HomeMy WebLinkAbout15-105254Mech>icl
City of Federal Way Permit #: 15-105254-00-M E
Community &Econ. Dev. Services
33325 8th Ave S
Federal WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: O'NEIL
Project Address: 36921 5TH AVE SW Parcel Number: 218820 2175
Project Description: Install new gas furnace with gas piping to 5 outlets and install 3 -ton heat pump
Owner
Applican
Contractor
CHARLEEN ONEIL
JAIMIE HOW
BRENNAN HEATING & A/C LLC (GENERAL
LLOYD ONEIL
BRENNAN HEATING & A/C
01)
36921 5TH AVE SW
4601 S 134TH PL
BRENNHA971R9 (12/29/15)
FEDERAL WAY WA 98023
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Compressors / Heat Pumps............ 1 Furnaces ......................................... 1 Gas Pipe Outlets............................. 5
PERMIT EXPIRES Tuesday, April 12, 2016
Permit Issued on Thursday, October 15, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent:
Date:
C1WQF,
Federal Way
PERMIT #:
15 -105254 -00 -ME
THIS CARD IS TO RKMAIN ON-SITE
Construction Incoon RecordINSPECTION REQUE TS: (253) 835-3050
Address: 36921 5TH AVE SW
Project: CHARLEEN O'NEIL FEDERAL WAY, WA 98023-7346
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read lett to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
0 Gas Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
B Date 1 jC> _V3 _� M
By IAS% Date 10 9-t'
Rough Electrical
Approved
EFinal
Electrical
Approved
EJRight
of Way -~
Approved
By
Date
By
Date
By
Date