Press Alt + R to read the document text or Alt + P to download or print.
1
2This document contains no pages.
HomeMy WebLinkAbout15-105173_Mechanical
Crof federal Way Permit #: 15 -105173 -00 -ME �
Community &Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609 FILE
Inspection Request Line: (253) 835-3050
Project Name: SAUCEDO
Project Address: 33827 26TH AVE SW Parcel Number: 010920 0370
Project Description: Relocation of the gas meter "
Owner
ARRIlicant
Contractor
DENISHA D SAUCEDO
COREY ALEXANDER
INFRASOURCE SERVICES LLC
ALFONSO SAUCEDO
INFRASOURCE SERVICES LLC
INFRASL871C2 (2/22/17)
33827 26TH AVE SW
13330 STONE AVE N
14103 STEWART RD
FEDERAL WAY WA 98023
SEATTLE WA 98133
SUMNER WA 98390
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Gas Pipe Outlets ............................. 1
PERMIT EXPIRES Saturday, April 9, 2016
Permit Issued on Monday, October 12, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
CITY OF
Federal Way
PERMIT #:
15 -105173 -00 -ME
THIS CARD IS TOIN ON-SITE
Construction Inrection Record
INSPECTION REQUE TS: (253) 835-3050
Address: 33827 26TH AVE SW
Project: DENISHA D SAUCEDO FEDERAL WAY, WA 98023-7709
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑
Mechanical Rough -in (4165)Gas
Piping (4125)
Final Electrical
Approved
Final - Mechanical (40 5)
Approved
By
Approved to release test
Approved
By
Date
By
Date 22�
By
Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date