Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-106240 ••
Mechanical
City of Federal Way �./,
Community&Econ.Dev.Services Permit #: 15-106240-00-ME
33325 8th Ave S FILE
Federal Way,WA 98003 Ins ection Re uest Line: 253 835-3050
Ph:(253)835-2607 Fax (253)835-2609 p 4
Project Name: LARSEN
Project Address: 2802 S 285TH PL Parcel Number: 730320 0240
Project Description: Replace 100k gas furnace
•
Owner Applicant Contractor
NANCY LARSEN NORTHWEST PERMIT/WESCO PACIFIC AIR SYSTEMS(GENERAL)
2802 S 285TH ST 1345 W GULF RD PACIFAS093KA (9/8/17)
FEDERAL WAY WA 98003-3337 POINT ROBERTS WA 98281 12811 PACIFIC HWY SW
LAKEWOOD WA 98499
- Additional Permit Information
Mechanical Work Valuation? 2500 Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Furnaces 1
• PERMIT EXPIRES Tuesday, June 7, 2016
Permit Issued on Thursday, December 10, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
nd h C ederal Way.
Owner or agent Date: _
efol)
' • •
• . TIS CARD IS TO IN ON-SITE
CITY OF Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 15-106240-00-ME Address: 2802 S 285TH PL
Project: NANCY LARSEN FEDERAL WAY, WA 98003-3337
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Mechanical Rough-in(4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By VIA Date 1 /4 ( I II
•
. • . .
Rough ElectricalEl Final Electrical Ek Right of Way
Approved Approved Approved
By Date By Date By Date