Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-104762ity bf Federal Way
ity & Econ. DEV. Services
33325 8th Ave
Federal Way, WA 98003 r
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SCOTT DONOGH HOMES (BRUELL LOT 7)
Project Address: 29804 23RD AVE SW
Building - Single=
Permit #: 15-104762-0 o
Inspection Request Line: (253) 835-3050
Parcel Number: 012103 9157
Project Description: NEW - Construction of a 6404 square foot 2 -story single family residence with basement,
161 square foot covered entry, 396 square foot deck, 687 square foot attached garage and a
213 square foot shop. Includes plumbing & mechanical.
**4 bedrooms; $1,180,000 estimated selling price**
Owner
Applicant
Contractor
Lender
SCOTT DONOGH HOMES INC
SCOTT DONOGH HOMES INC
SCOTT DONOGH HOMES
OWNER IS LENDER
2806 NE SUNSET BLVD SUITE F
2806 NE SUNSET BLVD SUITE F
SCOTTDH952NB (10/13/17)
New / Additional Sq. Feet - Total ..........................
RENTON WA 98056
RENTON WA 98056
2806 NE SUNSET BLVD SUITE F
family)
RENTON WA 98056
Census Category: 101 - New Single Family House
Includes:
#1 #2 #3 #4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
New / Additional Sq. Feet - Garage .......................900
Floor Areas . ft.
6,654 0 0 0
Additional Permit Information
New/ Additional Sq. Feet - 1 st Floor .................... 2944
New / Additional Sq. Feet - 3rd Floor....................0
New / Additional Sq. Feet - Basement...................2649
No
Occupancy # 1 - Construction Type ........................Type
V - B
New / Additional Sq. Feet - Garage .......................900
Occupancy #I - Class.............................................R-3
New / Additional Sq. Feet - Other ..........................0
Plumbing to be Included?.......................................Yes
New / Additional Sq. Feet - Total ..........................
Occupancy #I - Use ...............................................
Residence (1 or 2
family)
New / Additional Sq. Feet - 2nd Floor...................1061
Occupancy # I - Area (Sq. Feet).............................6654
BasicPlan?...........................................................
No
New / Additional Sq. Feet - Deck ..........................1637
Mechanical to be Included?....................................Yes
New / Additional Sq. Feet - Other ..........................0
New / Additional Sq. Feet - Total ..........................
9191
Mechanical Fixtures
Air Handling Units ......................... 1 Air Conditioners - Stand Alone Un 2 Ducting ........................................... 1
Fans................................................ 8 Furnaces......................................... 2 Gas Piping ...................................... 1
Gas Pipe Outlets ............................. 6 Hot Water Tanks............................ 2
Plumbing Fixtures
Bathtubs......................................... 2 Dishwashers................................... 1 Drains............................................. 3
Lavatories....................................... 12 Showers.......................................... 4 Sinks............................................... 2
Water Closets ................................. 6 Hose Bibbs..................................... 3
CONDITIONS:
1. An approved automatic fire sprinkler system is required. No framing inspection until the sprinkler system
is installed and approved.
2. NO GAS PIPING TO BE INSTALLED UNTIL GAS RISER PLAN SUBMITTED AND APPROVED BY
THE CITY OF FEDERAL WAY BUILDING DEPARTMENT.
3. If necessary to maintain access to the residence at 29800, the developer of this residence shall make
arrangements to provide that access. The access should be provided prior to any construction activies on this
A*^- E
.e�h*t may obstruct the existing access.
Eleven (11) trees must be planted per the locations shown on the approved site plan prior to issuance of ,
rtificate of Occupancy. Contact Senior Planner, Stacey Welsh, at 253-835-2634 or
sta,:ey.welsh@cityoffederalway.com to schedule an inspection.
PERMIT EXPIRES Sunday, September 25, 2016
Permit Issued on Tuesday, March 29, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and theus ill be in accordgnce with the laws, rules and regulations of the State of Washington
//' �tpd the City of Federal Way.
Owner or agent:
City of Federal Way
Certificate of Occupancy
Date: 5��/ '` 6
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed by City staff.
Tenant Name: SCOTT DONOGH HOMES (BRUELL LOT 7) Permit #: 15 -104762 -00 -SF
Address: 29804 23RD AVE SW
Includes:
41 #2 #3 44
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load:
Floor Area (sq. ft.)
6,654 0 0 0
Owner Name: SCOTT DONOGH HOMES INC
Owner Address: 2806 NE SUNSET BLVD SUITE F
RENTON WA 98056
Building Official
`/1/)7
Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severly affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which itis situated. Such compliance is the responsibility of the owner and/or occupant of the premises.
THIS CARD IS TO REMAIN ON -SATE
Construction Inspection Record
INSPECTION REQUESTS: 253 835-3050
A-ralWay
PERMIT #: 15 -104762 -00 -SF Address: 29804 23RD AVE SW
Project: SCOTT DONOGH HOMES INC FEDERAL WAY, WA
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El
SWM Precon Site Mtg (4400)
By
Initial Erosion Control (4365)
❑
Footings/Setback (4110)
❑
By ��
Approved
By
To be done prior to breaking ground
By
Approved to place concrete
By
Date
By
Date
By
Date
By
Foundation Wall (4115)
Approved to place concrete
Date
By
Drainage/Downspout (4040)
Approved to backfill :PP
ry Datei 1 Z (r- /
Framing (4120)
Rough Plumbing (4230)
❑
By ��
Plumbing Groundwork (4190)
Approved to cover
S Date S` _ l
By
Approved to install rooting
By
Approved
By
,(,j Date %% 21
By
Slab/Concrete Floor (4255)
Approved to place concrete
A rJ Date 51,? %4
By
Underfloor Framing (4285)
Approved to sheath floor
Date
By
Floor Sheathing (4105)
Approved to install flooring
Date
By 6rj Date /0JhJ j b I[By Date J I S Date VJ_..? L
Shear Walls (4245)
Prior to scheduling a Framing inspection;
Roof Sheathing (4220)
Framing (4120)
Rough Plumbing (4230)
By
Approved to install siding
By
Approved to install rooting
By
Approved
By
,(,j Date %% 21
By
hJ Date -1
By
bpi Date .1 kA `t (s
Insulation (4150)
Gypsum Wallboard Nailing (4130)
E]
Mechanical Rough -in (4165)
In
Gas Piping (4125) Q n
E]
Fire/Draft Stops (4095)
Approved
Approved
Date _ L
Approved to release test
By
Approved
By 6rj Date /0JhJ j b I[By Date J I S Date VJ_..? L
FJ
Interim Erosion Control (4370)
Approved
Prior to scheduling a Framing inspection;
Final Electrical
Framing (4120)
Right of Way
By
Electrical, Plumbing & Mechanical Rough -in and
By
Approved to insulate
By
Date
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
By
Y "r`1 Date I II
Insulation (4150)
Gypsum Wallboard Nailing (4130)
E]
Final Erosion Control (4375)
Approved to install wallboard
Approved to install mud & tape
Approved
By
Date _ L
By AIJ Date 2 J lsz i4
By
Date
Final - Mechanical (4065)
E] Final - Plumbing (4075)
❑
Final - Building (4050)
Approved
Approved # 0
Approved
By
Date 46 lC� ��
By e Date '715 ) -7
By
f� N Date r ll �
Sti 04,' JI -17
FJ
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Way
By
Date
By
Date
By
Date
�—
Fa cj� 4 VL"' t
n
v, 1, w— _ �+�.c�S +-• vim. �cie t V^\S'Pe c,�
5 »
ra
9+t( C- i p c CA CIC
1 135-at
S�OWIC- j2on5Q
.ft
Spanish peaks �n9ineerin9 GvnsiAltin9, LLC
Structural Civil Aquatic
November 8, 2016
Monsef / Donogh Design Group, LLC
2806 NE Sunset Blvd #F
Renton, WA 98056
Re: Review of Deviations Noted by the Building Inspector at
Adelaide 1B at 29084 23rd Ave SW, Federal Way, WA
Dear Mr. Monsef,
P.O. Box 114
Bozeman, Montana 59771-0114
Phone: 406-587-4051
Fax: 406-587-4053
ma i I @spa n ish pea kse ng. com
The purpose of this letter is to address the plan deviations noted by the Building Inspector
on your Adelaide 1 B Plan located at 29084 23`d Ave SW in Federal Way, WA.
Specifically, it will provide either approval or required alterations of the items noted in the
attached redlined drawings and photos forwarded to me by you and summarized below:
1. Upper Floor (Sheet A501): The 5 1/8" x7 ''/2" GLB Headers (Photos 1&2) are
adequate substitutions for the 6'-0" window openings at this location with no
further action required (see attached supplemental calculations).
2. Upper Floor (Sheet A501): The four studs called out on Sheet A501 are only
required for the full height studs; the single trimmer (Photo 2) is adequate is
approved with no further action required.
3. Upper Floor (Sheet A501): The single trimmer stud called out in the foyer tall
wall is being braced at mid -span by the adjacent lower wall and therefore
acceptable with no further action required.
4. Upper Floor (Sheet A501): The 5 1/8" x7 %" GLB Headers (Photo 5) are
adequate substitutions for the 8'-0" window openings at this location with no
further action required (see attached supplemental calculations).
