HomeMy WebLinkAbout15-105257Mechanical
� C ty Federal Way
Community & Econ. Dev: Services Permit #: 15 -105257 -00 -;ME
33325 8th Ave S
W
Federal Way, WA 98003
Inspection Request Li
Ph: (253) 835-2607 Fax: (353) 835-2809 'FILEQuesne: (253 ) 835-3050 ,
Project Name: MOORE
Project Address: 33807 38TH PL SW Parcel Number: 921150 0270
Project Description: Install 2 1/2 ton A/C and replace existing gas furnace
Owner
TERRY MOORE
A Ian icant
JAIMIE HOW
Contractor
BRENNAN HEATING & A/C LLC (GENERAL
KAYHNNA MOORE
BRENNAN HEATING & A/C
01)
33807 38TH PL SW
4601 S 134TH PL
BRENNHA971R9 (12/29/15)
FEDERAL WAY WA 98023-2944
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Air Conditioners - Stand Alone Un 1 Furnaces ......................................... 1
PERMIT EXPIRES Tuesday, April 12, 2016
Permit Issued on Thursday, October 15, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
an ed W
Owner or agent: ONfl=—Date:
d
CITY OF '
Federal Way
THIS CARD IS TOIN ON-SITE
Construction In ection Record •
INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 15 -105257 -00 -ME Address: 33807 38TH PL SW
Project: TERRY MOORE FEDERAL WAY, WA 98023-2944
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑
Mechanical Rough -in (4165)El
Gas Piping ( 125)
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Xh'jDate
❑
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date