Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-1014714 ".0
Mechanical
City of Federal way ��..{{
Community & Econ. Dev. Services Permit #: 15-101471 -00-M E
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: 253 835-3050
Ph: (253} 835-2607 Fax: (253) 835-2609 p q
Project Name: THOVSON 3�
50
Project Address: 34506 30TH AVE SW Parcel Number: 797200 0180
Project Description: replace gas furnace like fo rlike
Owner
Aonlican
Contractor
LEE THOVSON
NORTHWEST PERMIT/ WESCO
WASHINGTON ENERGY SERVICES CO
PO BOX 25493
1345 W GULF RD
(GENERAL)
FEDERAL WAY WA 98093-2493
POINT ROBERTS WA 98281
WASIRES97IOB (9/2/15)
2800 THORNDYKE AVE W
SEATTLE WA 98199
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Furnaces ......................................... 1
PERMIT EXPIRES Wednesday, September 23, 2015
Permit Issued on Friday, March 27, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: nK11 ilk if -Date:
FILE
a
CrrY
Federal Way
PERMIT #:
15 -101471 -00 -ME
THIS CARD IS TOMAIN ON-SITE
` Construction In ection RecordINSPECTION REQ TS: (253) 835-3050
Address: 34506 30TH AVE SW
Project: LEE THOVSON FEDERAL WAY, WA 98023-3020
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final Electrical
Approved
Final - Mechanical (4 5)
1:1Approved
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date