Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-102172 • Plumbing
City of FeDev Way Permit #: 15-102172-00-PL.
Community&Econ.Dev.Services
33325 8th Ave S
Federal way,WA 98003 FILELine:Request Inspection
Ph:(253)835-2607 Fax:(253)835-2609 p (253)835-3050
Project Name: ROLLING FRITO-LAY SALES LP
Project Address: 33930 9TH AVE S Parcel Number: 926480 0120
Project Description: REMOVE AND REPLACE ELECTRIC WATER HEATER
Owner Applicant Contractor
ROLLING FRITO-LAY SALES LP NICOLE TRAZO FAST WATER HEATER CO(GENERAL)
C/O MCELROY GEORGE INC FAST WATER HEATER COMPANY FASTWWH948BC(1/4/16)
3131 S VAUGHN WAY SUITE 301 11715 NORTH CREEK PKWY 11715 NORTH CREEK PARKWAY S
AURORA CO 80014 BOTHELL WA 98011 BOTHELL WA 98011
Plumbing Fixtures
Water Heaters 1
PERMIT EXPIRES Tuesday, November 3, 2015
Permit Issued on Thursday, May 7, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent ONLINE Date:
• • THIS CARD IS T MAIN ON-SITE - -
�,�of Construction I ection Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 15-102172-00-PL Address: 33930 9TH AVE S
Project: ROLLING FRITO-LAY SALES LP FEDERAL WAY, WA 98003-6708
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Plumbing Groundwork(4190) Ei Rough Plumbing(4230) El Gas Piping(4125)
Approved to cover Approved Approved to release test
By Date By Date By Date
0 Final-Plumbing(4075)
Approved
By 4 AL Date S-2.t.-l,)
El Rough ElectricalEl Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date