HomeMy WebLinkAboutAG 19-104 - Talakai Construction RETURN TO: PW ADMIN EXT: 2700 ID#: 3(e2
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
ORIGINATING DEPT/DIv: PUBLIC WORKS/STRF.FTS
ORIGINATING STAFF PERSON:JOHN MULKEY EXT:2722 3. DATE REQ.BY:ASAP
�. TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
❑ CONTRACT AMENDMENT(AG#): 19-104 ❑ INTERLOCAL
❑ OTHER CHANGE ORDER#I
G. PROJECT NAME:BROOK LAKE CENTER CONNECTOR
i, NAME OF CONTRACTOR:T_ALAKAI CONSTRUCTION,LLC.
ADDRESS:9236 26T"AVENUE SW,SEATTLE,WA 98106 TELEPHONE(206)551-7076
E-MAIL: TALAKAIC ONCa',HQT.MAIL.COM FAX:
SIGNATURE NAME:DANA TALAKAI TITLE:MEMBER/OFFICE ADMIN
i. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#19-102472 BL,EXP. 12/31/19 UBI# 603066669 ,EXP. 11/30/19
'. TERM: COMMENCEMENT DATE:JUNE 13, 2019 COMPLETION DATE:UPON COMPLETION
�. TOTAL COMPENSATION:$0.00/281,231.50 TOTAL (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $ 0
IS SALES TAX OWED: ❑YES ❑NO IF YES,$ PAID BY: ❑CONTRACTOR Cl CITY
RETAINAGE: RETAINAGE AMOUNT: $0L00/14.06i.5$TOTAL ❑RETAINAGE AGREEMENT(SEL CONTRACT) OR ❑RETAINAGE BOND PROVIDED
❑ PURCHASING: PLEASE CHARGE To:304-4100-284-595-31-650
�. DOCUNT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED
DC7 PROJECT MANAGER
❑/DIVISION MANAGERet—
r
i❑ DEPUTY DIRECTOR Y Y l
.DIRECTOR
❑ RISK MANAGEMENT (IF APPLICABLE)
yrLAW DEPT d I
0. COUNCIL APPROVAL(IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING2 3 // ((
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: DATE REC'D:
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDERINOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.
INITIAL/DATE SIGNED
N SIGNATORY( RR
CITY CLERK
l
6 ASSIGNED AG# AG#
❑ SIGNED COPY RETURNED DATE SENT:
14R.ETURN ONE ORIGINAL
:OMMENTS:
;XECUTE 1 ORIGINALS.
4/2017
CITY OF FEDERAL WAY
CONTRACT CHANGE ORDER AGREEMENT
260 AG 19-104 1
PROJECT NUMBER AGREEMENT CHANGE ORDER NUMBER EFFECTIVE DATE
NUMBER
Brook Lake Center Connector Talakai Construction, LLC
PROJECT TITLE CONTRACTOR
SUMMARY OF PROPOSED CHANGES:
This Change Order covers the work changes summarized below:
1. RETAINAGE VVITHOLDING
This change order changes the method of withholding form the original Exhibit C Contractor's
Retainage Option, from Option 2, with a bank holding the retainage to Option 1, with the City
holding the retainage, per the attached revised Exhibit C.
The time provided for completion in the Contract is
® Unchanged
❑ Increased by_Working Day(s)
Ll Decreased by_Working Day(s)
This Document shall become an Amendment to the Contract and all provisions of the
Contract not amended herein will apply to this Change Order.
Will this change affect expiration or extent of Insurance coverage? ❑ Yes ❑ No
If"Yes" Will the Policies Be Extended? ❑ Yes ❑ No
THESE ARE MODIFICATIONS TO UNIT PRICES INVOLVED IN THIS CHANGE:
PREVIOUS REVISED
ITEM NO. ITEM QUANTITY UNIT PRICE UNIT PRICE ADD OR DELETE
N/A
THESE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE:
ITEM NO. ITEM QUANTITY UNIT PRICE ADD OR DELETE
N/A
TOTAL NET CONTRACT: NCREASE $0 00 DECREASE$
DEPARTMENT RECAP TO DATE:
ORIGINAL CONTRACT AMOUNT $ 281.321.50
PREVIOUS CHANGE ORDERS 0.00
THIS CHANGE ORDER $ 0.00
*ADJUSTMENTS $ 0.00
NEW CONTRACT AMOUNT $ 251,321,50
ADJUSTMENTS
CHANGE ORDER ESTIMATE IS HEREBY ❑ INCREASED $ 0,00
❑ DECREASED,$ 0,40
Change Order No.7 continued 2 of 2
PAY THIS ADJUSTED AMOUNT $ 0.00
STATEMENT:
Payment for the above work will be in accordance with applicable portions of the standard
specifications, and with the understanding that all materials, workmanship and measurements shall
be in accordance with the provisions of the standard specifications, the contract plans, and the special
provisions governing the types of construction.
�/-,`�'
ONTRACTOR'S SIdNATURE DATE
e -moi 9 jz31 A
EJ WA H, P.E. DATE
PUBLIC WORKS DIRECTOR
RETURN TO: PW ADMIN EXT: 2700 ID#: 359 Gl
CITY OF FEDERAL WAY LAW DEPARTMENT(ROUTING FORM
ORIGINATING DEPT/DIv: PUBLIC WORKS/STREETS
;. ORIGINATING STAFF PERSON:JOHN MULKEY EXT:2722 3. DATE REQ.BY:ASAP _
TYPE OF DOCUMENT(CHECK ONE):
❑ CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP,RFQ)
❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS)
❑ ORDINANCE ❑ RESOLUTION
❑ CONTRACT AMENDMENT(AG#): ❑ INTERLOCAL
❑ OTHER AG#19-104-RETAINAGE BANK ACCEPTANCE AGREEMENT
I. PROJECT NAME:BROOK LAKE CENTER CONNECTOR
i. NAME OF CONTRACTOR:TALAKAI CONSTRUCTION.LLC.
ADDRESS:9236 26T"AVENUE SW SEATTLE.WA 98106 TELEPHONE(206)551-7076
E-MAIL: TALAKAICON(a-)HOTMAIL.COM FAX:
SIGNATURE NAME:DANA TALAKAI— TITLE:MEMBER/OFFICE ADMIN
i. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE#19-102472 BL,EXP. 12/31/19 UBI# 603066669 ,EXP. 11/30/19
'. TERM: COMMENCEMENT DATE:JUNE 13, 2019 COMPLETION DATE:UPON COMPLETION
�. TOTAL COMPENSATION:$281,231.50 (INCLUDE EXPENSES AND SALES TAX,IF ANY)
(IF CALCULATED ON HOURLY LABOR CHARGE-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $ 0
IS SALES TAX OWED: ❑YES ❑NO IF YES,$ PAID BY' ❑CONTRACTOR ❑CITY
RETAINAGE: RETAINAGE AMOUNT: $14.061.58 ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED
❑ PURCHASING: PLEASE CHARGE To:304-4100-284-595-31-650
F, DOCUMENT/CONTRACT REVIEW INM / ATE RE W D INITIAL/DATE APPROVED
PROJECT MANAGERtl
DIVISION MANAGER J
DEPUTY DIRECTOR
DIRECTOR g
❑ RISK MANAGEMENT (IF APPLICABLE)
`P'LAW DEPT
0. COUNCIL APPROVAL(IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE:
1. CONTRACT SIGNATURE ROUTING
❑ SENT TO VENDOR/CONTRACTOR DATE SENT: DATE REC'D:
❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS
❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR I MONTH PRIOR TO EXPIRATION DATE
(INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
INITIAL/DATE SIGNED
❑ FINANCE DEPARTMENT
AW DEPT
�IGNATORY(MAYOR OR DIRECTOR) Z
ITY CLERK
• Ass IGNED AG# AG –104 A�7
❑ SIGNED COPY RETURNED DATE SENT: 1• Itl!ll
❑RETURN ONE ORIGINAL
:OMMENTS:
;XECUTE° 1 ORIGINALS.
4/2017 _... . -... .._
RETAINAGE BANK ACCEPTANCE AGREEMENT
The undersigned financial institution("Bank")hereby accepts that certain Contractor's Retainage
Option provided to the City of Federal Way("City")by Talakai Construction,LLC ("Contractor")dated
8/7/19 a copy of which is attached hereto as Exhibit "A" and incorporated by this reference,
providing Contractor's instructions to invest retainage equal to five percent(5%) of the total contract
amount("Retainage Funds").
The Retainage Funds shall be on deposit at the Key Bank, White Center branch,under
account no. 471393009553 ("Account"),payment of which shall be made upon demand by the
City with no other conditions of release of the Account.The Bank agrees to hold the Account,without
deduction or withdrawal, until it receives a written notice from the City authorizing the release of the
Retainage Funds to either the City and/or the Contractor. The Bank acknowledges that it has no duty to
evaluate any dispute which may exist between the City and Contractor regarding the Account and shall
not interplead or in any manner delay payment of the Account to the City,upon its demand. The Bank
hereby agrees to bind itself, and its heirs, executors, administrators and assigns,jointly and severally.
BY:
Signal c of!luthtarired r;onnel, (To be notarized below)
ITS: _ t CY. 117
1.`,JP )RFSS)f
Sr
(PHONE)
STATE OF WASHINGTON )
COUNTY OF ` L '� .._ ) ss.
On this day personally appeared before me Dana Gervais Talakai , to me
known to be the Member of Talakai Construction, LLC the corporation
that executed the within and foregoing instrument,and acknowledged the said instrument to be the free
and voluntary act and deed of said corporation,for the uses and purposes therein mentioned,and on oath
stated that he/she was authorized to execute said instrument and that the seal affixed, if any, is the
corporate seal of said corporation. q
GIVEN in.% liand and of�fiv:ial seal hereto of ,:ed this3 day of 4-UA-7) . 20) 1
,1.11511...... /
rTQC!s `' � L
� ......�..� _ _ _
......... ic, s itit ed Name of Notary:--7—r-i,n
� s1°"ESA _ Notary Public in and for the State a % 'asliin-wn
c°NOTAL y,N My commission expires: r 0 -
xtr:3 ry
f�'rcofi WAS�r�ON, 3/18
�I f I 1 1 1 10"ti
CITY OF FEDERAL WAY:
E.J. th.Public Works Director
333? Ave S
Federal Way,Washington 98003-6325
ATTEST:
qwft� A A
Sthahie Courtney, CMC(I Clerk
APPROVED AS TO FORM:
-��646��
J. Ryan Call, City Attorney
EX1-1 B 1
2
3/18
RETURN TO: PW ADMIN EXT: 2700 ID #: � 1 362,1
621
CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM
. ORIGINATING DEPT/DIv: PUBLIC WORKS /CAPITAL P Ri" (FCTS
ORIGINATING STAFF PERSON: JOHN MULKEY EXT: 2722 3. DATE REQ. BY:ASAP
TYPE OF DOCUMENT (CHECK ONE):
1-11 CON I IC ACTOR SE -€_E 1 ]UN DO( L Al ENT (E.GRFB RFP, RFQ) 00 9
' PLIIi1. IC Wc)RI S CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT
❑ PROFESSIONAI SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT
❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/ CDBG
❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS)
Cl ORDINANCE ❑ RESOLUTION
❑ CONTRACT AMENDMENT (AG#):_ ❑ INTERLOCAL
❑ OTHER
I. PROJECT NAME: BROOK LAKE CENTER CONNECTOR
NAME OF CONTRACTOR:
ADDRESS: L
E-MAIL: `-rC I Cti1:� M'I
SIGNATURE NAME:
G�
TELEP:
FAX:_
TITLE:
ig
EXHIBITS AND ATTACHMENTS: ❑ SCOPE, WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER
REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS
CFW LICENSE # BL, EXP. 12/3 /n1// j q UBI #00 �EXP.ILIO/ t9
(guTERM. lYl.L� COMMENCEMENT DATE: _ 4 COMPLETION DATE:
TOTAL COMPENSATION: $ /1, ! v (INCLUDE EXPENSES AND SALES TAX, IF ANY
(IF CALCULATED ON HOURLY LABOR CHARGE - ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES)
REIMBURSABLE EXPENSE: ❑ YES ❑ NO IF YES, MAXIMUM DOLLAR AMOUNT: $
IS SALES TAX OWED: ❑ YES
RETAINAGE: RETAINAGE AMOUNT
PURCHASING: PLEASE CHARGE TO:
o Nn IF VFS_ $ PAID BY: ❑ CONTRACTOR ❑ CITY
jk.�� �{(Ij , �, RETAINAGE AGREEMENT (SEE CONTRACT) OR ❑ RETAINAGE BOND PROVIDED
1. DOCUMENT / CONTRACT REVIEW
M PROJECT MANAGER
ic DIVISION MANAGER
1,n DEPUTY DIRECTOR
y DIRECTOR
❑ RISK MANAGEMENT (IF APPLICABLE
INITIAL-y3ALE REVIEWED INITIAL DANE APPROVED
-L12— y 0 A
r c I
LAW DEPT �&W q1l 7114
` I lY
0. COUNCIL APPROVAL (IF APPLICABLE COMMITTEE APPROVAL DATE; COUNCIL APPROVAL DATE:
lt
A1. CONTR ICT SI(;N:Vl R1'. RO UTI NG
fI RACTOR SCVTTU\'[ VD€:'Oti F� DATERECD: !�1 01
:1 1 ACC Sl(- — 1F URF. I l it [(11,1 fY. INSUR l'NC F t'E:l� l ]) IC'ATE, LICENSES, EXHIBITS`s�lxs-
'` y( P�E;1TC FITC I -R[]31(' RENIINDER,'NOTIFICAIiO1 FOR 1 MONTI•I PRIORTO EXPIRATION DATE
(INCLUDE DEPT. SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.)
DATF SIGNED
-I, LAW DEPT
S 16 N, A ] 010' (MAYOR OR DIRECTOR)
r
CITY CLERK
`Ass IG N ED AG # AG#
DATE SENT: I
,RETURN ORIGINALS
:OMMENTS:
:XECUTE" 3"ORIGINALS.
*-TV:3 ;i Nod �Jk-eJ UthA. wVj sew- 4r JPUi o v
17
41k
Feder-diCITY o. Way
ORIGINAL CONTRACT #1 OF 3
CITY CLERK
BID AND CONTRACT DOCUMENTS
I_1 FAI/6
SPECIFICA TIONS
OA
BROOK LAKE CENTER CONNECTOR
RFS # 19-004
City of Federal Way
Public Works Department
33325 Eighth Avenue South
Federal Way, WA 98003
Mailing Address:
City of Federal Way
Public Works Department
Federal Way, WA 98003-8325
BID AND CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
BROOK LAKE CENTER CONNECTOR
Project # 284
Bids Accepted Until 10:00 a.m., March 22, 2019
Bids Opened 10:10 a.m., March 22, 2019
AT:
City of Federal Way
Hylebos Conference Room
33325 Eighth Avenue South
Federal Way, WA 98003
Prepared By:
City of Federal Way
Public Works Department
CITY OF FEDERAL WAY, WASHINGTON
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 2 2019
RFB ver. 5-18
TABLE OF CONTENTS
PAGE
PUBLIC NOTICE — REQUEST FOR BIDS.......................................................................4
BIDDER'S CHECKLIST.................................................................................................6
SECTION 1: INSTRUCTIONS TO BIDDERS...................................................................8
SECTION 2: GENERAL CONTRACTUAL TERMS AND CONDITIONS ............................ 15
NO BID RESPONSE FORM (Attachment A)............................................................... 21
BIDFORM (Attachment B)....................................................................................... 22
BID SCHEDULE (Attachment C)................................................................................ 24
BID SIGNATURE PAGE (Attachment D).................................................................... 25
BID BOND FORM (Attachment E)............................................................................. 26
SUBCONTRACTOR LIST (Attachment F)................................................................... 27
COMBINED AFFIDAVIT AND CERTIFICATION FORM (Attachment G) ...................... 28
CONTRACTOR'S COMPLIANCE STATEMENT (Attachment H) .................................... 30
CONTRACTOR CERTIFICATION — WAGE LAW COMPLIANCE (Attachment I) .......... 31
PUBLIC WORKS CONTRACT (Attachment 3)............................................................. 32
(with Exhibits A—H and Appendices as attached)
Exhibit A Notice of Completion
Exhibit B Contract Change Order Agreement
Exhibit C Contractor's Retainage Option
Exhibit D Retainage Bond to the City of Federal Way
Exhibit E Notice to Labor Unions or Other Employment Organizations Nondiscrimination
in Employment
Exhibit F Certificate(s) of Insurance
Exhibit G Performance/Payment Bond
Exhibit H Title VI Assurances
SPECIAL PROVISIONS............................................................................... BLUE PAGES
STANDARD PLANS AND DETAILS........................................................... WHITE PAGES
PREVAILING WAGES AND BENEFIT CODE KEY ....................................YELLOW PAGES
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 3 2019
RFB ver. 5-18
CITY OF FEDERAL WAY
REQUEST FOR BIDS
BROOK LAKE CENTER CONNECTOR RFB # 19-044
SUBMITTAL OF SEALED BIDS:
Notice is hereby given that the City of Federal Way, Washington, will receive sealed bids through
March 22, 2019, at 10:00 a.m., at the City Hall Purchasing Office or by US Mail at City of Federal
Way, Purchasing Office, 33325 8th Avenue South, Federal Way, Washington 98003. Proposals
received after 10:00 a.m. on said date will not be considered.
PRE-BID MEETING:
An informational meeting for interested contractors will be held March Monday, March 18, 2019 at
10:00 a.m. at the Project site located at 850 S 356th Street, Federal Way, Washington, to discuss
the work to be performed. All prospective bidders are strongly encouraged to attend.
BID OPENING:
All bids will be opened and read publicly aloud at 10:10 a.m. on Friday March 22, 2019, at the
Hylebos Conference Room, 33325 8th Avenue South, Federal Way, Washington, for this RFB.
All bid proposals shall be accompanied by a bid deposit by a cashier's or certified check, or Bid
Bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the
successful bidder fail to enter into a contract and furnish satisfactory Performance Bond within the
time stated in the specifications, the bid deposit or bond shall be forfeited to the City of Federal
Way.
DESCRIPTION OF WORK:
This project shall consist of:
Construct a boardwalk made of field built and pre -assembled sections connecting the existing
boardwalk path within the Hylebos Wetlands Park to the Brook Lake Center, including all materials,
and equipment necessary to perform the Work.
The Contractor shall complete all work within 30 working days.
The bidder is urged to check the plans and contract provisions carefully.
All bid proposals shall be in accordance with the Instructions to Bidders and all other contract
documents. Any questions concerning the description of the work contained in the contract
documents must be directed to John Mulkey, P.E., Street System Project Engineer, by email at
john.mulkey@cityoffederalway.com, or by letter addressed to John Mulkey, P.E., Street Systems
Project Engineer. The questions must be received by the City on or before Tuesday, March 19,
2019 to allow a written reply to reach all prospective Bidders before the submission of their bids.
BID DOCUMENTS:
Free -of -charge access to project bid documents (plans, specifications, addenda, and Bidders List) is
provided to Prime Bidders, Subcontractors, and Vendors by going to www.bxwa.com and clicking
on "Posted Projects," 'Public Works," and "City of Federal Way." This online plan room provides
Bidders with fully usable online documents with the ability to: download, view, print, order
full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off tool.
It is recommended that Bidders "Register" in order to receive automatic e-mail notification of future
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 4 2019
RFB ver. 5-18
addenda and to place themselves on the "Self -Registered Bidders List." Bidders that do not register
will not be automatically notified of addenda and will need to periodically check the on-line plan for
addenda issued on this project. Contact Builders Exchange of Washington at (425) 258-1303
should you require assistance with access or registration.
An informational copy of plans, specifications, and addenda are also available for viewing only at
the Public Works Department, Federal Way City Hall, 33325 8th Avenue South, Federal Way,
Washington.
The City, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d
to 2000d-4 and Title 49 C.F.R., Department of Transportation, Subtitle A, Office of the Secretary,
Part 21, Nondiscrimination in Federally -assisted programs of the Department of Transportation
issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, disadvantaged business enterprises as
defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this
invitation and will not be discriminated against on the grounds of race, color, national origin, or sex
in consideration for an award. The City encourages minority and women -owned firms to submit
bids consistent with the City's policy to ensure that such firms are afforded the maximum
practicable opportunity to compete for and obtain public contracts.
The Contractor will be required to comply with all local, State, and Federal laws and regulations
pertaining to equal employment opportunities.
The City anticipates awarding this project to the successful bidder and intends to give Notice to
Proceed as soon as the Contract and all required associated documents are executed in full.
Regardless of the date of award or Notice to Proceed, the Contractor must complete all work under
this project by August 31 , 2019.
RESERVATION OF RIGHTS:
The City of Federal Way reserves the right to reject any and all bids, waive any informalities or
minor irregularities in the bidding, and determine which bid or bidder meets the criteria set forth in
the bid documents. No bidder may withdraw his or her bid after the hour set for the opening
thereof unless the award is delayed for a period exceeding thirty (30) days.
Dated the 7th day of March, 2019.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 5 2019
RFB ver. 5-18
BIDDER'S CHECKLIST
The bidder's attention is especially called to the following forms, which must be executed in full as
required and submitted as part of the bid. Failure to comply shall result in rejection of any bid not
so complying.
❑ Bid Form (Attachment B)
The Bid Form shall be completed and fully executed, including filling in the total bid amount.
❑ Bid Schedule (Attachment C)
The unit prices shall be set forth in the space provided.
❑f Bid Signature Page (Attachment D)
The Bid Signature Page shall be filled in and fully executed by the bidder.
❑ Bid Bond Form (Attachment E)
This form is to be executed by the bidder and the surety company unless a certified check is
submitted with the bid. The amount of this bond or certified check shall not be less than five
percent (5%) of the total bid amount and shall be shown in both words and figures.
❑ Subcontractor List (Attachment F)
The Subcontractor List shall be filled in by the bidder. (This section may/may not apply)
❑ Combined Affidavit and Certification Form (Attachment G)
This form must be subscribed to and sworn before a Notary Public and notarized.
Q Contractor's Com fiance 'Statement (Attachment H)
The Contractor's Compliance Statement shall be filled in and fully executed by the bidder.
❑ CONTRACTOR CERTIFICATION! — WAGE LAW COMPLIANCE (Attachment I)
This form must be filled in and fully executed by the bidder.
Contractor's Certificate of registration
The bidder shall provide a copy of Contractor's current registration with the State of
Washington.
❑ Contractor's State Identification Numbers
The bidder shall provide a copy of Contractor's current state unified business identifier
number and, as applicable, an employment security department number and state excise
tax registration number.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 6 2019
RFB ver. 5-18
SUCCESSFUL BIDDER'S CHECKLIST
The following documents are to be executed and delivered to the City within ten (10) calendar days
after the Bid is awarded:
❑ Public WorksContract (Attachment ))
The successful bidder will fully execute and deliver to the City the Brook Lake Cetner
Connector Public Works Contract ("Contract's from these Bid Documents.