5. Upper Floor (Sheet A501): The (3) studs under the bathroom window header is
adequate at this location (only two studs actually required).
6. Main Floor (Sheet A301): The four (4) flat 2x8's over the 12'-0" back tall wall
windows are governed by lateral wind loads. These (4) 2x8's are not adequate
due to deflections (see attached calculations). This header should be replaced
with the originally specified 5.125 x 7 '/2" GLB; or alternatively, two (2) Simpson
CS 16 straps can be nailed full length to the inside of two of the flat 2x8's and
ensure the 2x8 layers are nailed to each other with 3"x.131" nails at 4" o.c.
staggered, or toe -nailed at 4" from both the outside and inside of the wall at each
layer.
7. Main Floor (Sheet A301): The 5 1/8" x 10 '/z" GLB Header is acceptable for the
12'-2" Rec Room window opening with no further action required.
8. Main Floor (Sheet A301): The 5 1/8" x 12" GLB Header is more than adequate
(see attached calculations) for the Header across the 5'-0" opening into the Family
Room with no further action required.
Letter to Monsef/ Donogh Homes
Page 2 of 2 SqR-nisti peaks ,�rc�ineeriru� � Govcstltin9, LGG
RE: Review of Deviations Noted by Building Inspector to structural awl Aquatic
Adelaide 1 B at 29084 231 Ave SW, Federal Way, WA
9. Main Floor (Sheet A301): The 6x12 DF42 Header over the 8' Garage opening
can be substituted with a 4x 12 DF#2 plus a 2x 12 DF#2 lapped adjacent to it and
nailed with 3"x.131" nails @ 12" o.c. (staggered).
10. Main Floor Framing (Sheet A200.2): The 2x12 Main Floor Living Room Joists
were drilled within 2" of the bottom of joist. At these locations, an acceptable
repair is to nail a Simpson CS 16 x 24" long strap centered on the underside of
these joists.
11. Lower Floor (Sheet A200.2): The 5 1/8" x 12" GLB Header over the 8'-0"
window opening exceeds the minimum standard size of 5 1/8" x 7'/2" GLB for
openings up to 8'-0". No further action required.
12. Lower Floor (Sheet A200.2): The 5 1/8" x 12" GLB supporting the porch
exceeds the originally specified 5 1/8"x12" GLB for this location and meets the
requirements by the Engineer to cantilever the deck floor joists up to 36" over this
bigger (15" deep) beam. No further action is required.
13. Lower Floor (Sheet A200.2): The two (2) 2x8's for the bathroom header in the
basement are not adequate; however, (3) 2x8's are. A third 2x8 DF#2 is required
to be sistered next to the existing two members at this location.
14. Exterior Columns (Sheet S2.3): The shear wall panels noted on Sheet S2.3 and
depicted in Photo #8 need to be extended down to the concrete pads (or pads
poured up to the walls). The framing (and sheeting) needs to extend down to the
concrete pads and the base of each wall should be anchored with a minimum of
(2)'/2" anchors in each wall panel.
Supplemental calculations are attached with this letter as noted in the descriptions above
as well as redlined drawings and photos which were provided by you (Architect) to
outline the areas in question.
I hope this letter and attachments provides the direction you seek. Please let me know if
your framer, or the inspector has any questions or comments.
Regards,
David Sigler, PE
Spanish Peaks Engineering & Consulting, LLC
Enclosures: (As Noted)
Cc: File -- 15166
\O-W�p
P.O. Box 114
Bozeman, Montana 59771-0114
Phone: 406-587-4051
Fax: 406-587-4-053
mallVspanishpeakseng.com
6Pom v peaks Z"'neeri" 4 Gon5Hltin9, LLLG
Structural Civil Aquatic
October 14, 2016
Monsef / Donogh Design Group, LLC
2806 NE Sunset Blvd #F
Renton, WA 98056
Re: Alternative Hold -Down Options for
Adelaide 1B at 29084 23`d Ave SW, Federal Way, WA
Dear Mr. Monsef,
The purpose of this letter is to address the proposed alternative hold-downs for the
locations you sent me which are noted on the attached plan sheet. Your proposed
substitution of Simpson HDU5 Hold-downs anchored with 5/8" A307 Threaded Rod
drilled and epoxied using Simpson SET Epoxy is acceptable. The epoxy anchors must be
installed per the manufacturer's recommendations and will require a Special Inspection.
The drilled holes must be made with a percussion drill or roughened after drilling and then
cleaned out of dust and debris prior to placing the epoxy; and then filled from the bottom
up to ensure complete anchor bondage.
Please let mq-J�now if your framer, or the inspector has any questions or comments.
David Sigler, PE
Spanish Peaks Engineering & Consulting, LLC
Enclosures: (As Noted)
Cc: File — 15166
39"
:GIs
NAL L�G1�
J
al s
71
Adelaide 1BMONSEF
Y
I DONOGH
DESIGN GROUP
N
p$
��
Cb
r _
d
U
i
A
!Q
s
ill
iIQ
iQ
if
iu,
11;11
1
IF
(D
! 1.1
J
N
al s
71
Adelaide 1BMONSEF
I DONOGH
DESIGN GROUP
N
p$
��
Cb
r _
_
!Q
ill
! 1.1
0
(
I
I � S
-
(-i
A
!I
[1
r
T
T
Z
S'
1
s
N
xm O
oyrZ
OF
D H
v
_p
;
Adelaide 1BMONSEF
I DONOGH
DESIGN GROUP
N
p$
��
29804 23rd Ave SW, Federal Way
....Oea pn.comlYa6 MAW
'4
Z9
Holdown & Tension Ties
fiis product is preferable to similar conneclors because of
a) easier installation, b) higher loads, c) lower Installed cost,
• or a Combination of these features.
HDU holdowns are pre -deflected during the manufacturing
process, virtually eliminating deflection under load due to material
stretch. They use Simpson Strong -Ties Strong -Drive® SDS Heavy -Duty
Connector screws which install easily, reduce fastener slip and provide
a greater net section when compared to bolts.
The HDU series of holdowns are designed to replace previous versions
of the product such as PHDs as well as bolted holdowns. The HDU2, 4
and 5 are direct replacements for the PHD2, 5 and 6, respectively.
The DTT tension ties are designed for lighter -duty holdown applications
on single or 2x posts. The new DTT1Z is installed with nails or Simpson
Strong -Tie Strong -Drive SD Connector screws and the DTT2Z installs
easily with the Strong -Drive SDS Heavy -Duty Connector screws
(included). The DTT1Z holdowns have been tested for use in designed
shearwalls and prescriptive braced wall panels as well as prescriptive
wood -deck applications (see page 209 for deck applications).
For more information on holdown options, contact Simpson Strong -tie.
HDU SPECIAL FEATURES:
• Holdown designs virtually eliminate deflection due to material stretch.
• Uses Strong -Drive SDS Heavy -Duty Connector screws which
install easily, reduce fastener slip, and provide a greater net
section area of the post compared to bolts.
• Strong -Drive SDS Heavy -Duty Connector screws are supplied
with the holdowns to ensure proper fasteners are used
• No stud bolts to countersink at openings.
MATERIAL: See table
FINISH: HDU - Galvanized; DTT1Z and DTT2Z - ZMAX® coating;
DTT2SS - stainless steel
INSTALLATION: • See General Notes on page 45.
• The HDU requires no additional washer, the DTT requires a
standard cut washer (included with DTT2Z) be installed
between the nut and the seat.
• Strong -Drive SDS Heavy -Duty Connector screws install best
with a low speed high torque drill with a 3g' hex head driver.
CODES: See page 12 for Code Reference Key Chart.
BIL
0
0
i
46
These products are available with additional corrosion protection.
Additional products on this page may also be available with this
option, check with Simpson Strong -Tie for details.
iWrwsasn
Post
W,mcsc-ess
0
O
o O °
0
U s
4'Vk.
0MZ
r DTT1Z
�' U.S. Patent
Wood Pending
Ademher
Tttiduxss
I. ShAsfflw
i Pr—s Sna- - Threaded m!
treatw barrier Rod .. r
mar be
F reG,med -
2-ar
Typical
HDU Tie
Between
O Floors
Horizontal HDU
Offset Installation
(Plan View)
See Holdown and Tension Tie
—Harger General Notes on page 45.
Vertical HDU Installation
Model
No.
Ga
Dimensions
- rn'
Fasteners
Miaimam AilotuabteTansioaloadz
Wood 1110 '
Member Deflection at
ThlekOesV OF)SP SPF)HF Allowable Load
(in.) (in.)
Code
Ref.
W
H
8F:V4
So
Anchor
8011 013.
(in.)
Fas Post
DTT1Z
14
1'/a
T/s
1%
'/6
3/n
6 SD E9x1 h
840____ 840 0.170
1Yz 910 640 0.167
910 850 0.167
160
6-10dx1'h
8-100x1
DTT2Z
14
3'/.
6'3;6
1%
%6
Vie
14
8 -SDS %.'x114'
1'h 1825 1800 0.105
-
8-SDS''f.ki'h'
3 2145 1835 0.128
DTT2Z-SDS2.5
8 -SDS -.'x214'
3 2145 2105 0.128
HDU2-SDS2.5
14
3
8"/6
3'/.
