HomeMy WebLinkAbout15-103671-Al, Ele" rival
City of Federal Way .//.�
Community & Econ. Dev. Services Permit #: 15-103671-00-E L
33325 8th Ave S FILE
Federal Way, WA 98003 253 835-3050 Inspection Request Line:
Ph: (253) 835-2607 Fax: (253) 835-2609 p q E
Project Name: STARBUCKS @ THE CROSSINGS
Project Address: 1401 S 348TH ST Suite M101 Parcel Number: 185295 0080
Project Description: Pull new low voltage "cable for speaker post outside in drive thru to inside the building to
the drive thru area
Owner
ARRlican
Contractor
OPUS NORTHWEST LLC
SEAN GREENOUGH
INSTALLATION & SERVICE
915 118TH AVE SE SUITE 300
INSTALLATION & SERVICE TECHNOLOGIES
TECHNOLOGIES INC
BELLEVUE WA 98005
INC
INSTAST926QD (11/5/16)
8340 N MISSION RD SUITE B4
8340 MISSION RD SUITE B4
PRAIRIE VILLAGE KS 66206
PRAIRIE VILLAGE KS 66206
Is this an Online or O.T.C. application?.................Yes
Service greater than 999 Amps? .............................No
Electrical Fixtures
Low Voltage - Other (Commercial; 5
Is Use Educational or Institutional? ....................... No
PERMIT EXPIRES Saturday, January 23, 2016
Permit Issued on Monday, July 27, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City
of Federal Way.
Owner or agent: Date:
V,NALED
.CITY oF THIS CARD IS TO MAIN ON-SITE -
Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 15 -103671 -00 -EL Address: 1401 S 348TH ST Suite M101
Project: OPUS NORTHWEST LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
13 Final - Electrical (4055)
Approved
By UWj Date g' 11 S'
LIFER Ground (4295)Ditch
cover (4030)
Temporary Power (4275)Service
Slab/Concrete Floor (4255)
1:1Approved
Approved
By
Approved
Approved to place concrete
By
Date
By
Date
By
Date
13 Final - Electrical (4055)
Approved
By UWj Date g' 11 S'
Pool Bonding (4195)
Temporary Power (4275)Service
1:1Approved
(4235)
By
Approved
By
Approved
By
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
13 Final - Electrical (4055)
Approved
By UWj Date g' 11 S'
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way --�
By
Date
By
Date
By
Date