❑ Contractor's Retainage Option (Exhibit C)
The successful bidder will fully execute and deliver to the City the Contractor's Retainage
Option.
❑ Contractor's Retainage Bound (Exhibit D) — If Applicable
If the retainage bond option is chosen, then the successful bidder will fully execute and
deliver to the City the Contractor's Retainage Bond.
Notice to Labor Unions or Other Employment 0[ganizatiions Nondiscrimination in
EmRloyment (Exhibit E)
If this applies, the successful bidder will sign and post copies of this Notice in conspicuous
places available to employees or applicant for employment.
❑ Certificate of Insurance (Exhibit F)
The successful bidder will provide a Certificate of Insurance evidencing the insurance
requirement set forth in the Contract.
❑ Performance/ Payment Bond (Exhibit G)
The successful bidder will provide a fully executed Performance/Payment Bond as
appropriate.
Business License
The successful bidder will provide a copy of a current Business License with the City of
Federal Way.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 7 2019
RFB ver. 5-18
SECTION 1: INSTRUCTIONS TO BIDDERS
1-1 Time and Place for Submission and Opening of Bids
Sealed bids must be submitted by 10:00 a.m. local time on March 22, 2019, to the
Purchasing Office of the City of Federal Way (the "City', located on the second floor of City
Hall, or received by US Mail at City of Federal Way, Purchasing Office, 33325 8th Avenue S,
Federal Way, Washington, 98003-6325, and will be publicly opened and read aloud in City
Hall Council Chambers on March 22, 2019, at 10:10 a.m. local time.
The City's Purchasing Coordinator must receive the sealed bid before the time and date
specified in order to be considered. Telex or facsimile bids will not be accepted. The bidder
accepts all risks of late delivery of mailed bids or of misdelivery regardless of fault. Late bids
will be returned unopened.
If, after reviewing this document the bidder chooses not to submit a bid, the bidder may
complete and return the "No Bid Response Form" provided as Attachment "A" by the date
and time indicated above.
1-2 Bid Form
Bids shall be made on the "Bid Form" (Attachment "B') issued by the City as part of these
contract documents, without reservation or amendment. Bids must be typewritten or printed
in ink. Upon completion, the Bid Form and the bid bond or certified check and any
requested information shall be placed in a sealed envelope. On the outside of the envelope,
place the bid name, bid number and the time bids are due.
1-3 Bid Signature
All bids shall give the total bid price and shall be signed in ink by the bidder or their
authorized representative, with the address. If the bid is made by an individual, the name,
signature, and address must be shown. If the bid is made by a firm or partnership, the
name and address of the firm or partnership and the signature of at least one of the general
partners must be shown. If the bid is made by a corporation, the bid shall show the title of
the person authorized to sign on behalf of the corporation, his or her title and the address.
The City reserves the right to request documentation showing the authority of the individual
signing the bid to execute contracts on behalf of anyone, or any entity, other than
himself/herself. Refusal to provide such information upon request may cause the bid to be
rejected as nonresponsive.
1-4 Bid Withdrawal Due to Error
Bids may not be withdrawn due to a claim of error in a bid unless written notice of such
claim and supporting evidence for such claim including cost breakdown sheets are delivered
to the City within forty-eight (48) hours prior to the opening of bids.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 8 2019
RFB ver. 5-18
1-5 Modification of Bid
A modification of a bid already received will be considered only if the modification is
received prior to the time announced for bid opening. All modifications shall be made in
writing, executed, and submitted in the same form and manner as the original bid.
1-6 Examination, of Bid and Contract Documents — Bidder Responsibilities
The submission of a bid shall constitute an acknowledgment upon which the City may rely
that the bidder has thoroughly examined and is familiar with the bid and contract
documents and has reviewed and inspected all applicable federal, state and local statutes,
regulations, ordinances and resolutions dealing with or related to the equipment and/or
services to be provided herein. The failure or neglect of a bidder to examine such
documents, statutes, regulations, ordinances or resolutions shall in no way relieve the
bidder from any obligations with respect to the bidder's bid or the contract documents. No
claim for additional compensation will be allowed which is based upon a lack of knowledge
of any contract documents, statutes, regulations, ordinances or resolutions. Bidders shall
visit delivery and service locations(s) as required. Bidders shall become familiar with and
verify any environmental factors, which may impact current or future prices for this
requirement.
1-7 Interpretation of Bid and Contract Documents
No oral interpretations will be made to any bidder as to the meaning of the bid or contract
documents and no oral communications will be binding upon the City. Any questions
concerning the description of the work contained in the contract documents must be
directed to John Mulkey, P.E., Street Systems Project Engineer, by email at
john.mulkey@cityoffedealway.com, or by letter addressed to John Mulkey, P.E., Street
Systems Project Engineer. The questions must be received by the City on or before March
19, 2019 to allow a written reply to reach all prospective Bidders before the submission of
their bids. Any interpretation deemed necessary by the City will be in the form of an
addendum to the bid documents and when issued will be sent as promptly as is practical to
all parties to whom the bid documents have been issued. All such addenda shall become
part of the bid.
1-8 Addenda
Each bid shall include acknowledgment of receipt and review of all addenda issued during
the bidding period on the Bid Form.
1-9 Bid Price
The bid price shall include everything necessary for the completion of the contract including,
but not limited to, furnishing all materials, equipment, tools, freight charges, facilities and all
management, superintendence, labor and service, except as may be provided otherwise in
the contract documents. All Washington State sales tax and all other government
taxes, assessments and charges shall be included in the various Bid item prices
as required by law. The offer shall remain in effect ninety (90) days after the bid opening.
In the event of a discrepancy between a unit price and an extended amount and/or the total
price, the unit price will govern and the extended amount and/or total price will be
corrected accordingly; however, downward correction of a bid, which would displace the
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 9 2019
RFB ver. 5-18
apparent low bidder, will only be permitted if the error made and the intended bid price can
be determined solely from the bid documents.
1-10 Postponement of Bid Opening
The City reserves the right to postpone the date and time for the opening of bids by
announcing such postponement at any time prior to the date and time announced in these
documents.
1-11 Rejection of Bids
A. The City reserves the right to reject any bid for any reason including, but not limited to,
the following: any bid which is incomplete, obscure, irregular or lacking necessary detail
and specificity; any bid which omits a price on any one or more items on the Bid Form
and Bid Schedule; any bid in which prices are unbalanced in the opinion of the City; any
bid accompanied by insufficient or irregular bid bond; any bid from bidders who (in the
sole judgment of the City) lack the qualifications and/or responsibility necessary to
perform the work after considering the elements in Section 1-14.B; any bid for which a
bidder fails or neglects to complete and submit any qualifications information within the
time specified by the City and as may be otherwise required herein; and, any bid
submitted by a bidder who is not registered or licensed as may be required by the laws
of the State of Washington.
B. The city further reserves the right to reject any portion of any bid and/or to reject all
bids. In consideration for the City's review and evaluation of its bid, the bidder waives
and releases any claims against the City arising from any rejection of any or all bids.
1-12 Alterations to Documents Prohibited
Any addition, limitation or provision attached to the bid may render it informal or
nonresponsive and cause its rejection. Alteration by erasure or interlineations must be
explained or noted in the bid form over the signature of the bidder. No oral, telegraphic or
telephonic bids or modifications will be considered.
1-13 Disqualification of Bidder
If, in the opinion of the City, there is reason to believe that collusion exists among bidders,
none of the bids of the participants in such collusion will be considered. All bidders are
required to submit the Affidavit of Non -Collusion (Attachment G) with their bids.
1-14 Evaluation of Bids
It is the intent of City to award a contract to the lowest responsive bid by a responsible
bidder as evaluated by the City. The bidder may be required by the City to submit
documentation demonstrating compliance with the criteria.
A. Responsiveness — The bidder must complete all required forms and bid documents and
provide all required and requested information. Refusal to provide such information may
cause the bid to be rejected. The City will consider all the material submitted by the
bidder to determine whether the bid is in compliance with the bid terms and documents
and responsive to the requested work.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 10 2019
RFB ver. 5-18
B. Responsibility — The City will consider all the material submitted by the bidder, and other
evidence it may obtain including information from previous project owners, to determine
whether the bidder is responsible. The bidder must meet the following bidder
responsibility criteria and supplemental bidder responsibility criteria to be considered a
responsible bidder:
1. Mandatory Bidder Responsibility Criteria
a. Have a current certificate of registration as a contractor in compliance with
Chapter 18.27 RCW, which must have been in effect at the time of bid
submittal;
b. Have a current Washington Unified Business Identifier (UBI) number;
C. If applicable:
L Have Industrial Insurance (workers' compensation) coverage for the
bidder's employees working in Washington, as required in Title 51
RCW;
ii. Have a Washington Employment Security Department number, as
required in Title 50 RCW;
iii. Have a Washington Department of Revenue state excise tax registration
number, as required in Title 82 RCW;
d. Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065(3).
e. Within a three-year period immediately preceding the date of the bid solicitation,
the bidder shall not be a willful violator, as defined in RCW 49.48.082, of any
provision of Chapters 49.46, 49.48, or 49.52 RCW, as determined by a final
and binding citation and notice of assessment issued by the Department of
Labor and Industries or through a civil judgment entered by a court of limited
or general jurisdiction.
2. Supplemental Bidder Responsibility Criteria
a. The bidder shall not have a record of excessive claims filed against the
retainage, payment, or performance bonds for public works projects during
the previous three years, that demonstrate a lack of effective management
by the bidder of making timely and appropriate payments to its
subcontractors, suppliers, and workers, unless there are extenuating
circumstances acceptable to the City.
b. The bidder shall have a reasonable history of successfully completed projects
of a similar size and scope as required by the contract documents for this
project. The City will evaluate whether the projects were "successfully
completed" and of a "similar size and scope."
C. The bidder shall have evidence that it is able to begin and complete the
work, and complete it in a timely fashion.
3. As evidence that the bidder meets the supplemental bidder responsibility criteria in
paragraph (B)(2) above, the apparent low bidder must submit the following
documentation to the City within 48 hours of the bid opening. The City reserves the
right to request such documentation from other bidders also. Refusal to provide such
information upon request may cause the bid to be rejected.
a. The bidder shall submit a list of the public works projects completed within
the previous three years and include for each project the following
information; the owner and contact information for the owner; a list of claims
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 11 2019
RFB ver. 5-18
filed against the retainage, payment, or performance bond for any of the
projects listed; a written explanation of the circumstances surrounding each
claim and the ultimate resolution of the claim.
b. The bidder shall submit a list of projects of similar size and scope to this
project and include information about each project, including the following:
the owner and contact information for the owner; the awarded contract
amount; the final contract amount; a description of the scope of the project
and how the project is similar to this project; the bidder's assessment of its
performance of each project. The information should include any information
regarding performance in the following areas; quality control; safety record;
timeliness of performance; use of skilled personnel; management of
subcontractors; availability of and use of appropriate equipment; compliance
with contract documents; management of submittals process, change orders,
and close-out.
C. The bidder shall furnish acceptable evidence of the bidder's current ability to
perform, such as firm commitments by subcontractors, equipment, supplies
and facilities, and the bidder's ability to obtain the necessary personnel.
d. Under penalty of perjury, the bidder shall provide certification that the bidder
is in compliance with the responsible bidder criteria in section 1-14(B)(2)(d)
and referenced wage payment statutes under RCW 39.04.350(1)(g) and (2).
4. If the City determines the bidder does not meet the bidder responsibility criteria in
paragraph (B)(1) and (B)(2) above and is therefore not a responsible bidder, the City
shall notify the bidder in writing with the reasons for its determination. If the bidder
disagrees with this determination, it may appeal the determination within 24 hours
of receipt of the City's determination by presenting additional information to the City
and meeting the requirements of section 1-20(B). The City will consider the
additional information before issuing its final determination. If the final
determination affirms that the bidder is not responsible, the City will not execute a
contract with any other bidder until two business days after the bidder determined to
be not responsible has received the final determination.
C. Lowest Bid — The lowest bid shall be determined as set forth on the Bid Form.
The acceptance of a bid will be evidenced by a Notice of Award. No other act of the City
shall constitute acceptance of a bid. Within ten (10) days after receipt of Notice of
Award, the bidder whose bid is accepted, shall furnish the required performance bond,
certificate of insurance, execute the contract and perform all other acts required by the
bid and contract documents as conditions precedent to formation of the contract.
1-15 Procedures When Only One Bid is Received
In the event only a single responsive bid is received, the City reserves the right to conduct a
price and/or cost analysis of such bid. The sole bidder shall provide such information, data
and other documentation as deemed necessary by the City for such analysis. The City
reserves the right to reject such bid.
1-16 Bid Documents
Bidders are required to submit with the bid package the following:
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 12 2019
RFB ver. 5-18
A. AttachmentA— No Bid Response Form, if applicable.
B. Attachment B— Bid Form.
C. Attachment C— Bid Schedule.
D. AttachmentD— Bid Signature Page.
E. Attachment E— Bid Bond Form.
F. Attachment F— Subcontractor List, if applicable.
G. Attachment G— Combined Affidavit and Certification Form.
H. Attachment H— Contractor's Compliance Statement.
I. Attachmentl— Contractor Certification — Wage Law Compliance.
1-17 Conflicts of Interest and Noncompetitive Practices
By submitting a bid, the Contractor agrees as follows:
A. Conflict of Interest — That it has no direct or indirect pecuniary or proprietary interest,
that it shall not acquire any interest which conflicts in any manner or degree with the
work, services, equipment or materials required to be performed and/or provided under
this contract and that it shall not employ any person or agent having any such interests.
In the event that the Contractor or its agents, employees or representatives hereafter
acquires such a conflict of interest, it shall immediately disclose such interest to the City
and take action immediately to eliminate the conflict or to withdraw from this contract, as
the City may require.
B. Contingent Fees and Gratuities
That no person or selling agency except bona fide employees or designated agents
or representatives of the Contractor have been employed or retained to solicit or
secure this contract with an agreement or understanding that a commission,
percentage, brokerage, or contingent fee would be paid; and
2. That no gratuities in the form of entertainment, gifts or otherwise, were offered or
given by the Contractor or any of its agents, employees or representatives, to any
official, member or employee of the City or other governmental agency with a view
toward securing this contract or securing favorable treatment with respect to the
awarding or amending, or the making of any determination with respect to the
performance of this contract.
1-18 Bid Security
No bid will be considered unless accompanied by either a cashier's or certified check in an
amount equal to five percent (5%) of the Total Bid Price as indicated on Attachment B, "Bid
Form," or a bid bond in the form of Attachment E or a letter of credit for a like amount. The
check or bond shall be payable to the City; it shall be forfeited as fixed and liquidated
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 13 2019
RFB ver. 5-18
damages in case the bidder fails, neglects or refuses to enter into a contract for the faithful
performance of said work (including the providing of any evidence of insurance and/or
performance bond required herein), in the event the contract is awarded to them, within ten
(10) days after the award is made. If a bid bond is submitted in lieu of a check, it shall be
executed by a corporate surety authorized to transact business in the State of Washington
and in the form prescribed in Attachment E, "Bid Bond." If a letter of credit is offered in lieu
of a check or bidder's bond, it shall be issued as an irrevocable documentary letter of credit
drawn on a banking institution licensed to do business in the State of Washington. The
letter of credit shall include instruction and provisions prescribed in Attachment E, "Bid
Bond." Any questions as to the qualification of the banking institution or instruction shall be
submitted to the City at least ten (10) days prior to the bid submittal date. The check,
bidder's bond or letter of credit shall be attached to the bid form.
The City further reserves the right to hold all bids (and the accompanying bid security) from
the date of the bid opening until the contract and any performance/payment bond are
executed, provided that such period does not exceed ninety (90) days, and each bid shall
remain effective during that period.
1-19 Performance/ Payment Bond
The bidder to whom the City has awarded this Contract will remove the
Performance/Payment Bond (Exhibit G) attached to the Public Works Contract and deliver it
to the City fully executed by the bidder and a surety company in the amount of one hundred
percent (100%) of the contract price as security for the faithful performance of the work
including the payment of all persons furnishing materials and performing labor on the work
and all payments arising from the performance of the work due the State of Washington
pursuant to Titles 50 and 51 RCW. Such bond must be executed by a duly licensed surety
company, which is registered with the Washington State Insurance Commissioner, and the
surety's name shall appear in the current Authorized Insurance Company List in the State of
Washington, published by the Office of the Insurance Commissioner. The scope of the
Performance/Payment Bond (Exhibit G) shall in no way affect or alter the liabilities of the
Contractor to the City under Section 8 "Indemnification" of the Public Works Contract.
The City may require the surety company to appear and qualify itself upon the bond. If, at
any time, the City determines in its sole judgment that the surety company is insufficient,
the City may require the Contractor to furnish additional surety in form and arrangement
satisfactory to the City and in an amount not exceeding that originally required. The
Contractor shall submit a performance bond complying with the requirements of this
paragraph within ten (10) days after the award is made. Payments will not be made on the
Contract until sufficient surety as required is furnished.
1-20 Bid Dispute
A. Any actual or prospective bidder, including sub -contractors and suppliers showing a
substantial economic interest in this contract who is aggrieved in connection with the
solicitation or award of this contract, may protest to the City in accordance with the
procedures set forth herein. Protests based on the specifications or other terms in the
contract documents, which are apparent prior to the date established for submittal of
bids, shall be submitted not later than ten (10) calendar days prior to said date, or shall
be deemed waived. All other protests shall be accepted only from actual bidders and shall
be submitted within five (5) calendar days after the aggrieved person knows or should
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 14 2019
RFB ver. 5-18
have known of the facts and circumstances upon which the protest is based; provided,
however, that in no event shall a protest be considered if all bids are rejected or after the
award of this contract.
B. In order to be considered, a protest shall be in writing and shall include: (1) the name
and address of the aggrieved person; (2) the RFB number and contract title under which
the protest is submitted; (3) a detailed description of the specific grounds for protest
and any supporting documentation; and (4) the specific ruling or relief requested. The
written protest shall be addressed to:
City of Federal Way
33325 8th Avenue South
Federal Way, Washington 98003-6325
Attention: Bid Protest -- Brook Lake Center Connector RFB # 19-004
C. Upon receipt of a written protest, the City will promptly consider the protest. The City
may give notice of the protest and its basis to other persons, including bidders involved
in or affected by the protest; such other persons may be given an opportunity to submit
their views and relevant information. If the protest is not resolved by mutual agreement
of the aggrieved person and the City, the City will promptly issue a decision in writing
stating the reasons for the action taken and informing the aggrieved person of his or her
right to appeal the decision to the Mayor or his or her designee. A copy of the decision
shall be mailed (by certified mail, return receipt requested) or otherwise promptly
furnished to the aggrieved person and any other interested parties who requested a
copy of the decision. The decision will be considered final and conclusive unless
appealed within five (5) calendar days after receipt of the decision to the Mayor or his or
her designee. If the decision is appealed, then the subsequent determination of the
Mayor or his or her designee shall issue within five (5) days of the Mayor's receipt of the
appeal and shall be final and conclusive.
D. Failure to comply with these protest procedures will render a protest untimely or
inadequate and shall result in rejection thereof by the City.
SECTION 2: GENERAL CONTRACTUAL TERMS AND CONDITIONS
2-1 Administration
This contract will be between the City and the Contractor who will be responsible for
delivering all equipment and performing all work and services described herein. The City is
not party to defining the division of work between the Contractor and the Contractor's
subcontractors, if any, and the specifications have not been written with this intent.
The Contractor represents that it has or will obtain all personnel and equipment required to
perform the services hereunder. Such personnel shall not be employees of the City.
The Contractor's performance under this contract will be monitored and reviewed by John
Mulkey, Street System Engineer. Questions by the Contractor regarding interpretation of the
terms, provisions and requirements of this contract shall be addressed to John Mulkey,
Street System Engineer, for response.
2-2 Proof of Compliance with Contract
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 15 2019
RFB ver. 5-18
2-3
2-4
2-5
In order that the City may determine whether the Contractor has complied with the
requirements of the contract documents, the Contractor shall, at any time when requested,
submit to the City properly authenticated documents or other satisfactory proofs as to the
Contractor's compliance with such requirements.
Contract Documents and Precedence
The documents embodying the legally binding obligations between the City and the
Contractor for completion of the work consist of the following: The City's Request for Bid,
Bid Form, Bid Signature Page, Instructions to Bidders, Bid Bond, Brook Lake Center
Connector Contract, General Contractual Terms and Conditions, Contractor's Compliance
Statement, Combined Affidavit and Certification Form, Technical Specifications, Addenda
and Change Orders, and the Brook Lake Center Connector Special Provisions. The contract
documents are intended to be complementary so that what is required by any one of them
shall be as binding as if called for by all of them. In the event of any conflicting provisions
or requirements within the several parts of the contract documents, the City will issue an
interpretation regarding the controlling provision, which interpretation shall be binding.
Charges to Contractor
Charges which are the obligation of the Contractor under the terms of the contract shall be
paid by the Contractor to the City on demand and may be deducted by the City from any
money due or to become due to the Contractor under the contract and may be recovered
by the City from the Contractor or its surety.
Change Orders
The City may, at any time, without notice to the sureties, by written order designated or
indicated to be a change order, make any change in the specifications within the scope of
this contract. Oral orders will not be binding on the City unless confirmed in writing by the
City. Except as provided herein, no order, statement, or conduct of the City will be treated
as a change hereunder or will entitle the Contractor to an equitable adjustment.
If any change hereunder causes an increase or decrease in the Contractor's cost of, or time
required for, the performance or any part of the work under this contract, an equitable
adjustment will be made and the contract modified in writing accordingly. However, no
claim will be allowed for any costs incurred more than five (5) days before the Contractor
gives written notice as required.
If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall,
within five (5) days after receipt of a written change order form from the City or after giving
the City the written notice required above, as the case may be, submit to the City a written
statement setting forth the general nature and monetary extent of such claim; provided the
City, in its sole discretion, may extend such five (5) day submittal period upon request by
the Contractor. The Contractor shall supply such supporting documents and analysis for the
claims as the City may require to determine if the claims and costs have merit.
No claim by the Contractor for an equitable adjustment hereunder will be allowed if asserted
after final payment under this contract.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 16 2019
RFB ver. 5-18
2-6 Work and Materials Omitted
The Contractor shall, when directed in writing by the City, omit work, services and materials
to be furnished under the contract and the value of the omitted work and materials will be
deducted from the contract price and the delivery schedule will be reviewed if appropriate.
The value of the omitted work, services and materials will be a lump sum or unit price, as
mutually agreed upon in writing by the Contractor and the City. If the parties cannot agree
on an appropriate deduction, the City reserves the right to issue a unilateral change order
adjusting the price and the delivery schedule.
2-7 Washington State Sales Tax
The Contractor shall make payment directly to the State for all applicable Washington State
sales taxes and all other governmental taxes, assessments and charges.