19 6
134
%
6-SOS'/i x21/z'
3 3075 2215 0.088
U4-SDS2.5
14
3
10'V s
3'/.
13 .
135
10-SDS''/'x2'h'
_ _
3 4565 3285 0.114
16,
HDU5-S6S2.5
14
3
133;6
3Y.
1956
1%
9,
14 -SDS %i x2'h'
3 5645 406 0.115
HDU8-SDS2.5
10
3
16%6
314
1%
1'h
%
20 -SDS % x2'h•
6765 4870 0.084
L8, F5
3'h 6970 5020 0.116
4% 7870 5665 0.113
HDUll-SDS2.5
-- —
10
3
22'/.
3fi
136
1'h
1
30-SDS'/.'x214'
5�f` 9535 6865 0.137
_
7'/4 11175 8045 0.137
HDU14-SDS2.5
7
3
25"fie
3'h
1Ms
IY6
1
36-SDS'/.'x214'
4x6-1_ 10770 7755 0.122
170
NP 14390 10435 0.177
16, L8,
F5
5'h?a 14445 10350 0.177
i aee page 45 Tor Holdown and Tension re General Notes.
2 Noted HOU14 allowable loads are based on a 5%:' wide post (6x6 min.).
3. HOW 4 requires heavy hex anchor nut to achieve tabulated loads (supplied with holdown).
4. Loads are applicable to installation on either narrow or wide face of post.
Cure Schedule
7
In -Service Temperature Sensitivity
I Refer to temperature sensitivity chart
for allowable bond strength reduction
for temperature. See page 13 for
more information
2. percent allowable load may be linearly
interpolated for intermediate base
material temperatures
3. *C = (F-32) / 18
Improperly Prepared Holes optional testing with SET adhesive was done in
compliance with ASTM E488 to determine the
t Left in the hole on the
effect of concrete dust
performance of this adhesive. The load
0.97 0.63 adjustment tactors in the table were developed
from the results of those tests
I Hole depth was over-dnlW to account for dust in
hole to achieve required embedment depth
SftwvT17e
ANCHOR SYSTEMS
A2 j
Tension Loads for Threaded Rod Anchors
118
-'jA
3,31
1/2-
1161 ' 1
42
11
11,11105
_ff, [a*
in Normal -Weight
Concrete (continued
on next page)
7518
791/4
1/2
124'
1/4
81
5 318
16
V
-
17,M I
2
Re
8.0
4,425
132.1)
18,400
_7111111
-4.60
9,7511
II'M
6,470
;T1 1"d
108
162
432
Z8.
11,220 50-1)
• 49.9
Tew&m Usd Based
on Bond Strength
3.5
20.5
Rod, - Drift,
Rod
&
Dia: Bit
zftd.
DeA
Critical
Edve
CdftM,
Spaft
-�
6
0
24
re >- 2M
(13.8 MPa) Cumb rc >. 4M 1W (2T.6 Wa) tomets
A307 A193 GR FM
(SM 1818) (SM4140) (A30 S8)
tn.
In.
DIEL
Did.-
1
2 1/2
229
3 3/4
0
61(
10
In.
In.
315
In.
(MM)
In.
(Mini)
Ut"Moft
3W. on.
A1164
1". p
'Utd=tB Still.
(1111) tbs.
Ua (WkiO
U!'
1101USI-i ARM.
IM as. (M)
95
254
30.2
hL (1011)
ft. (0)
GO.21
5
4,875
1 314
2 518
7
1,900
495
475
1,900 •
475
2.1
0
3/8
44
31/2
67
51/4
178
14
8.5
10,200
2.2
119
2.1
2.
.5
10,280 7
2,570
2,105 4,535 3,630
1/Z
89
133
356
(45-41
0.5
11.3
5.7 0.4
11.4
(9.4) (16.1)
(9.5)
4 112
5 3/4
5.0
10,613
94
2,655
10,613
2,655
11,8
(56.3)
(45.0)
liA
71
I,
15�7
4�6
.2
0.4
11.8
7.2
See Notes on Next Page
of the load table icons
yv - 11/4" Diameters
on next page
21
118
-'jA
3,31
1/2-
1161 ' 1
42
11
11,11105
7,216
51 6
(129)
1,11
&
5 ills
7518
791/4
1/2
124'
1/4
81
5 318
16
V
-
17,M I
2
Re
8.0
4,425
132.1)
18,400
_7111111
-4.60
9,7511
II'M
6,470
518
108
162
432
Z8.
11,220 50-1)
• 49.9
181.8
3.5
20.5
(16.7)
(35.9)
(28-8)
(12.7)
6
0
24
11111556
HO
18,556
1
2 1/2
229
3 3/4
0
61(
10
M15
6,780
315
20.6
1,
.5
5,780
20.6
r
I 95
95
254
30.2
1.4
4,190
GO.21
5
4,875
3 3/4
5 5/8
15
18.6
0
21.7
95
143
7 112
381
20
26,700
1,121
2,200
964
8,050
5,875
12.660
10,120
5/8 3/4127
191
508
118.8
5.0
29.7
43.2
4.3
(35.8)
(26.1)
(56.3)
(45.0)
(15.9
7 3116
10 7B
28 3/4
7,515
8,200
36
183
(276
73D)
33.4
.5
See Notes on Next Page
of the load table icons
yv - 11/4" Diameters
on next page
21
3'1
9 3
2381
37Z/2 I
13V2
(343)
't�.!W I -',� I li' I -i;-- '' 37.1
48.6
15,j -5i -FG-21 3.05 15.455 3AG15
1 72
(68.8 (11.7) 17.2 .8 172
M
3 318
86
51 6
(129)
5 ills
7518
791/4
7 ,
7,195 7,245
2
32.2
32
3/4 ,6.314
129
310
10 Ile
M4J_
ZI
32.0 _
�620
42,140 1,945 10.525 42.480 11 10,620
18,230 12.400
8 0 1(8� 1(2;4
8,460
(81 J (55.
6) 17
lt
718
(19.1)
-
(171)
-
187.3 8.7 46. 089.0) (7.0) 147.2
(�46
(37.6)
-13 111Z
36
11,220 50-1)
• 49.9
229
111 114
343
914
.45
47,534 600 11,910 47.634 11,410
(286)
(42M
'1143
2119 2.7) (211 -9) (53M
See Notes on Next Page
of the load table icons
yv - 11/4" Diameters
on next page
21
Holdowas & Tension Ties
Tension ties offer a solution for resisting tension loads that are fastened
with nails. The HTT4 and HTT5 are the latest generation of tension ties. They
feature an optimized nailing pattern which results in better performance with
less deflection. Designed to meet new code standards, the HTT4 and HTT5
offer higher loads than their predecessors.
HTT5KT is sold as a kit with the holdown, bearing plate washer and
Strong -Drives SD Connector screws. The HTT5-3/ is designed to use a
3/: diameter anchor bolt. 3/4' epoxied anchor bolts are commonly used when
retrofitting tension ties to horizontal wood members
The LTT19 Light Tension Tie is designed for 2x joists or purlins and the
LTT20B is for nail- or bolt -on applications. The 3' nail spacing makes the
LTT20B suitable for wood 1 -joists with 10dx11h. The LTT131 is designed for
wood chord open web truss attachments to concrete or masonry walls and
may also be installed vertically on a minimum 2x6 stud.
MATERIAL: See table
FINISH: Galvanized. May be ordered HDG; contact Simpson Strong -Tie.
INSTALLATION:
• See General Notes on page 45.
• A standard cut washer is required for LTT19 and LTT20B when using
1/2' or '/a' anchor bolts. No additional washer is required when using
3/a' anchor bolt.
CODES: See page 12 for Code Reference Key Chart.
These products are available with additional corrosion protection. Additional products on
this page may also be available with this option• check with Simpson Strong -Tie for details.
SIMPSON
Strong -Tie
v„ I
strapWood
Mat.
(Ga)
Dimensions
w L
Seat
Thick
ness
fasteners Minimum Allowable Tension Oeftection
Loads(160) at Highest
re8mber Allowable
Anchor Fasteners Size DF/SF SPF/HF Load
-4`I
W i-
i6
1'/i
t />s
13/e
'/16or
y2 5/e
Y.
OU
• 1
8-1Od 3 x 3:1, 1340 1150 0.157
LTT20B
00
6.
193/,
6'
o o
o °
10-10dx1'/2 3 x 3'h 1355 1165 0.195
1
0o
L 3.
-Y4'
18
33/,
,LL
13A
'/4
00
18-10dx1'/z 3 x 31/2 1350 1160 0.193
HTT4
o°
21/2
12%
16',a
Load
%
18 10dx1'/z 1' x 5'/z 3000 2580 0.090
/z
160
u transfer
L19,
IP2, F4
_
1 S-16*21h 3 x 3'/2 4235 3640 0.123
18 -SD #10x1''/2 1'/2 x 5'/2 4455 3830 0.112
o pwashe
18 -SD #10x1'/2 3 x 31/2 4455 383 0.112
4'
11
r
16
15/18
'/ia
not
required
26-16dx1'/2 3 x 3'/z 0 0.120
L19,
ip2, F4
60,
1��,/2 3 x 3'/z 5090' 4375' 0.135
D F10x1'/z 1'/z x 5'iz 55 0.114
160
HTf5Kf
11
2'/z
g
`L
144s
'/,e
LTT20B
HTT5
160
LTT131
(LTT19 similar)
(HTT4 similar)
®these
products are approved
for installation with
the Strong -Drive"
SD
Connector screw See page 27 for more information.
