptual Geotechnical Engineering Report. Portions of the report will be incorporated into Task 15.9
(Draft and Final IJR Report Preparation). The Conceptual Geotechnical Report for the preferred alternative will
include the following elements:
• Site Reconnaissance: Shannon & Wilson will perform a site reconnaissance of individual project elements
included in the preferred alternative. Vegetation clearing and subsurface explorations will not be
performed as part of Task 10.2. Soil, rock, and water samples will not be collected.
• Geologic Hazards: Shannon & Wilson will evaluate potential geologic hazards that could affect individual
project elements included in the preferred alternative. Potential hazards at the site may include seismic,
volcanic, landslide, and erosion. Geologic Hazard Maps for these hazards will not be developed.
• Review of historical borings and geotechnical information as they relate to the preferred alternative
project elements. This effort will include preparing maps and tables and, where there is sufficient soil
information, existing, subsurface profiles.
• Impact and Mitigation: Shannon & Wilson will perform an evaluation of the impacts associated with the
preferred alternative and provide recommendations for mitigation of the impacts.
City of Federal Way August 15, 2017
City Center Access Project 22
SCOPE OF WORK (continued)
• Conceptual Recommendations: Shannon & Wilson will provide conceptual geotechnical
recommendations for the preferred alternative related to:
• Suitable foundation types for bridges. Approximate bearing layers will be identified if existing soil
information is available.
• Feasible wall types for cuts and fills.
• Stormwater detention facilities geotechnical considerations including feasible foundation methods
• Cut and fill slopes geotechnical considerations.
Assumptions:
• Conceptual layouts, including roadway alignments, bridges, walls, and stormwater facilities, will be made
available to Shannon & Wilson at the time of the study. If layouts and /or structures change, or are added
or removed from the study after the geology and soils review has begun, additional scope and fee may be
necessary.
• In areas where no subsurface information is available, it may not be possible to provide conceptual
geotechnical recommendations.
• Two cycles of review will be required for the Conceptual Geotechnical Report.
Deliverables:
• Draft and Final Conceptual Geotechnical Report— Preferred Alternative
Task 11 — Alternatives Development
Task 11.1 Update Base Mapping
The Consultant will provide updates to the basemap to a sufficient detail to support the update and re- evaluation
of the two Build alternatives. This work will involve:
• Control Survey /Monumentation: Establish a network of control points and survey the locations of
existing monuments within the project area. This includes researching existing survey records
produced by WSDOT, the City of Federal Way, and surrounding developments.
• Field- Survey Obscured Areas and Recent Developments: Field- survey select areas identified from the
current aerial base map that are obscured by vegetation, or that have been developed since the
aerial base map was completed, and are needed to support the update of the two alternatives.
• Development of a digital terrain model (DTM) in select locations to support vertical design.
Assumptions
• Mapping will initially be developed by using photogrammetry methods, utilizing an Unmaned Aerial
Vehicle (UAV). This flight will provide high - resolution data to update the existing photogrammetric
basemap.
• The initial basemap update will only capture visible surface features; underground features will be
estimated based on available as- builts from the City, public utilities, and private utilities.
• A full area DTM will be developed only for the preferred alternative area, but the data to do this
work will be based, in part, on the aerial photogrammetry and supplemental ground survey
accomplished in this task
City of Federal Way August 15, 2017
City Center Access Project 23
SCOPE OF WORK (continued)
• The basemap will be updated in more detail to support the preliminary design of the preferred
alternative as part of Task 13.
Deliverables
• Updated Microstation basemap from previous alternatives development project, including new surface
for use in InRoads
• Basemap in AutoCAD Civil 3D format with DTM surface
Task 11.2 Conceptual Design Workshop
The Consultant will provide materials for one conceptual design workshop, lead the workshop, and provide
documents for the workshop in order to update conceptual designs for the two final alternatives. This work will
involve:
a. Prepare Alternative Plots and Materials for Workshop: Prepare roll plots and other graphics
of the previously developed final two alternatives for use at the Conceptual Design
Workshop. It is assumed that no new alternatives will be prepared in advance of the
workshop. However, additional design concepts within the context of the two final
alternatives will be presented for discussion and evaluation at the workshop.
b. Lead Conceptual Design Workshop: A maximum of two roadway design team members will
take part in the workshop along with the project manager and IJR manager from the
Consultant Team. Part of the workshop will focus on design strategies and efficiencies to
provide a least -cost solution for each alternative.
c. Prepare Workshop Summary: Summarize the results of the Conceptual Design Workshop in
a technical memorandum. Planning -level sketches of design concepts resulting from the
meeting will be included in the memorandum. No detailed engineering or estimates will be
performed on any variances to the two final alternatives or any new concept revisions to
them that may be produced at the workshop.
Deliverables
• Plots and supporting materials of the alternatives for the Conceptual Design Workshop
• Summary technical memorandum for the Conceptual Design Workshop
Task 11.3 Existing Utilities:
Existing utilities shall be surface - located by a utility locate service. These specific locations will be determined
after the design workshop, field- surveyed, and updates made to the basemap. All survey activities are provided as
part of Task 11.1. Subsurface utility locations will be needed as part of the preliminary design to determine utility
depths where excavation and structural foundations are proposed and only related to the preferred alternative.
Task 11.4 Practical Design Analysis
This project will undergo the WSDOT practical design process according to the current WSDOT Design Manual,
Chapter 1100. This process is integrated with both the environmental and IJR processes. The process is divided
into seven primary steps as follows:
City of Federal Way August 15, 2017
City Center Access Project 24
SCOPE OF WORK (continued)
a. Assemble the project advisory team, which will be a combined IJR Support and Multiagency,
Interdisciplinary, and Stakeholder Advisory Team (MAISA)
b. Identify the project baseline need in terms of performance, contributing factors, and
underlying reasons for the need
c. Identify land use and transportation context
d. Select the design controls compatible with the context
e. Evaluate alternatives that provide least -cost solutions
f. Select the design elements that are employed based on the alternatives evaluation
g. Determine and document the design element dimensions consistent with the least -cost
solutions evaluation
The conceptual design portion of this project will conduct steps a through e above, and will be documented as
part of a Practical Design Analyses document, with associated documentation as needed according to the WSDOT
practical design process. This process directly supports the WSDOT /FHWA design approval process that will be
completed as part of the preliminary design.
The alternatives screening and evaluation will be conducted as part of the overall National Environmental Policy
Act (NEPA) environmental process, with practical solutions and least -cost concepts integrated within the
screening process.
Task 11.5 Conceptual Channelization Plan
The conceptual channelization layout of each Build alternative will be developed. The channelization will provide
a more detailed level of design compared to the current layouts of the two final alternatives, including lane
widths, curve radii, turn storage lengths, tapers, super elevation, and design speeds.
Task 11.6 Conceptual Structures Type, Size, and Location
Prepare a conceptual level Structures Type, Size, and Location (TS &L) Technical Memorandum. The TS &L
memorandum will conform to the guidance of the WSDOT Bridge Design Manual Section 2.1.5, but be modified
to support the conceptual design of the two interchange alternatives previously identified at S 312th and S 324th
Streets.
The following activities will be performed:
• Conduct field visit
• Coordinate with all disciplines to determine feasible bridge and wall design alternatives for the two
interchanges
• Develop a list of feasible alternatives
• Analyze existing S 320th Street structure if modifications to it are necessary
• Perform sufficient bridge structural analysis to refine feasibility, develop structure cross sections and
abutment foundation types, and determine probable costs
• Develop conceptual layouts for up to three different bridge structure types at each interchange
• Develop conceptual wall layouts for each interchange
• Determine probable wall costs
• Compile conceptual TS &L Technical Memorandum to summarize and document data generated and
preliminary design decisions sufficient to support the alternatives analysis
City of Federal Way August 15, 2017
City Center Access Project 25
SCOPE OF WORK (continued)
Assumptions
The following assumptions are associated with this task:
• Preliminary geotechnical information will be provided by Shannon & Wilson as part of this scope of work
(separate task)
• Comparative cost estimates will be based on planning level costs and parametric quantification
• Section 2.1.5 of the WSDOT Bridge Design Manual (BDM) will be used as a guide in the development of
the TS &L Technical Memorandum. This will not be a full TS &L Report as defined in the BDM.
• Conceptual design criteria will be based on the WSDOT Bridge Design Manual and AASHTO LRFD Bridge
Design Specifications.
• One structure concept for each bridge and wall will be recommended as the proposed structure type for
the preliminary design.
Deliverables
The following deliverables are associated with this task:
• A draft and final Conceptual Type, Size, and Location Technical Memorandum (electronic; final is sealed
by a Washington Professional Engineer).
Task 11.7 Conceptual Profiles and Roadway Typical Sections
Roadway profiles and typical sections for each Build alternative will be produced. Typical sections will not show
paving depths at this level of design.
Task 11.8 Conceptual Impact Boundary
The conceptual channelization layout and roadway profiles will be used for the earthwork modeling, which will
produce cut /fill lines. The cut /fill lines will provide the basis for the impact boundary for each build of the two
alternatives.
Task 11.9 Cost Estimates
Conceptual construction cost estimates for each of the Build alternatives will be produced based on the
conceptual roadway design tasks. Appropriate cost markups will be included to account for the early stages of
design.
Deliverables
• Draft Practical Design Analysis Documentation, pdf only
• Roll plot conceptual design layouts and profiles for each Build alternative
• Conceptual construction cost estimates for each full project alternative (Excel and pdf copies)
Task 12 — Alternatives Evaluation and Screening
Task 12.1 Alternatives Evaluation and Screening
The Consultant, along with input from the project stakeholder team, will develop alternative screening criteria
based on the project purpose and need, performance criteria, and least -cost solutions. This screening will be
applied to the two updated final alternatives developed as part of the conceptual design. This analysis supports
both the NEPA and the practical design analysis processes. The outcome of this process will be the preferred
alternative.
City of Federal Way August 15, 2017
City Center Access Project 26
SCOPE OF WORK (continued)
Deliverables
• Draft and final evaluation criteria
• Draft and final alternatives analysis documentation, including the preferred alternative recommendation
Task 13 — Preliminary Engineering for the Preferred Alternative
Task 13.1 Preliminary Design and Plans
The Consultant will advance the conceptual design of the preferred alternative to an approximate 30% design
level using the WSDOT design manual; AASHTO's A Policy on Geometric Design of Highways and Streets, 6th
Edition (2011); and City of Federal Way Design standards. The preliminary design and plans will be informed by
the design documentation; the structural type, size, and location documentation; the stormwater design and
analysis; and the environmental mitigation measures as detailed in other areas of this scope of work.
The Consultant will also develop the Plan for Approval documents according to the WSDOT guidelines, as
indicated at: http: / /www.wsdot.wa.gov /design /projectdel. The Channelization Plans for Approval (PFA) checklist
will be followed and submitted with the first draft set for review.
A detailed preliminary design estimate of construction will be developed, which will include an electronic Excel
workbook utilizing the City standard format. An estimate calculation notebook will be developed as a backup to
the electronic estimate workbook.
Assumptions
• The preliminary design plans will follow the WSDOT Plans Preparation Manual and CADD standards
guidelines.
• The plans will be developed in the current version of Microstation in use at WSDOT.
• The design will be accomplished in the current version of InRoads in use at WSDOT.
• AutoCAD and Civil3D may be used in the design process, or for transferring information to the City, but
Microstation and InRoads will be the main design platforms.
• The PFA will undergo up to a maximum of three review iterations at WSDOT before they are approved.
Deliverables
• Draft and final PFA, electronic pdf (half size for reviews and full size for final)
• Draft and final preliminary design plans (half size pdf)
• Draft and final engineers' estimate of construction (Excel workbook and backup notebook
documentation)
• Draft and Final preliminary Design Report (draft pdf and final paper and pdf)
Task 13.2 Traffic Engineering Design
The Consultant will perform traffic engineering designs, based on the selection of the preferred alternative.
The Consultant will:
• Develop plans that include:
• Traffic signals
City of Federal Way August 15, 2017
City Center Access Project 27
SCOPE OF WORK (continued)
• Illumination
• ITS elements
The plans will show the following information:
• The location of control equipment, signal poles, signal phasing diagram for up to eight
signalized intersections, service equipment, corridor (between first adjacent intersection
west of proposed interchange and first adjacent intersection east of proposed
interchange), and interchange and intersection lighting for up to three intersections.
Modifications to the existing intersections at the S 320th Street interchange are included
in this eight intersection total.
Assumptions
• The circuit and conduit system will not be designed. No voltage drop and power calculations will be
prepared. Luminaire type, distribution, mounting height, and standard spacing by facility type will be
provided by the City for this preliminary layout and corresponding high -level cost - estimating purposes.
Deliverables
• Draft and final for the preliminary signal plans (half size pdf)
• Draft and final for the preliminary illumination plans, including ITS equipment that may be requested by
the City and /or WSDOT (half size pdf)
Task 13.3 Design Approval /Project Development Approval
The Consultant will continue the practical design analysis from the conceptual design portion of the project and
prepare the following (practical design steps 6 and 7 as defined in the WSDOT design manual, chapter 1100):
a. Select the design elements that are employed based on the alternatives evaluation
b. Determine and document the design element dimensions consistent with the least -cost
solutions evaluation
This design approval will only be completed on the preferred alternative. It is assumed that there will be a single
Design Approval /Project Development Approval Package according to Design Manual 300.04(1).
The Consultant will continue to work with the MAISA team that was started in conceptual design portion of the
project to coordinate the advancement of the preliminary design.
The Consultant will review horizontal, vertical, and cross - section geometrics within the project for opportunities
to reduce the project footprint and cost while not compromising safety or operations. A quantitative safety
analysis utilizing the Highway Safety Manual is required. The document will also provide confirmation that the
design is still valid.
Prepare Basis of Design Document (WSDOT Design Manual 300.06(2) and 1100)
The Consultant will verify the Purpose and Need, baseline need, and contextual needs identified for the project
through historical WSDOT- approved documents (IJR, Channelization Plan, etc.).
Prepare draft design controls to document the following:
• Design year (20 -year design year assumed)
City of Federal Way August 15, 2017
City Center Access Project 28
SCOPE OF WORK (continued)
• Modal priority (consider various design users as specified in Understanding Flexibility in Transportation
Design — Washington; Design Vehicle is WB -67)
• Access control (full access control)
• Terrain classification (rolling)
Select design elements in cooperation with the City and WSDOT and prepare a Project Design Parameters
template as found at: www.wsdot.wa.gov /Design /Support.htm. Lane and shoulder width dimensions will use
Operational Analysis (HSM and HCM) methods using crash analysis data prepared herein.
Prepare a Basis of Design document using the template and instructions found
at: www.wsdot.wa.gov /Design / Support.htm.
Prepare Crash Analysis Report (WSDOT Design Manual 321)
• Meet with Headquarters Safety Technical Group to verify the scope of safety analysis according to Design
Manual 321.05.
• Prepare an ISATe (Interstate Safety Analysis Tool enhanced) analysis to assess differing lane /shoulder
widths. Summarize the predicted collisions.
• Prepare a WSDOT Crash Modification Factors spreadsheet template to asses differing lane /shoulder
widths. Summarize the predicted collisions.
• Prepare a Crash Analysis Report per Design Manual 321.08(1).
Prepare Design Analysis (WSDOT Design Manual 300.06(4) and 1106.04(2))
• Prepare variance requests if needed using the template found at www.wsdot.wa.gov /design /support.htm
such as:
• Travel Lane Width
• Shoulder Width (left and right)
Prepare Design Approval Documents (WSDOT Design Manual 300.04(1))
The Consultant will assemble and prepare the following documents within this task order: see attached Design
Approval Document checklist for applicable items including, but not limited to:
• Channelization Plans for Approval
• Current cost estimate with a Basis of Estimate
• A reader - friendly memorandum that describes the project
• Design Variance inventory
• Barrier /safety element documentation; barrier calculations such as length of need will be provided
• Basis of Design document
• Alternatives comparison table
• Project design parameters
• Design analysis
City of Federal Way August 15, 2017
City Center Access Project 29
SCOPE OF WORK (continued)
Assumptions
• WSDOT will provide a report from the Design Variance Inventory System for Consultant's use to prepare
the Design Approval.