2-8 Shipping Charges
'All prices shall include freight. Requests for additional compensation for freight charges will
be rejected by the City.
2-9 Warranty
All materials and equipment sold and labor performed under this contract are warranted by
the Contractor to be free from defects in materials or workmanship for a period of at least
one (1) year from date of delivery and installation; provided, however, that this warranty
may extend beyond this time period pursuant to any contractual or attached warranties. If
the merchandise sold or work performed hereunder is defective on account of workmanship
or materials, the Contractor agrees to replace the merchandise or, at the City's sole option,
repair the defective merchandise. All defects in work or materials shall be promptly
corrected.
2-10 No Waiver of Warranties and Contract Rights
Conducting of tests and inspections, review of specifications or plans, payment for goods or
services, or acceptance by the City does not constitute a waiver, modification or exclusion of
any express or implied warranty or any right under this contract or in law.
2-11 Legal Relations
The Contractor shall comply with all of the City's resolutions and regulations applicable
under this contract and with any local, state or federal law or regulation applicable to the
materials, equipment or service provided under this contract. Neither the Contractor nor the
City shall assign any interest, obligation or benefit under or in this contract or transfer any
interest in the same, whether by assignment or novation, without prior written consent of
the other party. This contract shall be binding upon and inure to the benefit of the
successors of the parties.
2-12 Applicable Law and Forum
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 17 2019
RFB ver. 5-18
Except as hereinafter specifically provided, this contract shall be governed by and construed
according to the laws of the State of Washington including, but not limited to, the Uniform
Commercial Code, Title 62A RCW. Any suit arising herefrom shall be brought in King County
Superior Court, which shall have sole and exclusive jurisdiction and venue.
2-13 Hazardous Chemical Communication
In order to comply with WAC 296-62-054, Hazard Communication, the Contractor shall
submit with each shipment a Material Safety Data Sheet (MSDS) for all products containing
any toxic products that may be harmful to the end user. The MSDS Sheet is to accompany
the toxic product(s) to the specified delivery sites.
Include the following information in the MSDS:
A. Chemical Abstract Service (CAS) numbers for every chemical that is listed in the
MSDS.
B. If the product is actually used diluted, the dilution rate should be so stated in the
MSDS and the hazards and corresponding personal protection, etc., also be listed.
C. A statement as to the intended use of the product.
2-14 Delivery and Liquidated Damages
Time -is of the essence of the contract and each and all of its provisions in which
performance is a factor. The Contractor will be held to strict compliance with the prescribed
date(s) set forth in these contract documents. For each and every day that delivery is
delayed beyond the specific date(s), damage will be sustained by the City. Because of the
difficulty in computing the actual damages and disadvantages to the City, and as a
reasonable forecast of actual damages which the City will suffer by the delay in delivery, the
parties agree that for each such delay the Contractor will pay the City liquidated damages
(and not as a penalty) in accordance with Section 1.3 of Attachment J, Public Works
Contract, to compensate for any damages caused by such delay. The City may deduct from
any payment owing to the Contractor, any liquidated damages, which may be incurred by
the Contractor pursuant to this paragraph.
2-15 Force Majeure
The Contractor's or City's failure to perform any of its obligations under this contract shall
be excused if due to causes beyond the control and without the fault or negligence of the
Contractor or City, respectively, including, but not restricted to, acts of God, acts of public
enemy, acts of any government, fire, floods, epidemics, and strikes.
2-16 Patents, Copyrights and Rights in Data
Any patentable result or material suitable for copyright arising out of this contract shall be
owned by and made available to the City for public use, unless the City shall, in a specific
case where it is legally permissible, determine that it is in the public interest that it not be
so owned or available.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 18 2019
RFB ver. 5-18
The Contractor agrees that the ownership of any plans, drawings, designs, specifications,
computer programs, technical reports, operating manuals, calculations, notes and other
work submitted or which is specified to be delivered under this contract, whether or not
complete (referred to in this subsection as "Subject Data', shall be vested in the City or
such other local, state or federal agency, if any, as may be provided by separate contract
with the City.
All such Subject Data furnished by the Contractor pursuant to this contract, other than
documents exclusively for internal use by the City, shall carry such notations on the front
cover or a title page (or in such case of maps, in the same block) as may be requested by
the City. The Contractor shall also place their endorsement on all Subject Data furnished by
them. All such identification details shall be subject to approval by the City prior to printing.
The Contractor shall ensure that substantially the foregoing paragraphs are included in each
subcontract for the work on the project.
2-17 Patents and Royalties
The costs involved in license fees, royalties or in defending claims for any patented
invention, article, process or method that may be used in or connected with the work under
this contract or with the use of complete work by the City, shall be paid by the Contractor.
The Contractor and the Contractor's sureties shall, at their own cost, defend, indemnify and
hold the City, together with its officers and employees, harmless against any and all
demands made for such fees, royalties or claims brought or made by the holder of any
invention or patent. Before final payment is made on the account of this contract, the
Contractor shall, if requested by the City, furnish acceptable proof of a proper release of the
City, its officers, agents and employees from all such fees or claims.
Should the Contractor, its agent, servants or employees, or any of them be enjoined from
furnishing or using any invention, article, material, computer programs or equipment
supplied or required to be supplied or used under the contract, the Contractor shall
promptly substitute other articles, materials, computer programs or equipment in lieu
thereof of equal efficiency, quality, finish, suitability and market value, and satisfactory in all
respects to the City.
2-18 Disagreements, Disputes, Claims, and Appeals
If any disagreements occur with anything required in a change order, another written order,
or an oral order from the Project Engineer, including any direction, instruction,
interpretation, or determination by the Project Engineer, the Contractor shall follow the
procedures outlined in Standard Specification Sections 1-04.5 and 1-09.11, which are
incorporated by this reference.
By failing to follow the procedures of Sections 1-04.5 and 1-09.11, the Contractor
completely waives any claims for protested Work.
Any claims or causes of action shall be brought only in the Superior Court for King County,
Washington.
2-19 Recycled Products
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 19 2019
RFB ver. 5-18
The Contractor shall use recycled paper for proposals and for any printed or photocopied
material created pursuant to a contract with the City whenever practicable and use both
sides of paper sheets for reports submitted to the City whenever practicable.
In the event this RFB covers the sale of product to the City that is capable of containing
recycled materials, Contractor is hereby advised that the City intends to procure products
with recycled content, pursuant to the recycled content notice delivered with these bid
documents. Contractor shall certify the percentage of recycled content and products sold to
the City, including a percentage of post -consumer waste that is in the product. This
certification is required to be in the form of a label on the product or a statement by the
Contractor attached to the bid documents. The certification on multi-component or multi -
material products shall verify the percentage and type of post -consumer waste and recycled
content by volume contained in the major constituents of the product. The Contractor
agrees to grant the City, as a procuring agency, permission to verify the certification of
recycled content by review of the bidder's or manufacturer's records as a condition of any
bid award, in the event of a bidder's protest, or other challenge to the bid accepted.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 20 2019
RFB ver. 5-18
Attachment A
NO BID RESPONSE FORM
When submitting a "No Bid," mail this completed form to Federal Way Purchasing, 33325 8th
Avenue South, Federal Way, Washington 98003-6325. Be sure the form is in a sealed envelope with
the bid number and bid title indicated on the outside of the envelope. The form must be received
by the date and time specified for the bid opening as indicated in Section 1-1. Failure to return this
form, if not submitting a Formal bid, may result in your firm being disqualified From future City
project s.
Bid Number: RFB No. 19-004
Bid Title: Brook Lake Center Connector
❑ Cannot comply with specifications.
❑ Cannot meet delivery requirement.
❑ Do not regularly manufacture or sell the type of commodity involved.
❑ Other (please specify).
Explanation of reason(s) checked:
Check one of the following:
❑ WE DO
❑ WE DO NOT desire to be retained on the mailing list for future procurements of this
commodity.
Firm Name:
Address:
Signature
Date
Name (Type or Print) Title
Phone:
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 21 2019
RFB ver. 5-18
Aftnchn,-Y,antH
BID FOE
CITY OF FEDERAL. VJAY
BROOK LAKE CENTER CGNITkIECTOR
BID FORT
Bidder: Talakai Construction, LLC Date: March 21,2019
ITEM BID AMOUNT
A) Brook Lake Center Connector $ 255,665.00
TOTAL BID AMOUNT �o°r° $ $25,566.50
(including Washington State sales tax, all other
government taxes, assessments and char es $281,231.50
To City Council Members
City of Federal Way
33325 8th Ave South
Federal Way, Washington 98003-6325
Pursuant to and in compliance with your advertisement for bids for construction of the Brook Lake
Center Connector, and other documents relating thereto, the undersigned has carefully examined
all of the bid and contract documents as the premises and conditions affecting the delivery, supply
and maintenance of the Brook Lake Center Connector, and hereby proposes to furnish all labor,
materials and perform all work as required in strict accordance with the contract documents, for the
above -referenced amount, inclusive of Washington State wiles tax and all other government
taxes, assessments and charges as required by law.
The required bid security consisting of a certified check, bid bond, or cashier's check in an amount
of not less than five percent (5%) of the total amount bid is attached hereto, which it is agreed
shall be collected and retained by the City as liquidated damages in the event this bid is accepted
by the City within forty-five (45) calendar days after the day of the bid opening and the
undersigned fails to execute the Brook Lake Center Connector Public Works Contract and to provide
the required certificate of insurance to the City, under the conditions thereof, within ten (10)
calendar days after the Notice of Award; otherwise said Bid Security will be returned to the
undersigned.
Bond or Certified Check Bid Bond 5% Dollars ($ )
The Bidder shall complete this entire Bid Form or this bid may be considered non-responsive. The
City may correct ,obvious mathematical errors.
The City of Federal Way reserves the right to reject any and all bids, waive any informalities or
minor irregularities in the bidding, and determine which bid or bidder meets the criteria set forth in
the bid documents.
Receipt of the following Addendums is hereby acknowledged:
Addendum No. WA Date Issued:
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 22 2019
RFB ver. 5-18
Addendum No.
Addendum No. —
Date Issued:
Date Issued:
Limited Liability Company
Corporation/Partnership/Individual
(Delete Two)
TALAKCL*891 CP
Bidder's State License No.
603066669
Talakai Construction, LLC
Firm Name
Z�2 zilzd—
Signature
Member / Office Administrator
Bidder's State Tax No. Title
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 23 2019
RFB ver. 5-18
Attachment C
Not Applicable
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 24 2019
RFB ver. 5-18
Attaclwient D
BID SIGNATURE PACE
Date:
March 21,2019
The undersigned bidder hereby proposes and agrees to deliver the equipment and/or
services pursuant to the Brook Lake Center Connector and comply with all other terms and
conditions of the contract and bid documents of RFB 19-004.
No bidder may withdraw his/her bid for a period of ninety (90) days after the day of bid
opening.
The required bid security consisting of a certified check, bid bond, or cashier's check in an
amount of not less than five percent (5%) of the total amount will be delivered to the City.
The undersigned individual represents and warrants that he or she is dully authorized to
execute the bid and all bid documents on behalf of any partnership, joint venture or corporation.
Limited Liability Company
Corporation/Partnership/Individual
(Delete Two)
Talakai Construction, LLC
Company
(Signatu i-�
Dana Gervais Talakai
(Printed Name)
Its: Member / Office Administrator
(Title)
9236 25th Ave SW
Seattle, Wa 98106
(Address)
206 763-2638
(Telephone Number)
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 25 2019
RFB ver. 5-18
Affirehment E
B.ID BOND FORM
Herewith find deposit in the form of a certified check, cashier's check, cash; or bid bond in
the amount of $ _: which amount is not less than five percent (5%) of the total bid.
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that we, Talakai Constiuctlon. LLC , as
Principal, and as Surety, are held and
firmly bound unto the City of Federal Way, as Obligee, in the penal sum of Five Percent of Tolal Amount Bid
and o0100 dollars (, for the payment of which the Principal and the Surety bond
themselves, their heirs and executors, administrators, successors and assigns, jointly and severally,
by these presents.
The condition of this obligation is such that if the Obligee shall make any award to the
Principal for:
BROOK (LAKE CENTER CONNECTOR
According to the terms of the proposal or bid made by the Principal therefore, and the Principal
shall duly make and enter into a contract with the Obligee in accordance with the terms of said
proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or
Sureties approved by the Obligee; or if the Principal shall in case of failure so to do, pay and forfeit
to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation
shall be null and void; otherwise, it shall be, and remain in full force and effect, and the Surety
shall forthwith pay and forfeit to the Obligee as penalty and liquidated damages, the amount of this
bond.
SIGNED, SEALED AND DATED THIS 19th DAY OF March
Received return of deposit in the sum of $
City of Federal Way
Brook Lake Center Connector Page 26
RFB ver. 5-18
2019.
Talok.ik Constructio -:, t,l,C
Prih
Phil hia In emnity In ompany
Nr�
Surety Pan Tash, Atlomey; a¢+••..
•�. A
Date; March 19 t 9
RFB # 19-004
2019
:ovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
SUBCOMT,"' •',C'PiDR a . w,, is
Prepared in Compliance with RCW 39.30.060
BROU,` LAis CENTER CONNECTOR
Failure to list subcontractors who are proposed to perform the work of heating, ventilation and air
conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter
19.28 RCW, or identify the bidder for the work will result in your bid being non-responsive and
therefore void.
Subcontractors that are proposed to perform the work of heating, ventilation and air conditioning,
plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW,
must be named below, or name the bidder for the work.
The bidder verifies that each first tier subcontractor, and every subcontractor of any tier that hires
other subcontractors, has a current certificate of registration in compliance with chapter 18.27
RCW; a current Washington Unified Business Identifier (UBI) number; has Industrial Insurance
(workers' compensation) coverage for the subcontractor's employees working in Washington, as
required in Title 51 RCW, if applicable; has a Washington Employment Security Department
number, as required in Title 50 RCW, if applicable; has a Washington Department of Revenue state
excise tax registration number, as required in Title 82 RCW, if applicable; has an electrical
contractor license, if required by Chapter 19.28 RCW, if applicable; has an elevator contractor
license, if required by Chapter 70.87 RCW.
The following listed bid items (listed in numerical sequence) for this project have been proposed for
subcontracting to subcontractors as indicated.
SUBCONTRACTOR ITEM NUMBERS
NAME
none
ESTIMATED AMOUNT
WMBE QUALIFIED?
/N
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 27 2019
RFB ver. 5-18
City of Federal Way
COMBINED AFFIDAVIT AND FOW11
Non -Collusion, Anti -Trust, Prevailing Wage (Non -Federal Aid),
Debarment, Eligibility, and Certification of Lawful Employment
NON -COLLUSION AFFIDAVIT
Being first duly sworn, deposes and says, that he/she is the identical person who submitted the
foregoing proposal or bid, and that such bid is genuine and not sham or collusive or made in the
interest or on behalf of any person not therein named, and further, that the deponent has not
directly induced or solicited any other Bidder on the foregoing work equipment to put in a sham
bid, or any other person or corporation to refrain from bidding, and that deponent has not in any
manner sought by collusion to secure to himself/herself or to any other person any advantage over
other Bidder or Bidders; and
NOTICE TO ALL BIDDERS ON PROJECTS INVOLVING
THE U.S. DEPARTMENT OF TRANSPORTATION (USDOT)
To report bid rigging activities call: 1-600-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll-free hotline Monday
through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone with knowledge of possible bid
rigging, bidder collusion, or other fraudulent activities should use the hotline to report such
activities. The hotline is part of USDOT's continuing effort to identify and investigate highway
construction contract fraud and abuse and is operated under the direction of the USDOT Inspector
General. All information will be treated confidentially and caller anonymity will be respected; and
CERTTF fCA ON RE: ASSIGNMENT OF ANTi-TRUST CLAIMS TO PURCHASER
Vendor and purchaser recognize that in actual economic practice, overcharges resulting from anti-
trust violations are, in fact, usually borne by the purchaser. Therefore, vendor hereby assigns to
purchaser any and all claims for such overcharges as to goods and materials purchased in
connection with this order or contract, except as to overcharges resulting from anti-trust violations
commencing after the date of the bid, quotation, or other event establishing the price under this
order or contract. In addition, vfirldor warrants and represents that each of his suppliers and
subcontractors shall assign any and all such claims to purchaser, subject to the aforementioned
exception; and
. PREVAILING WAGE AFFADAVIT
I, the undersigned, having duly sworn, deposed say and certify that in connection with the
performance of the work of this project, will pay each classification of laborer, work person, or
mechanic employed in the performance of such work, not less than the prevailing rate of wage or
not less than the minimum rate of wage as specified in the principal contract; that I have read the
above and forgoing statement and certificate, know the contents thereof and the substance as set
forth therein, is true to my knowledge and belief; and
City of Federal Way RFB # 19-004
DEBARMENT AFFIDAVIT
I certify that, except as noted below, the firm, association or corporation or any person in a
controlling capacity associated therewith or any position involving the administration of federal
funds; is not currently under suspension, debarment, voluntary exclusion, or determination of
ineligibility by any federal agency; has not been suspended, debarred, voluntarily excluded or
determined ineligible by any federal agency within the past three (3) years; does not have a
proposed debarment pending; and has not been indicted, convicted, or had a civil judgment
rendered against said person, firm, association or corporation by a court of competent jurisdiction
in any matter involving fraud or official misconduct within the past three (3) years.
AFFIDAVIT OF ELIGIBILITY
The Contractor certifies that it is properly licensed and registered under the laws of the State of
Washington and has not been determined to have been in violation of RCW 50.12.070(1)(b), RCW
51.16.070(1)(b), or RCW 82.32.070(2) within the last two years. The Contractor further certifies
that it has not been determined, within the last one year, to have committed any combination of
two of the following violations or infractions within a five-year period: (1) Violated RCW
51.48.020(1) or 51.48.103; or (2) Committed an infraction or violation under chapter 18.27 RCW.
CERTIi X-ATION OF LAWFUL EMPLOYMENT
The contractor hereby certifies that it has complied with all provisions of the Immigration and
Nationality Act, now or as herein after amended, 8 USC Section 1101 et. seq., and that all
employees, including subcontractor employees, are lawfully permitted to perform work in the
United States as provided in this agreement with the City of Federal Way.
FOR: Non -Collusion Affidavit, Assignment of Anti -Trust Claims to Purchaser, Prevailing Wage
Affidavit, Debarment Affidavit, Affidavit Of Eligibility, and Certification of Lawful Employment.
BROOK LAKE CENTER CONNECTOR
Name of Bidder's Firm Talakai Construction, LLC
Signature of Authorized Representative of Bidder
Subscribed and sworn to before me this RU day of a -V - z
MICHELLE L BENSON
Notary Public rinted/typed name of notary)
State of Washington Lary Public in and for the St to of ashington
Commission # 154223 commission ex ires: Z
My Comm, Expires Aug 28, 2019 y p
City of Federal Way RFB # 19-0(4
Brook Lake Center Connector Page 29 2019
RFB ver. 5-18
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Sacramento
On ..;;K/ /before me,
r`
Susan Fournier, Notary Public
(insert name and title of the officer)
personally appeared Ryan Tash
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(Seal)
yam- SUSAN FOUR,NJER
+! : Notary Public - California
5 _ i Sacramento County
' Commission # 2167974
P -'r Comm. res Nov 11. 2020 r'
8836
PHILADELPHIA INDEMNITY INSURANCE COMPANY
One Gala Pla 2.a, Suite 100
Bala PA 19004-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRF.SFNTS 'That PIIILADELI'H1A INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and
existing under the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint 1100, I.__I'_i;l r__f. .an i :a.liH It„p+ t_.ts iI1. tirr rl irr It,rlirl \.il,l.rrl
�ii,:en t +nrrnirr ,.f �nrrl1 �+ Gnlir+n. In,niaai• �er�irr+. 1ur. f its nl I<:r n Ir.. f rrerluss. "t:rtr ri l i, its [rue and Iatv4Ll Alto n -tact with full authority to
--�--
i:r:.ul� .u� it - r'. i..i i•; .. .icr c; ... r ._.�... i,. ; ,ri,t i Iii:. �• i. .I -
1j11 -:e i.ily .ii. !,.... .:.irgatory in the nature lherc. , issued in the course of its
business and to hind the Company thereby, in an amount not to excec ,;.ilrin,Inil}
this Power of Attorney is granted and is sigrnd and scaled by faCSIMIle under and by the authority of the Ihllowmg Resolution adopted by the Board of Directors of
PHILADFLPI IIA INDEMNITY INS IRANCF COMPANY on the 14°' oi'November, 2016
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company (I ) Appoint Attomcy(s) in Fact and authorize the Attorney(s) in Fact to
execute on behalf of the Company bonds and undertakings, contracts of indemnity and
other writings obligatory m the nature thereof and to attach the seal of the Company
thereto. and (2) to remove, at any time, any such Atlomcy-in-t=act and revoke the
authon,y given And, he it
F[JRTI ILR
RESOLYh:Di 1 -hat the ;ivnaltucs of such officers and the seal of the Company may be aflixed to any
such Pmt e orAItorney or certiIicale relating thereto by facsimile, and any such Power of
Attorney so cvec'uled and certified by facsimile signatures and lacsunile seed shall be
valid and biliding upon the Company in the future with re�•pccl to ;In,. bond or
undertaking to which it is attached
IN fISSTIMONY WHUREOF, PHILADLLPHIA INDEMNITY INSIIRANCI, COMPANY HAS CAUSED THIS INSTRIIMI'.N-I 1'0 BL SIGNED AND 1.1-S
CORPORATE SL ALTO BF. AFFIXFD BY ITS At_ H IORI'ED OFFICL I I IIS 27'” DAY OF OC'TORFR, 2017
A--
(Seal)
Rohert D O'Leary .Ir, President & CLO
Philadelphia Indemnity Insurance Companv
On this 27°i day of Octobei, 2017, before nie came the individual who executed the preceding instrument, tome personally known. and being by me duly sworn said
that he is the therein described and author ncd officer of the Pl11LADELP111A INDEMNITY INSURANCE COMPANY, that the seal aflixed to said instrument is
the Corporate seal of said Company- that the said Corporate Seal and his signature were drily aflixed
r.iwk. Kr,t
srHuacc�. r
"'.•,�.' �a��•.,�z Notary Public
w,.�..'I Wo
residingat
(Notary Seal)
My commission e ;pares
Bolo Cvn vr{ I'A_
Sentemhcr 25 2021
1, Edward Savago, Corporate Sueremry of PHIL.ADF.LPHIA INDEMNITY INSURANCE COMPANY, do hcrcby certily that the foregoing resolution ol'the Brruad of
Directors and the Power of AttornaW issued pursuant thereto on the 27°i day )fOctntnt. 2017 are true and corrc:t and are still in full fvrcrarid Orect l do further cenify
that Robert D O'Lcary .Ir , who executed tltr Power of Attomey as President, was oil the date ill execution Of ll c chat lied Power of AHInrticy the July cleetad President
ofPHILADF.LPHIA INDEMNITY INSURANCLC'OMPANI'
In Testimony Whur54 '$tflur(e*uky rlhcd my naiTie end affixed (he I;icsimll•, u d til each C omparly thl f iiay (it- , 20/�/
OWEr
192 7
•+ `;a%'ago. Corporate Secntar)
•ll
oi�,: 'A Pl-IILADELP111A INJIFIN1NITV INSURANCE COMPANY
Attze/imBrit H
CONTR'ACTOR'S COMPLIANCE STATEMENT
(President's Executive Order #11246)
Date: March 21,2019
This statement relates to a proposal contract with the City of Federal Way named
BROOK LAKE CENTER CONNECTOR
I am the undersigned bidder or prospective contractor. I represent that:
I ❑ have, ❑ have not, participated in a previous contract or subcontract subject to the President's
Executive Order #11246 (regarding equal employment opportunity) or a preceding similar
Executive Order.
