HomeMy WebLinkAbout15-100512 r .~ Mechanical
City of Federal Way Permit #: 15-100512-00-M E
Community&Econ.Dev.Services
33325 8th Ave S FILE
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p q
Project Name: EUN
Project Address: 330 S 302ND PL Parcel Number: 795450 0180
Project Description: replace existing gas furnace
Owner Applicant Contractor
KEE YANG CHO JAIMIE HOW BRENNAN HEATING&A/C LLC
SOOK EUN BRENNAN HEATING&A/C (GENERAL)
330 S 302ND PL 4601 S 134TH PL BRENNHA971R9(12/29/15)
FEDERAL WAY WA SEATTLE WA 98168 4601 S 134TH PL
98003 TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Sunday, August 2, 2015
Permit Issued on Tuesday, February 3, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent Date:
CITY OF • 'THIS CARD IS T MAIN ON-SITE
Federal WayConstruction In ection Record.
INSPECTION REQ TS: (253)835-3050
PERMIT#: 15-100512-00-ME Address: 330 S 302ND PL
Project: KEE YANG CHO FEDERAL WAY, WA 98003-4078
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) CI Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date Date By
• ' e Na..._ Date a.---1 r) --Ns-
El Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date