HomeMy WebLinkAbout15-101820- -` Electrical
City& Federal Way Permit #: 15 -101820 -00 -EL
Community Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Inspection Request Line: (2
53) 8353050
Project Name: TAKECHI
Project Address: 32800 26TH PL SW Parcel Number: 894520 0270
Project Description: Replace gas furnace and hot water heater
Owner
A o�
Contractor
RICHARD S TAKECHI
JAIMIE HOW
BRENNAN HEATING & A/C LLC
32800 26TH PL SW
BRENNAN HEATING & A/C
(ELECTRICAL)
FEDERAL WAY WA
4601 S 134TH PL
BRENNHA962DU (3/31/16)
98023
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Circuits - Residential ...................... 2
PERMIT EXPIRES Sunday, October 11, 2015
Permit Issued on Tuesday, April 14, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: h I I I h I 1= Date:
THIS CAIS TO MAIN ON-SITE
"�� RD Construction In ection Record
Federal Way INSPECTION REQ TS: (253) 835-3050
PERMIT #: 15 -101820 -00 -EL Address: 32800 26TH PL SW
Project: RICHARD S TAKECHI FEDERAL WAY, WA 98023-2819
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El
LIFER Ground (42 5)
Ditch cover (4030)
Temporary Power (4275)Service
Slab/Concrete Floor (4255)
1:1Approved
Approved
(4235)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
El
Pool Bonding (4195)
1:1Approved
Temporary Power (4275)Service
1:1Approved
Right of Way
(4235)
Date
Approved
By
Date
Approved
By
Date
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
Date.
El
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Way
By
Date
By
Date
By
Date