• A draft of the Design Approval /Project Development Approval will be submitted following WSDOT
concurrence with channelization plans for the project.
• A final draft of the Design Approval /Project Development Approval package will be submitted to WSDOT
for review in conjunction with the PS &E package for region review.
• The final Design Approval /Project Development Approval will be revised and prepared for WSDOT and
FHWA signature a minimum of 10 weeks prior to the advertisement date.
• WSDOT will provide crash data from the Safety Analyst and Collision Data Mart for Consultant's use.
• WSDOT will provide a Crash Analysis Report (CAR) template and instructions
from http: / /wwwi. wsdot. wa. gov/ riskmanagement /shs /safetytools.htm.
• The alternatives comparison table will use reduction of fatal and serious crashes as a baseline metric. The
Consultant will use the Performance Target Refinement Form (PTRF) per Design Manual 1106.04(1) to
document refinement of the performance target.
Deliverables
• Draft and Final Practical Design Analysis
• Draft and Final Design Approval and Project Development Approval
Task 13.4 Stormwater Design and Report
The stormwater design and report will be conducted only on the preferred alternative and is based on the
stormwater design criteria developed as part of conceptual design portion of the project.
After selection of a Preferred Alternative, the Consultant will prepare a draft Preferred Alternative Stormwater
Report that includes analyses of each TDA within the project area of the Preferred Alternative, and prepare a
planning level opinion of cost. The draft Preferred Alternative Stormwater Report will be prepared based on the
format of a Technical Information Report (TIR) and reflect the analyses for all TDAs regardless of jurisdiction. A
separate report for King County or WSDOT is not included. The TIR format will reflect sections applicable for
preliminary engineering.
The Consultant will meet with the City staff to discuss City comments on draft Preferred Alternative Stormwater
Report.
The Consultant will prepare a final Preferred Alternative Stormwater Report.
Deliverables:
• Preferred Alternative Stormwater Report (draft pdf and final paper and pdf)
Assumptions:
• Stormwater analyses for areas within City jurisdiction will be based on the 2016 King County Surface
Water Design Manual and errata and the 2016 Federal Way Addendum to the King County Surface Water
Design Manual.
City of Federal Way August 15, 2017
City Center Access Project 30
SCOPE OF WORK (continued)
• Stormwater analyses for areas within County jurisdiction will be based on the 2016 King County Surface
Water Design Manual and errata.
• Stormwater analyses for areas within WSDOT right -of -way will be based on the 2014 Highway Runoff
Manual and the February 2016 Supplement.
• Detailed geotechnical site investigation will be performed by Shannon & Wilson after selection of the
Preferred Alternative to support the BMPs designed for the Preferred Alternative Stormwater Report.
• Areas within King County are within King County's Urban Growth Area and will be considered a "Small
Road Improvement and Urban Road Improvement Project."
• HI -RUN v. 2.1 will be used.
• The Preferred Alternative Stormwater Report will include the following:
• Project Overview
• Conditions and Requirements summary
• Offsite Analysis based on Level 1 Analysis
• Flow Control, LID, and Water Quality Facility Analysis and Design.
• Conveyance System Analysis and Design.
• Identification of Special Reports and Studies.
• Identification of other Permits.
TIR Worksheet for each TDA. Only sections relevant to preliminary engineering will be included.
• Offsite Analysis Drainage System Table.
• Water Quality Facility Sizing Worksheets for applicable BMPs.
• Flow Control and Water Quality Facility Summary Sheet for each TDA.
• The overall project vicinity map will be adapted to title block for the TIR.
• The drainage sub -area exhibits will be enlarged from the main delineation CADD files with callouts
added. There may be multiple TDAs shown on a single map.
• The soil mapping exhibits will use the drainage sub -area exhibits as a base and then soil mapping
added from the NRCS website and /or information from Shannon & Wilson.
• The Preferred Alternative Stormwater Report will be up to 500 pages, including exhibits and appendices.
Task 13.5 Preliminary Right -of -Way Plans
Right -of -Way Needs and Access Change Management will be developed using the existing WSDOT right -of -way
plan and King County Assessor information; conceptual proposed right -of -way line and limited access limits will be
determined based on anticipated parcel acquisitions needed for the project.
City of Federal Way August 15, 2017
City Center Access Project 31
SCOPE OF WORK (continued)
Task 13.6 Limited Access and Right -of -Way
Conceptual Limited Access Limits
Using the existing WSDOT right -of -way plan and GIS Assessor's parcel map, the conceptual proposed right -of -way
line and limited access limits will be shown in Microstation based on anticipated parcel acquisitions needed for
the project. No title searches will be done at this time.
Draft Access Report Outline
A Draft Access Report Outline will be created to summarize the contents and formatting of the Access Report
Plan, which will follow current WSDOT guidelines. The Access Report Outline will create a template for the Access
Report to be completed in the next phase of the project.
Assumptions
• No title searches will be done as part of this project phase, but tax parcels that will be involved will be
recorded to support the formal right -of -way and access phase of the project.
Deliverables
• Draft Access Report Outline, paper and PDF copies
• Parcel listing of potentially affected properties, including area of need to support preliminary cost
assumptions
Task 13.7 Preliminary Structural Design
Conceptual Bridge Plans
Prepare Conceptual Bridge Plans for the preferred alternative. The Conceptual Bridge Plans will be prepared with
guidance from the WSDOT Bridge Design Manual. Each bridge plan will include as a minimum, the bridge layout
(plan and elevation), structure type (typical section), roadway geometrics, clearances, site utilities, stage
construction, aesthetic considerations, and cost estimate.
Assumptions
• The Conceptual Bridge Plans will consist of a bridge plan, elevation, a proposed framing plan, and typical
bridge section for each bridge.
• Structural information will be developed to provide the rationale for the selection of each preferred
bridge alternative.
• Preliminary geotechnical information will be used from Shannon & Wilson.
• One field visit will be conducted to the bridge site.
• One iteration of review comments is anticipated on the interim submittal of the Conceptual Bridge Plans.
Deliverables
• Interim submittal of the Conceptual Bridge Plan for client review — (electronic pdf)
• Final submittal of the Conceptual Bridge Plans (four hard copies and one electronic pdf copy)
• Conceptual Bridge Cost Estimates (electronic pdf)
City of Federal Way August 15, 2017
City Center Access Project 32
SCOPE OF WORK (continued)
Conceptual Wall Plans
The Consultant will provide conceptual retaining wall design required to accommodate the proposed
improvements on the plans and for use in determination of borings for geotechnical investigations. The plans will
include the geometric features of each wall, a plan and profile view of wall locations and elevation views,
including wall type selection, and a cost estimate.
Assumptions
• The Conceptual Wall Plans will consist of plans, elevations, and proposed typical sections.
• Preliminary geotechnical information will be used from Shannon & Wilson.
• One field visit will be conducted to the site.
• One iteration of review comments is anticipated on the interim submittal of the Conceptual Bridge Plans.
Deliverables
• Conceptual Retaining Wall Design (Layout and Elevation) (electronic pdf)
• Conceptual Retaining Wall Cost Estimate (electronic pdf)
Noise Wall Design
The Consultant will provide preliminary noise wall design required to accommodate the proposed improvements
on the plans and for use in determination of borings for geotechnical investigations. The plans will include the
geometric features of each wall, a plan and profile view of wall locations and elevation views, including wall type
selection, and a cost estimate.
Assumptions
• It is anticipated that a noise wall will be required at the northbound 1 -5 off -ramp and on the northbound
1 -5 on -ramp.
• No noise wall details will be provided at this design stage.
• No noise wall foundation or connection design will be provided at this design stage.
Deliverables
• Preliminary Noise Wall Design (Layout and Elevation) (electronic pdf)
• Preliminary Noise Wall Cost Estimate (electronic pdf)
Task 13.8 Utility Location
Subsurface utility locations will be determined to support the preliminary design based on the preferred
alternative. A utility coordination and documentation plan will be developed to manage this process. Each utility
identified within the limits of the overall project will be contacted early in the preliminary design process to
ensure that all known utilities are clearly identified. The conceptual design utility identification will be used as a
basis to this more detailed assessment of impacts.
Subsurface location will be necessary in locations where impacts are either close or imminent. A detailed location
plan will be developed, property rights of entries secured (if necessary), and subsurface utility engineering will be
accomplished. All locate information will be updated in the project basemap.
City of Federal Way August 15, 2017
City Center Access Project 33
SCOPE OF WORK (continued)
Assumptions
• Utility location will be done by a single utility location firm as part of the Consultant's contract.
• Washington State one -call locate will only be issued to assist in preliminary locations of utilities.
• As- builts will be provided by all public and private utilities within the project limits prior to any subsurface
utility locate planning.
Deliverables
• Subsurface Utility Location Plan
• Utility Coordination Log
• Subsurface Utility Location Report
13.9 Base Map Update for Preliminary Design
The basemap will be updated in more detail to support the early preliminary design of the preferred
alternative. This will include supplemental ground surveys of all visible and accessible elements that are
affected by the project footprint and right -of -way needs. This will also include all subsurface utility
locations as defined in Task 13.8. This will also provide the initial basemap for the final design.
Assumptions
• This version of the basemap will need to be detailed further for final design. Therefore, survey efforts
will be limited to the level of design needed to support the preliminary design of the preferred
alternative.
• No new UAV flights will be conducted for this update.
Deliverables
• Updated Microstation basemap focused on the preferred alternative, including an updated surface for
use in InRoads
• Updated basemap in AutoCAD Civil 3D format with DTM surface
Task 14 — Environmental Documentation
Environmental documentation is intended to address compliance with the National Environmental Policy Act
(NEPA), the State Environmental Policy Act (SEPA), Section 7 of Endangered Species Act (ESA), Section 106 of the
National Historic Preservation Act, and if necessary Section 4(f) of the U.S. Department of Transportation Act and
Section 6(f) of the U.S. Land and Water Conservation Fund Act.
Task 14.1 Documented Categorical Exclusion
To comply with NEPA, this scope of work assumes that a Documented Categorical Exclusion (DCE) will suffice. It is
assumed that the City will adopt NEPA to comply with SEPA and issue a Mitigated Determination of
Nonsignificance.
The Consultant will provide detailed analyses pertaining to ecological resources, noise, and hazardous waste in
support of the DCE. The results of the analyses will be submitted in draft, revised draft, and final reports. Detailed
analyses regarding endangered species are covered under Task 2; cultural resources in Task 3; and Section
City of Federal Way August 15, 2017
City Center Access Project 34
SCOPE OF WORK (continued)
4(f) /6(f) resources in Task 4. These analyses will focus on the impacts that may result from the preferred
alternative. The work will culminate with the preparation of a NEPA Categorical Exclusion Documentation Form.
a. Ecological resources
The Consultant will redelineate wetlands within 300 feet of the preferred alternative, applying
methods specified in the U.S. Army Corps of Engineers (USACE) Wetlands Delineation Manual
(Environmental Laboratory 1987) and the Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region (Version 2.0)
(USACE 2010). The Consultant will identify wetland boundaries in the field and mark them with
numbered flagging. The Consultant will have all wetland flag locations instrument - surveyed by
professional land surveyors. The Consultant will observe and estimate all other wetlands outside
the WSDOT and local right -of -ways from public vantage points and existing data sources.
The Consultant will classify wetlands according to the U.S. Fish and Wildlife Service (USFWS) and
hydrogeomorphic (HGM) classification systems and rate them according to the applicable local
jurisdiction's critical areas ordinance, and the currently accepted version of the Washington State
Wetland Rating System.
The Consultant will reclassify streams and identify ordinary high water mark for each. The
Consultant will collect incidental observations of other sensitive resources in the study area
during the wetland delineation.
The Consultant will prepare an ecological report to document resources identified within the
WSDOT and local right -of -ways. The Consultant's CADD staff will generate figures, buffer areas,
and potential impact area estimates.
b. Noise
The Consultant will conduct noise analysis consistent with WSDOT requirements and will meet
with the City and WSDOT to discuss the need and confirm the methodology for noise analysis
before beginning the work below.
The Consultant will describe existing conditions and the respective impacts of the No Build and
Build alternatives based on applicable guidance of federal, state, and local agencies. The
Consultant will measure existing noise levels at four locations over a 15- minute period at each
location. The time chosen for measurement will be the likely maximum traffic noise periods when
traffic speeds are high. This may not coincide with peak volumes, depending on congestion.
The Consultant will use the FHWA Traffic Noise Model (TNM) Version 2.5 for projection of future
noise levels from the proposal. This model is appropriate for estimating existing, future No Build,
and one Build alternative noise levels based on forecasted traffic volumes.
The analysis will identify whether the project is anticipated to cause noise levels that exceed the
threshold trigger specified for consideration of whether mitigation is reasonable and feasible.
Mitigation (noise walls) will be analyzed for up to four locations. The results of the analysis will be
incorporated into a technical memorandum.
City of Federal Way August 15, 2017
City Center Access Project 35
SCOPE OF WORK (continued)
c. Hazardous materials
Based on a more detailed look at the preferred alternative and potential methods of
construction, the Consultant will evaluate the potential for the project to encounter hazardous
materials. The findings will be documented in a technical memorandum.
d. Categorical Exclusion Documentation Form
The Consultant will prepare a draft NEPA Categorical Exclusion Documentation Form. The form
will rely on the findings of the discipline analyses completed as part of this scope of work, as well
as the preliminary design of the preferred alternative. The City will review and the Consultant will
revise the form to address City comments. The City will be responsible for submitting the revised
form to WSDOT.
Deliverables
• Preliminary draft, revised draft, and final wetland report
• Preliminary draft, revised draft, and final noise analysis technical memorandum
• Preliminary draft, revised draft, and final hazardous materials technical memorandum
• Draft and final NEPA Categorical Exclusion Form
Task 14.2 Endangered Species Act
To comply with Section 7 of the Endangered Species Act (ESA), this scope of work assumes the preparation of a
Biological Assessment (BA) addressing the potential impacts of the proposed action on species and habitat that
are protected under the ESA. However, as a first step in this scope of work, the Consultant will confirm the
appropriate level of documentation with the City and WSDOT. If the analysis finds no potential for effects on ESA -
listed species, these findings will be documented in the WSDOT No Effects Assessment format. Such an
assessment is typically used for projects that result in a no- effect determination but that require additional
documentation and analysis (including projects that create new impervious surfaces and new highway
interchanges). A similar level of effort as described here would likely be required to support a no- effect
determination.
To meet the needs of reviewers at the U.S. Fish and Wildlife Service (USFWS) and the National Marine Fisheries
Service (NMFS), the analysis will be based on at least 30 percent design documents. The BA will be prepared in
accordance with the scope and quality requirements in the WSDOT Advanced Training Manual for Biological
Assessment Preparation for Transportation Projects— Version 2015 and using WSDOT's biological assessment
template. By meeting those requirements, the BA will also meet the requirements of the USFWS's and NMFS's
ESA Section 7 Consultation Handbook (1998).
Project activities with the potential to affect ESA - listed species include (1) creation of a new highway interchange
that could facilitate additional development, and (2) creation of pollution - generating impervious surfaces (PGIS).
The BA will include an evaluation of potential direct and indirect effects of the preferred alternative on species
that are listed as threatened or endangered under the ESA, species that are proposed for listing, and designated
or proposed critical habitat for listed species. The BA will also analyze the effects of interrelated and
interdependent actions and will address effects on essential fish habitat (EFH).
