HomeMy WebLinkAbout15-104334 - 4111
• Mechanical
City of Federal ay
Community&Econ.Dev.Services Permit #: 15-104334-00-ME
33325 8th Ave S
Federal Way,WA 98003FILE
Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050
Project Name: SHINDO
Project Address: 1310 S 290TH PL Parcel Number: 516210 0380
Project Description: Relocation of the gas meter,out right
Owner Applicant Contractor
CHRISTOPHER Y SHINDO COREY ALEXANDER INFRASOURCE SERVICES LLC
AUTUMN SHINDO INFRASOURCE SERVICES LLC INFRASL871C2(2/22/17)
1310 S 290TH PL 13330 STONE AVE N 14103 STEWART RD
FEDERAL WAY WA SEATTLE WA 98133 SUMNER WA 98390
98003
Additional Permit Information
Is this an Online or O.T.C.application Yes
Mechanical Fixtures
Gas Piping 1
PERMIT EXPIRES Monday, February 22, 2016
Permit Issued on Wednesday,August 26, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
i1tt1
he.rN ral Way.
Owner or agent: Date:
. TJIIS,CARD IS TO IN ON-SITE
crr o Construction In ection Record .
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 15-104334-00-ME Address: 1310 S 290TH PL
Project: CHRISTOPHER Y SHINDO FEDERAL WAY, WA 98003-3760
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) -El Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
'By Date C� e��
, Date 15---13y fes- Date R I.4 15—
❑ Rough Electrical Electrical Right of Way
Approved Approved Approved
By Date By Date By Date