Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout15-102452I Ity of Egehical
Community & Eoon. Uev. Services Permit #: 15 -102452 -00 -EL
33325:M Ave S
Federal Way, WA 98003 Ins ection Re uest Line:
Ph: (253) 835-2607 Fax: (253) 835-2609 p q (253) 835-3050
1:1L Lz
Project Name: DRAKE, E.
Project Address: 31001 39TH AVE SW Parcel Number: 758200 0120
Project Description: Installation of a 8.960 kw new solar panel photovoltaic system
Owner
ELIZABETH DRAKE
Apply
A & R SOLAR (GENERAL)
Contractor
A & R SOLAR (ELECTRICAL)
31001 39TH PL SW
PO BOX 30513
RSOLAS'903JM (5/20/16)
FEDERAL WAY WA 98023-2179
SEATTLE WA 98113
2444 1ST AVE S
SEATTLE WA 98134
Additional Permit Information
Is this an Online or O.T.C. application?................No
Service greater than 999 Amps? .............................No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 amps (F 1
Is Use Educational or Institutional?.......................No
PERMIT EXPIRES Sunday, December 20, 2015
Permit Issued on Tuesday, June 23, 2015
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date: Z
LFINALED-.,
CITY OF 4
Federal Way
PERMIT #:
15 -102452 -00 -EL
THIS CARD IS TOrecfion
ON-SITE _
Construction In Record
INSPECTION REQUE3) 835-3050
Address: 31001 39TH AVE SW
Project: ELIZABETH DRAKE FEDERAL WAY, WA 98023-2179
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
LIFER Ground (4295)Ditch
cover (4030)
Temporary Power (4275)
Slab/Concrete Floor (4255)
1:1Approved
Approved
By
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
Temporary Power (4275)
1:1Approved
Service (4235)
By
Approved
By
Approved
By
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
roved
Date __ l
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date
CITY OF 4A
Federal Way
RBCMM
MAY 21 2015 ELECTRICAL
CITY OF FEDERAL WAY
cOs PERMIT APPLI ATION
� 5
PERMIT NUMBER is _ l O Z -4 S 7—_ 00 Lc l
SITE ADDRESS: 31001 39th Ave SW, Federal Way, WA 98023
SUITE/UNIT/SPACE N
POJECT VALUATION � �� �
ASSESS T jrCEL N O © - O
CURRENT/PROPOSED USE
PROJECT NAME
(Tenant or Homeowner Last Name)
Drake, Elizabeth
8.960 kW Grid tied Photovoltaic system installed on roof
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
PROPERTY OWNER
NAME
Elizabeth Drake
PRIMARY PHONE
( 253 )347 9658
MAILING ADDRESS
E-MAIL
31001 39th Ave SW
lizidrake@mac.com
CITY
STATE
ZIP
FAX
Federal Way
WA
98023
( ) -
NAME
A&R Solar
PRIMARY PHONE
( 206) 707 _9937
MAILING ADDRESS
E-MAIL
ELECTRICAL
2444 1st Ave S
evan@a-rsolar.com
CITY
STATE
ZIP
FAX
CONTRACTOR
Seattle
WA
98134
WA STATE CONTRACTOR'S LICENSE 8 EXPIRATION DATE
RSOLAS"903JM 0520 a
FEDERAL WAY BUSINESS LICENSE M
20-15-102370-00-131-
0-15-102370-00-BLNAME
NAME
PRIMARY PHONE
Jesse Anderson
( 206 ) 707 _ 9937
APPLICANT
MAILING ADDRESS
E-MAIL
2444 1 st Ave S
info@a-rsolar.com
CITY
STATE
ZIP
FAX
Seattle
IWA
98134
PROJECT CONTACT
NAME
Evan Manderbach
PRIMARY PHONE
(206 ) 743 _ 4634
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I cert(fy that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I cert(fy that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of this application.
SIGNATURE:
PRINT NAME: Jesse Anderson
5/19/2015
Bulletin #160 — January 1, 2013 Page 1 of 2 k:\Handouts\Electrical Permit Application