The analysis will follow WSDOT guidelines for addressing the potential effects of and use changes that may result
from the creation of a new highway interchange. The analysis will also address potential changes in pollutant
City of Federal Way August 15, 2017
City Center Access Project 36
SCOPE OF WORK (continued)
loadings in waters that receive discharges from facilities that detain and treat stormwater from existing and new
PGIS in the project area, based on the results of highway runoff modeling.
Based on the current status and distribution of ESA - listed and proposed species that may occur in the project
action area, it is anticipated that the BA will address two species of fish, both of which are listed as threatened
and are under the jurisdiction of NMFS. These are Puget Sound Chinook salmon and the Puget Sound steelhead
trout. The BA will also address potential effects on designated critical habitat for these species. Based on the
location of the project action area relative to stream reaches where these species have been documented, the
potential for project - related effects on these species or their critical habitat is very low. To err on the side of
caution, the assumption for this scope of work is that an effects determination of "may affect but not likely to
adversely affect" is appropriate for these species and critical habitat. As noted above, a similar level of effort
would likely be required to support a no- effect determination.
Based on the lack of potentially suitable habitat in the project vicinity, the project is not expected to have the
potential for any effects on the following species, all of which are under the jurisdiction of the USFWS: marbled
murrelet, streaked horned lark, yellow - billed cuckoo, bull trout, or North American wolverine. The BA will include
brief descriptions of the status, range, and habitat requirements of these species, along with an explanation of
why no effects are anticipated.
In order to present a thorough analysis and to minimize the potential for re- initiation of ESA consultation at a
later date, the BA will need to include a detailed description of the proposed action sufficient to complete the
effects determination. The Consultant will work with staff from the City of Federal Way to provide the following
information to the extent possible or to develop performance specifications in lieu of detailed information:
• Detailed project description that includes all pertinent information on construction activities, including
construction methods, timing, schedule, and phasing, and a list of all construction equipment required.
• Engineering design plans showing locations of all known streams, wetlands, stream crossing structures,
and road /bridge alignments.
• Location of all staging /stockpile areas, clearly identified and delineated.
• The location, and a detailed description, of any in- water /over -water work activities, including the number,
size, composition, and location of all temporary /permanent culverts, as well as the footprint of all in-
water structures.
• Information on stormwater treatment and detention specifications. At a minimum, the Consultant will
fully complete the WSDOT ESA Stormwater Checklist before preparing the BA.
• A list of proposed water quantity and quality BMPs for project construction and operation.
• Conceptual mitigation plans, if available, that address permanent impacts to project area streams and
wetlands.
The Consultant will submit a first draft of the BA to the City. City staff will review the draft document and provide
a single set of non - conflicting comments, either in the form of tracked changes in the Microsoft Word file or as a
separate list. After receiving the City's consolidated comments, the Consultant will produce a revised draft BA for
City staff review and confirmation that comments have been addressed appropriately. The BA will then be
submitted to the agency (FHWA) that will be responsible for coordinating the ESA Section 7 consultation process
with NMFS and USFWS.
After receiving a single set of non - conflicting comments from the agency responsible for consultation, the
Consultant will produce a final draft BA. Additional effort associated with revising the BA after this stage (e.g.,
City of Federal Way August 15, 2017
City Center Access Project 37
SCOPE OF WORK (continued)
responding to comments or requests for more information from NMFS and /or USFWS) would be completed
under a separate scope and budget.
Deliverables:
• Draft BA
• Revised Draft BA for FHWA
Task 14.3 National Historic Preservation Act
The Consultant will support compliance with Section 106 of the National Historic Preservation Act by providing
the following services:
Define Area of Project Effects (APE) - The Consultant will assist in defining the APE based on the preliminary design
of the preferred alternative and prepare a work plan. An aerial map and topographic map of the APE will be
included. The Consultant will also assist in drafting formal Section 106 consultation letters on behalf of WSDOT if
requested. In keeping with WSDOT's procedures, the City will be responsible for submitting the map to WSDOT
and Department of Archaeology and Historic Preservation (DAHP). This APE is subject to change depending upon
refinement of the project design, and approval of WSDOT and DAHP.
Refine Background Research - The Consultant will refine documentation results from background research
developed during alternative screening to focus on the preferred alternative.
Locate Utilities - Once the APE has been approved, and prior to archaeological fieldwork, the Consultant will
arrange for utility locates to meet the requirements of Washington's new Underground Utilities regulations (RCW
19.122). This requires obtaining a locate survey for any type of excavation on public and private property that will
exceed 12 inches in depth. A locate service must be notified by the excavator (HRA) at least 2 business days
before digging, and the area of proposed excavation must be marked with paint as described in RCW 19.122.030.
The Consultant will not mark the area in paint, but will provide the locate service with adequate documentation in
the form of maps and a text description to complete the survey.
Conduct Archaeological Inventory — The Consultant's archaeologists will conduct a surface and, where feasible,
subsurface inventory of the APE. For the proposed fieldwork, the Consultant's field staff will consider ground
visibility, slope, sediment saturation, and degree of previous disturbance in implementing field survey methods,
which is anticipated to consist of one to two transects spaced at up to 40 -meter intervals within the APE. The field
crew will excavate up to 90 shovel probes where feasible. The Field Supervisor will adjust methods to the field
conditions encountered, but will not compromise the goal of inventorying the overall project area by one or more
methods.
In general, shovel probes will measure approximately 35 to 40 centimeters (14 to 15.7 inches) in diameter and
will be excavated to sterile soils (e.g., glacial till or "C" horizon) or until halted by a buried obstacle. Excavated
sediments will be screened through 0.25 -inch hardware mesh and additional radial probes will be excavated at 5-
to 10 -meter intervals to investigate any finds. Basic information will be recorded for each probe on HRA field
forms including final depth, soil color and consistency, and any disturbances.
Archaeological materials will be documented and returned to the shovel probe and the probe backfilled. Under
this scope, up to one archaeological site or one isolated find will be recorded. As feasible, the Field Supervisor will
record survey transects, shovel probe locations, and archaeological resources using a handheld GPS instrument.
Survey mapping information will be recorded on field maps and, as appropriate, DAHP resource forms.
City of Federal Way August 15, 2017
City Center Access Project 38
SCOPE OF WORK (continued)
Refine Architectural Inventory - Once the architectural APE has been approved by WSDOT and DAHP, HRA's
architectural historian will commence their inventory and evaluation of the buildings within the APE. At this time
it appears that the APE may include up to a total of 14 buildings over 45 years of age. Recordation will consist of
photographing and documenting each building on a Washington State historic properties inventory form (HPI).
The buildings will be evaluated for their eligibility to the National Register of Historic Places at a reconnaissance
level according to DAHP guidelines.
Prepare Cultural Resources Technical Report - The Consultant will prepare a Cultural Resources Technical Report
summarizing the results of the project. The report will reflect professional standards for format and content as
expressed in DAHP guidelines. The Consultant will submit a draft of the report in PDF format to Parametrix for
comment. The Consultant will make revisions to the draft report in response to those comments and will submit a
revised draft for submittal to the City. Once the City has commented on the report, the Consultant will make any
necessary revisions and submit an electronic version of the final report for submittal to WSDOT and DAHP. The
report will include:
• A description of the project and applicable laws and regulations
• A summary of the results of the background literature and records research
• The methods used during the fieldwork and the result,
• A description of any cultural resources found
• An evaluation of architectural resources over 45 years of age
• A summary assessment of potential effects to any identified historically significant resources and extent
to which the proposed project may affect the resource
• Recommendations for completion of any additional cultural resources compliance obligations stemming
from the results of our study,
• A summary of project procedures that should be followed in the event of an unanticipated discovery of
buried cultural materials or human remains during construction
• References cited
The report will include such tables, maps, photographs, and other graphics as are needed to depict the scope of
the study and results. Forms for any recorded resources will be included in an appendix to the report.
Assumptions
• Consultation with DAHP and the affected tribes will be led by the Federal Highway Administration. The
Consultant will provide support.
• The City will provide rights -of -entry (ROE) for the project. All ROE will be in place prior to commencement
of fieldwork.
• Background research and a cultural resource inventory for only one alternative will be conducted.
• The Consultant will not be responsible for marking the project area prior to utility locate requests. The
Consultant will not begin subsurface fieldwork until an Excavation Confirmation Code is obtained from
the locate service and all known utilities are marked, or the Consultant has received direct confirmation
from each utility that no facilities are in the project area. Once the Consultant's fieldwork is completed,
the Consultant will not be responsible for maintaining the location survey markings.
• The scope provides for up to 90 probes to be excavated in five field days by four archaeologists
City of Federal Way August 15, 2017
City Center Access Project 39
SCOPE OF WORK (continued)
• The scope includes recording up to one archaeological site and /or isolated find.
• Up to ten buildings will be recorded and evaluated for the NRHP at a reconnaissance level.
• Only one draft and one final copy of the EA sections will be prepared.
• The APE for the project has not been approved by WSDOT or DAHP. Fieldwork cannot be conducted until
the APE has received these approvals.
• Teleconferences with the lead agency, DAHP, or the tribes will not exceed 2 hours over the term of the
project.
• The Consultant will provide a text description of the proposed project to use in the Cultural Resources
Technical Report.
• The Consultant will provide maps (GIS shapefiles are preferred) of the project area and design plans of
the proposed project to HRA in a format that can be adapted for use in its report.
• Reporting will not include the preparation of agreement documents (e.g., Memoranda of Agreement).
Deliverables:
• Draft Cultural Resources Technical Report
• Final Cultural Resources Technical Report
Task 14.4 Section 4(f) /Section 6(f) Compliance
Documentation describing compliance with Section 4(f) of the U.S. Department of Transportation Act will be
required if the preferred alternative impacts a Section 4(f) resource. Section 4(f) prohibits the FHWA from
approving a project or program that uses land from a significant public park, recreation area, wildlife or waterfowl
refuge, or historic site unless: (1) the project will have no more than a "de minimis impact "; or (2) there is no
feasible and prudent avoidance alternative to the use of the land, and the project includes all possible planning to
minimize harm to the property.
Documentation describing compliance with Section 6(f) of the Land and Water Conservation Fund Act will be
required if the preferred alternative requires conversion of land acquired with these funds. Section 6(f) directs the
National Park Service (NPS) to ensure that replacement lands of equal value, location, and usefulness are
provided as conditions to approval of land conversion. Therefore, the NPS must approve any conversion of
property acquired or developed with assistance under this act.
Prior to completion of the alternatives analysis and any revisions to the design of the preferred alternative, it is
difficult to predict what level of documentation and effort would be necessary for these tasks. For the purpose of
this scope of work, the Consultant will prepare a form documenting de minimis impact to 4(f) resources. For 6(f),
it is assumed that the replacement properties previous identified are still viable, and the Consultant will focus on
providing information to facilitate re- initiation of coordination with the NPS.
Deliverables:
• Draft and revised draft de minimis documentation form
• Draft and final report documenting impacts to and alternative replacement properties for 6(f) resources
City of Federal Way August 15, 2017
City Center Access Project 40
SCOPE OF WORK (continued)
Task 15 — Interchange Justification Report
It is assumed all eight policy points will be addressed in the IJR as described below. The traffic forecasting and
operations, design analysis, alternatives development and screening, environmental analysis, and outreach efforts
are covered under other task items. This work effort will be used to document the technical analysis in individual
policy points, complete technical reviews by the study support team including routing the policy points for review
and comments, and finalize the packaged IJR.
Task 15.1 Policy Point 1 - Need for Access Point Revision
The study will investigate investments in local infrastructure improvements to meet the purpose and need of the
proposal. This work will demonstrate the local infrastructure alone cannot be improved to address the purpose
and need and will be documented in Policy Point 1.
Task 15.2 Policy Point 2 - Reasonable Alternatives
Review will be conducted of prior development and analysis of alternatives and a description prepared identifying
how these met or did not meet the purpose and need of the project. An exhaustive list of local improvements,
interchange improvements, and interchange modifications were all considered and packaged into several
alternatives during previous work. The recommended improvement concept will be identified, reviewed, and
refined as necessary, and documented.
Task 15.3 Policy Point 3 - Operational and Collision Analyses
As described under Task 3, operations analysis will be conducted as agreed upon in the methods and assumption
document. The results of local intersection and freeway operational analysis and collision analysis will be
documented.
Task 15.4 Policy Point 4 - Access Connections and Design
Documentation will be prepared of the geometric design of the proposed improvements, conceptual horizontal
and vertical alignments, and conceptual signing and striping plans. Applicable design criteria including right -of-
way and access impacts will also be discussed.
Task 15.5 Policy Point 5 - Land Use and Transportation Plans
Current land use assumptions in the travel demand model will be documented. A discussion of consistency of the
proposed improvements with local, regional, and statewide transportation plans will also be prepared. The effort
to research and document current plans will occur under this task.
Task 15.6 Policy Point 6 - Future Interchanges
Documentation will be prepared of the consistency and compatibility of the proposed improvements with other
planned improvements in the Statewide Highway Plan.
Task 15.7 Policy Point 7 — Coordination
Documentation will be prepared to identify local plans and funded or programmed improvements that are
needed to support the recommended highway modifications. Discussion will include how local agencies will work
with WSDOT to pursue funding for the recommended interchange modifications, including identification of
previous financial or environmental commitments between agencies or private entities.
City of Federal Way August 15, 2017
City Center Access Project 41
SCOPE OF WORK (continued)
Task 15.8 Policy Point 8 - Environmental Processes
This policy point will summarize the environmental process required for the preferred alternative.
Task 15.9 Draft and Final IJR Report Preparation
The policy points summarized above will be consolidated into an IJR document for review by the project team. It
is anticipated that up to three rounds of drafts and revisions will be performed. After the reviews have been
completed, a final IJR report document will be prepared.
Assumptions
• It is assumed there will be a client review and a second IJR Support Team review for all individual policy
points, and the draft and final IJR. It is assumed WSDOT will compile their comments prior to submitting.
Deliverables
• Draft and Final Interchange Justification Report, including individual chapters completed for review by the
IJR support team
Table 15 -1 summarizes the optional public involvement tasks.
Table 15-1. Optional Public Involvement Support Tasks
Task Assumptions (if applicable)
Support • Door -to -door events up to four times in
communication with residential neighborhoods. Assumes two staff
residents along members for up to 10 hours per door -to -door
project alignment event, including planning, travel, day of
preparation, and summary draft work.
Deliverables /work
products
• Up to four
door -to -door
summaries
Est. Cost
(Labor Hours Only)
• $5,500 (PRR)
Present at City • The Consultant will develop draft and final
Council meetings presentation talking points for up to six City
Council meetings. Assumes one staff person
for up to 3 hours per set of talking points.
• The Consultant will attend up to six City
Council meetings. Assumes one staff person
for up to 4 hours per meeting to attend,
including travel, and summary e-mail.
• Up to six talking
points
• Up to six briefing
summaries
• $6,200 (PRR)
•
Press releases
• The Consultant will draft up to five press
releases to announce significant project
milestones and public meetings.
• The Consultant will develop a media
distribution list, distribute the press release,
and make follow -up calls to reporters.
• Up to five press
releases
• Draft and final
media
distribution list
• $2,300 (PRR)
• $1000 (PMX)
City of Federal Way August 15, 2017
City Center Access Project 42
SCOPE OF WORK (continued)
Deliverables /work Est. Cost
Task Assumptions (if applicable) products (Labor Hours Only)
Language support for • Interpretation at up to six community and • Printer -ready • $5,500 (PRR)
community and business briefings with limited English- artwork for
business briefings proficiency attendees. translated
• Translation and layout of up to six project materials, up to
materials translated into Korean, Russian, 24 total; six in four
Vietnamese, and Spanish. languages
• Labor hours include time to coordinate
translations, in -house translation for
Spanish, and graphic layout of translated
handouts
City of Federal Way
August 15, 2017
City Center Access Project 43
Exhibit B
DBE Participation
Not Applicable.