Model
No.
strapWood
Mat.
(Ga)
Dimensions
w L
Seat
Thick
ness
fasteners Minimum Allowable Tension Oeftection
Loads(160) at Highest
re8mber Allowable
Anchor Fasteners Size DF/SF SPF/HF Load
Code
Report
L1T19
i6
1'/i
a
13/e
'/16or
y2 5/e
Y.
8-10dx11/2 3 x 31/2 1310 1125 0.180
8-1Od 3 x 3:1, 1340 1150 0.157
LTT20B
12
2
193/,
1'/2
-_-
'As
o °
10-10dx1'/2 3 x 3'h 1355 1165 0.195
L19,
IF4
10-tOd 3 x 3'/z 1500 1290 0.185
2-+/2' Bolt 3 x 3'/2 1625 1400 0.183
LTT131
18
33/,
31
13A
'/4
a/a
18-10dx1'/z 3 x 31/2 1350 1160 0.193
HTT4
11
21/2
12%
16',a
'/s
%
18 10dx1'/z 1' x 5'/z 3000 2580 0.090
/z
160
18-10dx1'/2 3 x 31/2 3610 3105 0.086
L19,
IP2, F4
_
1 S-16*21h 3 x 3'/2 4235 3640 0.123
18 -SD #10x1''/2 1'/2 x 5'/2 4455 3830 0.112
160
18 -SD #10x1'/2 3 x 31/2 4455 383 0.112
HTT5
11
2'/z
16
15/18
'/ia
26-16dx1'/2 3 x 3'/z 0 0.120
L19,
ip2, F4
2&_10d 3 x 3'/z 4670 5 0.116
1��,/2 3 x 3'/z 5090' 4375' 0.135
D F10x1'/z 1'/z x 5'iz 55 0.114
160
HTf5Kf
11
2'/z
i6
144s
'/,e
D#10'fz3x3'/2 5445 5360 0.103
d
160
HTT5 '/+
11
2'/z
16
15/,e
'/,e
-10dx11'z 1'/z x 5'/2 4065 3495 0.103
160
D it Ox1'h f' z x 7'/� 4830 4155 0.100
t my') 'A 3 x 3'/z 5090 4275 0.121
1 LTT holdowns may not be installed more than 4W above the top of concrete.
2. LTT131 installed flush with concrete or masonry has an allowable load of 2285 lbs.
3 Allowable load for HTT5 with a BP'S 2 bearing plate washer installed in the seat
of the holdown is 5295 IDs for DF/SP and 4555 lbs for SPF/HF.
4 FASTENERS: 10dxl'/a = 0.148 dia. x 1h' long, 10d = 0.148' dia. x 3' long,
16dx2 h = 0.162' dia. x 21/F long, SO 110x1 Ys = 0.161' dia- x V/V,
SO 310X2''4 = 0.161' dia. x 2'/2'.
Uon not c1 —
Horizontal HTT Installation
Horizontal LTTI31
Installation
3'
Min.
Preservative-
treated
reservativetreated
barrier may
be required
Vertical HTT4
Installation
Horizontal LTT19 Installation
(LTT20B similar)
0
0
49
`0 This product is preferable to similar cannedars because of
• a) easier installation, b) higher loads, c) lacer Installed cost,
or a combination of these features.
�'"'' • The STHD is an embedded strap -tie holdown offering high load capacity
and a staggered nail pattern to help minimize splitting. The STHD incorporates many
features that aid correct installation and improve performance. When installed on
the forms with the StrapMate® strap holder the unique design of the STHD delivers
enhanced stability before and during the pour to help prevent both parallel and
perpendicular movement (relative to the form). This results in accurate positioning
of the strap and reduced possibility of spalling.
FEATURES
• The nailing pattern allows for nailing to the edges of double 2x's
• Strap nail slots are countersunk to provide a lower nail head profile
• The slots below the embedment line enable increased front -to -back
concrete bond and help to reduce spalling
• Rim joist models accommodate up to a 17' clear span without any
loss of strap nailing
MATERIAL. LSTHD8, LSTH08RJ-14 gauge, all others -12 gauge
FINISH: Galvanized
INSTALLATION: • Use all specified fasteners. See General Notes on page 45.
• Use table below for both standard concrete and post -tension stab installations.
• Install before concrete pour with a StrapMate, or other holding device-
• Nail strap from the bottom up. Install strap plumb.
• Strap may be bent one full cycle (hent horizontal 90' then hent vertical) to
aid wall placemerd, but may cause spalling behind the strap. If the spall is
1' or less, measured from the embedment line to the bottom of the spall,
full loads apply. 1' to 4' spalls for LSTHD8 achieve 0.9 times table loads.
STHD10 and STHD14 achieve full load for spalls less than 4'. Any portion
of the strap left exposed should be protected against corrosion.
• Other than where noted in the two -pour detail, do not install where=
(a) a horizontal Cold joint exists within the embedment depth between the slab
and foundation wall or footing beneath, unless provisions are made to transfer
the load, or the stab is designed to resist the load imposed by the anchor; or
(b) slabs are poured over concrete block foundation walls.
• Additional studs attached to the shearwall studs or post may be required
by the Designer for wall sheathing nailing.
• Wood shrinkage after strap installation across horizontal members may cause
strap to buckle outward.
Tension Loads for STHD Installations
SIMPSON
Strong -Tie
r 3-
R R a
a a
a a
a a Nails are countersunk for
L a a low -profile strap surface
1-
Errrb dment
Line
(Top of
i_- T-1
LSTHD8 varies from 4' to 4Yr'
STHD10, STHD14 varies
from 41-V to 5Y;
011111'STHD
U -S. Patent
5,813,182
Typical STH014RJ
Rim Joist Application
For Two -Pour Installation for Downturn Footings
• For STHD10 installed through a 4' thick slab, use the equivalent
8' stemwall loads of the LSTHD8.
• For STHD14 installed through a 4' thick slab, use the equivalent
8' stemwall loads of the STHD10.
• For STHD14 installed through a 6' thick stab, use the equivalent
8' stemwall loads of the LSTHD8
CODES: See page 12 for Code Reference Key Chart.
1 Allowable loads are for wind or seismic loading. Nail quantities reflect an
increase for duration of load with no further increase allowed Reduce
where other loads govern.
2. Concrete shall have a minimum concrete strength, fc of 2500 psi.
3. 1 O common (3' long x 0.148') or 1Odx2bz (2W long x 0.148') nails
may be used as a direct replacement for the required nails shown in the
table with no load reduction when installed directly over framing or
over ':z max structural sheathing.
4 Use the specified number of nails listed in table or as specified. In many
cases, not all nail holes will be tilled. Nail strap from the bottom up.
5 Deflection at highest allowable loads for install over wood double studs
are as follows: Installed on framing: LSTHD8 - 0-089', STHD10 = 0.11T and STHD14 = 0.118'
Installed over ,, maximum structural sheathing LSTHD8 = 0 114', STHD10 = 0 146'and
STHD14 = 0.164'.
6. Multiply, Seismic and Wind ASD load values by 1.4 or 1 b respectively to obtain LRFD capacities.
7- Per 2009 and 2012 IBC Section 1613.1, detached one- and two-family dwellings in Seismic Design
Category (SDC) C may use "Wind and SDC A&6" allowable loads.
8 Minimum center -to -center spacing is 3 times the required embedment (Smin = 3xk) for STHD's
acting in tension simultaneously. Midwall install is based on 1.5xie end distance.
9 See T-SCLCOLUMN for installation on structural composite lumber posts or columns
10. For brick ledge applications, use full loads shown for STHD14 installed in 8' stemwall
11 NAILS: 16d sinker = 0 148' dia x 3%,' long. See page 22-23 for other nail saes and information
C
0
y
WIND AND SDC A & B - ALLOWABLE TENSION LOADS FOR DF/SP/SPF/HF (150)
Min.
Stem
Wall
in
Model No.
Standard RlmJofst
Strap Length (L)
Standard Rim Joist
(in.) (in.)
le
(in.)
Retialred
Nails
Millwall
Non -Cracked
Comer
Endwall
Midwall
Cracked
—
Corner
Endwall
Code
Ref.
LSTHD8
LSTH08RJ
18%
32'x6
8
20 -16d Sinkers
31152700
+
1690
2675
2320
1455
6
STHD10
STHD10RJ
24%
38'4
10
24-16d Sinkers
3820
3820
2050
3140
3140
1705
ST014_
5TH614RJ
26'1
3951
14
30 -16d Sinkers
5150
5150
3200
5150
5150
3200
125.