Talakai Construction, LLC
Name of Bidder
Tignature
Its: Member / Office Administrator
Title
9236 25th Ave SW
Seattle, Wa 98106
Address
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 30 2019
RFB ver. 5-18
Att-aci meat l
Contractor Certification
Wage Law Compliance — Responsibility Criteria
FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL
PACKAGE WILL MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR
AWARD.
I hereby certify, under penalty of perjury under the laws of the State of Washington, on
behalf of the firm identified below that, to the best of my knowledge and belief, this firm
has NOT been determined by a final and binding citation and notice of assessment issued
by the Washington State Department of Labor and industries or through a civil judgment
entered by a court of limited or general jurisdiction to have willfully violated, as defined in
RCW 49.48.082, any provision of Chapters 49.46, 49.48, and 49.52 RCW within three (3)
years prior to the date of the Request for Bids.
Bidder Name: Talakai Construction, LLC
Name of Contractor/Bidder — Print Full Legal Entity Name of Firm
�
B h
Sipe tore of Autharir-e&P r on
Title: Member / Office Administrator
Title of Person Signing Certificate
Date:
March 21,2019
Dana Gervais Talakai
Print Name of Person Making Certifications for Firm
Place: Seattle, Washington
Print City and State Where Signed
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 31 2019
RFB ver. 5-18
4rtr
Al,
STATE OF --
WASHINGTON
Limited Liability Company
BUSINESS LICENSE
TALAKAI CONSTRUCTION, LLC
TALAKAI CONSTRUCTION,LLC
9236 25TH AVE SW
SEATTLE, WA 98106-2604 -�
UNEMPLOYMENT INSURANCE - ACTIVE
TAX REGISTRATION #603-066-669 - ACTIVE
LICENSING RESTRICTIONS:
Not licensed to hire minors without a Minor Work Permit,
REGISTERED TRADE NAMES:
TALAKAI CONSTRUCTION,LLC
Unified Business ID #: 603066669
Business ID #: 001
Location: 0001
INDUSTRIAL INSURANCE - ACTIVE
This document lists the registrations, endorsements, and licenses authorized for the business
named above. By accepting this document, the licensee certifies the information on the application
y
was complete, true, and accurate to the best of his or her knowledge, and that business will be
J,
P conducted in compliance with all applicable Washington state, county, and city regulations.
Director, Department of Revenue
" •... � - ..'
.. �. 3�.-.. ♦ wX.e c ...
. .ter : .'_i*.
Department of Labor and industries,
1 _ TALA KAI CONSTRUCTION LLC
PO Box 44450
Olympia, WA 98504-4450 Reg: CC TALAKCL891CP
UBI: 603-0616-669
Registered as providcO by Lava as:
C onstniction Contractor
(CC01) - (JIEN LI :A L
34H
TALAKAI CONSTRUCTION LLC p:Fi:cctive Dale: 2i 17/2011
,9236 25TH AVE SW 53is"at ic} y3 .rc.f I7/2021
SEATTLE WA 98106
Attachment 1
PUBLIC WORKS CONTRACT
FOR
BROOK LAKE CENTER CONNECTOR
THIS PUBLIC WORKS CONTRACT ("Contract's is dated effective this O- day of
20 and is made by and between the City of Federal Way, a Washington municipal
corporation ("City or Owner'), and Talakai Construction, LLC a Washington limited liability company
("Contractor'.
A. The City desires to retain an independent contractor to furnish all labor and materials
necessary to perform work necessary to complete the Brook Lake Center Connector Project in
Federal Way, etc.), located at Brook Lake, Federal Way, Washington ("Property'); and
B. The Contractor has the requisite skill and experience to perform such work.
NOW, THEREFORE, the parties ("Parties' agree to the following terms and conditions:
1. SERVICES BY CONTRACTOR
1.1 Description of Work. Contractor shall perform all work and furnish all tools, materials,
supplies, equipment, labor and other items incidental thereto necessary for the construction and
completion of the work, more particularly described as the Brook Lake Center Connector project,
including without limitation:
Construction of a new boardwalk connecting the existing boardwalk trail at the West Hylebos
Wetland park to the Brook Lake Center, with field assembled pieces with pin pile foundations, pre -
assembled pieces with tire foundations, approach ramp and ramp landing areas within the corridor
noted on the plans, ("Work'), in accordance with and as described in the Contract Documents,
which include without limitation, this Contract, Request for Bids, Bidder's Checklist, Instructions to
Bidders, General Contractual Terms and Conditions, Bid Form, Bid Signature Page, Bid Bond,
Combined Affidavit and Certification Form, Contractor's Compliance Statement, Notice of
Completion of Public Works Contract attached as Exhibit A, Contract Change Order Agreement
attached as Exhibit B, Contractor's Retainage Agreement attached as Exhibit C, Retainage Bond to
City of Federal Way attached as Exhibit D, Notice to Labor Unions or Other Employment
Organizations Nondiscrimination in Employment attached as Exhibit E, Certificate(s) of Insurance
Form attached hereto as Exhibit F, Performance / Payment Bond attached hereto as Exhibit G, Title
VI Assurances attached hereto as Exhibit H, current Prevailing Wage Rates attached as Appendix A,
2016 WSDOT / APWA Standard Specifications for Road, Bridge and Municipal Construction,
together with the APWA Supplemental (Division 1-99) ("Standard Specifications' and all other
Appendices attached hereto and incorporated by this reference, (collectively the "Contract
Documents', which Work shall be completed to the City's satisfaction, within the time period
prescribed by the City and pursuant to the direction of the Mayor or his or her designee.
1.2 Completion pate. The Work shall be commenced within five (5) days of receipt by the
Contractor of the City's Notice to Proceed. The Work shall be completed within 30 working days. In
the event the Work is not substantially completed within the time specified, Contractor agrees to
pay to the City liquidated damages in the amount set forth in the formula included in Section 1.3 of
this Contract. The Work shall not be deemed completed until the City has accepted the Work and
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 32 2019
RFB ver. 5-18
delivered a written Notice of Completion of Public Works Contract in the form attached hereto as
Exhibit "A."
1.3 Liquidated Damages. Time is of the essence of the Contract. Delays inconvenience the
public and cost taxpayers undue sums of money, adding time needed for administration, inspection,
and supervision. It is impractical for the City to calculate the actual cost of delays. Accordingly, the
Contractor agrees to pay liquidated damages calculated on the following formula for its failure to
complete this Contract on time:
(1) To pay (according to the following formula) liquidated damages for each working day
beyond the number of working days established for completion, and
(2) To authorize the City to deduct these liquidated damages from any money due or
coming due to the Contractor.
LIQUIDATED DAMAGES FORMULA
LD = 0.15C
T
Where: LD = Liquidated damages per working day (rounded to
the nearest dollar).
C = Original Contract amount.
T = Original time for completion.
When the Work is completed to the extent that the City has full and unrestricted use and
benefit of the facilities, both from an operational and safety standpoint, the City may determine the
Work is complete. Liquidated damages will not be assessed for any days for which an extension of
time is granted. No deduction or payment of liquidated damages will, in any degree, release the
Contractor from further obligations and liabilities to complete this entire Contract.
1.4 Performance Standard. Contractor shall perform the Work in a manner consistent with
accepted practices for other properly licensed contractors.
1.5 Compliance with Laws. Contractor shall perform the Work in accordance with all
applicable federal, state and City laws, including but not limited to all City ordinances, resolutions,
standards or policies, as now existing or hereafter adopted or amended, and obtain all necessary
permits and pay all permit, inspection or other fees, at its sole cost and expense.
1.6 Change Orders. The City may, at any time, without notice to sureties, order changes
within the scope of the Work. Contractor agrees to fully perform any such alterations or additions
to the Work. All such change orders shall be in the form of the Contract Change Order Agreement
attached hereto as Exhibit "13," which shall be signed by both the Contractor and the City, shall
specifically state the change of the Work, the completion date for such changed Work, and any
increase or decrease in the compensation to be paid to Contractor as a result of such change in the
Work. Oral change orders shall not be binding upon the City unless confirmed in writing by the City.
If any change hereunder causes an increases or decrease in the Contractor's cost of, or time
required for, the performance or any part of the Work under this Contract, an equitable adjustment
will be made and the Contract modified in writing accordingly.
If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall,
within five (5) days after receipt of a written change order from the City or after giving the written
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 33 2019
RFB ver. 5-18
notice required above, as the case may be, submit to the City a written statement setting forth the
general nature and monetary extent of such claim; provided the City, in its sole discretion, may
extend such five (5) day submittal period upon request by the Contractor. The Contractor shall
supply such supporting documents and analysis for the claims as the City may require to determine
if the claims and costs have merit. No claim will be allowed for any costs incurred more than five
(5) days before the Contractor gives written notice as required. No claim by the Contractor for an
equitable adjustment hereunder will be allowed if asserted after final payment under this Contract.
1.7 Work and Materials Omitted. The Contractor shall, when directed in writing by the City,
omit work, services and materials to be furnished under the Contract and the value of the omitted
work and materials will be deducted from the Total Compensation and the delivery schedule will be
reviewed if appropriate. The value of the omitted work, services and materials will be a lump sum
or unit price, as mutually agreed upon in writing by the Contractor and the City. If the parties
cannot agree on an appropriate deduction, the City reserves the right to issue a unilateral change
order adjusting the price and the delivery schedule.
1.8 Utilit7V Loeabon. Contractor is responsible for locating any underground utilities affected
by the Work and is deemed to be an excavator for purposes of Chapter 19.122 RCW, as amended.
Contractor shall be responsible for compliance with Chapter 19.122 RCW, including utilization of the
Axone call" locator system before commencing any excavation activities.
1.9 Air Environment_. Contractor shall fully cover any and all loads of loose construction
materials including without limitation, sand, dirt, gravel, asphalt, excavated materials, construction
debris, etc., to protect said materials from air exposure and to minimize emission of airborne
particles to the ambient air environment within the City of Federal Way.
2. TERM
This Contract shall commence on the effective date of this Contract and continue until the
completion of the Work.
3. WARRANTY
3.1 Requisite Skill. The Contractor warrants that it has the requisite skill to complete the
Work, and is appropriately accredited and licensed by all applicable agencies and governmental
entities, including but not limited to being registered to do business in the City of Federal Way by
obtaining a City of Federal Way business registration. Contractor represents that it has visited the
site and is familiar with all of the plans and specifications in connection with the completion of the
Work.
3.2 Defective Work. The Contractor shall, at its sole cost and expense, correct all Work
which the City deems to have defects in workmanship and material discovered within one (1) year
after the City's final acceptance of the Work as more fully set forth in the General Conditions of the
Contract; provided, however, that this warranty may extend beyond this time period pursuant to
the warranties as specified in the special provisions, contract plans, other parts of the Contract
Documents, or as attached hereto as an appendix and incorporated by this reference. This
warranty shall survive termination of this Contract. Conducting of tests and inspections, review of
specifications or plans, payment for goods or services, or acceptance by the City does not
constitute waiver, modification or exclusion of any express or implied warranty or any right under
this Contract or law.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 34 2019
RFB ver. 5-18
4. COMPENSATION
4.1 Total Compensation. In consideration of the Contractor performing the Work, the City
agrees to pay the Contractor an amount not to exceed Two Hundred Eighty -One Thousand Two
Hundred Thirty -One and 50/100 Dollars ($281,231.50), which amount shall constitute full and
complete payment by the City ("Total Compensation').
4.2 Contractor Responsible for Taxes. The Contractor shall be solely responsible for the
payment of any taxes imposed by any lawful jurisdiction as a result of the performance and
payment of this Contract.
4.3 Noppa,,qHent. The City shall have the right to withhold payment to the Contractor for
any of the Work not completed in a satisfactory manner, in the City's sole discretion, which shall be
withheld until such time as Contractor modifies or repairs the Work so that the Work is acceptable
to the City.
4.4 McLhod of Payment. The basis of payment will be the actual quantities of work
performed according to the contract and as specified for payment. Payments will be made for work
and labor performed and materials furnished under the contract according to the price in the
proposal unless otherwise provided. Partial payments will be made once each month, based on
partial estimates prepared by the Engineer and signed by the Contractor. Failure to perform any
obligation under this Contract may be adequate reason for the City to withhold payments until the
obligation is performed.
Upon completion of all work and after final inspection, the amount due the Contractor under
the contract will be paid based upon the final estimate made by the Engineer and signed by the
Contractor.
Payment to the Contractor for partial estimates, final estimates, and retained percentages
shall be subject to controlling laws.
4.5 Retainage. Pursuant to Chapter 60.28 RCW, five percent (5%) of the Total
Compensation shall be retained by the City to assure payment of Contractor's state sales tax as well
as payment of subcontractors, suppliers and laborers. Upon execution of this Contract, Contractor
shall complete, execute and deliver to the City the Contractor Retainage Agreement attached
hereto as Exhibit "C" or execute the Retainage Bond attached hereto as Exhibit "D." No payments
shall be made by the City from the retained percentage fund ffund'� nor shall the City release any
retained percentage escrow account to any person, until the City has received from the Department
of Revenue a certificate that all taxes, increases, and penalties due from the Contractor and all
taxes due and to become due with respect to the Contract have been paid in full or that they are,
in the Department's opinion, readily collectible without recourse to the State's lien on the retained
percentage. Upon non-payment by the general contractor, any supplier or subcontractor may file a
lien against the retainage funds, pursuant to Chapter 60.28 RCW. Subcontractors or suppliers are
required to give notice of any lien within forty-five (45) days of the completion of the Work and in
the manner provided in RCW 39.08.030. Within sixty (60) days after completion of all Work on this
Contract, the City shall release and pay in full the money held in the Fund, unless the City becomes
aware of outstanding claims made against this Fund.
5. EQUAL OPPORTUNITY EMPLOYER
In all Contractor services, programs or activities, and all Contractor hiring and employment
made possible by or resulting from this Contract, there shall be no discrimination by Contractor or
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 35 2019
RFB ver. 5-18
by Contractor's employees, agents, subcontractors or representatives against any person because
of sex, age (except minimum age and retirement provisions), race, color, creed, national origin,
marital status or the presence of any disability, including sensory, mental or physical handicaps,
unless based upon a bona fide occupational qualification in relationship to hiring and employment,
advertising, layoff or termination, rates of pay or other forms of compensation, and selection for
training, including apprenticeship. Contractor shall comply with, and shall not violate any of the
terms of, Chapter 49.60 RCW, Title VII of the Civil Rights Act of 1964, the Americans With
Disabilities Act, Section 504 of the Rehabilitation Act of 1973, 49 CFR Part 26, or any other
applicable federal, state, or local law or regulation regarding non-discrimination. Any material
violation of this provision shall be grounds for termination of this Contract by the City and, in the
case of the Contractor's breach, may result in ineligibility for further City agreements. If this project
involves federal funds including USDOT funds administered by WSDOT, the contractor agrees to
the clauses contained in Exhibit H.
6. INDEPENDENT CONTRACTOR/ CONFLICT OF INTEREST
6.1 It is the intention and understanding of the Parties that the Contractor shall be an
independent contractor and that the City shall be neither liable nor obligated to pay Contractor sick
leave, vacation pay or any other benefit of employment, nor to pay any social security or other tax
which may arise as an incident of employment. The Contractor shall pay all income and other taxes
due. Industrial or any other insurance that is purchased for the benefit of the City, regardless of
whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed
to convert this Agreement to an employment contract. It is recognized that Contractor may or will
be performing professional services during the Term for other parties; provided, however, that such
performance of other services shall not conflict with or interfere with Contractor's ability to perform
the Services. Contractor agrees to resolve any such conflicts of interest in favor of the City.
6.2 If the Contractor is a sole proprietorship or if this is a contract with an individual, the
contractor agrees to notify the City and complete any required form if the Contractor retired under
a State of Washington retirement system and agrees to indemnify any losses the City may sustain
through the Contractor's failure to do so.
7. CITY'S RIGHT TO TERMINATE CONTRACT
7.1 Termination Without Cause. Prior to the expiration of the Term, this Contract may be
terminated without cause upon oral or written notice delivered to Contractor from the City. Upon
termination, all supplies, materials, labor and/or equipment furnished prior to such date shall, at
the City's option, become its property. In the event Contractor is not in breach of any of the
provisions of this Contract, Contractor will be paid for any portion of the Work which has been
completed to the City's satisfaction, calculated by the percentage amount that portion of the Work
completed and accepted by the City bears to the Total Compensation.
7.2 Termination For Cause. The City may immediately terminate this Contract, take
possession of the Property and all materials thereon and finish the Work by whatever methods it
may deem expedient, upon the occurrence of any one or more of the following events:
(1) If the Contractor should be adjudged a bankrupt.
(2) If the Contractor should make a general assignment for the benefit of its
creditors.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 36 2019
RFB ver. 5-18
(3) If a receiver should be appointed on the account of insolvency of Contractor.
(4) If Contractor should persistently or repeatedly refuse or fail to supply a sufficient
number of properly skilled workmen or proper materials for completion of the Work.
(5) If the Contractor should fail to complete the Work within the time specified in
this Contract.
(6) If the Contractor should fail to complete the Work in compliance with the plans
and specifications, to the City's satisfaction.
(7) If the Contractor should fail to make prompt payment to subcontractors or for
material labor.
(8) If Contractor should persistently disregard laws, ordinances or regulations of
federal, state, or municipal agencies or subdivisions thereof.
(9) If Contractor should persistently disregard instructions of the Mayor or his or her
representative.
(10) If Contractor shall be in breach or violation of any term or provision of this
Contract, or
(11) If the Work is not being performed pursuant to RCW 49.28.050 or 49.28.060.
7.3 Result of Termination. In the event that this Contract is terminated for cause by the
City, the City may do any or all of the following:
(1) Stop payments. The City shall cease any further payments to Contractor and
Contractor shall be obligated to repay any payments it received under this contract.
(2) Complete Work. The City may, but in no event is the City obligated to, complete
the Work, which Work may be completed by the City's agents, employees or
representatives or the City may retain independent persons or entities to complete
the Work. Upon demand, Contractor agrees to pay to the City all of its costs and
expenses in completing such Work.
(3) Take Possession. The City may take possession of the Properly and any
equipment and materials on the Property and may sale the same, the proceeds of
which shall be paid to the City for its damages.
(4) Remedies Not Exclusive. No remedy or election under this Contract shall be
deemed an election by the City but shall be cumulative and in addition to all other
remedies available to the City at law, in equity or by statute.
S. INDEMNIFICATION
8.1 Contractor Indemnification. The Contractor agrees to indemnify, defend, and hold the
City, its elected officials, officers, employees, agents, and volunteers harmless from any and all
claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 37 2019
REB ver. 5-18
and all persons or entities, including, without limitation, their respective agents, licensees, or
representatives, arising from, resulting from, or connected with this Contract to the extent caused
by the negligent acts, errors or omissions of the Contractor, its partners, shareholders, agents,
employees, or by the Contractor's breach of this Contract. Contractor waives any immunity that
may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW.
Contractor's indemnification shall not be limited in any way by any limitation on the amount of
damages, compensation or benefits payable to or by any third party under workers' compensation
acts, disability benefit acts or any other benefits acts or programs.
8.2 City Indemnification. The City agrees to indemnify, defend, and hold the Contractor, its
officers, directors, shareholders, partners, employees, and agents harmless from any and all claims,
demands, losses, actions and liabilities (including costs and attorney fees) to or by any and all
persons or entities, including without limitation, their respective agents, licenses, or
representatives, arising from, resulting from or connected with this Contract to the extent solely
caused by the negligent acts, errors, or omissions of the City, its employees or agents.
8.3 Survival. The provisions of this Section shall survive the expiration or termination of this
Contract with respect to any event occurring prior to such expiration or termination.
9. INSURANCE
9.1 Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance,
in such forms and with such carriers who have a rating which is satisfactory to the City:
(1) Workers' compensation and employer's liability insurance in amounts sufficient
pursuant to the laws of the State of Washington;
(2) Commercial general liability insurance with combined single limits of liability not
less than $5,000,000 for bodily injury, including personal injury or death, products
liability and property damage.
(3) Automobile liability insurance with combined single limits of liability not less than
$2,000,000 for bodily injury, including personal injury or death and property
damage.
9.2 Endorsements. Each insurance policy shall contain, or be endorsed to contain, the
following provisions:
(1) The City, its officers, officials, employees, volunteers and agents shall each be
named as additional insured.
(2) Coverage may not be terminated or reduced in limits except after thirty (30)
days prior written notice by certified mail, return receipt requested, to the City.
(3) Coverage shall be primary and non-contributory insurance as respects the City,
its officials, employees and volunteers. Any insurance or self-insurance maintained
by the City, its officials, employees or volunteers shall be in excess of Contractor's
insurance.
(4) Coverage shall apply to each insured separately against whom claim is made or
suit is brought.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 38 2019
RFB ver. 5-18
(5) Coverage shall be written on an 'occurrence" form as opposed to a "claims
made" or "claims paid" form.
9.3 Verification. Contractor shall furnish the City with certificates of insurance evidencing the
coverage required by the Section, in compliance with the Certificate(s) of Insurance Form attached
hereto as Exhibit "F," which certificate must be executed by a person authorized by the insurer to
bind coverage on its behalf. The City reserves the right to require complete certified copies of all
required insurance policies, at any time.
9.4 Subcontractors. Contractors shall include all subcontractors as additional insured under
its policies or shall furnish separate certificates for each subcontractor. All coverage for
subcontractors shall be subject to all of the requirements stated herein.
9.5 Deductibles and Self -Insured Retentions. Any deductibles or self-insured retentions must
be disclosed by Contractor and approved in writing by the City. At the option of the City, Contractor
shall either reduce or eliminate such deductibles or self-insured retentions or procure a bond
guaranteeing payment for any amounts not covered by the insurance by reason of such deductibles
or self-insured retentions.
9.6 Asbestos Abatement or Hazardous Materials. If asbestos abatement or hazardous
materials work is performed, Contractor shall review coverage with the City's Risk Manager and
provide scope and limits of coverage that are appropriate for the scope of Work and are
satisfactory to the City. Contractor shall not commence any Work until its coverage has been
approved by the Risk Manager.
