HomeMy WebLinkAbout15-101506 • Plumbing
City of Federal Way Permit #: 15-101506-00-PL
Community&Econ.Dev.Services
33325 8th Ave S
Federal way,WA 98083 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2809 FILE
Project Name: ROBERTSON
Project Address: 2100 S 336TH ST Unit G1 Parcel Number: 259620 0300
Project Description: replace existing electric water heater
Owner Applicant Contractor
GARY ROBERTSON JAMIE HOW BRENNAN HEATING&A/C LLC
2100 S 336TH ST#H3 BRENNAN HEATING&A/C (GENERAL)
FEDERAL WAY WA 4601 S 134TH PL BRENNHA97IR9(12/29/15)
98003-8%8 SEATTLE WA 98168 4601 S 134TH PL
TUKWILA WA 98168
Plumbing Fixtures
Water Heaters 1
PERMIT EXPIRES Saturday, September 26, 2015
Permit Issued on Monday, March 30, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
cNLINE
Ca9
tx11,4V
. THIS CARD IS T MAIN ON-SITE
+6F Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 15-101506-00-PL Address: 2100 S 336TH ST Unit G1
Project: GARY ROBERTSON FEDERAL WAY, WA 98003-8967
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Plumbing Groundwork(4190) El Rough Plumbing(4230) El Gas Piping(4125)
Approved to cover Approved Approved to release test
By Date By Date By Date
o Final-Plumbing(4075)
Approved
By IMP) Date 4 ( to tS".
ID Rough ElectricalEl Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date