LSTHD8LSTHD8RJ
18%
32'1
8
20-16d Sinkers
3115
1 2700
2230
2675
2320
1915
F33
8
STHD10
STHD10RJ
24%
381A
10
28 -16d Sinkers
4755
4120
3145
4195
3500
2585
STHD14
STHDI4RJ
26%
39%
14
30 -16d Sinkers
5345
5345
4210 15345
5345
4210
SDC C -F -ALLOWABLE TENSION LOADS FOR OF/SP/SPF/HF (160)
Min.
Stem
Wall
in
---
Model No.
Strap Length (L)
—(in.)
T
1e
(la.)
Required
Nails
Midwall
Non -Cracked
Corner
Endwall
Midwall
Cracked
Corner
Endwall
Code
Ret.
-_-- Standard Rim Joist
Standard Rim Joist (in.)
LSTHD8
ILSTHD8RJ
18%
32'1
1 8
16 -16d Sinkers
2270
2090
1220
2250
1950
1220
5
STHD10
i STHD10RJ
24%
381A
10
18 -16d Sinkers
2750
2750
1615
2640
2640
1435
_
STHD14
j STHD14RJ
26Ya
1 3934
14
22 -16d Sinkers
3695
3695
2685
3695
3695
2685
125,
LSTH08
LSTHDSRJ
18%
32'k
8
16 -16d Sinkers
2615
2125 1
1635
2250
1950
1610
F33
8
STI
STHD10 RJ
STHD14RJ
2434
I 26'1
1 38%
I 39Y.
10
14
20 -16d Sinkers
24 16d Sinkers
81
1
3815 1
22
3500 1
3815
3815
175
1 3500
1 Allowable loads are for wind or seismic loading. Nail quantities reflect an
increase for duration of load with no further increase allowed Reduce
where other loads govern.
2. Concrete shall have a minimum concrete strength, fc of 2500 psi.
3. 1 O common (3' long x 0.148') or 1Odx2bz (2W long x 0.148') nails
may be used as a direct replacement for the required nails shown in the
table with no load reduction when installed directly over framing or
over ':z max structural sheathing.
4 Use the specified number of nails listed in table or as specified. In many
cases, not all nail holes will be tilled. Nail strap from the bottom up.
5 Deflection at highest allowable loads for install over wood double studs
are as follows: Installed on framing: LSTHD8 - 0-089', STHD10 = 0.11T and STHD14 = 0.118'
Installed over ,, maximum structural sheathing LSTHD8 = 0 114', STHD10 = 0 146'and
STHD14 = 0.164'.
6. Multiply, Seismic and Wind ASD load values by 1.4 or 1 b respectively to obtain LRFD capacities.
7- Per 2009 and 2012 IBC Section 1613.1, detached one- and two-family dwellings in Seismic Design
Category (SDC) C may use "Wind and SDC A&6" allowable loads.
8 Minimum center -to -center spacing is 3 times the required embedment (Smin = 3xk) for STHD's
acting in tension simultaneously. Midwall install is based on 1.5xie end distance.
9 See T-SCLCOLUMN for installation on structural composite lumber posts or columns
10. For brick ledge applications, use full loads shown for STHD14 installed in 8' stemwall
11 NAILS: 16d sinker = 0 148' dia x 3%,' long. See page 22-23 for other nail saes and information
C
0
y
61
S�ani5k peaks 4"ixeen'" 4 Con.sr+16", LLC
Structural Civil Aquatic
November 17, 2016
Monsef / Donogh Design Group, LLC
2806 NE Sunset Blvd #F
Renton, WA 98056
Re: Special Inspection for Post -Installed Epoxy Anchor Bolts at
Adelaide 1 B at 29084 23' Ave SW, Federal Way, WA
Dear Mr. Monsef,
P.O. Box 114
Bozeman, Montana 59771-0114
Phone: 406-587-4051
Fax: 406-587-4053
mail@spanishpeakseng.com
The purpose of this letter is to provide a summary of the Special Inspection and approval of the
twelve (12) post -installed drill & epoxy anchors on your Adelaide 1B Plan located at 29084 23'
Ave SW in Federal Way, WA. This special inspection was for the installation of 5/8" threaded
rods epoxied in 3/4" diameter by 5" deep drilled holes (3 '/4" min. embedment) at six (6) locations
(A -F); and for the post -installed tension testing up to 5,000 lb (1.25x design tension) of six (6)
additional previously installed 5/8" anchor bolts (1-6) using a center hole jack . The twelve (12)
location are noted on the attached marked S2.2 Plan Drawing.
The Special Inspection for the installation of the six (6) epoxied anchors were completed today
(November 17, 2016) using the skype service provided by Iphones (Face Time). These locations
are denoted on site with the letters "A" through "F" as shown on the attached photos. The size
and depth of the holes were confirmed with the Contractor as well as the cleaning of the holes
prior to placement of the epoxy. The holes were filled from the bottom to the top and the anchors
gently agitated into place in accordance with the manufacturer's recommendations for full contact
surface area and bonding. The holes were drilled to a depth of approximately 5" to achieve the
minimum embedment depth of 3 3/4" per the manufacturer's recommendations to achieve the
required 4,000 lb tension load.
The first of the six tension tests (Location #1) for the existing post installed anchor bolts was also
completed live using the Iphone's Face Time feature as well. The jacking setup, procedure, and
required pressure to reach 5,000# (1.25x the required 4,000 lb tension load) were verified (see
attached calibration curve). The contractor was instructed for the remaining 5 tests to provide a
photograph of the jacking operation with the jack setup, pressure gauge reading, and location
clearly visible (see attached drawings).
I hope this letter and associated attachments provides you and your inspector everything that you
need for the Special Inspection of the post installed anchors summarized above. Please let me
know if you, yobframer, or the inspector has any questions or comments.
David Sig'1tfv2 .1
Spanish Peaks Engineering & Consulting, LLC
Enclosures: (As Noted)
Cc: File — 15166
-VXk U
EXPIRES1.
l
�FO This product is preferable to similar connectors because of
a) easier installation, b) higher loads, c) lower installed cost,
or a combination of these features.
� 333'•......:
HDU holdowns are pre -deflected during the manufacturing
CZ
process, virtually eliminating deflection under load due to material
stretch. They use Simpson Strong -Ties Strong -Drive® SDS Heavy -Duty
Connector screws which install easily, reduce fastener slip and provide
~ a greater net section when compared to bolts.
°b The HDU series of holdowns are designed to replace previous version;
of the product such as PHDs as well as bolted holdowns. The HDU2, 4
o and 5 are direct replacements for the PHD2, 5 and 6, respectively.
b The DTT tension ties are designed for lighter -duty holdown applications
Cb
on single or 2x posts. The new DTT1Z is installed with nails or Simpson
Strong -Tie Strong -Drive SD Connector screws and the DTT2Z installs
easily with the Strong -Drive SDS Heavy -Duty Connector screws
(included). The DTT1Z holdowns have been tested for use in designed
shearwalls and prescriptive braced wall panels as well as prescriptive
wood -deck applications (seepage 209 for deck applications).
For more information on holdown options, contact Simpson Strong -Tie
HDU SPECIAL FEATURES:
• Holdown designs virtually eliminate deflection due to material stretch
• Uses Strong -Drive SDS Heavy -Duty Connector screws which
install easily, reduce fastener slip, and provide a greater net
section area of the post compared to bolts.
• Strong -Drive SDS Heavy -Duty Connector screws are supplied
with the holdowns to ensure proper fasteners are used
• No stud bolts to countersink at openings.
MATERIAL: See table
FINISH: HDU - Galvanized; DTT1Z and DTT2Z - ZMAX® coating;
DTT2SS - stainless steel
INSTALLATION: • See General Notes on page 45.
• The HDU requires no additional washer, the DTT requires a
standard cut washer (included with DTT2Z) be installed
between the nut and the seat.
• Strong -Drive SDS Heavy -Duty Connector screws install best
with a low speed high torque drill with a %* hex head driver.
CODES: See page 12 for Code Reference Key Chart.
190
M
46
These products are available with additional corrosion protection.
Additional products on this page may also be available with this
option, check with Simpson Strong -Tie for details.
L
MPSON
onb Tie
Mt Holes
amw urox
Purposes
not creel
HDU
U.S. Patent
6,112,495;
5,979.130
—� — DTT1Z
Vertical
U.S Patent
dWrIurn wood
pod Mc l mernber Pending
dm by rn V" Thickness
t r mr_trc
O SAr�Pnst
o
t2aleA barrier Rod
nuir be
rcu"all
t
2-2x
Bloc"
Nerhical HDU Installation
notanrri
Horizontal HDU
Offset Installation
(Plan View)
See Holdown and Tension Tie
General Notes on page 45
Typical
HDU Tie
Between
Floors
. JGG POyu VJ wi nuiuuwn ana tension lie General NoteS.
2 Noted HDU14 allowable loads are based on a 5%' wide post (6x6 min.).
3. HDU14 requires heavy hex anchor nut to achieve tabulated loads (supplied with holdown).
4. Loads are applicable to installation on either narrow or wide face of post.
L
—
DimenslonE
lin')
-
Fasteners Minimum AflawableTensiosLoads
'
Model
Wood 180
No.
Ga
Anchor Member Deflection at
*Zl
Ref.