Agreement Number: 17- l
WSDOT Form 140 -089 EF Exhibit B Page 1 of 1
Revised 10/30/2014
Exhibit C
Preparation and Delivery of Electronic Engineering and Other Data
In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is
to use in preparing electronic files for transmission to the agency. The format and standards to be provided may
include, but are not limited to, the following:
I. Surveying, Roadway Design & Plans Preparation Section
A. Survey Data
Base map in AutoCAD, Civil 3D format with DTM Surface.
B. Roadway Design Files
AutoCAD, Civil 3D.
C. Computer Aided Drafting Files
AutoCAD, Civil 3D.
Agreement Number: 17- I S4-
WSDOT Form 140 -089 EF Exhibit C Page 1 of 4
Revised 10/30/2014
D. Specify the Agency's Right to Review Product with the Consultant
The Agency retains ownership of all electronic files created.
E. Specify the Electronic Deliverables to Be Provided to the Agency
AutoCAD, Civil 3D drawings, signed and sealed PDFs.
F. Specify What Agency Furnished Services and Information Is to Be Provided
AutoCAD, Civil 3D, base maps, and drawings.
Agreement Number: 17- 1
WSDOT Form 140 -089 EF Exhibit C Page 2 of 4
Revised 10/30/2014
II. Any Other Electronic Files to Be Provided
As deemed necessary by agreement of the Agency and Consultant.
III. Methods to Electronically Exchange Data
Email, FTP, Compact Disk, DVD, and Flash Drive.
WSDOT Form 140 -089 EF Exhibit C Page 3 of 4
Revised 10/30/2014
A. Agency Software Suite
MS Office, AutoCAD, Civil3D.
B. Electronic Messaging System
Microsoft Office Outlook 2010.
C. File Transfers Format
Adobe PDF, ZIP files, Microsoft Office: Word (2010), Excel (2010), Project (2010), PowerPoint (2010),
and Publisher (2010).
WSDOT Form 140 -089 EF Exhibit C Page 4 of 4
Revised 10/30/2014
Exhibit D
Prime Consultant Cost Computations
PLEASE SEE ATTACHED
Agreement Number: 17- I -
WSDOT Form 140 -089 EF Exhibit D Page 1 of 1
Revised 10/30/2014
f
0
N
0
Jx
rOUg'
^°",
:“.$m..mU:','
`3i3l'n'
7,
r
^3W��^
o4
.
°�N�EM
r8���
°8R
F.P.
m
-
$10,769.60
$28,395.36
$144,836.33
$11,375.28
m8
$6,834.36
$7,431.72
;
$293,114.38
$17,591.79
$30,184.31
$70,833.08
$60,518.51
$11,782.12
w, mSO
"ar<
$3,278.24
$169,356.56
$169,356.56
- $62,103.64
S;
0
78
$149,801.92
$10,108.28
$23,863.02
031,368.30
VM
;888
r.
'
g;
$19,768.12
$19,768.12
$67,635.72
$67,635.72
$103,794.05
$51,416.24
$52,377.81
$219,356.74
88
$8,938.40
$22,978.60
8
$17,396.18
$15,838.88
$24,686.24
$356,385.88
$96,179.80
$38,802.38
8
J88888888888888888
00000000000000000000000000000000000000000000
$m
00000000000000
8888881,889,888888888888888888
8888888888888888888888888888
°»«
aaaoaaagFa'asaa°°a�°°
;84.888888888888888
IlaN
o �+
�n
a
.n
0 0
0
..
°' Y..
r
.. m
a888888888888888888s888888888888888888888888
°�N�nn�
0 0
0 0
0 0
0 o
v
0 0
000000000000000000000000000000
v
nn
«n81881
a
aHN
«�naa
°m,88e8M888888
��
n"“"
of0
88888Rm
^4.,
r 0000000000000000000000000000
8
3
0
00
0 0
00
0 .
8 0000000000000000000000000
8
88888°
0888888888888888
. n. n.
n. n.
n. n
.n.n8.n.nv..n.n.9..°n.9.«.gi88
$$88$888888T88T8T888888800
.n.naaa«.Qi
u.u4v4u4a+4i.°..n
,8808888888
.n....,
a.qi
°088
°0,8888
go
Jm8�88a8888888888888a88
oogioapO00000000t000004
050
„
goo
1
80
0
;&a
zg
°8888888888888888888888888888
:...0.00000000000000000000000
aaaaaa
ga°oaaa
aaoaa
$
N
°
haaaagaoaa
ti
aaaaa
g,
e$8a888$8888
8,;
E.
WF.
"a
`iza
a ;8°°
n
Eo
..o1I
g38.';'
....NO
....r
?.F.
;s;
`"'88
��
"8888;
#8;885
8“R°
^S
;
-a8am
�aii
°1,
8
,g ar
o�
#88
§"7
^8r
$8858
mom;
;Mm
48^
aye
Task 1Description
Project Management
Project Management Plan
Monthly Progress Reports & Invoices
Monthly Progress Meetings / Other Communication
Subconsultant Coordination
I Consultant Team Meetings
Team Chartering
Purpose and Need
Prey Alts Screening Validation
DCE Verification
Ilve ent
Pub Involvmt Cmm Plan
Stakeholder Engagement
Community Events and Engagement
City Council Meetings
Support City Website
Public Info Materials and Special Graphics
Advertising
Environmental Justice Outreach
Comment Management
I Strategic Assistance
t Team Meetings
4.11 UR Support Team Meetings
Travel Demand Model Forecasts
Review Existing Information
Confirm Traffic Analysis Zone Land Use Assumptions
Travel Demand Model Forecasts
Technical Memoranda
a`
066
Detailed Traffic Forecasts
Screening level Traffic Operations Analysis
I Policy Point 3 and Env. Doc. Traffic Op Analysis
is and Assumptions
7.11 Methods and Assumptions Document
Environmental Evaluation for Alts
Cultural Resources
Ecological Resources
Noise
Hazardous Waste
Park and Recreation Resources
Social and Community Effects
Preliminary Hydraulics Evaluation
9.11 Preliminar�Hydraulics Evaluation
IGeotechnical
10.11 Geology, Soils, and Topography Technical Memorandum
10.21 Preferred Alternative Conceptual Engineering
Alternatives Development
Update Base Mapping
Conceptual Design Workshop
Utilities
Practical Design Analysis
Conceptual Channelization Plan
Conceptual Structures Type, Size, and location
Conceptual Profiles - Roadway Typical Sections
Conceptual Impact Boundary
Cost Estimates
ition and Screening
12.11 Alts Evaluation and Screening
Prelim Engineering Preferred Alt
13.1 Preliminary Design and Plans
13.2 Traffic Engineering Design
................
o
e e
........
m m
m m
m m
m m
:1 `.1
::, 0
f
ti
3
a
ram
lo
3
R
<
a
8°
8:64'5715555
v$$$
V
N N
N
$15,283.80
$38,182.72
$194,831.01
$108,264.82
N N
$28,686.30
$65,150.18
$2,519.74
$3,598.10
$19,153.52
$4,985.54
537“.'
N N
$
N
a
m g
N i
$60,534.61
$2,149,082.75
roo00000a0000000000000a
s
S
J8888888888888888888888m8^,
NNNNNNNNNNNNNNNNNNN
aN
iN
gi
aaaaaaaaaaaaaaaaaaaaaaN
888.8888888888888888888L
NNNNN��
&ANN
»a°NNNNNa°r
R
e
S
ri
r 0
S
8
3
0 0
0 0
o
00,„100000000000§
8888888n88"888088888882
NNNNN
Nsr
ON
can sr
NNg
Si
si u
2
O
O O
O O
O O
o 0
0 0
0 0
0 0
0 0
0 0
0 0
a S
588888
NNNNNNNRS33VO���s3rVrg
8558
88
888£+188558
44
F.
p$
O
F.
0 0
0 aF
2
$$
.i
8 e
274
.e
ry 271'
:". il
Cost
$37,727.42
$43,777.60
$16,953.80
$8,465.76
$61,012.60
$15,283.80
$38,182.72
$170,225.86
$108,264.82
$30,133.74
$3,141.00
$28,686.3
$65,158.18
N N
$19,153.52
$4,985.54
$3,598.10
$2,519.74
°8
a
H
$18,331.30
$1,634,544.12
8g
l KR
N a
Description
Design Approval /Project Development Approval
Stormwater Design and report
Prelim Right of Way Plans
limited Access and Right of Way
Structural design
Utility Location
Base Map Update for Preliminary Design
ntal Documentation
I Documented Categorical Exclusion
Endangered Species Act
National Historic Preservation Act
Section 4(f) /Section 6(f)
Policy Point 1
Policy Point 2
Policy Point 3
Policy Point 4
ii
L L
Policy Point 7
Policy Point 8
Draft and Final NR Rpt
Labor Subtotal
Indirect Expenses (mileage, parking, etc.)
Q8 r.
g
N S
S
E
a
E
E
E
uosuyofueaf
lolells!u!wpy
slxuluo) is
n
m
n
..
o
—
o
o
o
- o
0
0
R
S o
0
Ailed Aall
11sI8o!o!H/ls!lua!l5
v
o
0
0
0
a
0
0
$
$
0
0
0
laAaf yaf
ls!Holo!Hps!lua!eS l5
m
0
0
0
o
a
o
S
3
o
a
o
PH- Iaeyo1W
Al ls!Holo!H/1slda!as
o
a
o
o
a
a
a
a
0
0
0
0
1a1.laS uAlay1e2
Ill ...weld
m
a
e
o
a
o
0
0
0
Q w
w
0
m
m
a!PuaM'a IAIeO
luglnsuoD ledpoud
a
a
a
a
a
0
o
a
o
a
o
door 1 Aalyaf
aaau!8u3 .5
a
a
a
a
a
a
a
o
a
..
ti
4
A
Aasnd'AA LagOH
Jospvadns Aaning
0
0
0
a
0
0
0
0
0
0
010S 'd P+eMP3
Ill laau18u3
e
o
0
0
0
0
0
o
a
o
3
yllaeN'A ydasof
laau!8u315
g
0
0
0
0
0
0
0
0
0
ti
m
ry
$
1y8liM 3oef
l0a4u3K
n
a
a
a
a
o
a
o
a
o
e
g
70
4$
r
wngpooM'o oeuo
El laau!8u3
$
o
o
a
o
a
§"1:11"a
o
a
Alaayyy yeuleiN
loelunony 3.3fold
m
ry
.s
o
a
a
0
0
0
0
0
a
0
ileH uoual5
lsgenads
s!olloo] llafold
vi
Z a
n
m
a
a
a
o
a
o
a
a
a
o
Aal!eg'Ola)ryuaf
lauueld l5o
V.
m
$
A/
n
a
°
23°
a
0
2"""44°
ry
n
ry
n
Hu!IIO'O Uanai
.0.080315
N
^
8°34
a4
$
a n
4
°
3S°
a
a
o
a
a w
n
n
exlervo9'NI sisal
lauueld 15
..
$
a 3
n a
a a.
m
n n
a
a
/§7'
'A"
-
$ S
ur m
a
n
o
a
a
w
$
.02!N11,01
luellnsuoD 15
mr
a
o
0
o
a
o
0
0
0
0
ry
m
m ry n
lan0l9 elpuevaly
laa0u315
n
a m
�
n 3
$ 4
m 4
m 8
m$$
P
r
m a
a a
a a
a n
n a
ry
ry
a a
a
n n
n
0 a
a m
a a/
m
"
m m°
l!Nad'Nuyof
luap!sada!A150
3
$
n m
Q
a S
m 4
a
FA"
o
a a
o
a
o
m
a
Parametrix Labor
E
e3
F.23
*
.3
3$8F.
'1 8m
n
mm^
.'.'13
$$$a
Fl
2F..NN
'1 2E.U,2
..n
mH
$a
Nh
-
Om
o
N
7Znn•ei
�
w4Vtiln
wn
n
rHn
41
em
u S
e,
L;
*.
41 i,
a"-
n
m
nm2
ii ,at
-HNa
"
Description
Project Management
Project Management Plan
Monthly Progress Reports & Invoices
Monthly Progress / Other Communication
Subconsukant Coordination
Consultant Team Meetings
R! initiation
Team Chartering
Purpose and Need
Prey Alts Screenin&Validation
DCli Verification
Public Involv t
Pub Invotvmt Cmm Plan
Stakeholder Engagement
Community Events and Engagement
City Council Meetings
___ __.........
6L.
O.P
1a'
Advertising
Environmental Justice Outreach
g"
f
O
s�
IJR Support Team Meetings
Uii Support Team Meetings
Travel Demand Model Forecasts
Review Existing Information
Confirm Traffic Analysis Zone Land Use Assumptions
Travel Demand Model Forecasts
Technical Memoranda
Traffic Forecasts and Operations Analysis
Data Collection
Detailed Traffic Forecasts
Screening Level Traffic Operations Analysis
1 Policy Point 3 and Env. Doc. Traffic Op Analysis
tilL
�
�'
i2c
�
E m
Ecological Resources
Noise
Hazardous Waste
Park and Recreation Resources
a
Ej
EY
9
o 'c
mg
VT
Preliminary Hydraulks Evaluation
Geotedmkal
Geology, Soils, and Topography Technical Memorandum
Preferred Alternative Conceptual Engineering
Alternatives Development
Update Base Mapping
Conceptual Design Workshop
Existing Utilities
Practical Design Analysis
Conceptual Channelizatlon Plan
Conceptual Structures Type, Site, and Location
;x
uosuyofueaf
,Ole» s1U1wpv^
s1Oe,luo3 ,
F
0
0
0
0
0
0
0
A„ed Aa,l
11SIHOlo1H/15!luep5
c
0
0
0
0
0
,aAaiN of
ls!HOlo1H/ASpuap5 ,S
^
0
0
0
o
m
0
II,H1 laCHHlVN
Al ls1HOIO19/u!luaps
r
0
0
c
o
o
0
1a1la5 UA1a41eH
III,auueId
m
0
0
0
0
8§
o
alpudM'e Ibea
luellnsuo3ledpupd
m
°
°
o
o
°
doop 1 Aa,yaf
,aau!HU3.1S
a
o
do o
0 2
v 0
0
0
Aasnd'M Laspa
!n,adns Aan,n5^
o
0
0
0
0
0
0
olo5'd POMP3
III ,aau!HU3
Po
$ m
n
R2°
N
8
g
o
0
0
41,4118 Hdasof
,aa0u3,s
w
e
v o
0
0
1HHpM 3oef
,.0,0113 ,5
h
r
ry
,.,
n
r
0
0
0
wngpooM 11 UepO
Ill,aau!Hu3
8
o
0
0
0
0
0
0
A,aa,7]LVWOMIN
lue,Uno31y11afo,d^
0
0
0
0
0
0
8
8
J,eH uoue45
15!le2adS
SIO,luO3 pafo,d
^
°
0
c
0
o
c
0
A.11.8 'V' ,al!uuaf
,auueld,S
9
n
n
°
°
m
.n
:.
Hu!IIO 13 na0015
,001,003,5
N
r .r
.. 9
N
r
.. ^,
..