9.7 Termination.. The Contractor's failure to provide the insurance coverage required by this
Section shall be deemed to constitute non-acceptance of this Contract by the Contractor and the
City may then award this Contract to the next lower bidder.
10. PERFORMANCE/ PAYMENT BOND
Pursuant to RCW 39.08.010, Contractor shall post a Performance/Payment Bond in favor of
the City, in the form attached to this Contract as Exhibit "G" and incorporated by this reference, in
a dollar amount satisfactory to the City; to guarantee Contractor's performance of the Work to the
City's satisfaction; to insure Contractor's performance of all of the provisions of this Contract; and
to guarantee Contractor's payment of all laborers, mechanics, subcontractors and material persons.
Contractor's obligations under this Contract shall not be limited to the dollar amount of the bond.
11. SAFETY
Contractor shall take all necessary precautions for the safety of employees on the work site
and shall comply with all applicable provisions of federal, state and municipal safety and health
laws and codes, including without limitation, all OSHA/WISHA requirements, Safety and Health
Standards for Construction Work (Chapter 296-155 WAC), General Safety and Health Standards
(Chapter 296-24 WAC), and General Occupational Health Standards (Chapter 296-62 WAC).
Contractor shall erect and properly maintain, at all times, all necessary guards, barricades, signals
and other safeguards at all unsafe places at or near the Work for the protection of its employees
and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger
signs warning against any known or unusual hazards and do all other things necessary to prevent
accident or loss of any kind. Contractor shall protect from danger all water, sewer, gas, steam or
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 39 2019
RFB ver. 5-18
other pipes or conduits, and all hydrants and all other property that is likely to become displaced or
damaged by the execution of the Work. The Contractor shall, at its own expense, secure and
maintain a safe storage place for its materials and equipment and is solely responsible for the
same.
12. PREVAILING WAGES
12.1 Wages of Employees. This contract is subject to the minimum wage requirements of
Chapter 39.12 RCW and Chapter 49.28 RCW (as amended or supplemented). On Federal -aid
projects, Federal wage laws and rules also apply. The Hourly minimum rates for wages and fringe
benefits are listed in Appendix B. When Federal wage and fringe benefit rates are listed, the rates
match those identified by the U.S. Department of Labor's "Decision Number" shown in Appendix B.
The Contractor, any subcontractor, and all individuals or firms required by Chapter 39.12
RCW, Chapter 296-127 WAC, or the Federal Davis -Bacon and Related Acts (DBRA) to pay minimum
prevailing wages, shall not pay any worker less than the minimum hourly wage rates and fringe
benefits required by Chapter 39.12 RCW or the DBRA. Higher wages and benefits may be paid.
When the project is subject to both State and Federal hourly minimum rates for wages and
fringe benefits and when the two rates differ for similar kinds of labor, the Contractor shall not pay
less than the higher rate unless the state rates are specifically preempted by Federal law.
The Contractor shall ensure that any firm (Supplier, Manufacturer, or Fabricator) that falls
under the provisions of Chapter 39.12 RCW because of the definition "Contractor" in Chapter 296-
127-010 WAC, complies with all the requirements of Chapter 39.12 RCW.
12.2 Exemptions to Prevailing Wage. The prevailing wage requirements of Chapter 39.12
RCW, and as required in this Contract do not apply to:
(1) Sole owners and their spouses;
(2) Any partner who owns at least 30% of a partnership;
(3) The President, Vice President and Treasurer of a corporation if each one owns at least
30% of the corporation.
12.3 Reporting Requirements. On forms provided by the Industrial Statistician of State L&I,
the Contractor shall submit to the Engineer the following for itself and for each firm covered under
Chapter 39.12 RCW that provided work and materials of the contract:
(1) A copy of an approved "Statement of Intent to Pay Prevailing Wages" State L&I form
number F700-029-000. The City will make no payment under this contract for the work
performed until this statement has been approved by State L&I and a certified copy of the
approved form has been submitted to the City.
(2) A copy of an approved "Affidavit of Prevailing Wages Paid," State L&I form number
F700-007-000. The City will not release to the contractor any funds retained under Chapter
60.28.011 RCW until all of the "Affidavit of Prevailing Wages Paid" forms have been
approved by State L&I and a certified copy of all the approved forms have been submitted
to the City.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 40 2019
RFB ver. 5-18
The Contractor shall be responsible for requesting these forms from the State L&I and for
paying any approval fees required by State L&I.
Certified payrolls are required to be submitted by the Contractor to the City, for the
Contractor and all subcontractors or lower tier subcontractors.
12.4 Disputes. In the event any dispute arises as to what are the prevailing rates of wages
for work of a similar nature and such dispute cannot be resolved by the City and the Contractor,
the matter shall be referred for arbitration to the Director of the Department of Labor and
Industries of the State of Washington and the decision therein shall be final and conclusive and
binding on all parties involved in the dispute.
13. FAILURE TO PAS' SUBCONTRACTORS
In the event the Contractor shall fail to pay any subcontractors or laborers, fail to pay for
any materials, or fail to pay any insurance premiums, the City may terminate this Contract and/or
the City may withhold from the money which may be due the Contractor an amount necessary for
the payment of such subcontractors, laborers, materials or premiums.
14. OWNERSHIP OF DOCUMENTS
All originals and copies of work product, including plans, sketches, layouts, designs, design
specifications, records, files, computer disks, magnetic media, all finished or unfinished documents
or material which may be produced or modified by Contractor while performing the Work shall
become the property of the City and shall be delivered to the City at its request.
15. CONFIDENTIALITY
Any records, reports, information, data or other documents or materials given to or
prepared or assembled by the Contractor under this Contract will be kept as confidential and shall
not be made available to any individual or organization by the Contractor without prior written
approval of the City.
16. !BOOKS AND RECORDS
The Contractor agrees to maintain books, records, and documents which sufficiently and
properly reflect all direct and indirect costs related to the performance of this Contract and such
accounting procedures and practices as may be deemed necessary by the City to assure proper
accounting of all funds paid pursuant to this Contract. These records shall be subject at all
reasonable times to inspection, review or audit by the City, its authorized representative, the State
Auditor, or other governmental officials authorized by law to monitor this Contract.
17. CLEAN UP
At any time ordered by the City and immediately after completion of the Work, the
Contractor shall, at its own expense, clean up and remove all refuse and unused materials of any
kind resulting from the Work. In the event the Contractor fails to perform the necessary clean up,
the City may, but in no event is it obligated to, perform the necessary clean up and the costs
thereof shall be immediately paid by the Contractor to the City and/or the City may deduct its costs
from any remaining payments due to the Contractor.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 41 2019
RFB ver. 5-18
18. CONTRACTOR AND SUBCONTRACTOR RESPONSIBILITY:
18.1 Contractor__ Verification. The Contractor verifies that it has a certificate of registration
with the State of Washington; has a current state unified business identifier number; is not
disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3); has
industrial insurance as required by Title 51 RCW, if applicable; has an employment security
department number as required in Title 50 RCW, if applicable; has a state excise tax registration
number as required in Title 82 RCW, if applicable; possesses a valid electrical contractor license as
required by Chapter 19.28 RCW, if applicable; and possesses an elevator contractor license as
required by Chapter 70.87 RCW, if applicable.
18.2 Subcontractor Contracts. The Contractor shall include the language of this section in
each of its first tier subcontracts, and shall require each of its subcontractors to include the same
language of this section in each of their subcontracts, adjusting only as necessary the terms used
for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide
documentation to the Owner demonstrating that the subcontractor meets the subcontractor
responsibility criteria below. The requirements of this section apply to all subcontractors regardless
of tier.
18.3 Subcontractor Verification. At the time of subcontract execution, the Contractor shall
verify that each of its first tier subcontractors meets the following bidder responsibility criteria:
Have a current certificate of registration in compliance with chapter 18.27 RCW, which must have
been in effect at the time of subcontract bid submittal; Have a current Washington Unified Business
Identifier (UBI) number; Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065(3); Have Industrial Insurance (workers' compensation) coverage for the
subcontractor's employees working in Washington, as required in Title 51 RCW, if applicable; A
Washington Employment Security Department number, as required in Title 50 RCW, if applicable; A
Washington Department of Revenue state excise tax registration number, as required in Title 82
RCW, if applicable; An electrical contractor license, if required by Chapter 19.28 RCW, if applicable;
An elevator contractor license, if required by Chapter 70.87 RCW.
19. GENERAL PROVISIONS
19.1 Entire_ Contract. The Contract Documents contain all of the agreements of the Parties
with respect to any matter covered or mentioned in this Contract and no prior agreements or
understandings pertaining to any such matters shall be effective for any purpose.
19.2 Modification. No provisions of this Contract, including this provision, may be amended
or added to except by agreement in writing signed by the Parties or their respective successors in
interest.
19.3 Full Force and Effect. Any provision of this Contract, which is declared invalid, void or
illegal, shall in no way affect, impair, or invalidate any other provision hereof and such other
provisions shall remain in full force and effect.
19.4 Assignment. The Contractor shall not transfer or assign, in whole or in part, any or all
of its obligations and rights hereunder without the prior written consent of the City. In the event
the City consents to any such assignment or transfer, such consent shall in no way release the
Contractor from any of its obligations or liabilities under this Contract.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 42 2019
RFB ver. 5-18
19.5 Successors In Interest. Subject to the preceding Subsection, this Contract shall be
binding upon and inure to the benefit of the Parties' successors in interest, heirs and assigns.
19.6 Attorney Fees. In the event the City or the Contractor defaults on the performance of
any terms in this Contract, and the Contractor or City places the enforcement of the Contract or
any part thereof, or the collection of any monies due, or to become due hereunder, or recovery of
possession of any belongings, in the hands of an attorney, or file suit upon the same, each Parry
shall pay all its own attorneys' fees, costs and expenses. The venue for any dispute related to this
Contract shall be King County, Washington.
19.7 No + 'alver. Failure of the City to declare any breach or default immediately upon
occurrence thereof, or delay in taking any action in connection with, shall not waive such breach or
default. Failure of the City to declare one breach or default does not act as a waiver of the City's
right to declare another breach or default.
19.8 Governing Law. This Contract shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington.
19.9 Authority. Each individual executing this Contract on behalf of the City and Contractor
represents and warrants that such individuals are duly authorized to execute and deliver this
Contract on behalf of the Contractor or City.
19.10 Notices. Any notices required to be given by the City to Contractor or by the
Contractor to the City shall be delivered to the Parties at the addresses set forth below or by email
to John Mulkey, P.E. at john.mulkey@cityoffederalway.com for the City, and to Talakai
Construction, LLC at 9236 25th Ave SW, Seattle, WA 98106 (or Talakaicon@hotmail.com for the
Contractor. Any notices may be delivered personally to the addressee of the notice, emailed to the
contact listed above, or may be deposited in the United States mail, postage prepaid, to the
address set forth herein. Any notice so posted in the United States mail shall be deemed received
three (3) days after the date of mailing.
19.11 CaLtions. The respective captions of the Sections of this Contract are inserted for
convenience of reference only and shall not be deemed to modify or otherwise affect in any respect
any of the provisions of this Contract.
19.12 Performance. Time is of the essence of this Contract and each and all of its provisions
in which performance is a factor. Adherence to completion dates is essential to the Contractor's
performance of this Contract.
19.13 Compliance with Ethics Code. If a violation of the City's Ethics Resolution No. 91-54,
as amended, occurs as a result of the formation and/or performance of this Contract, this Contract
may be rendered null and void, at the City's option.
19.14 Contlictinci Provisions. In the event of a conflict between the terms and provisions of
any of the Contract Documents, the Mayor or his or her designee shall issue an interpretation of the
controlling document, which interpretation shall be final and binding.
DATED the day and year set forth above.
[signature page follows]
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 43 2019
RFB ver. 5-18
CITY OF FEDERAL WAY:
By:
Im Ferrell, Mayor
33325 8th Avenue South
Federal Way, WA 98003-6325
ATTEST:
E§6kllnie Courtney, CMC, (i Clerk
APPROVED AS TO FORM:
0447-z
-�O/J. Ryan Call, City Attorney
TALAKAI CONSTRUCTION, LLC:
By: -`(Signature) ✓� —�
r
(Name)
923625 th Ave SW
Seattle, WA 98106
(206) 763-2638
STATE OF WASHINGTON
) ss.
COUNTY OF YZ )
On this day personally a ared before me r'/r'f'? � � to me
known to be the % -- of Talakai Construction, LLC that executed
the foregoing instrume t, and "acknowledged the said instrument to be the free and voluntary act
and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated
that he/she was authorized to execute said instrument and that the seal affixed, if any, is the
corporate seal of said corporation.
GIVEN my hand and official seal this f 2019.
�
MICHELLE L BENSON `(jj
Notary Public
Comm or wasntngcon (typed/printed name of notary)
Commission a 154223
My Comm. Expires Aug 28, 2019 Notary Public in and for the 5tateof shin ton.
My commission expires � L'LS I aoR
City of Federal Way
Brook Lake Center Connector Page 44
RFB ver. 5-18
RFB # 19-004
2019
EXHIBIT A
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT.
tit
❑ Original
.t
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: Contractor's UBI Number:
Name & Mailing Address of Public Agency Departmcltt Use Ottl►'
Assigned to:
fate Assigned:
UBI Number:
Notice is herehtr given relative to the rnotaleti m at'contract or nroirvt deccrihed hvinw
Project Name
Contract Number
Job Order Contracting
❑ Yes ❑ No
Description of Wort. Done/Include Jn110(e Addresstes)
Federally funded tr:urspoI Int ion project? ❑ Yes ❑ No (if yes, protide Contract Bond Statement below)
Contractor's NameE-mail
Address Affidavit 1D*
Contractor Address
I cicphone
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
❑ Retainage Bond ❑ Contract/Payinent bond (valid for federally funded transportation projects)
Name: I Bond Number:
Date Contract Awarded
Date Worli Commenced
Dare Work Completed
Date Work Accepted
Were Subcontracters used on this project? If so, please complete Addendum A. ❑Yes ❑ No
Affidavit ID" - No L&I release will be granted until all affidavits are listed.
Contract Amount $
Additions, (+) $ Liquidated Damages $
Reductions (-) $ Amount Disbursed $
Sub -Total $ 0.00 Amount Retained $
Sales Tax Rate
(If various rates apply, please send a bicakdown)
Sales Tax Amount $
TOTAL $ n.nn TOTAL $ 0.00
ivvzc: jnese nvo zotais must oe
Comments:
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract. I NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name:
Email Address:
T"j-
Dapanmont of Revnue
Public Works Section
(360)704-5650
PWC@dor wa gov
REV 310020c(10/26/15) F215-038-00010-2014
Washingmn Bran• nrtenn,rm nl
Labor & Industries
Contract Release
(855) 545-6163, option k 4
ContractRelease@LNI. W AGOV
Title:
Phone Number:
Aff
Employment Security
Department
Reglstratit Inquiry,
Standards & Coordination
Unit
(360) 902-9450
publimorks@esd we gov
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 45 2019
RFB ver. 5-18
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide (mown affidavits at this time. No L&I relemp will he er-anted until all effidmits are listed.
I Sub con tractor's Name: IUBINumber: (Required) I Affidavit ID* I
IFor tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washineton Relay Service by calline 711.
IREV 31 0020e Addendum (10/26/15) F215-038-000 10-2014
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 46 2019
RFB ver. 5-18
EXHIBIT B
CITY OF FEDERAL WAY
CONTRACT CHANGE ORDER AGREEMENT
PROJECT NUMBER CHANGE ORDER NUMBER
PROJECT TITLE
SUMMARY OF PROPOSED CHANGES:
EFFECTIVE DATE
CONTRACTOR
The time provided for completion in the Contract is ❑ Unchanged ❑ Increased ❑ Decreased by Calendar
Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended
herein will apply to this Change Order.
Will this change affect expiration or extent of Insurance coverage? ❑ Yes ❑ No
If "Yes" Will the Policies Be Extended? ❑ Yes ❑ No
PRICE CHANGE LUMP SUM: INCREASE $ DECREASE $
UNIT PRICE:
THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE
ITEM NO. ITEM QTY. UNIT PRICE ADD OR DELETE
TOTAL NET CONTRACT: INCREASE $
DECREASE $
STATEMENT:
Payment for the above work will be in accordance with applicable portions of the standard specifications, and with
the understanding that all materials, workmanship and measurements shall be in accordance with the provisions of
the standard specifications, the contract plans, and the special provisions governing the types of construction. The
execution of this Change Order shall constitute full satisfaction and a waiver of any and all claims by the
Contractor arising out of, or relating in any way to, the Work identified, to be performed, or deleted pursuant to
this Change Order except as specifically described in this Change Order.
DEPARTMENT RECAP TO DATE:
ORIGINAL CONTRACT AMOUNT
PREVIOUS CHANGE ORDERS
THIS CHANGE ORDER
*ADJUSTMENTS
NEW CONTRACT AMOUNT
CONTRACTOR'S SIGNATURE DATE
DIRECTOR'S SIGNATURE
DATE
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 47 2019
RFB ver. 5-18
ADJUSTMENTS
CHANGE ORDER ESTIMATE IS HEREBY ❑ INCREASED
❑ DECREASED
PAY THIS ADJUSTED AMOUNT:
DIRECTOR'S SIGNATURE
City of Federal Way
Brook Lake Center Connector
RFB ver. 5-18
DATE
Page 48
RFB # 19-004
2019
EXHIBIT C
CONTRACTOR'S RETAINAGE OPTION
IDENTIFICATION AND DESCRIPTION
Project Title: BROOK LAKE CENTER CONNECTOR
RFB No: 19-004
Contractor: Talakai Construction, LLC
GENERAL REQUIREMENTS
1. In accordance with applicable State Statutes, a contract retainage not to exceed five percent of the moneys
earned by the contractor will be reserved by the City.
2. All investments selected are subject to City approval.
3. The final disposition of the contract retainage will be made in accordance with applicable State Statutes.
CONTRACTOR'S INSTRUCTIONS
Pursuant to RCW 60.28.011 I hereby notify the City of Federal Way of my instructions for the retainage withheld under
the terms of this contract:
0 Option 1: Retained in a fund by the City of Federal Way. No interest will be paid to the contractor.
Z11-61p't—lon 2: Deposited in an interest bearing account in a bank, mutual savings bank, or savings and loan
association. Interest paid to the contractor. Contractor shall have the bank (or other) execute a separate "City of
Federal Way Retainage Bank Acceptance Agreement" upon contract award. The City will provide the agreement
to the Contractor if this option is selected. ---- r -
0 Option 3: Placed in escrow with a bank or trust company. Contractor shall execute, and have escrow account
holder execute a separate "City of Federal Way Construction Retainage Escrow Agreement" upon contract
award. The City will provide the agreement to the Contractor if this option is selected. All investments are
subject to City approval. The cost of the investment program, and risk thereof, is to be borne entirely by the
contractor.
D Option 4: Contractor shall submit a "Retainage Bond" on City -provided form (Exhibit D of this Agreement).
4i
Contractor Signdtdre Date
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 49 2019
RFB ver. 5-18
EXHIBIT D
RETAINAGE BOND TO CITY OF FEDERAL WAY
BROOK LAKE CENTER CONNECTOR
KNOW ALL PERSONS BY THESE PRESENTS that we, the undersigned, Talakai Construction, LLC, as principal
("Principal'J, and _ . a Corporation organized and existing under the laws of the
State of as a surety Corporation, and qualified under the laws of the State of Washington to
become surety upon bonds of Contractors with Municipal Corporations, as surety ("Surety's, are jointly and severally held
and firmly bonded to the City of Federal Way ("City's in the penal sum of: Fourteen Thousand Sixty One Dollars and
58/100 ($ 14,061.58) for the payment of which sum we bind ourselves and our successors, heirs, administrators or
personal representatives, as the case may be.
A. This obligation is entered into in pursuant to the statutes of the State of Washington and the ordinances,
regulations, standards and policies of the City, as now existing or hereafter amended or adopted.
B. Pursuant to proper authorization, the Mayor is authorized to enter into a certain contract with the Principal,
providing for the Brook Lake Center Connector Project, which contract is incorporated herein by this reference
("Contract's, and
C. Pursuant to State law, Chapter 60.28 RCW, the City is required to reserve from the monies earned by the
Principal pursuant to the contract, a sum not to exceed five percent (5%), said sum to be retained by the City as a trust
fund for the protection and payment of any person or persons, mechanic, subcontractor or material men who shall
perform any labor upon such contract or the doing of such work, and all persons who shall supply such person or persons
or subcontractors with provisions and supplies for the carrying on of such work, and the State with the respect to taxes
imposed pursuant to Title 82 RCW which may be due from said Principal. Every person performing labor or furnishing
supplies towards completion of said improvement or work shall have a lien on said monies so reserved, provided that
such notice of the lien of such claimant shall be given in the manner and within the time provided in RCW 39.08.030 as
now existing and in accordance with any amendments that may hereafter be provided thereto; and
D. State law further provides that with the consent of the City, the Principal may submit a bond for all or any
portion of the amount of funds retained by the public body in a form acceptable to the public body conditioned upon such
bond any proceeds therefrom being made subject to all claims and liens and in the same manner and priority as set forth
retained percentages pursuant to Chapter 60.28 RCW; and
E. The Principal has accepted, or is about to accept, the Contract, and undertake to perform the work therein
provided for in the manner and within the time set forth, for the amount of $ 281,231.50; and
F. The City is prepared to release any required retainage money previously paid by the Principal prior to
acceptance and successful operation and fulfillment of all other terms of said contract upon being indemnified by these
presents,
NOW, THEREFORE, if the Principal shall perform all the provisions of the Contract in the manner and within the
time period prescribed by the City, or within such extensions of time as may be granted under the Contract, and shall pay
all laborers, mechanics, subcontractors and material men or women, and all persons who shall supply the Principal or
subcontractors with provisions and supplies for the carrying on of said work, and if the Principal shall pay to the State all
taxes imposed pursuant to Title 82 RCW which may be due from such Principal as a result of this contract then and in the
event this obligation shall be void; but otherwise it shall be and remain in full force and effect.
And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications
accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any
change, extension of time, alterations or additions to the terms of the Contract or to the Work.
The Surety hereby agrees that modifications and changes may be made in the terms and provisions of the
Contract without notice to Surety, and any such modifications or changes increasing the total amount to be paid the
Principal shall automatically increase the obligation of the Surety on this Retainage Bond in a like amount, such increase,
however, not to exceed twenty-five percent (25%) of the original amount of this bond without consent of the Surety.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 50 2019
RFB ver. 5-18
Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the
Contract, the Surety shall make written commitment to the City that it will either: (a) cure the default itself within a
reasonable time period, or (b) tender to the City, the amount necessary for the City to remedy the default, including legal
fees incurred by the City, or (c) in the event that Surety's evaluation of the dispute is not complete or in the event the
Surety disputes the City's claim of default, the Surety shall notify the City of its finding and its intent, if any, to interplead.