W
H
B
4j
SO
Thickness' OF/SP SPF/HF Allowable Load
Bolt Dla. Fes
(in.) (in_)
6 -SD 19x11fr 840_ 840 0.170
DTT1Z
14
1'h
7'/s
1'Fia
V4
'/ts
%
_
6-10dx11h 1'/z 910 640
160
----0.167
8-10dxt %z 910 850 0.167
DTT2Z
8-SDS'/.'x114' 1'i4 1825 1800 0.105
14
3'/
6'Vis
lea
'Ste
3'u
fz
8-SDS'/:xl'fe' 3 2145 1835 0.128
DTT2Z-SDS2.5
8 -SDS AV V2, 3 2145 2105 0.128
HDU2-SDS2.5
14
3
8'%s
3%
IMs
1%
is
6 -SDS %: x2V 3 3075 2215 0.088
U4-SDS2.5
14
3
10'Y1s
3'/.
ilia
11Th
_ ___
10-SDS'/V' i' 3 4565 3285 0.114
—
14-SD5'/:x2'/z' 3 5645 406 0.115
16,
HDUS SDS2.5
14
3
13'/s
3'/.
lac
135
�.
6765 4870 0.084
L8, F5
HDU8-SDS2.5
10
3
165A
3'/z
1%
114
'%
20-SDS''/.'x2'k' 3'% 6970 5020 0.116
4%7870 5665 0.113
HDU11-SDS2.5
10
3
22'/.
3'Fi
1'/a
1'h
1
5'� 9535 6865
30 -SDS'/: x2'Fi' - 0.137
-- ----
__
7'/. 11175 8045 0.137
44M 10770 7755 0.122
170
HDU14-SOS2.5
7
3
25"/is
3'/t
I%a
1'/s
1
_
36 -SDS !44VV 7'/c3 14390 10439 0.177
16, L8,
5'fira 14445 10350 0.177
F5
. JGG POyu VJ wi nuiuuwn ana tension lie General NoteS.
2 Noted HDU14 allowable loads are based on a 5%' wide post (6x6 min.).
3. HDU14 requires heavy hex anchor nut to achieve tabulated loads (supplied with holdown).
4. Loads are applicable to installation on either narrow or wide face of post.
L
Cure Schedule in -Service Temperature Sensitivity
I Refer to temperature sensitivity chart
for allowable bond strength reduction
for temperature. See page 13 for
more information.
2. Percent allowable load may be linearly
interpolated for intermediate base
material temperatures
3. °C = (`f-32) / 1.8
Improperly Prepared Holes
Optional testing with SET adhesive was done in
r ::Hole gid ! compliance with ASTM E488 to determine the
Hale;Not effect of concrete dust left in the hole on the
performance of this adhesive. The load
0.97 0.63 adjustment factors in the table were developed
Ad]
Is the results of those tests
I Hole depth was over-dnlled to account for dust in
hole to achieve required embedment depth
ltlr;0=4
Tension Loads for Threaded Rod Anchors
39/16
SJ/2
7.215
54
81
®;
in Normal -Weight
Concrete (continued on next page)
83/8
17
`,17,700
(127) 108
162
w
432
�/
78.
14 ri4f.
381
(28.8)
3,556
18.6
7 111
20
26,700
Tendon lead
B2.5
191
508
118.8
5.0
Taldoa Lest d Based of � ShenO
10 7/8
f3aseA ow Stell Stretlgth
Rod .. `Drift
Dia Bit
Embed.
C f6cal
�e
MUC811
t c 2008
730
A307 A193 GR 87
(13.5 Wa) Ceemb Pc x 491M pd (27.6 MPa) t' (� 1010) (SAE 4140) (A304SS) .
In. Dia.
in.
Dlat
T
33,402
1,198
8,351
343
67/9
4
.45
�mm) In.
(mm)
in,
(twat)
(iSMr)
Uttim to
Std. Dfsv.
AtMnr.
[ft. (111
Utthnaw Std, on.
t6s. (kN) tbs. (fat)
Allow.
lbs. (1161)
Allow. _ Allow. AIltnr. =`<
lbs. (1d1) Ills. (M) 11113 - OX),
12,660
10,120
143.2
4.3
Ms. (MYIlbs,
(tell)
(56.3)
(45.0)
8,200
1 3/4
2 5/8
7
1,900
485
475
1,900
475
2-1
3/8
44
3 111
67
5 114
178
14
8.5
10,200
2.2
119
2.1'
2,550
.5
10,280 97
2,570
29 05 4,5353,630(9
1R
89
133
356
45.4
0.5
11.3
5.7 0.4
11.4
5)
4 112
6 3/4
18
10,613
84
2,655
10,613
1155
114
171
457
47.2
In.4
11.8
7.2
2 118
39/16
SJ/2
7.215
54
81
216 -
32.1
111 616 4114
83/8
17
`,17,700
(127) 108
162
w
432
�/
78.
14 ri4f.
5/81 3/4
05.9
9 3/8
(238)
33/8
3/4 i 718
(19.1) 1
see Notes on Next Page
3 3/4
10
6,780
315
or.1
3,845
17.2
95
254
30.2
1-4
3,750
5 5/8
15
31.8
3.5
4,190
143
381
(28.8)
3,556
18.6
7 111
20
26,700
1,121
B2.5
191
508
118.8
5.0
291
10 7/8
28 3/4
1,695
89.0
7,51E
276
730
13112
7.5
33.4
141/8
1 3718
33,402
1,198
8,351
,216
953
13 1
1,805
5.3
2,621
11.7
or.1
3,845
17.2
ryo.v:'
15,456
.8
12.1
1,400
a
788
8.0
4,ON
3,750
8,480
6.470.,
31.8
3.5
20.5
(16.7)
(35.9)
(28.8)
3,556
194
1® 118
514
27
42,160
1,945
32.0
16.525
B2.5
1,575
20.6
8,460 18,230 12.400
257
1,780
8.
1,695
89.0
.0
47.2
30.2
13112
7.5
11,220
,
,
4,875
343
67/9
4
.45
47,634
6,a
21.7
47.634
50.1
11,010
2,200
964
8,050
5,875
12,660
10,120
143.2
4.3
35.8
(26.1)
(56.3)
(45.0)
8,200
36.5
2,402
8,350
359
953
13 1
148.6
15,456
68,8
5.3
2,621
11.7
or.1
3,845
17.2
ryo.v:'
15,456
.8
3,ft&9
17.2
511/116
129
7 518
28 114
7,195
"
7,245
32.2
194
1® 118
514
27
42,160
1,945
32.0
16.525
42,480
1,575
10,620
8,460 18,230 12.400
257
187.3
8.
MAI
89.0
.0
47.2
(37.6) (81.1) (55.2)
13112
35
11,220
,
,
11,265
343
67/9
4
.45
47,634
6,a
49.9
11,910
47.634
50.1
11,010
4
1143
2119
2
53.0
119
`-
oI the load table ico/e" ns
' -11/4" Diameters
on next page
21
Hoitfowns 3r Tension Ties
Tension ties offer a solution for resisting tension loads that are fastened
with nails. The HTT4 and HTT5 are the latest generation of tension ties. They
feature an optimized nailing pattern which results in better performance with
less deflection. Designed to meet new code standards, the HTT4 and HTT5
offer higher loads than their predecessors.
HTT5KT is sold as a kit with the holdown, bearing plate washer and
Strong -Drive -1 SD Connector screws. The HTT5-'h is designed to use a
3/; diameter anchor bolt. 3/4' epoxied anchor bolts are commonly used when
retrofitting tension ties to horizontal wood members
The LTT19 Light Tension Tie is designed for 2x joists or purlins and the
LTT20B is for nail- or bolt -on applications. The 3' nail spacing makes the
LTT20B suitable for wood I -joists with 10dx1112. The LTT131 is designed for
wood chord open web truss attachments to concrete or masonry walls and
may also be installed vertically on a minimum 2x6 stud.
MATERIAL: See table
FINISH: Galvanized. May be ordered HDG; contact Simpson Strong -Tie.
INSTALLATION:
• See General Notes on page 45.
• A standard cut washer is required for LTT19 and LTT20B when using
1/2' or 5/e anchor bolts. No additional washer is required when using
3/' anchor bolt.
CODES: See page 12 for Code Reference Key Chart.
IP
r
these products are available with additional corrosion protection. Additional products on
this page may also be available with this option, check with Simpson Strong -Tie for details.
1% T -n
V V
00
C
o°
Load
o transfer
° plate 4'
washer
not
required
LTT20B HT15
LTT131 (LTT19 similar) (HTT4 similar)
or These products are approved for installation with the Strong-DriveQ
SD Connector screw See page 27 for more information.
Model No.
Sip
Mat.
(Da)
Dimensions
W L J
Seat
Trym_
peasAnchor
Fasteners Minimum Allowable Tension Deflection
— Wood Loads(160) at Highest
- Member Allowable
Botts Fasteners Size DF/SF SPF/HF Lead
Code
Report
LTT19
16
13/.
19'/a
1 %
356
'/z, s/e
or Y.
