Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-103655City of Federal Way
15
�* y+
Community 8 Econ. Dew. services Permit: 'F V�ii�Y�`�
33325 8th Ave s
Federal Way, WA 98003 Inspection Request Line: 253 83
Ph: {253) 835-2607 Fax (253) 835-2609 q �
FILE
Project Name: IHS PROPERTY WASHINGTON LP
Project Address: 32644 20TH AVE SW Parcel Number: 010456 0300
Project Description: water .heater removal and installation
Pi�ntl�t�g=l=ieu. ras
Water Heaters ................................. 1
PERMIT EXPIRES Wednesday, January 20, 2016
Permit Issued on Friday, July 24, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of federal Way.
Owner or agent: Date:
.Owner
IH5 PROPERTY WASHINGTON
ARRIIcant
MICHELLE LUNA
Contractor
MY PHD SERVICES INC
15400 SE 30TH PL SUITE 100
MY PHD SERVICES INC
MYPHDPS891B6 (1/26/15)
BELLEVUE WA 98007
4524 S WARNER ST
3501 S 38TH ST SUITE 41
TACOMA WA 98409
TACOMA WA 98409
Pi�ntl�t�g=l=ieu. ras
Water Heaters ................................. 1
PERMIT EXPIRES Wednesday, January 20, 2016
Permit Issued on Friday, July 24, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of federal Way.
Owner or agent: Date:
VA!01�A THIS CARD IS TO MAIN ON-SITE
Fed�l"al Way � C INSPECTION I ection Record
ON REQUE ITS: (253) 835-3050
PERMIT #: 15 -103655 -00 -PL Address: 32644 20TH AVE SW
Project: I1-15 PROPERTY WASHINGTON FEDERAL WAY, WA 98023-5480
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Final - Plumbing (4075)
Approved
By Date _ 13
FILE
Plumbing Groundwork (4190)
Rough Plumbing (4230)
11
Gas Piping (41 5)
Approved to cover
rBy
Approved
I
Approved to release test
By
Date
By
Date
By
Date
Final - Plumbing (4075)
Approved
By Date _ 13
FILE
Rough Electrical
Approved
1:1Approved
Final Electrical
Right of Way
Approved
By
Date
By
Date
By
Date