HomeMy WebLinkAbout15-102568City of Federal Way «
Community & Econ. Dev. Services
ILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: VETERE
Project Address: 31979 36TH AVE SW
Project Description: Replace gas furnace
Mechanical
Permit #: 15 -102568 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 873198 3360
Owner
An licant
Contractor
FRANK VETERE
JAIMIE HOW
BRENNAN HEATING & A/C LLC
ANNE BARBARA VETERE
BRENNAN HEATING & A/C
(GENERAL)
31979 36TH AVE SW
4601 S 134TH PL
BRENNHA971R9 (12/29/15)
FEDERAL WAY WA
SEATTLE WA 98168
4601 S 134TH PL
98023-2138
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Flxtims
Furnaces ......................................... 1
PERMIT EXPIRES Tuesday, November 24, 2015
Permit Issued on Thursday, May 28, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent:r)KII11-7 Date:
LFINALED
QTY OF 4�&
Federal Way
PERMIT #:
Project:
,THIS CARD IS TO MAIN ON-SITE "
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
15 -102568 -00 -ME Address: 31979 36TH AVE SW
FRANK VETERE FEDERAL WAY, WA 98023-2138
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
1:1Approved
Approved
By
Approved to release test
Approved
By
Date
By
Date
B
Date
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way —�
By
Date
By
Date
By
Date