8 10dx1'/z 3 x 31%7 1310 1125 0.180
8-1 Od 3 x 3'.1, 1340 1150 0.157
LTT20B
12
2
193/4
1'/2
--
3S6
or 3/4
10-10dxl'/2 3 x 3'/2 1355 1165 1 0.195
L19,
IF4
10-1Od 3 x 3'/z 1500 1290 0.185
2-'h' Bolt 3 x 3'/2 1625 1400 0.183
LTT131
18
33/4
31
131a
'/4
r/,6
'/6
18-t Odxi'/z 3 x 3'/2 1350 1160 0.193
HTT4
11
2'/z
123k
I Y,e
3e
18-10dx1 1/2 11h x 5Ys 3000 2580 0.090
160
18-10dx1'/z 3 x 3'/2 3610 3105 0.086
L19,
IP2, F4
160
18-16dx2'/z 3 x 3'/2 4235 3640 0.123
18 -SD 110x1'/2 1'/z x 5'/z 4455 3830 0.112
18 -SD #10x/2 1' 3 x 3'/2 4455 383 0.112
HTT5
111
2'/2
16
1'As
'/,6
5/s
26-1Odx1'r4 3 x 3'/2 0 0.120
L19,
Ip2 F4
26-- 3 x 3'/z 4670 5 0.116
�1��,/2 3 x 3'/z 5090' 4375' 0.135
26 -SD #10x1 %2 1'/z x S'/z 55 0.114
160
HTT5KT
11
2'/2
16
1356
'/,6
73
26 -SD #10X2'#4 3 x 2 5445 5360 0.103
160
HTT5_
11
2'/2
16
3/4
26 1Odx1'/2 1112 x 5'/2 4065 3495 0.103
160
26 -SD it Ox11 1'/2 x 71h 4830 4155 0.100
26 16dx2'/2 3 x 31/2 5090 4275 0.121
1. LTT noldowns may not be installed more than 4W above the top or concrete.
2. LTT131 installed flush with concrete or masonry has an allowable load of 2285 lbs
3 Allowable load for HTT5 with a BPS' 2 bearing plate washer installed in the seat
of the holdown is 5295 lbs. for DF/SP and 4555 lbs. for SPF/HF.
4 FASTENERS: 10dxt'h = 0.148 dia- x 11f2' long, 10d = 0.148 dia. x 3' long,
16dx2'/2 = 0.162' dia. x 21W long, $O 110xlYz = 0.161' dia. x 114%
SO 110x21/2 = 0.161' dia. x 2'h'.
4Jnn not cMn n
Horizontal HTT Installatlon
Horizontal LTT131
Installation
3'
Min.
e
e Preservative-
'0
reservative-
o treated
e barrier may
be required
e
to �
W
Vertical HTT4
Installation
Horizontal LTT79 Installation
(LTT20B similar)
0
0
rA
Ro
era
y
ed
h
� mei
t=:�7
49
SIMPSON
LSTHO/STHD Strap -Tie Holdoivn Strong -Tie'
A0 This product is preferable to similar rnnrredors because or
a) easter installation, b) higher loads, c) lower Installed cost,
UJI
• or a combination of these Ieafrrres.
The STHD is an embedded strap -tie holdown offering high load capacity
and a staggered nail pattern to help minimize splitting. The STHD incorporates many
features that aid correct installation and improve performance. When installed on
the forms with the StrapMater'strap holder the unique design of the STHD delivers
enhanced stability before and during the pour to help prevent both parallel and
perpendicular movement (relative to the form). This results in accurate positioning
of the strap and reduced possibility of spalling.
FEATURES
• The nailing pattern allows for nailing to the edges of double 2x's
• Strap nail slots are countersunk to provide a lower nail head profile
• The slots below the embedment line enable increased front -to -back
concrete bond and help to reduce spalling
• Rim joist models accommodate up to a 17' clear span without any
loss of strap nailing
MATERIAL: LSTHD8, LSTHD8RJ-14 gauge, all others -12 gauge
FINISH: Galvanized
INSTALLATION: • Use all specified fasteners. See General Notes on page 45.
• Use table below for both standard concrete and post -tension stab installations.
• Install before concrete pour with a StrapMate, or other holding device.
• Nail strap from the bottom up. Install strap plumb.
• Strap may be bent one full cycle (bent horizontal 90' then bent vertical) to
aid wall placement, but may cause spilling behind the strap. If the spall is
1' or less, measured from the embedment line to the bottom of the spall,
full loads apply. 1' to 4' spalls for LSTHD8 achieve 0.9 times table loads.
STHD10 and STHD14 achieve full bad for spalls less than 4'. Any portion
of the strap left exposed should be protected against corrosion.
• Other than where noted in the two -pour detail, do not install where:
(a) a horizontal cold joint exists within the embedment depth between the slab
and foundation wall or footing beneath, unless provisions are made to transfer
the load, or the slab is designed to resist the load imposed by the anchor; or
(b) slabs are poured over concrete block foundation walls.
• Additional studs attached to the shearwall studs or post may be required
by the Designer for wall sheathing nailing.
• Wood shrinkage after strap installation across horizontal members may cause
strap to buckle outward.
Tension Loads for STHD Installations
- r 3-F
P R
F
FF
Nails are countersunk for
L ' a law -profile strap surface.
LSTHD8 varies from 4' to 414'
STHD10, STHD14 varies
from 43'l to 5W
OT"STHID
U.S. Patent
5,813,182
Typical STH014RJ
Rim Joist Application
For Two -Pour Installation for Downturn Footings
• For STHD10 installed through a 4' thick slab, use the equivalent
8' stemwall loads of the LSTHD8.
• For STHD14 installed through a 4' thick slab, use the equivalent
8' stemwall loads of the STHD10.
• For STHD14 installed through a 6' thick slab, use the equivalent
8' stemwall loads of the LSTHD8.
CODES: See page 12 for Code Reference Key Chart.
I Allowable loads are for wind or seismic loading. Nail quantities reflect an
increase for duration of toad with no further increase allowed. Reduce
where other loads govern.
2 Concrete shall have a minimum concrete strength, f,, of 2500 psi.
3. 10d common (3' long x 0.148') or 1Odx2'.7 (21'?' long z 0.148') nails
may be used as a direct replacement for the required nails shown in the
table with no load reduction when installed directly over framing or
over'.''',' max. structural sheathing.
4 Use the specified number of nails listed in table or as specrtied. In many
cases, not all nail holes will be filled. Nail strap from the bottom up.
5. Deflection at highest allowable loads for install over wood double studs
are as follows: Installed on framing: LSTHD8 = 0.089', STHD10 = 0.11 T and STHD14 = 0.118'
Installed over '>z' maximum structural sheathing: LSTHD8 = 0-114', STHD10 = 0 146'and
STHD14 - 0.164'.
6. Multiply Seismic and Wind ASD load values by 1.4 or 1.6 respectively to obtain LRFD capacities.
T Per 2009 and 2012 IBC Section 1613.1, detached one- and two-family dwellings in Seismic Design
Category (SDC) C may use "Wind and SDC A&B" allowable loads.
8 Minimum center -to -center spacing is 3 times the required embedment (Smin = 3xk) for STHO's
acting in tension simultaneously. Midwall install is based on 1.5xle end distance.
9. See T-SCLCOLUMN for installation on structural composite lumber posts or columns -
10. For brick ledge applications, use full loads shown for STHD14 installed in 8' stemwall
11 NAILS: 16d sinker= 0 148' dia. x TA' long. Seepage 22-23 for other nail saes and information.
11
WIND AND SDC A & B -ALLOWABLE TENSION LOADS FOR OF/SP/SPF/HF (160)
Min.
Model
Standard
No.
Rim Joist
Strap Length
Standard
(in.)
(L)
Rim Joist
(in.)
le
(in.)
Required
Nails
Midwall
Non Cracked
Corner
Endwall
Midwall
Cracked
Corner
Endwall
Code
Ret.
Stem
Wali
LSTHD8
LSTHD8RJ
18%
32'1
8
20 -16d Sinkers
3115
2700
1690
2675
2320
14_55
6
STHD10
STHD10RJ
24%
381A
10
24 -16d Sinkers
3820
3820
2050
3140
3140
1705
STHD14
--
STHDI4RJ--
----
26'A
3944
14
-----
30 -16d Sinkers
5150
5150
3200
5150
5150
3200
125-
LSTHD8
LSTHD8RJ
1835
32'1A
8
20-16dSinkers
3115
2700
2230
2675
2320
1915
F33
8
STHD10
STHDIORJ
24%
38111
10
28-16dSinkers
4755
4120
3145
4195
35002585
STHD14
STHDI4RJ
26'A
3944 �
14
3O t6d Sinkers
5345
5345
4210
5345
5345
4210
SDC C-F—ALLOWABLE TENSION LOADS
FOR OF/SP/SPF/HF (160)
Mln.
Wait Standard
in
Model No.
Standard Rim Joist
Strap Length (L)
Rim Joist
(in) (in)
ie
In.
( )
Required
Nails
Midwall
Nan Crocked
Comer
Endwall
Midwall
Crocked
Corner
Endwall
Cede
flet.
LSTHD8
LSTH08RJ
18%
32'A
1 8
16 -16d Sinkers
2270
2090
1220
2250
1950
1220
6
I STHD10
FSTHD10BJ
24%
38%
I 10
18-16dSinkers
2750
2750
1615
2640
2640
1435
STHD14
STHDI4RJ
26'/a
! 39%
14
22 -16d Sinkers
3695
3695
2685
3695
3695
2685
125.