The Surety shall then fulfill its obligations under this bond, according to the option it has elected. Should Surety elect
option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually
incurred by the Surety in curing the default. If the Surety elects option (b), then upon completion of the necessary work,
the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the
Surety and the Surety shall pay to the City any actual costs which exceed the City estimate, limited to the bond amount.
Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below
paragraph, prior to any interplead action.
In the event a dispute should arise between the Parties to this Bond with respect to the City's declaration of
default by the Principal, the Parties agree to participate in at least four hours of mediation to resolve said dispute. The
Parties shall proportionately share in the cost of the mediation. The mediation shall be administered by Judicial Dispute
Resolution, LLC, 1425 Fourth Avenue, Suite 300, Seattle, Washington 98101. The Surety shall not interplead prior to
completion of the mediation.
The parties have executed this instrument under their separate seals this day of
20._, the name and corporate seal of each corporate party hereto affixed, and these presents duly signed by its
undersigned representatives pursuant to authority of its governing body.
CORPORATE SEAL:
CORPORATE SEAL:
TALAKAI CONSTRUCTION, LLC:
By: ,
Title:
9236 25' Ave SW
Seattle, WA 98106
SURETY
By:
Title:
Address:
Attorney -in -Fact
(Attach Power of Attorney)
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 51 2019
RFB ver. 5-18
CERTIFICATES AS TO CORPORATE SEAL
I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the
within bond; that , who signed the said bond on behalf of the Principal, was
of said Corporation; that I know his or her signature thereto is genuine, and
that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its
governing body.
Secretary or Assistant Secretary
I hereby certify that I am the (Assistant) Secretary of the Corporation named as Surety in the within
bond; that , who signed the said bond on behalf of the Surety, was
of the said Corporation; that I know his or her signature thereto is genuine, and
that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its
governing body.
Secretary or Assistant Secretary
APPROVED AS TO FORM:
J. Ryan Call, City Attorney
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 52 2019
RFB ver. 5-18
TO:
AND TO:
EXHIBIT E
NOTICE TO LABOR UNIONS OR OTHER EMPLOYMENT ORGANIZATIONS
NONDISCRIMINATION IN EMPLOYMENT
ALL EMPLOYEES
(Name of Union or Organization)
The undersigned currently holds contract(s) with involving
funds or credit of the City of Federal Way, Washington, or (a) subcontract(s) with a prime
contractor holding such contract(s).
You are advised that, under the provisions of the above contract(s) or subcontract(s) and in
accordance with Section 202 of Executive Order 11246 dated September 24, 1965, the undersigned
is obliged not to discriminate against any employee or applicant of employment because of race,
color, creed or national origin. This obligation not to discriminate in employment includes, but is not
limited to, the following:
EMPLOYMENT, UPGRADING, TRANSFER OR DEMOTION
RECRUITMENT AND ADVERTISING
RATES OF PAY OR OTHER FORMS OF COMPENSATION
SELECTION FOR TRAINING INCLUDING APPRENTICESHIP, LAYOFF OR TERMINATION
This notice is furnished to you pursuant to the provisions of the above contract(s) or
subcontractor(s) and Executive Order 11246.
Copies of this Notice will be posted by the undersigned in conspicuous places available to
employees or applicants for employment.
Complaints may be submitted to: John Mulkey, P.E.
City of Federal Way
33325 8th Avenue South
Federal Way, WA 98003
{Contractor,or subcontractor)
.r
41)
Date
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 53 2019
RFB ver. 5-18
EXHIBIT F
CERTIFICATE OF INSURANCE
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 54 2019
RFB ver. 5-18
DATE (MMIDD/YY)
ACORD CERTIFICATE OF LIABILITY INSURANCE
MAY 3119
PRODUCER
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
SHL IIVSURANCEBROKERAGEINC
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
1 800 829 8908
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
15435 WBEC%ER LANE
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Sir BPRISE, AZ 85379
COMPANIES AFFORDING COVERAGE
COMPANY
A NAUTILUS INSURANCE COMPANY
INSURED
COMPANY
TALAKAI CONSTRUCTION LLC
B
9236 - 25TH AVE S W
SEATTLE WA 98106
COMPANY
C
COMPANY
D
COVERAGES
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY
PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO
WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO
ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.
LIMITS SHOWN MAY HAVE RFFN REDUCED BY PAID CLAIMS
COI
TYPE OF INSURANCE POLICY NUMBER
POLICY EFFECTIVE POLICY EXPIRATION LIMITS
T4
DATE (MMIDDIYV) DATE (MM/DD/YY)
GENERAL LIABILITY
GENERAL AGGREGATE
$ 2,000,000
$ 2,000,000
NN967678
AUG 30 18 AUG 30 19 PRODUICTS-COMP/OP AGI.
)C COMMERCIAL GENERAL LIABILITY
--------------
CLAIMS MADE X OCCUR
PERSONAL & ADV INJURY
$ 1,000,000
$ 1,000,000
A OWNER'S & CONTRACTOR'S PROT
EACH OCCURRENCE
$ 5(),000
FIRE DAMAGE (Any One Fire)
$ 5,000
MED EXP (Any One Person)
AUTOMOBILE LIABILITY
COMBINED SINGLE LIMIT
$
ANY AUTO
ALL OWNED AUTOS
BODILY INJURY
SCHEDULED AUTOS
(Perperson)
3
HIRED AUTOS
BODILY INJURY
$
NON -OWNED AUTOS
(Per accident)
[PROPERTY DAMAGE
$
GARAGE LIABILITY
JAUTO ONLY - EA ACCIDENT $
OTHER THAN AUTO ONLY: i
ANY AUTO
EACH ACCIDENT $
AGGREGATE $
EXCESS LIABILITY
EACH OCCURRENCE Is 3,000,000
A
' UMBRELLA FORM
AN056095
AUG 30 18
AUG 30 19
AGGREGATE $
F $
XOTHER THAN UMBRELLA FORM
WORKERS COMPENSATION AND
WC STATU- EOTH
EMPLOYERS' LIABILITY
T a ` TS
EACH ACCCIDEENN T $
THE PROPRIETOR/ INCL
DISEASE -POLICY LIMIT $
PARTNERSIEXECUTIVE
OFFICERS ARE: F1 EXCL
- -- --
DISEASE -EACH EMPLOYEE $
OTHER:
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS THE CITY OF FEDERAL WAY, ITS OFFICERS, OFFICIALS,
EMPLOYEES, VOLUNTEERS AND AGENTS ARE NAMES AS PRIMARY ADDITIONAL INSURED WITH WAIVER OF SUBROGATION AND NOW
CONTRIBUTORY.
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL MAIL 30 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT.
CITY OF FEDERAL WAY
33325 8TH AVE S
FEDERAL WAY WA
AUTHORIZED REPRESENTATIVE
Attention:y
r
ACORD 25-S (1/96)
Certificate # 9085
DATE (MM/DDIYYYY)
CERTIFICATE OF LIABILITY INSURANCE
05130/2019
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
NAME' Laurie Mata
FAX
Wagner Insurance NW
PHO
Nh Lxes 360-653-3737 {ArC, No): 360-659-5828
EDCRE Imala('wa nernw:com
1375 State Ave r.a�l=.Ess: s
Marysville, Wa 98270 _ _ !NSORER(S) AFFORDING COVERAGE NAIC#
NSURERA;United Financiai Casualty Company
INSURED INSURER B
TALAKAI CONSTRUCTION LLC INSURER C;
9236 25TH AVE SW INSURER 0: _
SEATTLE, WA 98106 INSURER E:
INSURER F
r r%1/CDAr^-CC f FDTIFICATF NIIMRFR• nnnnnnnn-1RS799 RFV11;4f7N NI IMRFR• 3
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT
WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
AUTHORIZED REPRESENTATIVE
INSR TYPE OF INSURANCE ADDL SLiBR POLICY NUMBER MO OCOrA MMlDOyYYYY
LT
LIMITS
(LKM)
COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE
S
_�A L'TJ_RrI_TED
_
CLAIMS -MADE C OCCUR
PREMISES (Ea occurrenca).
S
MED EXP (Any one person)
S
PERSONAL 8 ADV INJURY
$
GEN'L AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE
$
POLICYI�. FILOC
PRODUCT$ - COMP/OP AGG
$
A
AUTOMOBILE LIABILITY
Y
� 05837194-4 01/3012019 o�l3oizo�s
;_,;,_,;c_ -I; _
11000.000
ANY AUTO
BODILY INJURY (Per person)
$
OWNEDX SCHEDULED
BODILY INJURY (Per accident)
$
A
AUTOS ONLY UTOS
HIRED NON -OWNED
�.._...— DAMAGE —
— ----
$
AUTOS ONLY AUTOS ONLY
5
UMBRELLA LIAB OCCUR
EACH OCCURRENCE
S
AGGREGATE
S
EXCESS LIAR CLAIMS -MADE
—DED
S
RETENTION $
WORKERS COMPENSATION
SEATUTE OT
AND EMPLOYERS' LIABILITY YIN
I
ANY PROPRIETORIPARTNER/EXECUTIVE
E.L. EACH ACCIDENT
S
OFFICER/MEMBER EXCLUDED? ❑
N / A
- -
(Mandatory in NH)
E.L. DISEASE - EA EMPLOYEE S
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE- POLICY LIMIT
$
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
CITY OF FEDERAL WAY NAMED AS ADDITIONAL INSURED
rC17TEI 1rniC wni nGD ('AN( -FI I ATInN
U 7988-ZU95 AGUKU GUKPUKAI IUN. All ngnts reserves.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
Printed by LKM on May 30, 2019 at 03:40PM
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
CITY OF FEDERAL WAY
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
33325 8TH AVE S
AUTHORIZED REPRESENTATIVE
FEDERAL WAY, WA 98003
(LKM)
U 7988-ZU95 AGUKU GUKPUKAI IUN. All ngnts reserves.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
Printed by LKM on May 30, 2019 at 03:40PM
PREMIUM IS FOR CONTRACT TERM
AND IS SUBJECT TO ADJUSTMENT
BASED ON THE FINAL CONTRACT AMOUNT.
EXHIBIT G
CITY OF FEDERAL WAY
PERFORMANCE/PAYMENT BOND
KNOW ALL PEOPLE BY THESE PRESENTS:
BOND NUMBER: CE11511000411
EXECUTED IN TRIPLICATE
We, the undersigned Talakai Construction, LLC, C'Principal') and i'hilacfelphia lrsdemnity Insurance Company
the undersigned corporation organized and existing under the laws of the State of Pennsylvania
and legally doing business in the State of Washington as a surety ("Surety', are held and firmly bonded unto
the City of Federal Way, a Washington municipal corporation ("City') in the penal sum of Two Hundred
Eighty -One Thousand Two Hundred Thirty -One and 50/100 Dollars ($281,231.50) for the payment of which
we firmly bind ourselves and our legal representatives, heirs, successors and assigns, jointly and severally.
This obligation is entered into pursuant to the statutes of the State of Washington and the ordinances,
regulations, standards and policies of the City, as now existing or hereafter amended or adopted.
The Principal has entered into an Agreement with the City dated (� , 20LIfor the Brook lake
Connector Project.
NOW, THEREFORE, if the Principal shall perform all the provisions of the Agreement in the manner and within
the time period prescribed by the City, or within such extensions of time as may be granted under the
Agreement, and shall pay all laborers, mechanics, subcontractors and material men or women, and all
persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of
said work, and shall hold the City, their officials, agents, employees and volunteers harmless from any loss or
damage occasioned to any person or property by reason of any carelessness or negligence on the part of the
Principal, or any subcontractor in the performance of said work, and shall indemnify and hold the City
harmless from any damage or expense by reason of failure of performance as specified in the Agreement
within a period of one (1) year after its final acceptance thereof by the City, then and in the event this
obligation shall be void; but otherwise, it shall be and remain in full force and effect.
And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the
specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby
waive notice of any change, extension of time, alterations or additions to the terms of the Agreement or to
the Work.
The Surety hereby agrees that modifications and changes may be made in terms and provisions of the
Agreement without notice to Surety, and any such modifications or changes increasing the total amount to be
paid the Principal shall automatically increase the obligation of the Surety on this Performance Bond in a like
amount, such increase, however, not to exceed twenty-five percent (25%) of the original amount of this
bond without the consent of the Surety.
Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of
the Agreement, the Surety shall make a written commitment to the City that it will either: (a) cure the default
itself within a reasonable time period, or (b) tender to the city, the amount necessary for the City to remedy
the default, including legal fees incurred by the City, or (c) in the event that Surety's evaluation of the dispute
is not complete or in the event the Surety disputes the City's claim of default, the Surety shall notify the City
of its finding and its intent, if any, to interplead. The Surety shall then fulfill its obligations under this bond,
according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the
Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default. If
the Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of
its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety
shall pay to the City any actual costs which exceed the City estimate; limited to the bond amount. Should the
Surety elect option (c), the Parties shall first complete participation in mediation, described in the below
paragraph, prior to any interplead action.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 55 2019
RFB ver. 5-18
In the event a dispute should arise between the Parties to this Bond with respect to the City's declaration of
default by the Principal, the Parties agree to participate in at least four hours of mediation to resolve said
dispute. The Parties shall proportionately share in the cost of the mediation. The mediation shall be
administered by Judicial Dispute Resolution, LLC, 1425 Fourth Avenue, Suite 300, Seattle, Washington 98101.
The Surety shall not interplead prior to completion of the mediation.
DATED this 25th day of April 2019 .
CORPORATE SEAL OF PRINCIPAL:
TAL,AAKAI CONSTRUCTION, LLC:
( - .-f �,By. [��.
(Name of Perste Executing Bcnd1
I
Its:
9236 25TH Ave SW
Seattle, WA 98106
(206) 763-2638
CF -P i IFICATE AS TO CORPORATE SEAL \
r h• x t h i c �a,lca l�a.i
I hereby cer -f that I am the (Assistant) eCretary of Lhe Cat paratiC)ri named as Principal in the
within bond; that)W "' w o signed the said bond on behalf of the Principal, was
M(�h t.✓ of the said Corporation; that I know his or her signature thereto is genuine,
and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of
its governing body.
Secretary of Assistant Secretary
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 56 2019
RFB ver. 5-18
CORPORATE'SEAL OF SURETY:
APPROVED AS TO FORM:
-�v Aiv-
40/3. Ryan Call, City Attorney
Philadelphia Indemnity Insurance Company
SURETY
By:
Attorney -in -Fact'
(Attach Power of Attorney) ''r� ,*,,,.•••., e,
Susan Fournier, Attorney -lid -Fact-
(Name of Person Executin Bo
01 I.
251 South Lake Ave., Ste 360A
Pasadena, CA 91101
(Address)
(626) 639-1321
(Phone)
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 57 2019
RFB ver. 5-18
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Sacramento
On
before me,
Katherine DuPont, Notary Public
(insert name and title of the officer)
personally appeared _ Susan Fournier
who proved to me on the basis of satisfactory evidence to be the person(s) whose riame(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
z
COMM ,lo
WITNESS my hand and official seal.pvb+�2G4i1°T°'�
'.\
Comm.
N®5
Signature (Seal) �i
9312
PHILADELPHIA ONIwEIMNi"I :' INSURANCE COMPANY
UrePlaza, Suite 100
Baia Cyrr.Nyd, PA 1900.1-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and
existing under the laws of the Commonwealth of Pennsyivania, does hereby constitute and appoint.Inhu'l Psec Rv.in Tach Roger Ball. Stephanie Raquel Nakken
& 5usnn Vot rnier of Surety Solutions 1psurgnee Scrviees, Int. City of Rj— Ic., z ,rcltle a. tii:{ tr ol:( :, its true and lawful Attomey-in-fact with full authority to
execute on its behalf bonds, undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the course of its
business and to bind the Company thereby, in an amount not to exceed $5.000,9 -
This Power of Attorney is granted and is signed and sealed by facsimile ender and,by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 14" of November, 2016
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company: (1) Appoint Atlorneyis) in Fact and authorize the Attomey(s) in Fact to
execute on behalf of the Company bonds and underiakmgs, comragLs of indemnity and
other writings obligatory in the nature thereof and to attach the seal of the Company
thereto; and (2) to remove, at any time any such Attorney -in -Fact and revoke the
authority given And be it
FURTHER
RESOLVED: Th::t the signatures of such officers and the seal of the Compaw, may be affixed to any
s -ch Power of Attomey or certificate relating thereto by facs:,r,ile, and any such Power of
Attorney so executed and certified by t'acsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future wrath respect to any bond or
undertaking to which it is attavh: d.
IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS
CORPORATE SEALTO BF. AFFIXED. BY ffS AUTI:ORIZED OFFICE TIAs 27... DAY OF OCTOBER, 2017,
(Seal)
Robert D O'Leary Jr _ Piesident & CFO
Philadelphia Indemnity insurance Company
On this 27" day of October, 2017, before me came the md;vi.ival who executed the preceding instrument, to me personally known, and being by me duly sworn said
that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSUR:INC:E COMPANY; that the seal affixed to said instrument is
the Corporate seal of said Company, that the said Corporate Scat and his signature were duly affixed
Notary Public
residingat:
(Notary Seal)
My cemmission expires
Baia i':ttntid. PR
Se to b 5, 2021 __------__._--
I, Edward Sayago, Corporate Secretary of PHILADI'li-11141A INDEMNITY' li�Sl iRANCL COMPANY, do hereby certtty that the foregoing resolution of the Board of
Directors and the Power of Attorney issued pursuant thereto on the 27" day of October, 20 t7 are true ar,J correct and are still in full force and effect. 1 do further certify
that Robert D O'Leary -.Ir , w'io executed the Power of Attorney as President- was on the (late of execution ufthe attached Power ofAttorney the duly elected President
of PHILADELPHIA iNDEMNi"l Y INSURANCE COMPANY '
f
In Testimony Whereofitlpk tul* j0 -m) name -id at``+xed the facsimi!e ;rai of each Compam. this _ dad of _. ���'� , 2[)"/:;,
• c. ;". - � 9 27
Edward Sayago, Cc.poratc Secretarq
PHILADELPHIA INDI,MNIT) INSURANCE COMPANY
EXHIBIT H
TITLE VI ASSURANCES
During the performance of this contract, the contractor/consultant, for itself, its assignees and
successors in interest (hereinafter referred to as the "contractor') agrees as follows:
1. Compliance with Regulations
The contractor shall comply with the Regulations relative to non-discrimination in federally
assisted programs of United States Department of Transportation (USDOT), Title 49, Code of
Federal Regulations, part 21, as they may be amended from time to time, (hereinafter referred to
as the Regulations), which are herein incorporated by reference and made a part of this contract.
2. Non-discrimination
The contractor, with regard to the work performed by it during the contract, shall not
discriminate on the grounds of race, color, sex, or national origin in the selection and retention of
sub -contractors, including procurement of materials and leases of equipment. The contractor shall
not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the
Regulations, including employment practices when the contract covers a program set forth in
Appendix B of the Regulations.
3. Solicitations for Sub -contracts, Including Procurement of Materials and Equipment
In all solicitations either by competitive bidding or negotiations made by the contractor for
work to be performed under a sub -contract, including procurement of materials or leases of
equipment, each potential sub -contractor or supplier shall be notified by the contractor of the
contractor's obligations under this contract and the Regulations relative to non-discrimination on
the grounds of race, color, sex, or national origin.
4. Information and Reports
The contractor shall provide all information and reports required by the Regulations or
directives issued pursuant thereto, and shall permit access to its books, records, accounts, other
sources of information, and its facilities as may be determined by the contracting agency or the
appropriate federal agency to be pertinent to ascertain compliance with such Regulations, orders
and instructions. Where any information required of a contractor is in the exclusive possession of
another who fails or refuses to furnish this information, the contractor shall so certify to WSDOT or
the USDOT as appropriate, and shall set forth what efforts it has made to obtain the information.
S. Sanctions for Non-compliance
In the event of the contractor's non-compliance with the non-discrimination provisions of
this contract, the contracting agency shall impose such contract sanctions as it or the USDOT may
determine to be appropriate, including, but not limited to: Withholding of payments to the
contractor under the contract until the contractor complies, and/or; Cancellation, termination, or
suspension of the contract, in whole or in part
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 58 2019
RFB ver. 5-18
APPENDIX A
STANDARD PLANS AND DETAILS
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 60 2019
RFB ver. 5-18
6. Incorporation of Provisions
The contractor shall include the provisions of paragraphs (1) through (5) in every sub-
contract, including procurement of materials and leases of equipment, unless exempt by the
Regulations, or directives issued pursuant thereto. The contractor shall take such action with
respect to any sub -contractor or procurement as the contracting agency or USDOT may direct as a
means of enforcing such provisions including sanctions for non-compliance. Provided, however, that
in the event a contractor becomes involved in, or is threatened with, litigation with a sub -contractor
or supplier as a result of such direction, the contractor may request WSDOT enter into such
litigation to protect the interests of the state and, in addition, the contractor may request the
USDOT enter into such litigation to protect the interests of the United States.
City of Federal Way RFB # 19-004
Brook Lake Center Connector Page 59 2019
RFB ver. 5-18
INTRODUCTION TO THE SPECIAL PROVISIONS
(August 14, 2013 APWA GSP)
The work on this project shall be accomplished in accordance with the Standard Specifications
for Road, Bridge and Municipal Construction, 2018 edition, as issued by the Washington State
Department of Transportation (WSDOT) and the American Public Works Association (APWA),
Washington State Chapter (hereafter "Standard Specifications"). The Standard Specifications,
as modified or supplemented by the Amendments to the Standard Specifications and these
Special Provisions, all of which are made a part of the Contract Documents, shall govern all of
the Work.
These Special Provisions are made up of both General Special Provisions (GSPs) from various
sources, which may have project -specific fill-ins; and project -specific Special Provisions. Each
Provision either supplements, modifies, or replaces the comparable Standard Specification, or is
a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion
of the Standard Specifications is meant to pertain only to that particular portion of the section,
and in no way should it be interpreted that the balance of the section does not apply.
The project -specific Special Provisions are not labeled as such. The GSPs are labeled under
the headers of each GSP, with the effective date of the GSP and its source. For example:
(March 8, 2013 APWA GSP)
(April 1, 2013 WSDOT GSP)
(April 12, 2018 CFW GSP)
(***PROJECT -SPECIFIC SPECIAL PROVISION***)
Also incorporated into the Contract Documents by reference are:
a Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted
edition, with Washington State modifications, if any
• WSDOT Standard Plans
® City of Federal Way Public Works Development Standards
■ National Electric Code, current edition
Contractor shall obtain copies of these publications, at Contractor's own expense.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SPA PROJECT #2841 RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
DIVISION 1
GENERAL REQUIREMENTS
DESCRIPTION OF WORK
(March 13, 1995 WSDOT GSP)
This Contract provides for the improvement of the Brook Lake Center Connector Improvements
and other work, all in accordance with the attached Contract Plans, these Contract Provisions,
and the Standard Specifications.