°
°
..
ealeluo9'w e!sa,1
,auueld 15
9
9 3
9
8
S
„ a
`' S
m°
m
a 8
em!1Mlp!0
1uellnsuO3 IS
P
"'
°
,.,
0,
a
w
o
0
0
n0lg e,pueoaly
,..080315
m
°°
n
9 9
0
0 0
0 0
0 0
ti
n
r
n 0
° 0
0
0 0
ti
alpad 'N LAM
IUOP!SO,d 009115
o
m
o°
0
0
0
0
9
r a
n n
n n
n e
Parametrix Labor
8
08.°.8!r1
..
r
meek
090059
898899
m o
72 a-
3999
m
°
999
Description
Conceptual Profiles - Roadway Typical Sections
Conceptual Impact Boundary
Cost Estimates
Alts Evaluation and Screening
Airs Evaluation and Screening
Prelim Engineering Preferred Alt
Preliminary Benign and Plans
Traffic Engineering Design
m C
o $
t o
O
g
Prelim Right of Way Plans
Limited Access and Right of Way
Structural design
Utility Location
Base Map Update for Preliminary Design
Environmental Documentation
_
ry
8 w
o
National Historic Preservation Act
Section «f) /Section 6(f)
IDR
Policy Point 1
�?y
Policy Point
Policy Point
Policy Point B
Draft and Final IUR Rpt
ielloog llgA5
rol!P3 Iei!u4E1
g
o
—
o --
- o
—
0
0
o
4.0
-
.4
1
n
ti
m
seeds ]loos
III JoAarrn5
o
o
0
o
o
m
o
0
0
0
N
raBreH uwu0
II roAarans
wmi
o
0
0
0
0
0
0
0
0
o
:RA
Aesnd Lagoa
oswedn5A0o4n5
„
0
0
0
0
0
0
0
0
0
o
22
neapoq!ylla5e0
roAanrngr5
m
0
0
0
0
0
0
0
0
0
0
n
rauCglBM laeysl4V
Solid AVl
m
o
0
0
0
0
0
0
0
0
o
!A en!r3ed
rau8!sao alyderg K
N
o
o
n
n
N
o
0
m
m 0
o
0
n
n
sreHoo ApueIB
Al raaulOU3
m
0
0
0
0
0
0
0
0
0
0
S
S
04184505
(ralernwrosS)
Il raau!8u3
m
o
0
0
0
0
0
0
o
n n
n
nssnA lae43pg
(Bfl /°8151) I raau!Hu3
n
A
o
0
0
5 5
0
&
S
5 5 0
0
0
0
0
ra4GM 81lw3
I raau!Pu3
a
S
o
o
o
0
0
0
0
0
0
0
5
5
apl5apuoser
II1015ad0C1007
n
o
0
0
0
0
0
0
0
44.
°
S N
RS
Parametrix Labor
PD14e1
'AR
m .i.14§M”,.
n mm^
n.R2174
930
nnEii�n
^$r2�..4
.°.SS
°SSS
SSS
SS
�S
A3
�N
5:11-45555°:
71
a'Inl
ri
fAgPR��
AA
< °n���0
n
epm
a
5$5555
m
m
Description
Project Management
Project Management Plan
Monthly Progress Reports & Invokes
Monthly Progress Meetings / Other Communication t` }j
Subconsultant Coordination
Consultant Team Meetings --
c
L
z8
g
Purpose and Need
Prey Alts Screening Validation
4
dbi8
h;8x
Pub Involvmt Cmm Plan
Stakeholder Engagement
Community Events and Engagement
Public Info Materials and Special Graphics
Advertising
Environmental Justice Outreach
Comment Management
Strategic Assistance
IJR Support Team Meetings
UR Support Team Meetings
Travel Demand Model Forecasts
Travel Demand Model Forecasts
Technical Memoranda
Traffic Forecasts and Operations Analysis
Data Collection
Detailed Traffic Forecasts
Screening Level Traffic Operations Analysis
Policy Point 3 and Env. Doc. Traffic Op Analysis
UR Methods and Assumptions
Methods and Assumptions Document
Environmental Evaluation for Aks
Noise
Hazardous Waste
Park and Recreation Resources
Social and Community Effects
'Preliminary Hydraulics Evaluation
Preliminary Hydraulics Evaluation
i
Preferred Alternative Conceptual Engineering
Alternatives Development
Existing Utilities
Practical Design Analysis
Conceptual Channelization Plan
Conceptual Structures Type, Size, and Location
..
.+..
.. ..
nnn
mminmm�mnm
mm
m
omm
.f,
H..
0
1 r
S
8
8
9
JIoogl!gA5
1o11P31e>luglal
°
°
o
a m
a
o
0
ry
ry a
ry .+
f.,
ry o
saad5 Woos
in 1oAaA1nS
ma
o
8
0
0
8 0
0
0
1a81eH uUI119
II1oAaAms
0
°
m
°
°
m
Aasnd Uagoy
losvuadns AaA■n5
ry
°
a
o
o
0
0
0
neepoq!gl la!uea
1oAa0n51S
mo
o
ry
o°
o
0
0
Jau1!IlcM laega!W
Wild Awl
°
°
°
0
0
0
0
!A en!lled
,au8!sao anIdel715r
°
°
°
o
°
o
a
..
ry
ry n
m m
slalloy APueie
Al laau!an3
m
°
ry
°
°
o
o
an geleS
(1a7eAsuno15)
Illaaul8u3
^ro
m
,-�
ry
°
o o
ry
0
0
0
nssny!aeg155
(tlrl /'He11) I laasn2a3
n
°°
°
0
0 0
0
o
os 8
m
a m
n
s1IaM Apw3
Ilaau!8u3
a
°
?I
Q o
0
0°
0
amelaJ uoser
a 1oulad° aan
R :°
°
8
R
R
R
9
9 °
°
°
Parametrix Labor
3 9
Vo. m°S
Description
Conceptual Profiles - Roadway Typical Sections
Conceptual Impact Boundary
Cost Estimates
Acts Evaluation and Screening
Aks Evaluation and Screening
Prelim Engineering Preferred Alt
Preliminary Design and Plans
Traffic Engineering Design
Design Approval /Project Development Approval
Stormwater Design and report
Prelim Right of Way Plans
Limited Access and Right of Way
Structural design
Utility
Ryl location
Base Map Update toe Preliminary Design
Environmental Documentation
Documented Categorical Exclusion
Endangered Species Act
LNational Historic Preservation Act
section A(f)/sectionsm
NR
Policy Point 1
Policy Point
Policy Point 3
� r
Policy Point R
Graft and Final OR Rpt
1
8
8
8
Client: City of Federal Way
Project: City Center Access Project
Drnionr hln• 1f._mfn
Expense Totals:
5,960
20
7,500
20,000
533,688.60 $3,188.60 $3,000.00 $7,500.00 $20,000.00
CCA- 20170807_Budget.xlsx; PM%- Expenses
Parametrix Indirect Expenses
Cost
m
A
E
2
Rates:
0.54
$150
1.00
1.00
Phase
Task
Description
1
Project Management
$898.80
1680
1.1
Project Management Plan
1.2
Monthly Progress Reports & Invoices
1.3
Monthly Progress Meetings / Other Communication
$898.80
1680
1.4
Subconsultant Coordination
1.5
Consultant Team Meetings
2
Re- initiation
0
-2.1
Team Chartering
2.2
DCE Verification
2.3
Purpose and Need
2.4
Prey Alts Screening Validation
3
Public Involvement
$813.20
1520
3.1
Pub Involvmt Cairn Plan
3.2
Stakeholder Engagement
$428.00
800
3.3
Community Events and Engagement
$128.40
240
3.4
City Council Meetings
$256.80
480
3.5
Support City Website
$0.00
3.6
Public Info Materials and Special Graphics
$0.00
3.7
Advertising
$0.00
3.8
Environmental Justice Outreach
$0.00
3.9
Comment Management
$0.00
3.10
Strategic Assistance
$0.00
4
LIR Support Team Meetings
$599.20
1120
4.1
11R Support Team Meetings
$599.20
1120
5
Travel Demand Model Forecasts
50.00
0
5.1
Review Existing Information
$0.00
5.2
Confirm Traffic Analysis Zone Land Use Assumptions
$0.00
5.3
Travel Demand Model Forecasts
$0.00
5.4
Technical Memorandums
$0.00
6
Traffic Forecasts and Operations Analysis
$20,000.00
0
0
0
20,000
6.1
Data Collection
$20,000.00
20,000
6.2
Detailed Traffic Forecasts
$0.00
6.3
Screening Level Traffic Operations Analysis
$0.00
6.4
Policy Point 3 and Env. Doc. Traffic Op Analysis
$0.00
7
11R Methods and Assumptions
50.00
0
7.1
11R Methods and Assumptions Document
$0.00
8
Environmental Evaluation for Abs
$7,500.00
0
7500
8.1
Cultural Resources
$0.00
62
Ecological Resources
$0.00
8.3
Noise
$0.00
8.4
Hazardous Waste
$7,500.00
7500
8.5
Park and Recreation Resources
$0.00
8.6
Social and Community Effects
$0.00
9
Preliminary Hydraulics Evaluation
$42.80
80
9.1
Preliminary Hydraulics Evaluation
$42.80
80
10
Geology, Soils and Topography
50.00
0
10.1
Geology, Soils and Topography
$0.00
11
Alternatives Development
$1,756.80
480
10
11.1
Update Base Mapping
$1,714.00
400
10
11.2
Conceptual Design Workshop
$42.80
80
11.3
Existing Utilities
$0.00
11.4
Practical Design Analysis
$0.00
11.5
Conceptual Channelization Plan
$0.00
11.6
Conceptual Structure Design
$0.00
11.7
Conceptual Profiles - Roadway Typical Sections
$0.00
11.8
Conceptual Impact Boundary
$0.00
11.9
Cost Estimates
$0.00
12
Alts Evaluation and Screening
$42.80
80
12.1
Alts Evaluation and Screening
$42.80
80
13
Prelim Engineering Preferred Alt
$1,906.60
760
10
13.1
Preliminary Design and Plans
$321.00
600
13.2
Traffic Engineering Design
$0.00
13.3
Design Approval/ Project Development Approval
$0.00
13.4
Stormwater Design and report
$0.00
13.5
Prelim Right of Way Plans
$85.60
160
13.6
Limited Access and Right of Way
$0.00
13.7
Structural Design
$0.00
13.8
Utility Location
$0.00
13.9
Basemap Update for Preliminary Design
$1,500.00
10
14
Environmental Documentation
5128.40
240
14.1
Documented Categorical Exclusion
$107.00
200
• Ecological resources
$42.80
80
• Noise
$42.80
80
• Hazardous materials
$21.40
40
• Categorical Exclusion Doc
$0.00
14.2
Endangered Species Act
$21.40
40
14.3
National Historic Preservation Act
$0.00
14.4
Section 4(f) /Section 6(f)
$0.00
15
IUR
$0.00
0
15.1
Policy Point 1
$0.00
15.2
Policy Point 2
$0.00
15.3
Policy Point 3
$0.00
15.4
Policy Point 4
$0.00
15.5
Policy Point 5
$0.00
15.6
Policy Point 6
$0.00
15.7
Policy Point 7
$0.00
15.8
Policy Point 8
$0.00
15.9
Draft and Final 11R Rpt
$0.00
Expense Totals:
5,960
20
7,500
20,000
533,688.60 $3,188.60 $3,000.00 $7,500.00 $20,000.00
CCA- 20170807_Budget.xlsx; PM%- Expenses
Exhibit E
Sub - consultant Cost Computations
The CONSULTANT shall not sub - contract for
the performance of any work under this AGREEMENT without prior written permission of the AGENCY.
Refer to section VI "Sub- Contracting" of this AGREEMENT.
There are four subconsultants on the project identified in the scope of work in Exhibit A; Sub cost computations
are attached.