LSTHD8_
----
LST
18%
-
321A
8
16 -16d Sinkers
2615
2125 1
1635
2250
1950
1610
F33
8
--
STHD14
--
STHDIORJ
STHD14RJ
2444
26%
38'A
3944
10
14
20 16d Sinkers
24 -16d Sinkers
I
61
I
3815 1
?L95
3500
34
3815
3815
175
3500
I Allowable loads are for wind or seismic loading. Nail quantities reflect an
increase for duration of toad with no further increase allowed. Reduce
where other loads govern.
2 Concrete shall have a minimum concrete strength, f,, of 2500 psi.
3. 10d common (3' long x 0.148') or 1Odx2'.7 (21'?' long z 0.148') nails
may be used as a direct replacement for the required nails shown in the
table with no load reduction when installed directly over framing or
over'.''',' max. structural sheathing.
4 Use the specified number of nails listed in table or as specrtied. In many
cases, not all nail holes will be filled. Nail strap from the bottom up.
5. Deflection at highest allowable loads for install over wood double studs
are as follows: Installed on framing: LSTHD8 = 0.089', STHD10 = 0.11 T and STHD14 = 0.118'
Installed over '>z' maximum structural sheathing: LSTHD8 = 0-114', STHD10 = 0 146'and
STHD14 - 0.164'.
6. Multiply Seismic and Wind ASD load values by 1.4 or 1.6 respectively to obtain LRFD capacities.
T Per 2009 and 2012 IBC Section 1613.1, detached one- and two-family dwellings in Seismic Design
Category (SDC) C may use "Wind and SDC A&B" allowable loads.
8 Minimum center -to -center spacing is 3 times the required embedment (Smin = 3xk) for STHO's
acting in tension simultaneously. Midwall install is based on 1.5xle end distance.
9. See T-SCLCOLUMN for installation on structural composite lumber posts or columns -
10. For brick ledge applications, use full loads shown for STHD14 installed in 8' stemwall
11 NAILS: 16d sinker= 0 148' dia. x TA' long. Seepage 22-23 for other nail saes and information.
11
.. .. , . .
^ \\S«
w[2
p\
Adelaide Hold Down Special inspection
2016-11-17
Location #1— Existing hold down
Pressure test watched via FaceTime
Location #2 — Existing hold down
Location #3 — Existing hold down
Adelaide Hold Down Special inspection
2016-11-17
Location #4 — Existing hold down
Location #5 — Existing hold down
Adelaide Hold Down Special inspection
2016-11-17
Location #6 — Existing hold down
Location #A — New drilled and epoxied hold down — Watched via FaceTime
Adelaide Hold Down Special inspection
2016-11-17
Location #B — New drilled and epoxied hold down — Watched via FaceTime
Location #C — New drilled and epoxied hold down — Watched via FaceTime
Adelaide Hold Down Special inspection
2016-11-17
Location #E — New drilled and epoxied hold down — Watched via FaceTime
Location #F — New drilled and epoxied hold down — Watched via FaceTime
0 n1
�I
fel fil
F
>
O
: al-• I - -- ,1
_ ixl
Lijl
it:
j
Iw
- --
�o
a 1
0 0
71
I I
I I
j 41
� xl
'IV I
I Wl
it
iv
> _ 1
I IWC
.311 z
I o
– - —1� - -
W1— }
—
I
� I
i I
C It i 0 v I MONSEF DO N OG H "�" �•'"�'��
vii �go2 Adelaide 1B DESIGN GROUP
y m -.1206.6121647
N y 29804 23rd Ave SW, Federal Way
? 4
CITY
Federal Way
PERMIT NUMBER _t 5 _
iRECKVED
SEP
19 2015
PERM I'14APPLICATION
CIT`( OF FFEECDEERAL WAY
TARGET DATE ( () 2 ✓ ` ,
SITE ADDRESSSSj D_ , SUITE/UNIT #
� V '17 _ 4ql 3�!/I0 4;t i4
PROJECT VALUATION
$
ZONING
I S--
ASSESSOR'S TAR/PARCEL #
0- _L Z_ c2 -—
TYPE OF PERMIT
UILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
I `7
PROJECT DESCRIPTION
Detailed description of work to
c...�
be included on this permit only
PROPERTY OWNER
NAME-}�
-' .. >011 S 1 �,
PRIMARY PHONE
MAILING ADDRESS
L
CIT STATE
ZIP ^
IF
NAME
LPTS UAld
PHONE
MAILING ADDRESS
E-MAIL
CONTRACTOR
CITY
STATE
ZIP
FAX
WA TAT OfTRC O 'S LICENSE#
6�l
EXPIRATION DATE
o /1
FEDERAL WAY BUSINESS LICENSE #
Z0 la
NAME
NAME
PRIMARY PHONE
MAILING ADDRESS
E-MAIL
APPLICANT
CITY
STATE
ZIP
r
FAX
PROJECT CONTACT
NAME
b1
PRIMARY P ONE
MAILING SN
(�/J /
L �n
C
(The individual to receive and
respond to all correspondence
OJU,-)
STATE
ZIP
6
FAX
concerning this application)CITY
PROJECT FINANCING
NAME
OWNER -FINANCED
Required value of $5,000 or more
(RCW 19.27095)
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
I certify under penalty of perjury that.T am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and ense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such im arises out of the rel' of the city, including its officers and employees, upon the accuracy of the
information supplied the city as a par tss application.
07 �
SIGNATURE: DATE hwt
PRINT NAME:
Bulletin #100 — January 1, 2013 Page 1 of 3 k:\JIandouts\Permit Application
C
G_
VALUE OF
MECHANICAL PERMIT
Ite how many of each type of fixiure to be installed or relocated as Vert of this project. Do not include
AIR HANDLING UNITS FANS GAS PIPE OUTLETS _
AIR CONDITIONER FIREPLACE INSERTS HOODS (commerciai)
BOOII ERS FURNACES HOT WATER TANKS (Gas)
COMPRESSORS AS LOG SETS , REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
r
rNICALM
WORK
M
fixtures to remain.
OTHER (Describe)
RESIDENTIAL - NEW OR ADDITION
AREA DESCRIPTION (in square feet)
EXISTING
PROPOSED
VALUE of
PI,(Tm WORK
PLUMBING PERMIT
NEW BUILDING
1
$ l
Indicate how many of each
type of fixture to be installed or relocated as part of this project. Do not include a 'stin ures to remain.
BATHTUBS (or Tub/8bowercombo) —[:I—
LAVS (Hand Sinks)
TOILETS
WATER PIPING
DISHWASHERS
COMMERCIAL — REMODEL/TENANT IMPROVEMENTS
RAINWATER SYSTEMS URINALS
OTHER (Describe)
DRAINS
Construction
Type
SHOWERS
VACUUM BREAKERS
DECK
DRINKING FOUNTAINS�(�
SINKS (Kitchen/ubiiity)
WATER HEATERS (Electric)
GARAGE CARPORT ❑
HOSE BIBBS
U
SUMPS
WASHING MACHINES
TOTAL FIXTURES
PROJECT AREA ONLY
GENERAL INFORMATION
EHISTING
P PIJ�D�
9
f If
CRITICAL AREAS ON PROPERTY?
WATER PUR OR
SEWER PURVEYOR
VALUE OF EXISTINGROVEMENTS
VALUE
D 0
Q2
G�
l
Z�tV�IVI�
$
EXISTING/PREVIOUS USE
LOT SIZE (In Sqn
J6 1,
a Feet)
(),
EXISTING FIRE SPRINKLER SYSTEM?
❑ Yes, No
PROPOSED FI
SUPPRESSION SYSTEM?
vyes ❑ No
RESIDENTIAL - NEW OR ADDITION
AREA DESCRIPTION (in square feet)
EXISTING
PROPOSED
TOTAL
FOR OFFICE USE
— ... -............. _... ._.... -..... __._.... _...................... _.......... -...._.....-- -- ..._.....
BASEMENT
NEW BUILDING
1
FIRST FLOOR (or Mobile Home)
i
y Lr
SECOND FLOOR
COMMERCIAL — REMODEL/TENANT IMPROVEMENTS
AREA DESCRIPTION
COVERED ENTRY
Occupancy Group(s)
Construction
Type
# of
Stories
Additional Information
DECK
-
GARAGE CARPORT ❑
TENANT AREA ONLY
U
OTHER (describe) nd
PROJECT AREA ONLY
Area Totals
EHISTING
P PIJ�D�
9
f If
"NEW HOME,,S�O.NNLY*"
ESTIMATED SELLING PRICE $
D 0
Q2
# OF BEDROOMS
COMMERCIAL — NEW/ADDITION
AREA DESCRIPTION
Area
in Square Feet
Occupancy Group(s)
Construction
Type
# of
Stories
Additional Information
NEW BUILDING
i
ADDITION
COMMERCIAL — REMODEL/TENANT IMPROVEMENTS
AREA DESCRIPTION
Area
in Square Feet
Occupancy Group(s)
Construction
Type
# of
Stories
Additional Information
TOTAL BUILDING
TENANT AREA ONLY
PROJECT AREA ONLY
Bulletin #100 - January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application