HomeMy WebLinkAbout15-102594 Building - Commercial
City Vederal Way
Community&Econ.Dev.Services Permit #: 15-102594-00-CO
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p q
Project Name: AT&T SS40 PANTHER LAKE OPEN SPACE
Project Address: 650 SW CAMPUS DR Parcel Number: 192104 9003
Project Description: ALT-Replace(3)panels with(6)panel antennas;includes addition of smaller,associated
ancillary equipment.
Owner Applicant Contractor Lender
AT&T MOBILITY JESSE LONDON MASTEC NETWORK SOLUTIONS
16221 NE 72ND RTC 3 RYKA CONSULTING INC
REDMOND WA 98052 918 S HORTON ST SUITE 1002 MASTENS876KN(5/14/16)
SEATTLE WA 98134 1203 114TH AVE SE
\ BELLEVUE WA 98004
Census Category: 437- Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type: _
Occupancy Load:
Floor Area(sq.ft.) 0 0 0 0
Additional Permit Information
Mechanical to be Included) No Number of Stories 1
Permit for Building Shell Only? No Plumbing to be Included? No
New/Additional Sq.Feet-Total 0 Zoning Designation RS 35.0
No Fixtures Associated With This Permit!!
CONDITIONS:
PERMIT EXPIRES Tuesday, January 12, 2016
Permit Issued on Thursday,July 16, 2015
I hereby certify that the above' rmation is correct and that the construction on the above described property and
the occupancy and the us- •e in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: V Date: 7 /17/1.5
F,,,e,t(ci
THIS CARD IS TO REMAIN ON-SITE
`��° Construction Inspection Record r
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 15-102594-00-CO Address: 650 SW CAMPUS DR
Project: AT&T MOBILITY FEDERAL WAY, WA 98023-8425
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El SWM Precon Site Mtg(4400) ❑ Initial Erosion Control(4365) Footings/Setback(4110)
Approved To be done prior to breaking ground Approved to place concrete
By Date By Date By Date
O Foundation Wall(4115) 0 Drainage/Downspout(4040) ElRe-steel(4215)
Approved to place concrete Approved to backfill Approved to place concrete or grout
By Date By Date By Date
O Slab/Concrete Floor(4255) 'El Underfloor Framing(4285) ElFloor Sheathing(4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date By Date By Date
Shear Walls(4245) Roof Sheathing(4220) ElFire/Draft Stops(4095)
Approved to install siding Approved to install roofing Approved
By Date By Date By Date
,
❑ Interim Erosion Control(4370) Prior to scheduling a Framing inspection; 0 Framing(4120)
Approved Approved to insulate
Electrical,Plumbing&Mechanical Rough-in and
Fire/Draft Stop inspections must be signed-off and
By Date approved. IBC 109.3.4 By Date
❑ Insulation(4150) 0 Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid(4265)
Approved to install wallboard Approved to install mud&tape Approved to drop tile
By Date By Date By Date
I
Final-SKF&R(4060)
0 Final-Planning 0 Final Erosion Control(4375)
Approved Approved Approved
By Date By Date By Date
,
El Final-Building(4050)
Approved
By f--413 Date 14( 1,7
El Rough Electrical Final Electrical
El
Right of Way
Approved Approved Approved
By Date By Date By Date
.... Ai::---- •Receive° •
MY OF A MAY 2 9 2015 PERMIT APPLICATION
Federal Way
CITY OF FEDERAL WAY
�
CDS
PERM7 J/ cc/IT NUMBER y 5_ / i / � (6 _ (i TARGET DATE
0
SITE ADDRESS /// tSSS SUITE/UNIT#
650 SW Campus Drive Federal Way, WA 98023
PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL#
15,000 R535.0 1 9 2 1 0 4 _ 9 0 0 3
TYPE OF PERMIT E BUILDING ❑ PLUMBING 0 MECHANICAL 0 DEMOLITION ❑ENGINEERING 0 FIRE PREVENTION
NAME OF PROJECT SS40 Aqua enter /� u( � Lai)._ %,,,L.,......„...._
AT&T ro oses to remove three antennas andadd six new el antennas
PROJECT DESCRIPTION proposes panelP
Detailed description of work to This will include the addition of smaller associated ancillary equipment.
be included on this permit only
NAME PRIMARY PHONE
PROPERTY OWNER City of Federal Way 253-661-4000
33530A 1DRtSSWay S. E-MAIL
CITY STE
Federal Way WA ZIP 98003
ruiestec Network Solutions PHONE
425-214-7000
1M 203 ADDRESS1tAve SE revenson@mastec.com
CONTRACTOR
FAX
oBe .levue STATE 298004
WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE#
MASTENS876KN 05 14 /2016
NAME PRIMARY PHONE
Jesse London (Ryka Consulting c/o AT&T) 206-523-1941 (Consultant)
APPLICANT Minfin172nd Wa E-MAIL}r jlondon@rykaconsulting.com
CITY Redmond A ZIP98052 FAX
Km= Jesse London (same info as applicant) PRIMARY PHONE
PROJECT CONTACT 206-523-1941
(Tire individual to receive and m 1918®S Horton S t. #1002
respond to all correspondence j�ondon@rykaconsulting.c om
concerning this application) CITY Seattle STAZI
TE FAX
FAX
WA 98134
NAME No Lender
PROJECT FINANCING 0 OWNER-FINANCED
Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE
(RCW 19.22 0951
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
Ifurther agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied city as a part of this application.
pi
- � �`
SIGNATURE: DATE I 1
Pte ; J •ndon
Bulletin#100-January 1,2013 Page 1 of 3 k:\Handouts\Permit Application
•
VAWE OF MECHANICAL WORK
MECHANICAL PERMIT N/A $
Indicate how many of each type of fixture to be installed or relocated as part of this project Do not include existing fixtures to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe)
AIR CONDITIONER FIREPLACE INSERTS HOODS Icommero;at)
BOILERS FURNACES HOT WATER TANKS(Gas)
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
N/A VALUE OF PLUMBING WORK
PLUMBING PERMIT $
Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain.
BATHTUBS(or Tub/Shower combo) LAVS(laudsmka) TOILETS WATER PIPING
DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe)
DRAINS SHOWERS VACUUM BREAKERS
DRINKING FOUNTAINS SINKS(xitohea/utiaey) WATER HEATERS(med..)
HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS
No
$ 15,000
EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM?
Telecommunications 16.03 ❑Yes I8 No ❑Yes II No
RESIDENTIAL - NEW OR ADDITION
AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE
BASEMENT
FIRST FLOOR(or Mobile Home)
SECOND FLOOR
COVERED ENTRY
DECK
GARAGE 0 CARPORT 0
OTHER(describe)
Area Totals PROPOSED TOTAL
**NEW HONES ONLY**
ESTIMATED SELLING PRICE$ I #OF BEDROOMS
COMMERCIAL-NEW/ADDITION No new ground space
AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information
in Square FeetType Stories
NEW BUILDING
ADDITION
COMMERCIAL-REMODEL/TENANT IMPROVEMENTS No new ground space
AREA DESCRIPTION
AreaConstructionGrow Construction #of Additional Information
in Square Feet �s) Type Stories
TOTAL BUILDING
TENANT AREA ONLY
PROJECT AREA ONLY
Bulletin#100-January 1,2013 Page 2 of 3 k:tHandoutstPenmit Application