Agreement Number: 17-
WSDOT Form 140 -089 EF Exhibit E Page 1 of 1
Revised 10/30/2014
Client: City of Federal Way
Project: City Center Access Project
Project No: 16 -0760
Labor Totals:
5130,524.70 965 131 168 354 72 210 30
$27,882.04 528,402.08 $38,872.74 $9,800.64 $23,060.10 $2,507.10
CCA- 20170807 Budget.xlsx, DNS -Labor
i >
E
3
r
Y
f
u
3
m�
DKS Labor
vE
-
nv
E
Labor
Burdened Rates:
212.84
169.06
109.81
136.12
109.81
83.57
Phase
Task
Description
Labor Dollars
Labor Hours
1
Project Management
$14,851.82
88
58
0
0
0
0
30
1.1
Project Management Plan
$0.00
0
1.2
Monthly Progress Reports & Invoices
$7,189.58
52
22
30
1.3
Monthly Progress Meetings / Other Communication
$0.00
0
1.4
Subconsultant Coordination
50.00
0
1.5
Consultant Team Meetings
$7,662.24
36
36
2
Re- initiation
$0.00
0
0
0
0
0
0
0
2.1
Team Chartering
50.00
0
2.2
Purpose and Need
$0.00
0
2.3
Prey Alts Screening Validation
50.00
0
1.4
DEE Verification
$0.00
0
3
Public Involvement
$0.00
0
0
0
0
0
3.1
Pub Involvmt Cmm Plan
50.00
0
3.2
Stakeholder Engagement
50.00
0
3.3
Community Events and Engagement
$0.00
0
3.4
City Council Meetings
$0.00
0
3.5
Support City Website
$0.00
0
3.6
Public Info Materials and Special Graphics
$0.00
0
3.7
Advertising
50.00
0
3.8
Environmental Justice Outreach
50.00
0
3.9
Comment Management
3.10
Strategic Assistance
50.00
0
4
118 Support Team Meetings
$3,405.44
16
16
0
0
0
0
0
4.1
IUR Support Team Meetings
$3,405.44
16
16
5
Travel Demand Model Forecasts
$55,648.68
412
32
120
260
0
0
0
5.1
Review Existing Information
56,170.56
50
2
8
40
5.2
Confirm Traffic Analysis Zone Land Use Assumptions
$6,644.56
50
1
16
32
5.3
Travel Demand Model Forecasts
$31,802.52
232
20
72
140
0
0
0
Existing Model' Update land use
52,65664
18
2
8
8
Exisring Model: Update roadway network
53,095.88
22
2
8
12
Existing Model: Validation
$5,515.52
40
4
12
24
Existing Model: Calibration
55,51552
40
4
12
14
Future Base Model: Update land use
52,65664
18
2
8
8
Future Base Model: Update roadway network
$3,535.12
26
2
8
16
Future Build Models (2): Update roadway network
58,82720
68
4
16
48
5.4
Technical Memorandums
. $1103104
80
4
24
48
6
Traffic Forecasts and Operations Analysis
$15,732.06
126
0
32
94
0
0
0
6.1
Data Collection
50.00
0
6.2
Detailed Traffic Forecasts
$15,732.06
126
0
32
94
0
0
0
Develop and documentpost- processing methodology
55,323.02
41
12
30
Post - process volumes: AM /PM, 4 scenarios
510,409.04
84
20
64
6.3
Screening Level Traffic Operations Analysis
$0.00
0
6.4
Policy Point 3 and Env. Doc. Traffic Op Analysis
$0.00
0
7
11R Methods and Assumptions
$2,917.80
17
1
16
0
0
0
0
7.1
Methods and Assumptions Document
52,917.80
17
1
16
8
Environmental Evaluation for Alts
$0.00
0
0
0
0
0
0
0
8.1
Cultural Resources
50.00
0
8.2
Ecological Resources
50.00
0
8.3
Noise
$0.00
0
8.4
Hazardous Waste
$0.00
0
8.5
Park and Recreation Resources
$0.00
0
8.6
Social and Community Effects
$0.00
0
9
Preliminary Hydraulics Evaluation
$0.00
0
0
0
0
0
0
0
9.1
Preliminary Hydraulics Evaluation
$0.00
0
10
Geotechnical
$0.00
0
0
0
0
0
0
0
10.1
Geology, Soils, and Topography Technical Memorandum
$0.00
0
11
Altematives Development
$0.00
0
0
0
0
0
0
0
11.1
Update Base Mapping
$0.00
0
11.2
Conceptual Design Workshop
$0.00
0
11.3
Existing Utilities
$0.00
0
11.4
Practical Design Analysis
$0.00
0
11.5
Conceptual Channeliration Plan
$0.00
0
11.6
Conceptual Structure Design
50.00
0
11.7
Conceptual Profiles - Roadway Typical Sections
50.00
0
11.8
Conceptual Impact Boundary
$0.00
0
11.9
Cost Estimates
50.00
0
12
Alts Evaluation and Screening
$0.00
0
0
0
0
0
0
0
12.1
Alts Evaluation and Screening
50.00
0
13
Prelim Engineering Preferred Alt
$37,968.90
306
24
0
0
72
210
0
13.1
Preliminary Design and Plans
50.00
0
112
Traffic Engineering Design
937,968.90
306
24
72
210
Basis of Design Document
$0.00
0
Crash Analysis Report
$0.00
0
Design Analysis
$0.00
0
Design Approval Documents
$0.00
0
Stormwoter Design and report
50.00
0
Prelim Right of Way Pions
$0.00
0
Limited Access and Right of Way
$0.00
0
Geotechnical
50.00
0
14
Environmental Documentation
$0.00
0
0
0
D
0
0
0
14.1
Documented Categorical Exclusion
$0.00
0
0
0
0
0
0
0
• Ecological resources
50.00
0
• Noise
$0.00
0
• Hazardous materials
$0.00
0
• Categorical Exclusion Doc
$0.00
0
14.2
Endangered Species Act
$0.00
0
14.3
National Historic Preservation Act
$0.00
0
14.4
Section 4(f) /Section 6(f)
50.00
0
15
116
50.00
0
0
0
0
0
15.1
Policy Point 1
50.00
0
15.2
Policy Point 2
50.00
0
15.3
Policy Point 3
$0.00
0
15.4
Policy Point 4
$0.00
0
15.5
Policy Point 5
$0.00
0
15.6
Policy Point 6
$0.00
0
15.7
Policy Point 7
$0.00
0
15.8
Policy Point8
$0.00
0
15.9
Draft and Final UR Rpt
50.00
0
Labor Totals:
5130,524.70 965 131 168 354 72 210 30
$27,882.04 528,402.08 $38,872.74 $9,800.64 $23,060.10 $2,507.10
CCA- 20170807 Budget.xlsx, DNS -Labor
Client: City of Federal Way
Project: City Center Access Project
prr,jvrt Nr,
1F, -f17fn
DKS Indirect Expenses
Rates:
0.535
16.00
Phase
Task
Description
1
Project Management
$117.50
104
100
4
1.1
Project Management Plan
$0.00
0
1.2
Monthly Progress Reports & Invoices
$0.00
0
1.3
Monthly Progress Meetings / Other Communication
$0.00
0
1.4
Subronsultant Coordination
$0.00
0
1.5
Consultant Team Meetings
$117.50
104
100
4
2
Re- initiation
$0.00
0
0
0
2.1
Team Chartering
$0.00
0
2.2
DCE Verification
$0.00
0
2.3
Purpose and Need
$0.00
0
2.4
Prev Alts Screening Validation
$0.00
0
3
Public Involvement
$0.00
0
0
0
3.1
Pub Involvmt Cmm Plan
$0.00
0
3.2
Stakeholder Engagement
$0.00
0
3.3
Community Events and Engagement
$0.00
0
3.4
City Council Meetings
$0.00
0
3.5
Support City Website
$0.00
0
3.6
Public Info Materials and Special Graphics
$0.00
0
3.7
Advertising
$0.00
0
3.8
Environmental Justice Outreach
$0.00
0
3,9
Comment Management
3.10
Strategic Assistance
$0.00
0
4
IJR Support Team Meetings
$0.00
0
0
0
4.1
UR Support Team Meetings
$0.00
0
5
Travel Demand Model Forecasts
$53.50
100
100
0
5.1
Review Existing Information
$53.50
100
100
5.2
Con0rm Traffic Analysis Zone Land Use Assumptions
$0.00
0
5.3
Travel Demand Model Forecasts
$0.00
0
5.4
Technical Memorandums
$0.00
0
6
Traffic Forecasts and Operations Analysis
$0.00
0
0
0
6.1
Data Collection
$0.00
0
6.2
Detailed Traffic Forecasts
$0.00
0
6.3
Screening Level Traffic Operations Analysis
50.00
0
6.4
Policy Point 3 and Env. Doc. Traffic Op Analysis
$0.00
0
7
UR Methods and Assumptions
$0.00
0
0
0
7.1
IJR Methods and Assumptions Document
$0.00
0
8
Environmental Evaluation for Alts
$0.00
0
0
0
8.1
Cultural Resources
$0.00
0
8.2
Ecological Resources
$0.00
0
8.3
Noise
$0.00
0
8.4
Hazardous Waste
$0.00
0
8.5
Park and Recreation Resources
$0.00
0
8.6
Social and Community Effects
$0.00
0
9
Preliminary Hydraulics Evaluation
$0.00
0
0
0
9.1
Preliminary Hydraulics Evaluation
$0.00
0
10
Geology, Soils and Topography
$0.00
0
0
0
10.1
Geology, Soils and Topography
$0.00
0
11
Alternatives Development
$0.00
0
0
0
11.1
Update Base Mapping
$0.00
0
11.2
Conceptual Design Workshop
$0.00
0
11.3
Existing Utilities
$0.00
0
11.4
Practical Design Analysis
$0.00
0
11.5
Conceptual Channelization Plan
$0.00
0
11.6
Conceptual Structure Design
$0.00
0
11.7
Conceptual Profiles - Roadway Typical Sections
$0.00
0
11.8
Conceptual Impact Boundary
$0.00
0
11.9
Cost Estimates
$0.00
0
12
Alts Evaluation and Screening
$0.00
0
0
0
12.1
Alts Evaluation and Screening
$0.00
0
13
Prelim Engineering Preferred Alt
$0.00
0
0
0
13.1
Preliminary Design and Plans
$0.00
0
Design Documentation
$0.00
0
Basis of Design Document
$0.00
0
Crash Analysis Report
50.00
0
Design Analysis
$0.00
0
Design Approval Documents
$0.00
0
Stormwater Design and report
$0.00
0
Prelim Right of Way Plans
$0.00
0
Limited Access and Right of Way
$0.00
0
Geotechnical
$0.00
0
14
Environmental Documentation
$0.00
0
0
0
14.1
Documented Categorical Exclusion
$0.00
0
0
0
14.2
Endangered Species Act
$0.00
0
14.3
National Historic Preservation Act
$0.00
0
14.4
Section 4(f) /Section 6(f)
$0.00
0
15
IJR
$0.00
0
0
0
15.1
Policy Point 1
$0.00
0
15.2
Policy Point 2
$0.00
0
15.3
Policy Point 3
$0.00
0
15.4
Policy Point4
$0.00
0
15.5
Policy Point S
$0.00
0
15.6
Policy Point 6
$0.00
0
15.7
Policy Point 7
$0.00
0
15.8
Policy Point 8
$0.00
0
15.9
Draft and Final UR Rpt
$0.00
0
Expense Totals:
$171.00 204 200
4
$107.00 $64.00
CCA.20170807_Budget.xlsx; DKS - Expenses
091
?!ugoal
Ple!
o
-
—
091
?!uPal.
Pla!1
o
9
a1110
?!uquel
Pla!i
o
9,
unW
1s9epads
walsA9
uo0ewlo)9
mo
-
ry N
sgun0
loleils!u!wpy
lue[eud
m
n
ry ry
gqo7
ls!lepads
uo!lonpoid
w
..
1a20A
4uels!ssy uo
!lanpold /4OUP3
m
`z v
HMS
lu els!ssy
aupun000y
v
H ry
wdl!9
lolewploo9
Alales
pue ylleOH
9
.. ..
Ilalllo!d
519
/192oloaego,y
Uarold
0
.. ..
1au01oa9
ueyolsH
leinloal!goly
p rood
9
8 .n
azlingos
ls!Aoloaegoly
asa9
m
8 Fa
wad
Ilols!H
lempa0gwy
is
9
N `V
sedwo9
ls!8oloaego1y
zs
To
ti
H
c �
o°
HRA Labor
Description
Project Management
Project Management Plan
Monthly Progress Reports & Invoices
Monthly Progress Meetings / Other Communication
Subconsultant Coordination
Consultant Team Meetings
Re- initiation
Team Chartering
DCE Verification
Purpose and Need
Prey Alts Screening Validation
Public Involvement
Pub Involvmt Cmm Plan
Stakeholder Engagement
Community Events and Engagement
City Council Meetings
Support City Website
Public Info Materials and Special Graphics
Advertising
Environmental Justice Outreach
Comment Management
Strategic Assistance
IJR Support Team Meetings
I I1R Support Team Meetings
Travel Demand Model Forecasts
Review Existing Information
Confirm Traffic Analysis Zone Land Use Assumptions
Travel Demand Model Forecasts
Technical Memorandums
Traffic Forecasts and Operations Analysis
Data Collection
Detailed Traffic Forecasts
Screening Level Traffic Operations Analysis
Policy Point 3 and Env. Doc. Traffic Op Analysis
111R Methods and Assumptions
IJR Methods and Assumptions Document
Environmental Evaluation for Alts
Cultural Resources
Ecological Resources
Noise
Hazardous Waste
Park and Recreation Resources
Social and Community Effects
Preliminary Hydraulics Evaluation
Preliminary Hydraulics Evaluation
Geology, Soils and Topography
Geology, Soils and Topography
Alternatives Development
Update Base Mapping
Conceptual Design Workshop
091
9e!o!uyoa1
PIa!3
8S
u°'i
e
091
ue!o!uyoal
PI0!d
o
N
S
a
°111!1
ue!o!uyoal
Pla!3
o
rt
m
llnyry
lsge!oads
walsA5
uopewlalul
mo
"
sump
loleils!u!wpy
loafold
m
"
-
yyop
4sgenad5
ua!lonpold
m
IN
leSon
luels■ssv uo
11311P010011P3
e
00
m
11015
luelslssy
Supunony
01
e
^'
'"
u!d!!9
loleu!Pioo7
A1ale5
Pue y11e°H
0
"
11°111 >!d
SID
/ls!Soloae9e0
loafwd
N
»
.,
laupag
pols!H
lemloapyoiy
1pafold
ti
S
S
azllnyoS
1s!do1oee4»tl
yv EaSdU
m
„
..
wad
uei1ols!H
leznloaoyo,v
'15
2
m
e
v
sedwo7
ls!doloaeyoiy
'us
2
,.
..
a 'S
e
a
HRA Labor
Description
Existing Utilities
Practical Design Analysis
Conceptual Channelization Plan
Conceptual Structure Design
Conceptual Profiles - Roadway Typical Sections
Conceptual Impact Boundary
Cost Estimates
Alts Evaluation and Screening
Alts Evaluation and Screening
Prelim Engineering Preferred Alt
ans
Basis of Design Document
Crash Analysis Report
Design Analysis
Design Approval Documents
Stormwater Design and report
Prelim Right of Way Plans
Limited Access and Right of Way
Geotechnical
Environmental Documentation
Documented Categorical Exclusion
• Ecological resources
I • Noise
• Hazardous materials
Ir • Categorical Exclusion Doc
Endangered Species Act
National Historic Preservation Act
Section 4)f) /Section 6(f)
UR
Policy Point 1
Policy Point 2
Policy Point 3
Policy Point 4
Policy Point 5
Policy Point 6
Policy Point 7
Policy Point 8
Draft and Final I1R Rpt
8
3
8
$2,189.60 $1
Client: City of Federal Way
Project: City Center Access Project
CCA- 20170807_Budgetxlsx; HRA- Expenses
HRA Indirect Expenses
eZ 8
Rates:
0.20
0.20
20.00
0.535
Phase
Task
Description
Project Management
1.1
Project Management Plan
1.2
Monthly Progress Reports & Invoices
1.3
Monthly Progress Meetings / Other Communication
1.4
Subconsultant Coordination
1.5
Consultant Team Meetings
2
Re- initiation
2.1
Team Chartering
2.2
DCE Verification
2.3
Purpose and Need
2.4
Prey Alts Screening Validation
3
Public Involvement
31
Pub Involvmt Cmm Plan
3.2
Stakeholder Engagement
3.3
Community Events and Engagement
3.4
City Council Meetings
3.5
Support City Website
3.6
Public Info Materials and Special Graphics
3.7
Advertising
3.8
Environmental Justice Outreach
3.9
Comment Management
3.10
Strategic Assistance
4
IJR Support Team Meetings
4.1
IJR Support Team Meetings
5
Travel Demand Model Forecasts
5.1
Review Existing Information
5.2
Confirm Traffic Analysis Zone Land Use Assumptions
5.3
Travel Demand Model Forecasts
5.4
Technical Memorandums
6
Traffic Forecasts and Operations Analysis
6.1
Data Collection
6.2
Detailed Traffic Forecasts
6.3
Screening Level Traffic Operations Analysis
6.4
Policy Point 3 and Env. Doc. Traffic Op Analysis
7
IJR Methods and Assumptions
7.1
UR Methods and Assumptions Document
8
Environmental Evaluation for Alts
$173.50
502
200
200
2
100
8.1
Cultural Resources
5173.50
502
200
200
2
100
8.2
Ecological Resources
8.3
Noise
8A
Hazardous Waste
8.5
Park and Recreation Resources
8.6
Social and Community Effects
9
Preliminary Hydraulics Evaluation
9.1
Preliminary Hydraulics Evaluation
10
Geology, Soils and Topography
10.1
Geology, Soils and Topography
11
Alternatives Development
11.1
Update Base Mapping
11.2
Conceptual Design Workshop
11.3
Existing Utilities
11.4
Practical Design Analysis
11.5
Conceptual Channelization Plan
11,6
Conceptual Structure Design
11,7
Conceptual Profiles - Roadway Typical Sections
11.8
Conceptual Impact Boundary
11.9
Cost Estimates
12
Alts Evaluation and Screening
12.1
Alts Evaluation and Screening
13
Prelim Engineering Preferred Alt
13.1
Preliminary Design and Plans
Design Documentation
Basis of Design Document
Crash Analysis Report
Design Analysis
Design Approval Documents
Stormwater Design and report
Prelim Right of Way Plans
Limited Access and Right of Way
Geotechnical
14
Environmental Documentation
$948.00
1,420
400
200
20
800
14.1
Documented Categorical Exclusion
• Ecological resources
• Noise
• Hazardous materials
• Categorical Exclusion Doc
14.2
Endangered Species Act
14.3
National Historic Preservation Act
$948.00
1,420
400
200
20
800
14.4
Section 4(f) /Section 6(f)
15
UR
15.1
Policy Point 1
15.2
Policy Point 2
15.3
Policy Point 3
15.4
Policy Point 4
15.5
Policy Point 5
15.6
Policy Point 6
15.7
Policy Point?
