HomeMy WebLinkAbout15-102727 0 III .Electrical
Community&Econ.De v Services Permit #: 15-102727-00-EL
33325 8th Ave S
Federal Way,WA 98003 FILEInspection Re uest Line: 253 835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p Q
i7�
Project Name: JENKINS 31`."
Project Address: 2009 S 301ST PL Parcel Number: 798290 0260
Project Description: Replace existing service panel with 125A main breaker panel
Owner Applicant Contractor
TRINITY R JENKINS RICK NESTOR WILDERNESS ELECTRIC INC
2009 S 301ST PL WILDERNESS ELECTRIC INC WILDEEI147M4(7/24/16)
FEDERAL WAY WA 98003 23220 MAPLE VALLEY HWY RD SE SUITE 2( 23220 MAPLE VALLEY-BLACK DIAMOND F
MAPLE VALLEY WA 98038 MAPLE VALLEY WA 98038-0250
Additional Permit Information
Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No
Electrical Fixtures
Alt.Serv./Feeder:0 to 200 amps(F 1
PERMIT EXPIRES Wednesday, December 2, 2015
Permit Issued on Friday,June 5, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent NJ L I N E Date:
f.Jl.r_,Le_O
• THIS CARD IS TOOIAIN ON-SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 15-102727-00-EL Address: 2009 S 301ST PL
Project: TRINITY R JENKINS FEDERAL WAY, WA 98003-4262
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Ditch cover(4030) 0 Service(4235) ❑ Feeders/Sub-panels(4045)
Approved Approved Approved
By Date `By Date .o, q _2 S . By Date
' '
0 Rough Electrical(4225) El Final-Electrical(4055)
Approved Approved
By Date By Q:14.........., Date b of . is
El Rough Electrical Final ElectricalEl Right of Way
Approved Approved Approved
By Date By Date By Date