1-01.3 Definitions
(January 4, 2016 APWA GSP)
Delete the heading Completion Dates and the three paragraphs that follow it, and replace them
with the following:
Dates
Bid Opening Date
The date on which the Contracting Agency publicly opens and reads the Bids.
Award Date
The date of the formal decision of the Contracting Agency to accept the lowest
responsible and responsive Bidder for the Work.
Contract Execution Date
The date the Contracting Agency officially binds the Agency to the Contract.
Notice to Proceed Date
The date stated in the Notice to Proceed on which the Contract time begins.
Substantial Completion Date
The day the Engineer determines the Contracting Agency has full and unrestricted use
and benefit of the facilities, both from the operational and safety standpoint, any
remaining traffic disruptions will be rare and brief, and only minor incidental work,
replacement of temporary substitute facilities, plant establishment periods, or correction
or repair remains for the Physical Completion of the total Contract.
Physical Completion Date
The day all of the Work is physically completed on the project. All documentation
required by the Contract and required by law does not necessarily need to be furnished
by the Contractor by this date.
Completion Date
The day all the Work specified in the Contract is completed and all the obligations of the
Contractor under the contract are fulfilled by the Contractor. All documentation required
by the Contract and required by law must be furnished by the Contractor before
establishment of this date.
Final Acceptance Date
The date on which the Contracting Agency accepts the Work as complete.
Supplement this Section with the following:
All references in the Standard Specifications, Amendments, or WSDOT General Special
Provisions, to the terms "Department of Transportation", "Washington State
Transportation Commission", "Commission", "Secretary of Transportation", "Secretary",
"Headquarters", and "State Treasurer" shall be revised to read "Contracting Agency."
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -2 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
All references to the terms "State" or "state" shall be revised to read "Contracting
Agency" unless the reference is to an administrative agency of the State of Washington,
a State statute or regulation, or the context reasonably indicates otherwise.
All references to "State Materials Laboratory" shall be revised to read "Contracting
Agency designated location."
All references to "final contract voucher certification" shall be interpreted to mean the
Contracting Agency form(s) by which final payment is authorized, and final completion
and acceptance granted.
Additive
A supplemental unit of work or group of bid items, identified separately in the Bid
Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition
to the base bid.
Alternate
One of two or more units of work or groups of bid items, identified separately in the Bid
Proposal, from which the Contracting Agency may make a choice between different
methods or material of construction for performing the same work.
Business Day
A business day is any day from Monday through Friday except holidays as listed in
Section 1-08.5.
Contract Bond
The definition in the Standard Specifications for "Contract Bond" applies to whatever
bond form(s) are required by the Contract Documents, which may be a combination of a
Payment Bond and a Performance Bond.
Contract Documents
See definition for "Contract."
Contract Time
The period of time established by the terms and conditions of the Contract within which
the Work must be physically completed.
Notice of Award
The written notice from the Contracting Agency to the successful Bidder signifying the
Contracting Agency's acceptance of the Bid Proposal.
Notice to Proceed
The written notice from the Contracting Agency or Engineer to the Contractor authorizing
and directing the Contractor to proceed with the Work and establishing the date on
which the Contract time begins.
Traffic
Both vehicular and non -vehicular traffic, such as pedestrians, bicyclists, wheelchairs,
and equestrian traffic.
1-02 BID PROCEDURES AND CONDITIONS
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -3 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
1-02.1 Prequalification of Bidders
Delete this Section and replace it with the following:
1-02.1 Qualifications of Bidder
(January 24, 2011 APWA GSP)
Before award of a public works Contract, a bidder
qualifications of RCW 39.04.350(1) to be considered
to be awarded a public works project.
must meet at least the minimum
a responsible bidder and qualified
1-02.2 Plans and Specifications
(June 27, 2011 APWA GSP)
Delete this section and replace it with the following:
Information as to where Bid Documents can be obtained or reviewed can be found in the
Call for Bids (Advertisement for Bids) for the work.
After award of the Contract, Plans and specifications will be issued to the Contractor at
no cost as detailed below:
To Prime Contractor No. of
Sets
Basis of Distribution
Reduced Plans (11" x 17")
1
Furnished automatically upon award.
Contract Provisions
1
Furnished automatically upon award.
Large Plans (e.g., 22" x 34")
1
Furnished only upon request.
Additional Plans and Contract Provisions may be obtained by the Contractor from the
source stated in the Call for Bids, at the Contractor's own expense. Electronic Copies
will be provided by the City
1-02.4 Examination of Plans, Specifications, and Site Work
(June 27, 2011 APWA GSP)
1-02.4(1) General
(August 15, 2016 APWA GSP, Option B)
The first sentence of the last paragraph is revised to read:
Any prospective Bidder desiring an explanation or interpretation of the Bid
Documents, shall request the explanation or interpretation in writing by close of
business three (3) business days preceding the bid opening to allow a written
reply to reach all prospective Bidders before the submission of their Bids.
1-02.4(2) Subsurface Information
(March 8, 2013 APWA GSP)
The second sentence in the first paragraph is revised to read:
The Summary of Geotechnical Conditions and the boring logs, if and when
included as an appendix to the Special Provisions, shall be considered as part of
the Contract.
1-02.5 Proposal Forms
(July 31, 2017 APWA GSP)
Delete this section and replace it with the following:
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -4 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
The Proposal Form will identify the project and its location and describe the work. It will
also list estimated quantities, units of measurement, the items of work, and the materials
to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal
form that call for, but are not limited to, unit prices; extensions; summations; the total bid
amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment
of addenda; the bidder's name, address, telephone number, and signature; the bidder's
UBDE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor's
Registration Number; and a Business License Number, if applicable. Bids shall be
completed by typing or shall be printed in ink by hand, preferably in black ink. The
required certifications are included as part of the Proposal Form.
The Contracting Agency reserves the right to arrange the proposal forms with alternates
and additives, if such be to the advantage of the Contracting Agency. The bidder shall
bid on all alternates and additives set forth in the Proposal Form unless otherwise
specified.
1-02.6 Preparation of Proposal
(July 11, 2018 APWA GSP)
Supplement the second paragraph with the following:
4. If a minimum bid amount has been established for any item, the unit or lump sum
price must equal or exceed the minimum amount stated.
5. Any correction to a bid made by interlineation, alteration, or erasure, shall be
initialed by the signer of the bid.
Delete the last two paragraphs, and replace them with the following:
If no Subcontractor is listed, the Bidder acknowledges that it does not intend to use any
Subcontractor to perform those items of work.
The Bidder shall submit with their Bid a completed Contractor Certification Wage Law
Compliance form, provided by the Contracting Agency. Failure to return this certification
as part of the Bid Proposal package will make this Did Nonresponsive and ineligible for
Award. A Contractor Certification of Wage Law Compliance form is included in the
Proposal Forms.
The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner.
A bid by a corporation shall be executed in the corporate name, by the president or a
vice president (or other corporate officer accompanied by evidence of authority to sign).
A bid by a partnership shall be executed in the partnership name, and signed by a
partner. A copy of the partnership agreement shall be submitted with the Bid Form if any
UDBE requirements are to be satisfied through such an agreement.
A bid by a joint venture shall be executed in the joint venture name and signed by a
member of the joint venture. A copy of the joint venture agreement shall be submitted
with the Bid Form if any UDBE requirements are to be satisfied through such an
agreement.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -5 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
(August 2, 2004 WSDOT GSP, OPTION 15)
Section 1-02.6 is supplemented with the following:
The fifth and sixth paragraphs of Section 1-02.6 are deleted.
1-02.14 Disqualification of Bidders
(May 17, 2018 APWA GSP, OPTION B)
Delete this section and replace it with the following:
A Bidder will be deemed not responsible if the Bidder does not meet the mandatory
bidder responsibility criteria in RCW 39.04.350(1), as amended; or does not meet
Supplemental Criteria 1-7 listed in this Section.
Contracting Agency will verify that the Bidder meets the mandatory bidder responsibility
criteria in RCW 39.04.350(1), and Supplemental Criteria 1-2. Evidence that the Bidder
meets Supplemental Criteria 3-7 shall be provided by the Bidder as stated later in this
Section.
1. Delinquent State Taxes
A. Criterion: The Bidder shall not owe delinquent taxes to the Washington State
Department of Revenue without a payment plan approved by the Department
of Revenue.
B. Documentation: The Bidder, if and when required as detailed below, shall
sign a statement (on a form to be provided by the Contracting Agency) that
the Bidder does not owe delinquent taxes to the Washington State
Department of Revenue, or if delinquent taxes are owed to the Washington
State Department of Revenue, the Bidder must submit a written payment plan
approved by the Department of Revenue, to the Contracting Agency by the
deadline listed below.
2. Federal Debarment
A. Criterion: The Bidder shall not currently be debarred or suspended by the
Federal government.
B. Documentation: The Bidder shall not be listed as having an "active exclusion"
on the U.S. government's "System for Award Management" database
(www.sam.gov).
3. Subcontractor Responsibility
A. Criterion: The Bidder's standard subcontract form shall include the
subcontractor responsibility language required by RCW 39.06.020, and the
Bidder shall have an established procedure which it utilizes to validate the
responsibility of each of its subcontractors. The Bidder's subcontract form
shall also include a requirement that each of its subcontractors shall have
and document a similar procedure to determine whether the sub -tier
subcontractors with whom it contracts are also "responsible" subcontractors
as defined by RCW 39.06.020.
B. Documentation: The Bidder, if and when required as detailed below, shall
submit a copy of its standard subcontract form for review by the Contracting
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -6 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
Agency, and a written description of its procedure for validating the
responsibility of subcontractors with which it contracts.
4. Claims Against Retainaqe and Bands
A. Criterion: The Bidder shall not have a record of excessive claims filed against
the retainage or payment bonds for public works projects in the three years
prior to the bid submittal date, that demonstrate a lack of effective
management by the Bidder of making timely and appropriate payments to its
subcontractors, suppliers, and workers, unless there are extenuating
circumstances and such circumstances are deemed acceptable to the
Contracting Agency.
B. Documentation: The Bidder, if and when required as detailed below, shall
submit a list of the public works projects completed in the three years prior to
the bid submittal date that have had claims against retainage and bonds and
include for each project the following information:
• Name of project
The owner and contact information for the owner;
• A list of claims filed against the retainage and/or payment bond for any of
the projects listed;
• A written explanation of the circumstances surrounding each claim and
the ultimate resolution of the claim.
5. Public Bidding Crime
A. Criterion: The Bidder and/or its owners shall not have been convicted of a
crime involving bidding on a public works contract in the five years prior to the
bid submittal date.
B. Documentation: The Bidder, if and when required as detailed below, shall
sign a statement (on a form to be provided by the Contracting Agency) that
the Bidder and/or its owners have not been convicted of a crime involving
bldding on a publlc works contract.
6. Termination for Cause / Termination for Default
A. Criterion: The Bidder shall not have had any public works contract terminated
for cause or terminated for default by a government agency in the five years
prior to the bid submittal date, unless there are extenuating circumstances
and such circumstances are deemed acceptable to the Contracting Agency.
B. Documentation: The Bidder, if and when required as detailed below, shall
sign a statement (on a form to be provided by the Contracting Agency) that
the Bidder has not had any public works contract terminated for cause or
terminated for default by a government agency in the five years prior to the
bid submittal date; or if Bidder was terminated, describe the circumstances. .
7. Lawsuits
A. Criterion: The Bidder shall not have lawsuits with judgments entered against
the Bidder in the five years prior to the bid submittal date that demonstrate a
pattern of failing to meet the terms of contracts, unless there are extenuating
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -7 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
circumstances and such circumstances are deemed acceptable to the
Contracting Agency
B. Documentation: The Bidder, if and when required as detailed below, shall
sign a statement (on a form to be provided by the Contracting Agency) that
the Bidder has not had any lawsuits with judgments entered against the
Bidder in the five years prior to the bid submittal date that demonstrate a
pattern of failing to meet the terms of contracts, or shall submit a list of all
lawsuits with judgments entered against the Bidder in the five years prior to
the bid submittal date, along with a written explanation of the circumstances
surrounding each such lawsuit. The Contracting Agency shall evaluate these
explanations to determine whether the lawsuits demonstrate a pattern of
failing to meet of terms of construction related contracts
As evidence that the Bidder meets the Supplemental Criteria stated above, the apparent
low Bidder must submit to the Contracting Agency by 12:00 P.M. (noon) of the second
business day following the bid submittal deadline, a written statement verifying that the
Bidder meets the supplemental criteria together with supporting documentation
(sufficient in the sole judgment of the Contracting Agency) demonstrating compliance
with the Supplemental Criteria. The Contracting Agency reserves the right to request
further documentation as needed from the low Bidder and documentation from other
Bidders as well to assess Bidder responsibility and compliance with all bidder
responsibility criteria. The Contracting Agency also reserves the right to obtain
information from third -parties and independent sources of information concerning a
Bidder's compliance with the mandatory and supplemental criteria, and to use that
information in their evaluation. The Contracting Agency may consider mitigating factors
in determining whether the Bidder complies with the requirements of the supplemental
criteria.
The basis for evaluation of Bidder compliance with these mandatory and supplemental
criteria shall include any documents or facts obtained by Contracting Agency (whether
from the Bidder or third parties) including but not limited to: (i) financial, historical, or
operational data from the Bidder; (ii) information obtained directly by the Contracting
Agency from others for whom the Bidder has worked, or other public agencies or private
enterprises; and (iii) any additional information obtained by the Contracting Agency
which is believed to be relevant to the matter.
If the Contracting Agency determines the Bidder does not meet the bidder responsibility
criteria above and is therefore not a responsible Bidder, the Contracting Agency shall
notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees
with this determination, it may appeal the determination within two (2) business days of
the Contracting Agency's determination by presenting its appeal and any additional
information to the Contracting Agency. The Contracting Agency will consider the appeal
and any additional information before issuing its final determination. If the final
determination affirms that the Bidder is not responsible, the Contracting Agency will not
execute a contract with any other Bidder until at least two business days after the Bidder
determined to be not responsible has received the Contracting Agency's final
determination.
Request to Change Supplemental Bidder Responsibility Criteria Prior To Bid: Bidders
with concerns about the relevancy or restrictiveness of the Supplemental Bidder
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -8 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
Responsibility Criteria may make or submit requests to the Contracting Agency to modify
the criteria. Such requests shall be in writing, describe the nature of the concerns, and
propose specific modifications to the criteria. Bidders shall submit such requests to the
Contracting Agency no later than five (5) business days prior to the bid submittal
deadline and address the request to the Project Engineer or such other person
designated by the Contracting Agency in the Bid Documents.
1-02.15 Pre -Award Information
(August 14, 2013 APWA GSP)
Revise this section to read:
Before awarding any contract, the Contracting Agency may require one or more of these
items or actions of the apparent lowest responsible bidder:
1. A complete statement of the origin, composition, and manufacture of any
or all materials to be used,
2. Samples of these materials for quality and fitness tests,
3. A progress schedule (in a form the Contracting Agency requires) showing
the order of and time required for the various phases of the work,
4. A breakdown of costs assigned to any bid item,
5. Attendance at a conference with the Engineer or representatives of the
Engineer,
6. Obtain, and furnish a copy of, a business license to do business in the
city or county where the work is located.
7. Any other information or action taken that is deemed necessary to ensure
that the bidder is the lowest responsible bidder.
1-03 AWARD AND EXECUIJON OF CONTRA T
1-03.1 Consideration of Bids
(January 23, 2006 APWA GSP)
Revise the first paragraph to read:
After opening and reading proposals, the Contracting Agency will check them for
correctness of extensions of the prices per unit and the total price. If a discrepancy
exists between the price per unit and the extended amount of any bid item, the price per
unit will control. If a minimum bid amount has been established for anv item and the
bidder's unit or lump sum price is less than n the minimum specified amount, the
Contracting Agency will unilaterally revise the unit or lump sum price, to the minimum
specified amount and recalculate the extension. The total of extensions, corrected
where necessary, including sales taxes where applicable and such additives and/or
alternates as selected by the Contracting Agency, will be used by the Contracting
Agency for award purposes and to fix the Awarded Contract Price amount and the
amount of the contract bond.
1-03.10) Identical Bid Totals
(January 4, 2016 APWA GSP)
Revise this section to read:
After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then
the tie-breaker will be the Bidder with an equal lowest bid. that proposed to use the
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -9 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
highest percentage of recycled materials in the Project, per the form submitted with the
Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be
determined by drawing as follows: Two or more slips of paper will be marked as follows:
one marked "Winner" and the other(s) marked "unsuccessful." The slips will be folded to
make the marking unseen. The slips will be placed inside a box. One authorized
representative of each Bidder shall draw a slip from the box. Bidders shall draw in
alphabetic order by the name of the firm as registered with the Washington State
Department of Licensing. The slips shall be unfolded and the firm with the slip marked
"Winner" will be determined to be the successful Bidder and eligible for Award of the
Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest
responsive Bid, and with a proposed recycled materials percentage that is exactly equal
to the highest proposed recycled materials amount, are eligible to draw.
1-03.3 Execution of Contract
(October 1, 2005 APWA GSP)
Revise this section to read:
Copies of the Contract Provisions, including the unsigned f=orm of Contract, will be
available for signature by the successful bidder on the first business day following
award. The number of copies to be executed by the Contractor will be determined by the
Contracting Agency.
Within 10 calendar days after the award date, the successful bidder shall return the
signed Contracting Agency -prepared contract, an insurance certification as required by
Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. Before
execution of the contract by the Contracting Agency, the successful bidder shall provide
any pre -award information the Contracting Agency may require under Section 1-02.15.
Until the Contracting Agency executes a contract, no proposal shall bind the Contracting
Agency nor shall any work begin within the project limits or within Contracting Agency -
furnished sites. The Contractor shall bear all risks for any work begun outside such
areas and for any materials ordered before the contract is executed by the Contracting
Agency.
If the bidder experiences circumstances beyond their control that prevents return of the
contract documents within the calendar days after the award date stated above, the
Contracting Agency may grant up to a maximum of 5 additional calendar days for return
of the documents, provided the Contracting Agency deems the circumstances warrant it.
1-03.4 Contract Bond
(July 23, 2015 APWA GSP)
Delete the first paragraph and replace it with the following:
The successful bidder shall provide executed payment and performance bond(s) for the
full contract amount. The bond may be a combined payment and performance bond; or
be separate payment and performance bonds. In the case of separate payment and
performance bonds, each shall be for the full contract amount. The bond(s) shall:
1. Be on Contracting Agency -furnished form(s);
2. Be signed by an approved surety (or sureties) that:
a. Is registered with the Washington State Insurance Commissioner,
and
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -10 PROJECT #284 I RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
b. Appears on the current Authorized Insurance List in the State of
Washington published by the Office of the Insurance
Commissioner,
3. Guarantee that the Contractor will perform and comply with all
obligations, duties, and conditions under the Contract, including but not
limited to the duty and obligation to indemnify, defend, and protect the
Contracting Agency against all losses and claims related directly or
indirectly from any failure:
a. Of the Contractor (or any of the employees, subcontractors, or
lower tier subcontractors of the Contractor) to faithfully perform
and comply with all contract obligations, conditions, and duties, or
b. Of the Contractor (or the subcontractors or lower tier
subcontractors of the Contractor) to pay all laborers, mechanics,
subcontractors, lower tier subcontractors, material person, or any
other person who provides supplies or provisions for carrying out
the work;
4. Be conditioned upon the payment of taxes, increases, and penalties
incurred on the project under titles 50, 51, and 82 RCW; and
5. Be accompanied by a power of attorney for the Surety's officer
empowered to sign the bond; and
6. Be signed by an officer of the Contractor empowered to sign official
statements (sole proprietor or partner). If the Contractor is a corporation,
the bond(s) must be signed by the president or vice president, unless
accompanied by written proof of the authority of the individual signing the
bond(s) to bind the corporation (i.e., corporate resolution, power of
attorney, or a letter to such effect signed by the president or vice
president).
1-03.7 Judicial Review
(July 23, 2015 APWA GSP)
Revise this section to read:
Any decision made by the Contracting Agency regarding the Award and execution of the
Contract or Bid rejection shall be conclusive subject to the scope of judicial review
permitted under Washington Law. Such review, if any, shall be timely filed in the
Superior Court of the county where the Contracting Agency headquarters is located,
provided that where an action is asserted against a county, RCW 36.01.05 shall control
venue and jurisdiction.
1-04.2 Coordination of Contract Documents. Plans, Special Provisions, Specifications
and Addenda
(March 13, 2012 APWA GSP)
Revise the second paragraph to read:
Any inconsistency in the parts of the contract shall be resolved by following this order of
precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth):
1. Addenda,
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -11 PROJECT #284 I RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
2. Proposal Form,
3. Special Provisions,
4. Contract Plans,
5. Amendments to the Standard Specifications,
6. Standard Specifications,
7. Contracting Agency's Standard Plans or Details (if any), and
8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction.
III •� ZteLMIL61211141N�
1-05.4 Conformity With and Deviations from Plans and Stakes
("'PROJECT -SPECIFIC SPECIAL PROVISION''"")
Section 1-05.4 is supplemented with the following:
Contractor Surveying — Path
The boardwalk alignment is not specific to line and grade as it follows the terrain to avoid
trees, stumps slopes and other items to minimize impact to the surrounding wetlands.
The field built portion of the alignment is laid out so that the boardwalk is built within the
planned area are laid out for the path to meet the location for the end of the field built
and the beginning of the pre -assembled sections.
The location for the connecting point of the field built and pre -assembled sections will be
staked in the field. It is vital to have the field built section's alignment centerline meet as
close as possible to that staked location in order for the pre -assembled sections to avoid
obstacles in the path, such as trees and stumps, as laid out in the plans.
The Contractor must have the centerline of the boardwalk at the end of the field
constructed section match the location of the staked location by a tolerance of ±0.01
feet.
1-05.7 Removal of Defective and Unauthorized Work
(October 1, 2005 APWA GSP)
Supplement this section with the following:
If the Contractor fails to remedy defective or unauthorized work within the time specified
in a written notice from the Engineer, or fails to perform any part of the work required by
the Contract Documents, the Engineer may correct and remedy such work as may be
identified in the written notice, with Contracting Agency forces or by such other means as
the Contracting Agency may deem necessary.
If the Contractor fails to comply with a written order to remedy what the Engineer
determines to be an emergency situation, the Engineer may have the defective and
unauthorized work corrected immediately, have the rejected work removed and
replaced, or have work the Contractor refuses to perform completed by using
Contracting Agency or other forces. An emergency situation is any situation when, in the
opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause
serious risk of loss or damage to the public.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SPA PROJECT #2841 RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
Direct or indirect costs incurred by the Contracting Agency attributable to correcting and
remedying defective or unauthorized work, or work the Contractor failed or refused to
perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from
monies due, or to become due, the Contractor. Such direct and indirect costs shall
include in particular, but without limitation, compensation for additional professional
services required, and costs for repair and replacement of work of others destroyed or
damaged by correction, removal, or replacement of the Contractor's unauthorized work.