15.8
Policy Point8
15.9
Draft and Final IUR Rpt
CCA- 20170807_Budgetxlsx; HRA- Expenses
Client: City of Federal Way
Project: City Center Access Project
Expense Totals:
$1,121.50 1,922 600 400 22 900
$120.00 $80.00 $440.00 $481.50
CCA- 20170807 Budget.xlsx; HRA- Expenses
HRA Indirect Expenses
_
W
_ 6
m
2
Rates:
0.20
0.20
20.00
0.535
Phase
Task Description
Expense Totals:
$1,121.50 1,922 600 400 22 900
$120.00 $80.00 $440.00 $481.50
CCA- 20170807 Budget.xlsx; HRA- Expenses
voles ulwseA
Jau8!sap
m
o
o
-
N
ry 0
ry
o
0
0
0
0
0
0
0
sauleHloiAel
1oleulploo7
laafold
N
0
0
8
ry
d.
rv°
A
0
0
0
0
0
0
0
0
1egA8 yes
angmaxd
lunoaay
0
0
0
0
0
0
0
0
0
0
0
0
Su] uue -gSlal
1a8eueyl
]unony lolua5
a9neH ualslpl
1opa1!o
lunoaay dnolp
ro
0
o
ry
-
0 0
Aqunp alert
alepossy
gveasa8
v
o
o
ry
-
0
0
0
0
0
0
0
0
e11ed upsnr
Jopallo
wawa,
o
°
o
..
ti
°
O
sl0e0 ullsnr
luelunoaay
laafold
n
ry
ea
o
0
0
0
0
0
0
0
0
0
!Dauuepi Al!w3
I alepossyr
olua5
elenanp
ylagelll3
I alepossy
w
o
o
$
0
0
0
0
0
0
0
0
0
uovapuaH
euuepg
awculpl0o7
laafold
uolg9noH
0aa8
I alepossy
0fua5
$
ti
at S
u
3
8 3
8
4 m
.+
ry
o
0
0
0
0
0
ulAaN Mug
lolaap
lunoaay dnolp
8
4a0N Mg
ladolanap
qaM
lepAag
epuewy
JaSeuelN
lung.a / J01Ua5
g
algo5 xaly
1auflpap
1.1a5
rveta080000000ry
S..
Ij801000010100
Comment Management $24,307.90 360
Strategic Assistance $2,352.80 20
E
E E
° a
�_
Travel Demand Model Forecasts $0.00 0
Review Existing Information _ $0.00 0
Confirm Traffic Analysis Zone Land Use Assumptions $0.00 0
Travel Demand Model Forecasts $0.00 0
Technical Memorandums $0.00 0
Traffic Forecasts and Operations Analysis $0.00 0
Data Collection $0.00 0
Detailed Traffic Forecasts $0.00 0
' Screening Level Traffic Operations Analysis $0.00 MIME
Policy Point3 and Env. Don. Traffic OD Analysis $0.00
IIJR Methods and Assumptions $0.00 0
Methods and Assumptions Document $0.00 0
Environmental Evaluation for Alts $0.00 01
Cultural Resources $0.00 OI
Ecological Resources $0.00 0'
Noise $0.00 0
Hazardous Waste $0.00 0
Park and Recreation Resources $0.00 0
o >
Preliminary Hydraulics Evaluation $0.00 0
Geotechnical $0.00 0
Geology, Bolls, and Topography Technical Memorandum $0.00 0
(Alternatives Development $0.00 0
Update Base Mapping $0.00 0
Conceptual Design Workshop _ $0.00 0
Existing Utilities $0.00 0
Practical Design Analysis $0.00 0
Conceptual Channelization Plan $0.00 0
Conceptual Structure Design $0.00 0
Conceptual Profiles -Roadway Typical Sections $0.00 0
Conceptual impact Boundary $0.00 0
Cost Estimates $0.00 0
a8=
e8
m8888=
2a2,2
mMmo
M
�
� H
FA
n
Description
Project Management
Project Management Plan
Monthly Progress Reports & Invoices
Monthly Progress Meetings / Other Communication
Subconsultant Coordination
Consultant Team Meetings
Re- Initiation
Team Chartering
Purpose and Need
Prev Alts Screening Validation
c £
> `
Ea
Pub Involvmt Cmm Plan
Stakeholder Engagement
Community Events and Engagement
City Council Meetings
Support City Website
Public Info Materials and Special Graphics
Advertising
Environmental Justice Outreach
PRR Labor
la.
to
3
uoreg ulwseA
reu8!sa0
m
o
0
0 0
0
sauleH,oIAei
,oleulp,00p
laafad
0
0
0 0
0
,egAll pe5
anllnoc3
2Yngaay
n
e
0
0
° 0
0
81.13 uue -481x7
,a8eue161
lunooay ,olua5
m
°
0
0 0
0
aBneH Ualvp
,o»ala
zunooay dna9
°
°
0 0
0
Aqun9 OWN
aepossy
4o,easa8
<
°
0
0 0
0
tired upsnf
,olaal0
lunony
;�
0
0
0 0
0
Slued upsnf
luezunooay
13alo,d
0
0
0 0
°
Inauuepy Allw3
Ialepossy
,uryas
°ry
0
0
0 0
0
ennan9
4,agezll3
I alepossv
0
0
0 0
0
uosapuOH
euueig
,Oleulp,003
palo,d
g
o
0
° 0
0
uo,48noH
21ag
l a,epossy
.a5
$
ti
0
0
0 0
0
lnaN Awy
ma'am
wnoaay dno,9
N
0
0
0 0
0
yam)! joy
,adolana0
gaM
N
o
0
0 0
0
Iep4Aae
epuewy
,a8eueey
lunoaay Aquas
g
0
0
0 0
0
elgo5 salt'
,au8!sap
,oluas
n
o
0
0
0 0
0
r
a°
$
9
o 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 0
888888888888SSS8888
PRR Labor
I Description I
Alts Evaluation and Screening
Hits Evaluation and Screening
a „
`es
E I
d
Environmental Documentation
Documented Categorical Exclusion
Endangered Species Act
I National Historic Preservation Act
Section 4(t) /Section 6(f)
11R
I Policy Point 1
Policy Point 2
fel
$0.00 $41,660.84
8
8
8
Client: City of Federal Way
Project: City Center Access Project
•
Expense Totals:
525,004.51 14,347 7425 3500 30 3 3386
$2,673.00 $2,520.00 $3,000.00 $4,500.00 $1,811.51 $10,500.00
3
CCA- 20170807_Budget.xlsx; PRR- Expenses
PRR Indirect Expenses
display board
printing
postcard printing
advertising
Rates:
0.36
0.72
100.00
1500.00
0.535
3500.000
Phase
Task
Description
1
Project Management
$0.00
0
0
0
0
0
0
1,1
Project Management Plan
$0.00
0
1.2
Monthly Progress Reports & Invoices
$0.00
0
1.3
Monthly Progress Meetings /Other Communication
$0.00
0
1.4
Subconsultant Coordination
$0.00
0
1.5
Consultant Team Meetings
$0.00
0
2
Re- initiation
$0.00
0
0
0
0
0
0
2.1
Team Chartering
$0.00
0
2.2
DCE Verification
$0.00
0
2.3
Purpose and Need
$0.00
0
2.4
Prey Alts Screening Validation
$0.00
0
3
Public Involvement
$25,004.51
14,347
7425
3500
30
3
3386
3
3.1
Pub Involvmt Corns Plan
$33.17
62
62
3.2
Stakeholder Engagement
$207.51
486
300
186
3.3
Community Events and Engagement
$3,605.89
7,004
3450
2500
1054
3.4
City Council Meetings
$611.22
1,167
75
1092
3.5
Support City Website
$0.00
0
3.6
Public Info Materials and Special Graphics
$3,000.00
0
30
3.7
Advertising
$15,000.00
6
3
3
3.8
Environmental Justice Outreach
$2,546.72
5,592
3600
1000
992
0
3.9
Comment Management
$0.00
0
3.1
Strategic Assistance
$0.00
0
4
IJR Support Team Meetings
$0.00
0
0
0
0
0
0
4.1
11R Support Team Meetings
$0.00
0
5
Travel Demand Model Forecasts
$0.00
0
0
0
0
0
0
5.1
Review Existing Information
$0.00
0
5.2
Confirm Traffic Analysis Zone Land Use Assumptions
$0.00
0
5.3
Travel Demand Model Forecasts
$0.00
0
5.4
Technical Memorandums
$0.00
0
6
Traffic Forecasts and Operations Analysis
$0.00
0
0
0
0
0
0
6.1
Data Collection
$0.00
0
6.2
Detailed Traffic Forecasts
$0.00
6.3
_
Screening Level Traffic Operations Analysis
$0.00
0
6.4
Policy Point 3 and Env. Doc. Traffic Op Analysis
$0.00
0
7
IJR Methods and Assumptions
$0.00
0
0
0
0
0
0
7.1
11R Methods and Assumptions Document
$0.00
0
8
Environmental Evaluation for Alts
$0.00
0
0
0
0
0
0
8.1
Cultural Resources
$0.00
0
8.2
Ecological Resources
$0.00
0
8.3
Noise
$0.00
0
8.4
Hazardous Waste
$0.00
0
8.5
Park and Recreation Resources
$0.00
0
8.6
Social and Community Effects
$0.00
0
9
Preliminary Hydraulics Evaluation
$0.00
0
0
0
0
0
0
9.1
Preliminary Hydraulics Evaluation
$0.00
0
10
Geology, Soils and Topography
$0.00
0
0
0
0
0
0
10.1
Geology, Soils and Topography
$0.00
0
11
Alternatives Development
$0.00
0
0
0
0
0
0
11.1
Update Base Mapping
$0.00
0
11.2
Conceptual Design Workshop
$0.00
0
11.3
Existing Utilities
$0.00
0
11.4
Practical Design Analysis
$0.00
I
11.5
Conceptual Channelization Plan
$0.00
0
11.6
Conceptual Structure Design
$0.00
0
11.7
Conceptual Profiles - Roadway Typical Sections
$0.00
0
11.8
Conceptual Impact Boundary
$0.00
0
11.9
Cost Estimates
$0.00
0
12
Alts Evaluation and Screening
$0.00
0
0
0
0
0
0
12.1
Alts Evaluation and Screening
$0.00
0
13
Prelim Engineering Preferred Alt
$0.00
0
0
0
0
0
0
13.1
Preliminary Design and Plans
$0.00
0
Design Documentation
$0.00
0
Basis of Design Document
$0.00
0
Crash Analysis Report
$0.00
0
Design Analysis
$0.00
0
Design Approval Documents
$0.00
0
Stormwater Design and report
$0.00
0
Prelim Right of Way Plans
$0.00
0
Limited Access and Right of Way
$0.00
0
Geotechnical
$1.00
0
14
Environmental Documentation
$0.00
0
0
0
0
0
0
14.1
Documented Categorical Exclusion
$0.00
0
0
0
0
0
0
14.2
Endangered Species Act
$0.00
0
14.3
National Historic Preservation Act
$0.00
0
14.4
Section 4(f) /Section 6(f)
$0.00
0
15
OR
$0.00
0
0
0
0
0
0
15.1
Policy Point 1
50.00
0
15.2
Policy Point 2
$0.00
0
15.3
Policy Point 3
$0.00
0
15.4
Policy Point 4
$0.00
0
15.5
Policy Point 5
$0.00
0
15.6
Policy Point 6
$0.00
0
15.7
Policy Point 7
$0.00
0
15.8
Policy Point 8
$0.00
0
15.9
Draft and Final IJR Rpt
$0.00
0
Expense Totals:
525,004.51 14,347 7425 3500 30 3 3386
$2,673.00 $2,520.00 $3,000.00 $4,500.00 $1,811.51 $10,500.00
3
CCA- 20170807_Budget.xlsx; PRR- Expenses
Client: City of Federal Way
Project: City Center Access Project
•
1L r7L!
Expense Totals:
$549.00 1,007 450 150 7 400
$45.00 $150.00 $140.00 $214.00
CCA- 20170807 Budget.xlsx; SW- Expenses
Shannon and Wilson Indirect
Expenses
v 0.
9
Rates:
0.10
1.00
20.00
0.535
Phase
Task
Description
1
Project Management
$0.00
0
0
0
0
0
1.1
Project Management Plan
$0.00
0
1.2
Monthly Progress Reports & Invoices
$0.00
0
1.3
Monthly Progress Meetings / Other Communication
$0.00
0
1.4
Subconsultant Coordination
$0.00
0
1.5
Consultant Team Meetings
$0.00
0
2
Re- initiation
$0.00
0
0
0
0
0
2.1
Team Chartering
$0.00
0
2.2
DCE Verification
$0.00
0
2.3
Purpose and Need
$0.00
0
2.4
Prey Alts Screening Validation
$0.00
0
3
Public Involvement
$0.00
0
0
0
0
0
3.1
Pub Involvmt Cmm Plan
$0.00
0
3.2
Stakeholder Engagement
$0.00
0
3.3
Community Events and Engagement
$0.00
0
3.4
City Council Meetings
$0.00
0
3.5
Support City Website
$0.00
0
3.6
Public Info Materials and Special Graphics
$0.00
3.7
Advertising
$0.00
0
3.8
Environmental Justice Outreach
$0.00
0
3.9
Comment Management
$0.00
0
3.10
Strategic Assistance
$0.00
0
4
IJR Support Team Meetings
50.00
0
0
0
0
0
4.1
11R Support Team Meetings
$0.00
0
5
Travel Demand Model Forecasts
$0.00
0
0
0
0
0
5.1
Review Existing Information
$0.00
5.2
Confirm Traffic Analysis Zone Land Use Assumptions
$0.00
0
5.3
Travel Demand Model Forecasts
$0.00
0
5.4
Technical Memorandums
$0.00
0
6
Traffic Forecasts and Operations Analysis
$0.00
0
0
0
0
0
6.1
Data Collection
$0.00
0
6.2
Detailed Traffic Forecasts
$0.00
0
6.3
Screening Level Traffic Operations Analysis
$0.00
0
6.4
Policy Point 3 and Env. Doc. Traffic Op Analysis
$0.00
0
7
IUR Methods and Assumptions
$0.00
0
0
0
0
0
7.1
IUR Methods and Assumptions Document
$0.00
0
8
Environmental Evaluation for Alts
$0.00
0
0
0
0
0
8.1
Cultural Resources
$0.00
0
8.2
Ecological Resources
$0.00
0
8.3
Noise
$0.00
0
8.4
Hazardous Waste
$0.00
0
8.5
Park and Recreation Resources
$0.00
0
8.6
Social and Community Effects
$0.00
0
9
Preliminary Hydraulics Evaluation
$0.00
0
0
0
0
0
9.1
Preliminary Hydraulics Evaluation
$0.00
0
10
Geology, Soils and Topography
$549.00
1,007
450
150
7
400
10.1
Geology, Soils and Topography Technical Memorandum
$287.00
555
300
50
5
200
10.2
Preferred Alternative Conceptual Engineering
$262.00
452
150
100
2
200
11
Alternatives Development
$0.00
0
0
0
0
0
11.1
Update Base Mapping
$0.00
0
11.2
Conceptual Design Workshop
$0.00
0
11.3
Existing Utilities
$0.00
0
11.4
Practical Design Analysis
$0.00
0
11.5
Conceptual Channelization Plan
$0.00
0
11.6
Conceptual Structure Design
$0.00
0
11.7
Conceptual Profiles- Roadway Typical Sections
$0.00
0
11.8
Conceptual Impact Boundary
$0.00
0
11.9
Cost Estimates
$0.00
0
12
Alts Evaluation and Screening
$0.00
0
0
0
0
0
12.1
Abs Evaluation and Screening
$0.00
0
13
Prelim Engineering Preferred Alt
$0.00
0
0
0
0
0
13.1
Preliminary Design and Plans
$0.00
0
Design Documentation
$0.00
0
Basis of Design Document
$0.00
0
Crash Analysis Report
$0.00
0
Design Analysis
$0.00
0
Design Approval Documents
$0.00
0
Stormwater Design and report
$0.00
0
Prelim Right of Way Plans
$0.00
0
Limited Access and Right of Way
$0.00
0
Geotechnical
$0.00
0
14
Environmental Documentation
$0.00
0
0
0
0
0
14.1
Documented Categorical Exclusion
$0.00
0
0
0
0
0
14.2
Endangered Species Act
$0.00
0
14.3
National Historic Preservation Act
$0.00
0
14.4
Section 4(f)/Section 6(f)
$0.00
0
15
IUR
$0.00
0
0
0
0
0
15.1
Policy Point 1
$0.00
0
15.2
Policy Point 2
$0.00
0
15.3
Policy Point 3
$0.00
0
15.4
Policy Point
$0.00
0
15.5
Policy Point 5
50.00
0
15.6
Policy Point 6
$0.00
0
15.7
Policy Point 7
$0.00
0
15.8
Policy Point 8
$0.00
0
15.9
Draft and Final I1R Rpt
$0.00
0
Expense Totals:
$549.00 1,007 450 150 7 400
$45.00 $150.00 $140.00 $214.00
CCA- 20170807 Budget.xlsx; SW- Expenses
Exhibit F
Title VI Assurances
During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, and successors
in interest agrees as follows:
1. Compliance with Regulations: The CONSULTANT shall comply with the Regulations relative to non-
discrimination in federally assisted programs of the AGENCY, Title 49, Code of Federal Regulations,
Part 21, as they may be amended from time to time (hereinafter referred to as the "REGULATIONS "),
which are herein incorporated by reference and made a part of this AGREEMENT.
