HomeMy WebLinkAbout15-104864City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
FILE
Meckanical'
Permit #: 15-104864-00-M E
Inspection Request Line: (253) 835-3050
Project Name: HOLLINGER-LANT
Project Address: 31948 36TH AVE SW_ Parcel Number: 873198 0070
Project Description: REPLACING GAS WATER HEATER
Owner
DENNIS D HOLLINGER-LANT
Aoolicant
ANGELA LUDWIG
Contractor
WASHINGTON CORROSION SRVC INC
JOD HOLLINGER-LANT
WASHINGTON CORROSION SRVC INC
WASHICS055KC (5/4/16)
31948 36TH AVE SW
2238 55TH ST SE
1425 BLAINE AVE NE
FEDERAL WAY WA 98023
AUBURN WA 98092
RENTON WA 98056-2774
Additional Permit information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Hot Water Tanks ............................ 1
PERMIT EXPIRES Tuesday, March 22, 2016
Permit Issued on Thursday, September 24, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: OKDate:
■ A E
4%�
CITY of
Federal Way
PERMIT #:
15 -104864 -00 -ME
THIS CARD IS TOIN ON-SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3050
Address: 31948 36TH AVE SW
Project: DENNIS D HOLLINGER-LANT FEDERAL WAY, WA 98023-2138
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By (late
By *4S Date 1=-� 3 1t S—
By VAD Date 12, 13 I ( t;7-
Rough Electrical
Approved
❑Final
Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date