HomeMy WebLinkAbout15-10400141 t 4 0
. - *City of Federal Way
Community & Econ. Iev. Services V:1LE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MAPLEWOODS CONDOMEWUMS UNIT D-3
Project Address: 32130 45TH PL SW Unit D3
Quilding - Multi' Hy
Permit #: 15 -104001 -00 -MF
Inspection Request Line: (253) 835-3050
Parcel Number: 512600 0270
Project Description: REP - Exterior sheathing and interior sheetrock replaced due to rot damage
Owner
ARplicant
Contractor
Lender
KYLE A FRANKLIN
HARBOR ROCK CONSTRUCTION
HARBOR ROCK CONSTRUCTION
32130 45TH PL SW UNIT D-3
LLC
LLC
FEDERAL WAY WA 98023
DBA INNOVATIVE CONCRETE SO]
INNOVCS931KT (06/04/15)
3110 JUDSON ST PMB 206
DBA INNOVATIVE CONCRETE SO
FEDERAL WAY WA
3110 JUDSON ST PMB 206
FEDERAL WAY WA
Census Category: 434 - Residential alt/add - no change in number of units
Includes. #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load
Floor Areas . ft. 0 1 0 0 1 0
Additional Permit Information
Mechanical to be Included?...................................No Number of Stories ................................................. 2
Permit for Building Shell Only?............................No Plumbing to be Included? ....................................... No
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Saturday, February 6, 2016
Permit Issued on Monday, August 10, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
d the City of Federal Way.
Owner or agent: Date: /�� &
A. . 1 • THIS CARD IS TO *MAIN ON-SITE
CIT; or -
Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 15 -104001 -00 -MF Address: 32130 45TH PL SW Unit D3
Project: KYLE A FRANKLIN FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Insulation (4150)
Approved to install wallboard
By L Date _ 1
Final - S K F & R (4060)
Approved
By Date
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date $.
Final Erosion Control (4375)
Approved
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
0 Final - Building (4050)
Approved
By A L Date q Il Ls
SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
[]
Footings/Setback (4110)
1:1Approved
Approved
By
To be done prior to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
Insulation (4150)
Approved to install wallboard
By L Date _ 1
Final - S K F & R (4060)
Approved
By Date
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date $.
Final Erosion Control (4375)
Approved
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
0 Final - Building (4050)
Approved
By A L Date q Il Ls
Foundation Wall (4115)
Drainage/Downspout (4040)
[]
Re -steel (4215)
1:1Approved
Approved to place concrete
By
Approved to backfill
Approved to place concrete or grout
By
Date
By
Date
By
Date
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
Shear Walls (4245)11
Roof Sheathing (4220)
Fire/Draft Stops (4095)
Approved to install siding
Approved to install roofing
Approved
By
Date
By
Date
By
Date
Interim Erosion Control (4370)EFire/Draft
scheduling a Framing inspection;
Framing (4120)
Approved
lumbing & Mechanical Rougb-in and
Approved to insulate
By
Date
top inspections must be signed -off and
BY
Date
approved. IBC 1093.4
Insulation (4150)
Approved to install wallboard
By L Date _ 1
Final - S K F & R (4060)
Approved
By Date
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date $.
Final Erosion Control (4375)
Approved
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
0 Final - Building (4050)
Approved
By A L Date q Il Ls
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Way
By
Date
By
Date
By
Date
CITY OF
PERMIT PPLICATION
Federal Way RECEIVED
_ AUG 10 2015
PERMIT NUMBER 15 _ C _�
— — — — — — — — — Y TARGET DATE CITY OF FEDERAL WAY
CDS
SITE ADDRESS y C
-37zoo Lift pc ,St/ 41W
Bulletin
SUITE/UNIT #
- I>
PRO�fJECTDATION
ZONING
ASSESSOR'S TAX/PARCEL# � 0
�_ — U— -/—["/`'/—J
TYPE OF PERMIT
auILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
! • AA� Q
PROJECT DESCRIPTION
Detailed description of work to
t �� 1�
CI l
(44,0*'-
be included on this permit only
PROPERTY OWNER
NAME K 1� w k i t ^ D�
�` Iy{�M`
'
PRIMARY PHONE
MAILING AD15RESS
E-MAIL
CITY
STATE
ZIP
NAME♦ /f
0
PHONE
MAILING ADDRESS _ � /
E-MAIL
CONTRACTOR
CITY
K- -AJ At�
STATE
wa
ZIP
7 t' 3
FAX
WA STATE CONTRACTOR'S LICENSE #
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE #
NAME r, ^� 1
` s4v-(A
7,7-,7 PRIMARY PHONE '
_ V t
MAILING ADDRESS
o p sa. a 30b
E-MAIL
APPLICANT
CITY^ STATE
V_~p_
Zq
FAX
NAME
PRIMARY PHONE
PROJECT CONTACT
MAILING ADDRESS
E-MAIL
(The individual to receive and
respond to all correspondence
CITY
STATE
ZIP
FAX
concerning this application)
PROJECT FINANCING
NAME
OWNER -FINANCED
Required value of $5,000 or more
(RCW 19.27095)
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal Iaws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of th a plication.
'161 ' d -
SIGNATURE: DATE 9'11611d-
-
PRINT NAME: (A -
PRINT
Bulletin # 100 - January 1, 2013 Page I of 3 UHandoutsTermit Application