2. Non - discrimination: The CONSULTANT, with regard to the work performed during this AGREEMENT,
shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention
of sub - consultants, including procurement of materials and leases of equipment. The CONSULTANT
shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the
REGULATIONS, including employment practices when this AGREEMENT covers a program set forth
in Appendix B of the REGULATIONS.
3. Solicitations for Sub - consultants, Including Procurement of Materials and Equipment: In all solicitations
either by competitive bidding or negotiations made by the CONSULTANT for work to be performed
under a sub - contract, including procurement of materials or leases of equipment, each potential sub -
consultant or supplier shall be notified by the CONSULTANT of the CONSULTANT's obligations under
this AGREEMENT and the REGULATIONS relative to non - discrimination on the grounds of race, color,
sex, or national origin.
4. Information and Reports: The CONSULTANT shall provide all information and reports required by the
REGULATIONS or directives issued pursuant thereto, and shall permit access to its books, records,
accounts, other sources of information, and its facilities as may be determined by the AGENCY, the
STATE, or the Federal Highway Administration (FHWA) to be pertinent to ascertain compliance with such
REGULATIONS, orders and instructions. Where any information required of a CONSULTANT is in the
exclusive possession of another who fails or refuses to furnish this information, the CONSULTANT shall
so certify to the AGENCY, the STATE, or the FHWA as appropriate, and shall set forth what efforts it has
made to obtain the information.
5. Sanctions for Non - compliance: In the event of the CONSULTANT's non - compliance with the non-
discrimination provisions of this AGREEMENT, the AGENCY shall impose such AGREEMENT sanctions
as it, the STATE, or the FHWA may determine to be appropriate, including, but not limited to:
• Withholding of payments to the CONSULTANT under this AGREEMENT until the CONSULTANT
complies, and /or;
• Cancellation, termination, or suspension of this AGREEMENT, in whole or in part.
6. Incorporation of Provisions: The CONSULTANT shall include the provisions of paragraphs (1) through
(5) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the
REGULATIONS, or directives issued pursuant thereto. The CONSULTANT shall take such action with
respect to any sub - consultant or procurement as the STATE, the AGENCY, or FHWA may direct as a means
of enforcing such provisions including sanctions for non - compliance.
Provided, however, that in the event a CONSULTANT becomes involved in, or is threatened with,
litigation with a sub - consultant or supplier as a result of such direction, the CONSULTANT may request
the AGENCY enter into such litigation to protect the interests of the STATE and /or the AGENCY and, in
addition, the CONSULTANT may request the United States enter into such litigation to protect the interests
of the United States. Agreement Number: 17-
WSDOT Form 140 -089 EF Exhibit F Page 1 of 1
Revised 10/30/2014
Exhibit G
Certification Documents
Exhibit G -1(a) Certification of Consultant
Exhibit G -1(b) Certification of City of Federal Way
Exhibit G -2 Certification Regarding Debarment, Suspension and Other Responsibility Matters -
Primary Covered Transactions
Exhibit G -3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying
Exhibit G -4 Certificate of Current Cost or Pricing Data
Agreement Number: ( -7 --
WSDOT Form 140 -089 EF Exhibit G Page 1 of 1
Revised 10/30/2014
Exhibit G -1(a) Certification of Consultant
I hereby certify that I am the and duly authorized representative of the firm of
Parametrix, Inc.
whose address is
719 2nd Avenue, Suite 200, Seattle, WA 98104
and that neither the above firm nor I have:
a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration,
any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT)
to solicit or secure this AGREEMENT;
b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of
any firm or person in connection with carrying out this AGREEMENT; or
c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely
for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in
connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any);
I acknowledge that this certificate is to be furnished to the City of Federal Way
and the Federal Highway Administration, U.S. Department of Transportation in connection with this
AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and
Federal laws, both criminal and civil.
Parametrix, Inc.
Consultant (Firm Name)
Sig a (Authorized Official of Consultant) Date
Jeff Peacock
Chief Executive Officer (CEO)
Agreement Number: 17- 164
WSDOT Form 140 -089 EF Exhibit G Page 1 of 1
Revised 10/30/2014
Exhibit G -1(b) Certification of Agency
I hereby certify that I am the:
Mayor, Jim Ferrell
❑ Other
of the City of Federal Way
and
or its representative has not been required, directly or indirectly as an express or implied condition in connection
with obtaining or carrying out this AGREEMENT to:
a) Employ or retain, or agree to employ to retain, any firm or person; or
b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration
of any kind; except as hereby expressly stated (if any):
I acknowledge that this certificate is to be furnished to the
and the Federal Highway Administration, U.S. Department of Transportation, in connection with this
AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and
Federal laws, both criminal and civil.
Date
7/3//--7
Agreement Number: 17-1.54.
WSDOT Form 140 -089 EF Exhibit G Page 1 of 1
Revised 10/30/2014
Exhibit G -2 Certification Regarding Debarment, Suspension and Other
Responsibility Matters - Primary Covered Transactions
I. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals:
A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily
excluded from covered transactions by any Federal department or agency;
B. Have not within a three (3) year period preceding this proposal been convicted of or had a civil judgment
rendered against them for commission of fraud or a criminal offense in connection with obtaining,
attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under
a public transaction; violation of Federal or State anti -trust statues or commission of embezzlement,
theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving
stolen property;
C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity
(Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b)
of this certification; and
D. Have not within a three (3) year period preceding this application / proposal had one or more public
transactions (Federal, State and local) terminated for cause or default.
II. Where the prospective primary participant is unable to certify to any of the statements in this certification,
such prospective participant shall attach an explanation to this proposal.
Parametrix, Inc.
Consultant (Firm Name)
Sig
orized Official of Consultant)
Jeff Peacock
Chief Executive Officer (CEO)
lsfr7
Date
Agreement Number: 17-1 f
WSDOT Form 140 -089 EF Exhibit G
Revised 10/30/2014
Page 1 of 1
Exhibit G -3 Certification Regarding the Restrictions of the Use of Federal Funds
for Lobbying
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her
knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any
person for influencing or attempting to influence an officer or employee of any Federal agency, a Member
of Congress, a officer or employee of Congress, or any employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan,
the entering into of any cooperative AGREEMENT, and the extension, continuation, renewal, amendment,
or modification of Federal contract, grant, loan or cooperative AGREEMENT.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress,
an officer or employee of Congress, or an employee of a Member of Congress in connection with this
Federal contract, grant, loan or cooperative AGREEMENT, the undersigned shall complete and submit
Standard Form - LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into. Submission of this certification is a prerequisite for making or entering into
this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000.00, and not more than $100,000.00,
for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require
that the language of this certification be included in all lower tier sub - contracts, which exceed $100,000,
and that all such sub - recipients shall certify and disclose accordingly.
Parametrix, Inc.
Consultant (Firm Name)
Signatu u fit' ed Official of Consultant) Date
Jeff Peacock
Chief Executive Officer (CEO)
efts- (( 7
Agreement Number: l —I
WSDOT Form 140 -089 EF Exhibit G
Revised 10/30/2014
Page 1 of 1
Exhibit G -4 Certificate of Current Cost or Pricing Data
This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section
2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403 -4) submitted,
either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's
representative in support of City Center Access Project * are accurate, complete, and current
as of July 20, 2017
This certification includes the cost or pricing data supporting any advance AGREEMENT's and forward pricing
rate AGREEMENT's between the offer or and the Government that are part of the proposal.
**
Firm: Parametrix, Inc.
Signature
Date of Execution * * *:
Chief Executive Officer (CEO)
Title
*Identify the proposal, quotation, request for pricing adjustment, or other submission involved, giving the appropriate identifying number (e.g. project title.)
* *Insert the day, month, and year, when price negotiations were concluded and price AGREEMENT was reached.
** *Insert the day, month, and year, of signing, which should be as close as practicable to the date when the price negotiations were concluded and the
contract price was agreed to.
Agreement Number: 17- 1
Form 140 -089 EF Exhibit G Page 1 of 1
Revised 10/30/2014
limit of thc CONSULTANT to the AGENCY idcn i fied in Section -MII, Legal Relations
The CONSULTANT shall providc Professional Liability insurancc
amount of $
Such insurancc coverage shall be evidenced by one of the following mcthods:
• Sclf insurancc through an irrcvocablc Lcttcr of Crcdi -from a qualified financial institution.
from the fund, a copy of
thosc funds.
$1 million per occurrence or thc value of the contract, whichever is greater, thcn justification shall be submitted
If FHWA approval is obtaincd, thc AGENCY mey, at its -own eest, reimburse thc CONSULTANT for the additional
• Include all costs, fcc increase, premiums.
• This cost shall not be billed against an FHWA fundcd project.
• For final contract3, include this exhibit.
NOT APPLICABLE.
Agreement Number: 17- I S+
WSDOT Form 140 -089 EF Exhibit H Page 1 of 1
Revised 10/30/2014
Exhibit I
Alleged Consultant Design Error Procedures
The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a
nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution
and /or cost recovery procedures in those instances where the agency believes it has suffered some material damage
due to the alleged error by the consultant.
Step 1 Potential Consultant Design Error(s) is Identified by Agency's Project Manager
At the first indication of potential consultant design error(s), the first step in the process is for the Agency's
project manager to notify the Director of Public Works or Agency Engineer regarding the potential design
error(s). For federally funded projects, the Region Local Programs Engineer should be informed and
involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an
agency staff person other than the project manager, who has not been as directly involved in the project,
to be responsible for the remaining steps in these procedures.)
Step 2 Project Manager Documents the Alleged Consultant Design Error(s)
After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the
Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed
documentation than is normally required on the project. Examples include: all decisions and descriptions
of work; photographs, records of labor, materials and equipment.
Step 3 Contact the Consultant Regarding the Alleged Design Error(s)
If it is determined that there is a need to proceed further, the next step in the process is for the project
manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged
error(s). The project manager and other appropriate agency staff should represent the agency and the
consultant should be represented by their project manger and any personnel (including sub - consultants)
deemed appropriate for the alleged design error(s) issue.
Step 4 Attempt to Resolve Alleged Design Error with Consultant
After the meeting(s) with the consultant have been completed regarding the consultant's alleged design
error(s), there are three possible scenarios:
• It is determined via mutual agreement that there is not a consultant design error(s). If this is the case,
then the process will not proceed beyond this point.
• It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case,
then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement
with the consultant. The settlement would be paid to the agency or the amount would be reduced from
the consultant's agreement with the agency for the services on the project in which the design error
took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary
of the settlement for review and to make adjustments, if any, as to how the settlement affects federal
reimbursements. No further action is required.
• There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may
request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency
Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal
counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5.
Agreement Number: 17-
WSDOT Form 140 -089 EF Exhibit 1 Page 1 of 2
Revised 10/30/2014
Step 5 Forward Documents to Local Programs
For federally funded projects all available information, including costs, should be forwarded through the
Region Local Programs Engineer to LP for their review and consultation with the FHWA. LP will meet
with representatives of the agency and the consultant to review the alleged design error(s), and attempt
to find a resolution to the issue. If necessary, LP will request assistance from the Attorney General's Office
for legal interpretation. LP will also identify how the alleged error(s) affects eligibility of project costs
for federal reimbursement.
• If mutual agreement is reached, the agency and consultant adjust the scope of work and costs
to reflect the agreed upon resolution. LP, in consultation with FHWA, will identify the amount
of federal participation in the agreed upon resolution of the issue.
• If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration
or by litigation.
Agreement Number: 17-
WSDOT Form 140 -089 EF Exhibit 1 Page 2 of 2
Revised 10/30/2014
Exhibit J
Consultant Claim Procedures
The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following
procedures should only be utilized on consultant claims greater than $1,000. If the consultant's claim(s) are a total
of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the
Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant's claim(s)
that total $1,000 or less.
This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential
claim by the consultant.
Step 1 Consultant Files a Claim with the Agency Project Manager
If the consultant determines that they were requested to perform additional services that were outside
of the agreement's scope of work, they may be entitled to a claim. The first step that must be completed
is the request for consideration of the claim to the Agency's project manager.
The consultant's claim must outline the following:
• Summation of hours by classification for each firm that is included in the claim;
• Any correspondence that directed the consultant to perform the additional work;
• Timeframe of the additional work that was outside of the project scope;
• Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with
the additional work; and
• Explanation as to why the consultant believes the additional work was outside of the agreement
scope of work.
Step 2 Review by Agency Personnel Regarding the Consultant's Claim for Additional Compensation
After the consultant has completed step 1, the next step in the process is to forward the request to the
Agency's project manager. The project manager will review the consultant's claim and will met with the
Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the
FHWA is participating in the project's funding, forward a copy of the consultant's claim and the Agency's
recommendation for federal participation in the claim to the WSDOT Local Programs through the Region
Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from
agency funds.
If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs
(if applicable), and FHWA (if applicable) agree with the consultant's claim, send a request memo, including
backup documentation to the consultant to either supplement the agreement, or create a new agreement
for the claim. After the request has been approved, the Agency shall write the supplement and /or new
agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for
the agreement is subject to audit. No further action in needed regarding the claim procedures.
If the Agency does not agree with the consultant's claim, proceed to step 3 of the procedures.
Agreement Number: 17- l sq'
WSDOT Form 140 -089 EF Exhibit J Page 1 of 2
Revised 10/30/2014
Step 3 Preparation of Support Documentation Regarding Consultant's Claim(s)
If the Agency does not agree with the consultant's claim, the project manager shall prepare a summary
for the Director of Public Works or Agency Engineer that included the following:
• Copy of information supplied by the consultant regarding the claim;
• Agency's summation of hours by classification for each firm that should be included in the claim;
• Any correspondence that directed the consultant to perform the additional work;
• Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated
with the additional work;
• Explanation regarding those areas in which the Agency does /does not agree with the consultant's
claim(s);
• Explanation to describe what has been instituted to preclude future consultant claim(s); and
• Recommendations to resolve the claim.
Step 4 Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation
The Director of Pubic Works or Agency Engineer shall review and administratively approve or disapprove
the claim, or portions thereof, which may include getting Agency Council or Commission approval (as
appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain
concurrence from WSDOT Local Programs and FHWA regarding final settlement of the claim. If the claim
is not eligible for federal participation, payment will need to be from agency funds.
Step 5 Informing Consultant of Decision Regarding the Claim
The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final
decision regarding the consultant's claim(s). Include the final dollar amount of the accepted claim(s)
and rationale utilized for the decision.
Step 6 Preparation of Supplement or New Agreement for the Consultant's Claim(s)
The agency shall write the supplement and /or new agreement and pay the consultant the amount
of the claim. Inform the consultant that the final payment for the agreement is subject to audit.
Agreement Number: 17- I
WSDOT Form 140 -089 EF Exhibit J Page 2 of 2
Revised 10/30/2014