Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-103409H�
- Electrical
City of Federal Way
Community & Econ. Mv. Services Permit #: 1.5 -103409 -00 -EL
33325 8th Ave S
Federal Way, WA 98003 FILE
Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050
Project Name: STARBUCKS
Project Address: 1656 SW DASH POINT RD Parcel Number: 189880 0010
Project Description: pull new low voltage cable from speaker post in drive thru to inside the building in the
drive thru area
Owner
Annlicant
Contractor
STARBUCKS
SEAN GREENOUGH
INSTALLATION & SERVICE
2401 UTAH AVE S
INSTALLATION & SERVICE TECHNOLOGIES
TECHNOLOGIES INC
SEATTLE WA 98134
INC
INSTAST926QD (11/5/16)
8340 N MISSION RD SUITE B4
8340 MISSION RD SUITE B-4
PRAIRIE VILLAGE KS 66206
PRAIRIE VILLAGE KS 66206
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No
Service greater than 999 Amps? .............................No
Electrical Fixtures
Low Voltage - Other (Commercial 4
PERMIT EXPIRES Sunday, January 10, 2016
Permit Issued on Tuesday, July 14, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws rules and regulations of the State of Washington
Ity�aY
Owner or agent: Date:
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 15 -103409 -00 -EL Address: 1656 SW DASH POINT RD
Project: STARBUCKS FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Approved
By Date
IN
By
d cover
Approved
0
Date 7— (i —/ 41 By
Pool Bonding (4195)
Approved
By
Date
1:1Approved
Right of Way -^
Feeders/Sub-panels (4045)
Approved
By
Date
Final - Electrical (4055)
Approved
By
Date
IN
By
d cover
Approved
0
Date 7— (i —/ 41 By
Approved to place concrete
Date
Temporary Power (4275)
Approved
By
Date
1:1Approved
Right of Way -^
Rough Electrical (4225)
Approved
By
Date
Approved to place concrete
Date
Service (4235)
Approved
By
Date
1:1Approved
Right of Way -^
Ceiling Cover (4020)
Approved
By
Date
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Way -^
By
Date
By
Date
By
Date