No adjustment in Contract time or compensation will be allowed because of the delay in
the performance of the work attributable to the exercise of the Contracting Agency's
rights provided by this section.
The rights exercised under the provisions of this section shall not diminish the
Contracting Agency's right to pursue any other avenue for additional remedy or damages
with respect to the Contractor's failure to perform the work as required.
1-05.11 Final Inspection
(October 1, 2005 APWA GSP)
Delete this section and replace it with the following:
1-05.11 Final Inspections and Operat_ional_Test_ing_
1-05.1105 Substantial Completion Date
When the Contractor considers the work to be substantially complete, the Contractor
shall so notify the Engineer and request the Engineer establish the Substantial
Completion Date. The Contractor's request shall list the specific items of work that
remain to be completed in order to reach physical completion. The Engineer will
schedule an inspection of the work with the Contractor to determine the status of
completion. The Engineer may also establish the Substantial Completion Date
unilaterally.
If, after this inspection, the Engineer concurs with the Contractor that the work is
substantially complete and ready for its intended use, the Engineer, by written notice to
the Contractor, will set the Substantial Completion Date. If, after this inspection the
Engineer does not consider the work substantially complete and ready for its intended
use, the Engineer will, by written notice, so notify the Contractor giving the reasons
therefore.
Upon receipt of written notice concurring in or denying substantial completion, whichever
is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized
interruption, the work necessary to reach Substantial and Physical Completion. The
Contractor shall provide the Engineer with a revised schedule indicating when the
Contractor expects to reach substantial and physical completion of the work.
The above process shall be repeated until the Engineer establishes the Substantial
Completion Date and the Contractor considers the work physically complete and ready
for final inspection.
1-05.11(2) Final Inspection and Physical Completion Date
When the Contractor considers the work physically complete and ready for final
inspection, the Contractor by written notice, shall request the Engineer to schedule a
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -13 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
final inspection. The Engineer will set a date for final inspection. The Engineer and the
Contractor will then make a final inspection and the Engineer will notify the Contractor in
writing of all particulars in which the final inspection reveals the work incomplete or
unacceptable. The Contractor shall immediately take such corrective measures as are
necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously,
diligently, and without interruption until physical completion of the listed deficiencies. This
process will continue until the Engineer is satisfied the listed deficiencies have been
corrected.
If action to correct the listed deficiencies is not initiated within 7 days after receipt of the
written notice listing the deficiencies, the Engineer may, upon written notice to the
Contractor, take whatever steps are necessary to correct those deficiencies pursuant to
Section 1-05.7.
The Contractor will not be allowed an extension of Contract time because of a delay in
the performance of the work attributable to the exercise of the Engineer's right
hereunder.
Upon correction of all deficiencies, the Engineer will notify the Contractor and the
Contracting Agency, in writing, of the date upon which the work was considered
physically complete. That date shall constitute the Physical Completion Date of the
Contract, but shall not imply acceptance of the work or that all the obligations of the
Contractor under the Contract have been fulfilled.
1-05.12 Final Acceptance
Add the following new section.
1-05.1.20) One -Year Guarantee Period
(March 8, 2013 APWA GSP)
The Contractor shall return to the project and repair or replace all defects in
workmanship and material discovered within one year after Final Acceptance of
the Work. The Contractor shall start work to remedy any such defects within 7
calendar days of receiving Contracting Agency's written notice of a defect, and
shall complete such work within the time stated in the Contracting Agency's
notice. In case of an emergency, where damage may result from delay or where
loss of services may result, such corrections may be made by the Contracting
Agency's own forces or another contractor, In which case the cost of corrections
shall be paid by the Contractor. In the event the Contractor does not accomplish
corrections within the time specified, the work will be otherwise accomplished
and the cost of same shall be paid by the Contractor.
When corrections of defects are made, the Contractor shall then be responsible
for correcting all defects in workmanship and materials in the corrected work for
one year after acceptance of the corrections by Contracting Agency.
This guarantee is supplemental to and does not limit or affect the requirements
that the Contractor's work comply with the requirements of the Contract or any
other legal rights or remedies of the Contracting Agency.
1-05.13 Superintendents, Labor and Equipment of Contractor
(August 14, 2013 APWA GSP)
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -14 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
Delete the sixth and seventh paragraphs of this section.
1-05.15 Method of Serving Notices
(March 25, 2009 APWA GSP)
Revise the second paragraph to read:
All correspondence from the Contractor shall be directed to the Project Engineer. All
correspondence from the Contractor constituting any notification, notice of protest,
notice of dispute, or other correspondence constituting notification required to be
furnished under the Contract, must be in paper format, hand delivered or sent via mail
delivery service to the Project Engineer's office. Electronic copies such as e-mails or
electronically delivered copies of correspondence will not constitute such notice and will
not comply with the requirements of the Contract.
Add the following new section:
1-05.16 Water and Power
(**"PROJECT -SPECIFIC SPECIAL PROVISION...)
Water and power will be made available at the site for use by the Contactor.
1-05.19 Defects Arising in One Year and Remedies
(February 15, 2019 CFW GSP)
Section 1-05.19 is a new section:
The Contractor shall, at its own sole cost and expense, be responsible for correcting all
defects in workmanship and material discovered within one year after acceptance of this
work by the City of Federal Way. When corrections of defects are made, the Contractor
shall be responsible for correcting all defects in workmanship and/or materials in the
corrected work for one year after acceptance of the corrections by the Owner.
Conducting of tests and inspections, review of specifications or plans, payment for
goods or services, or acceptance by the City does not constitute waiver, modification, or
exclusion of any express or implied warranty or any right under law. This warranty shall
survive termination of this Contract.
The Contractor shall start work to remedy such defects within seven (7) calendar days of
mailing notice of discovery thereof by the Owner and shall complete such work within a
reasonable time. In emergencies, where damage may result from delay or where loss of
services may result, such corrections may be made by the Owner, in which case the cost
shall be borne by the Contractor. In the event the Contractor does not accomplish
corrections at the time specified, the work will be otherwise accomplished and the cost of
same shall be paid by the Contractor. These actions will be pursuant to the provisions of
Section 1-05.8 of the Standard Specifications.
The Contractor shall be liable for any costs, losses, expenses, or damages, including
consequential damages suffered by the Owner resulting from defects in the Contractor's
work including, but not limited to, cost of materials and labor extended by Owner in
making emergency repairs and cost of engineering, inspection and supervision by the
Owner or the Engineer. The Contractor shall hold the Owner harmless from any and all
claims which may be made against the Owner as a result of any defective work, and the
Contractor shall defend any such claims at his own expense.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -15 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
The Contractor agrees the above one-year limitation shall not exclude or diminish the
Owner's rights under any law to obtain damages and recover costs resulting from
defective and unauthorized work discovered after one year but prior to the expiration of
the legal time period set forth in RCW 9.16.040 limiting actions upon a contract in writing
or liability, expressed or implied, arising out of a written agreement. This warranty may
also extend beyond the one year time period pursuant to any other warranties specified
in the Special Provisions, Contract Plans, other parts of the Contract Documents, or
incorporated by this reference.
1-06.6 Recycled Materials
(January 4, 2016 APWA GSP)
Delete this section, including its subsections, and replace it with the following:
The Contractor shall make their best effort to utilize recycled materials in the
construction of the project. Approval of such material use shall be as detailed elsewhere
in the Standard Specifications.
Prior to Physical Completion the Contractor shall report the quantity of recycled
materials that were utilized in the construction of the project for each of the items listed
in Section 9-03.21. The report shall include hot mix asphalt, recycled concrete
aggregate, recycled glass, steel furnace slag and other recycled materials (e.g.
utilization of on-site material and aggregates from concrete returned to the supplier).
The Contractor's report shall be provided on DOT form 350-075 Recycled Materials
Reporting.
1-07 LEGAL RELATIONS AND RE5PONSIBILM1E$ TO THE PUBLIC
1-07.1 Laws to be Observed
(October 1, 2005 APWA GSP)
Supplement this section with the following:
In cases of conflict between different safety regulations, the more stringent regulation
shall apply.
The Washington State Department of Labor and Industries shall be the sole and
paramount administrative agency responsible for the administration of the provisions of
the Washington Industrial Safety and Health Act of 1973 (WISHA).
The Contractor shall maintain at the project site office, or other well-known place at the
project site, all articles necessary for providing first aid to the injured. The Contractor
shall establish, publish, and make known to all employees, procedures for ensuring
immediate removal to a hospital, or doctor's care, persons, including employees, who
may have been injured on the project site. Employees should not be permitted to work
on the project site before the Contractor has established and made known procedures
for removal of injured persons to a hospital or a doctor's care.
The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of
the Contractor's Plant, appliances, and methods, and for any damage or injury resulting
from their failure, or improper maintenance, use, or operation. The Contractor shall be
solely and completely responsible for the conditions of the project site, including safety
for all persons and property in the performance of the work. This requirement shall apply
continuously, and not be limited to normal working hours. The required or implied duty of
the Engineer to conduct construction review of the Contractor's performance does not,
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SPA 6 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
and shall not, be intended to include review and adequacy of the Contractor's safety
measures in, on, or near the project site.
1-07.2 State Taxes
Delete this section, including its sub -sections, in its entirety and replace it with the following:
1-07.2 State Sales Tax
(June 27, 2011 APWA GSP)
The Washington State Department of Revenue has issued special rules on the State
sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The
Contractor should contact the Washington State Department of Revenue for answers to
questions in this area. The Contracting Agency will not adjust its payment if the
Contractor bases a Bid on a misunderstood tax liability.
The Contractor shall include all Contractor -paid taxes in the unit Bid prices or other
Contract amounts. In some cases, however, state retail sales tax will not be included.
Section 1-07.2(2) describes this exception.
The Contracting Agency will pay the retained percentage (or release the Contract Bond if
a FHWA-funded Project) only if the Contractor has obtained from the Washington State
Department of Revenue a certificate showing that all Contract -related taxes have been
paid (RCW 60.28.051). The Contracting Agency may deduct from its payments to the
Contractor any amount the Contractor may owe the Washington State Department of
Revenue, whether the amount owed relates to this Contract or not. Any amount so
deducted will be paid into the proper State fund.
1-07.2(1) State Sales Tax — Rule 171
WAC 458-20-171, and its related rules, apply to building, repairing, or improving
streets, roads, etc., which are owned by a municipal corporation, or political
subdivision of the state, or by the United States, and which are used primarily for
foot or vehicular traffic. This includes storm or combined sewer systems within
and included as a part of the street or road drainage system and power lines
when such are part of the roadway lighting system. For work performed in such
cases, the Contractor shall include Washington State Retail Sales Taxes in the
various unit Bid item prices, or other Contract amounts, including those that the
Contractor pays on the purchase of the materials, equipment, or supplies used or
consumed in doing the work.
1-07.2(2) State Sales Tax — Rule 170
WAC 458-20-170, and its related rules, apply to the constructing and repairing of
new or existing buildings, or other structures, upon real property. This includes,
but is not limited to, the construction of streets, roads, highways, etc., owned by
the state of Washington; water mains and their appurtenances; sanitary sewers
and sewage disposal systems unless such sewers and disposal systems are
within, and a part of, a street or road drainage system; telephone, telegraph,
electrical power distribution lines, or other conduits or lines in or above streets or
roads, unless such power lines become a part of a street or road lighting system;
and installing or attaching of any article of tangible personal property in or to real
property, whether or not such personal property becomes a part of the realty by
virtue of installation.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -17 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
For work performed in such cases, the Contractor shall collect from the
Contracting Agency, retail sales tax on the full Contract price. The Contracting
Agency will automatically add this sales tax to each payment to the Contractor.
For this reason, the Contractor shall not include the retail sales tax in the unit Bid
item prices, or in any other Contract amount subject to Rule 170, with the
following exception.
Exception: The Contracting Agency will not add in sales tax for a payment the
Contractor or a subcontractor makes on the purchase or rental of tools,
machinery, equipment, or consumable supplies not integrated into the project.
Such sales taxes shall be included in the unit Bid item prices or in any other
Contract amount.
1-07.2(3) Services
The Contractor shall not collect retail sales tax from the Contracting Agency on
any Contract wholly for professional or other services (as defined in Washington
State Department of Revenue Rules 138 and 244).
1-07.7 Load Limits
(March 13, 1995 WSDOT GSP, OPTION 6)
Section 1-07.7 is supplemented with the following:
If the sources of materials provided by the Contractor necessitate hauling over roads other
than State Highways, the Contractor shall, at the Contractor's expense, make all
arrangements for the use of the haul routes.
1-07.13 Contractor's Responsibility for Work
1-07.13(4) Repair of Damage
(August 6, 2001 WSDOT GSP)
Section 1-07.13(4) is revised to read:
The Contractor shall promptly repair all damage to either temporary or
permanent work as directed by the Engineer. For damage qualifying for relief
under Sections 1-07.13(1), 1-07.13(2) or 1-07.13(3), payment will be made in
accordance with Section 1-04.4. Payment will be limited to repair of damaged
work only. No payment will be made for delay or disruption of work.
1-07.16 Protection and Restoration of Property
1-07.1.6(2) Vegetation Protection and Restoration
(August 2, 2010 WSDOT GSP)
Section 1-07.16(2) is supplemented with the following:
Vegetation and soil protection zones for trees shall extend out from the trunk to a
distance of 1 foot radius for each inch of trunk diameter at breast height.
Vegetation and soil protection zones for shrubs shall extend out from the stems
at ground level to twice the radius of the shrub.
Vegetation and soil protection zones for herbaceous vegetation shall extend to
encompass the diameter of the plant as measured from the outer edge of the
plant.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -18 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
1-07.18 Public Liability and Property Damage Insurance
Delete this section in its entirety, and replace it with the following:
1-07.18 Insurance
(January 4, 2016 APWA GSP)
1-07.18(1) General Requirements
A. The Contractor shall procure and maintain the insurance described in all subsections of
section 1-07.18 of these Special Provisions, from insurers with a current A. M. Best
rating of not less than A-: VII and licensed to do business in the State of Washington.
The Contracting Agency reserves the right to approve or reject the insurance provided,
based on the insurer's financial condition.
B. The Contractor shall keep this insurance in force without interruption from the
commencement of the Contractor's Work through the term of the Contract and for thirty
(30) days after the Physical Completion date, unless otherwise indicated below.
C. If any insurance policy is written on a claims made form, its retroactive date, and that of
all subsequent renewals, shall be no later than the effective date of this Contract. The
policy shall state that coverage is claims made, and state the retroactive date. Claims -
made form coverage shall be maintained by the Contractor for a minimum of 36 months
following the Completion Date or earlier termination of this Contract, and the Contractor
shall annually provide the Contracting Agency with proof of renewal. If renewal of the
claims made form of coverage becomes unavailable, or economically prohibitive, the
Contractor shall purchase an extended reporting period ("tail") or execute another form
of guarantee acceptable to the Contracting Agency to assure financial responsibility for
liability for services performed.
D. The Contractor's Automobile Liability, Commercial General Liability and Excess or
Umbrella Liability insurance policies shall be primary and non-contributory insurance as
respects the Contracting Agency's insurance, self-insurance, or self-insured pool
coverage. Any insurance, self-insurance, or selr-insured pool coverage ruaintdined by
the Contracting Agency shall be excess of the Contractor's insurance and shall not
contribute with it.
E. The Contractor shall provide the Contracting Agency and all additional insureds with
written notice of any policy cancellation, within two business days of their receipt of such
notice.
F. The Contractor shall not begin work under the Contract until the required insurance has
been obtained and approved by the Contracting Agency
G. Failure on the part of the Contractor to maintain the insurance as required shall
constitute a material breach of contract, upon which the Contracting Agency may, after
giving five business days' notice to the Contractor to correct the breach, immediately
terminate the Contract or, at its discretion, procure or renew such insurance and pay any
and all premiums in connection therewith, with any sums so expended to be repaid to
the Contracting Agency on demand, or at the sole discretion of the Contracting Agency,
offset against funds due the Contractor from the Contracting Agency.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -19 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
H. All costs for insurance shall be incidental to and included in the unit or lump sum prices
of the Contract and no additional payment will be made.
1-07.18(2) Additional Insured
All insurance policies, with the exception of Workers Compensation, and of Professional
Liability and Builder's Risk (if required by this Contract) shall name the following listed
entities as additional insured(s) using the forms or endorsements required herein:
• the Contracting Agency and its officers, elected officials, employees, agents, and
volunteers
• The consultant that completed the preparation of the engineering design and
project plans, and its officers, employees, agents, and subconsultants
• Consultants hired by the Contracting Agency for design, construction support, or
materials testing.
The above -listed entities shall be additional insured(s) for the full available limits of
liability maintained by the Contractor, irrespective of whether such limits maintained by
the Contractor are greater than those required by this Contract, and irrespective of
whether the Certificate of Insurance provided by the Contractor pursuant to 1-07.18(4)
describes limits lower than those maintained by the Contractor.
For Commercial General Liability insurance coverage, the required additional insured
endorsements shall be at least as broad as ISO forms CG 20 10 10 01 for ongoing
operations and CG 20 37 10 01 for completed operations.
1-07.18(3) Subcontractors
The Contractor shall cause each Subcontractor of every tier to provide insurance
coverage that complies with all applicable requirements of the Contractor -provided
insurance as set forth herein, except the Contractor shall have sole responsibility for
determining the limits of coverage required to be obtained by Subcontractors.
The Contractor shall ensure that all Subcontractors of every tier add all entities listed in
1-07.18(2) as additional insureds, and provide proof of such on the policies as required
by that section as detailed in 1-07.18(2) using an endorsement as least as broad as ISO
CG 20 10 10 01 for ongoing operations and CG 20 37 10 01 for completed operations.
Upon request by the Contracting Agency, the Contractor shall forward to the Contracting
Agency evidence of insurance and copies of the additional insured endorsements of
each Subcontractor of every tier as required in 1-07.18(4) Verification of Coverage.
1_-07.18(4) Verification of Coverage
The Contractor shall deliver to the Contracting Agency a Certificate(s) of Insurance and
endorsements for each policy of insurance meeting the requirements set forth herein
when the Contractor delivers the signed Contract for the work. Failure of Contracting
Agency to demand such verification of coverage with these insurance requirements or
failure of Contracting Agency to identify a deficiency from the insurance documentation
provided shall not be construed as a waiver of Contractor's obligation to maintain such
insurance.
Verification of coverage shall include:
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -20 PROJECT #284 I RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
1. An ACORD certificate or a form determined by the Contracting Agency to be
equivalent.
2. Copies of all endorsements naming Contracting Agency and all other entities listed in
1-07.18(2) as additional insured(s), showing the policy number. The Contractor may
submit a copy of any blanket additional insured clause from its policies instead of a
separate endorsement.
3. Any other amendatory endorsements to show the coverage required herein.
4. A notation of coverage enhancements on the Certificate of Insurance shall not satisfy
these requirements — actual endorsements must be submitted.
Upon request by the Contracting Agency, the Contractor shall forward to the Contracting
Agency a full and certified copy of the insurance policy(s). If Builders Risk insurance is
required on this Project, a full and certified copy of that policy is required when the
Contractor delivers the signed Contract for the work.
1-07.18(5) Coverages and Limits
The insurance shall provide the minimum coverages and limits set forth below.
Contractor's maintenance of insurance, its scope of coverage, and limits as required
herein shall not be construed to limit the liability of the Contractor to the coverage
provided by such insurance, or otherwise limit the Contracting Agency's recourse to any
remedy available at law or in equity.
All deductibles and self-insured retentions must be disclosed and are subject to approval
by the Contracting Agency. The cost of any claim payments falling within the deductible
or self-insured retention shall be the responsibility of the Contractor. In the event an
additional insured incurs a liability subject to any policy's deductibles or self-insured
retention, said deductibles or self-insured retention shall be the responsibility of the
Contractor.
1-07.18(5)A Commercial General Liability
Commercial General Liability insurance shall be written on coverage forms at least as
broad as ISO occurrence form CG 00 01, including but not limited to liability arising from
premises, operations, stop gap liability, independent contractors, products -completed
operations, personal and advertising injury, and liability assumed under an insured
contract. There shall be no exclusion for liability arising from explosion, collapse or
underground property damage.
The Commercial General Liability insurance shall be endorsed to provide a per project
general aggregate limit, using ISO form CG 25 03 05 09 or an equivalent endorsement.
Contractor shall maintain Commercial General Liability Insurance arising out of the
Contractor's completed operations for at least three years following Substantial
Completion of the Work.
Such policy must provide the following minimum limits:
$1,000,000 Each Occurrence
$2,000,000 General Aggregate
$2,000,000 Products & Completed Operations Aggregate
$1,000,000 Personal & Advertising Injury each offense
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -21 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
$1,000,000 Stop Gap / Employers' Liability each Accident
1-_0.7._18(5)B Automobile Liability
Automobile Liability shall cover owned, non -owned, hired, and leased vehicles; and shall
be written on a coverage form at least as broad as ISO form CA 00 01. If the work
involves the transport of pollutants, the automobile liability policy shall include MCS 90
and CA 99 48 endorsements.
Such policy must provide the following minimum limit:
$1,000,000 Combined single limit each accident
1-07.18(5)C Workers' Compensation
The Contractor shall comply with Workers' Compensation coverage as required by the
Industrial Insurance laws of the State of Washington.
1-07.18(5)D Excess or Umbrella Liability
(January 4, 2016 APWA GSP)
The Contractor shall provide Excess or Umbrella Liability insurance with limits of not less
than $3,000,000 each occurrence and annual aggregate. This excess or umbrella
liability coverage shall be excess over and as least as broad in coverage as the
Contractor's Commercial General and Auto Liability insurance.
All entities listed under 1-07.18(2) of these Special Provisions shall be named as
additional insureds on the Contractor's Excess or Umbrella Liability insurance policy.
This requirement may be satisfied instead through the Contractor's primary Commercial
General and Automobile Liability coverages, or any combination thereof that achieves
the overall required limits of insurance.
1-07.18(5)J Pollution Liability
(January 4, 2016 APWA GSP)
The Contractor shall provide a Contractors Pollution Liability policy, providing coverage
for claims involving bodily injury, property damage (including loss of use of tangible
property that has not been physically injured), cleanup costs, remediation, disposal or
other handling of pollutants, including costs and expenses incurred in the investigation,
defense, or settlement of claims, arising out of any one or more of the following:
1. Contractor's operations related to this project.
2. Remediation, abatement, repair, maintenance or other work with lead-based
paint or materials containing asbestos.
3. Transportation of hazardous materials away from any site related to this project.
All entities listed under 1-07.18(2) of these Special Provisions shall be named by
endorsement as additional insureds on the Contractors Pollution Liability insurance
policy.
Such Pollution Liability policy shall provide the following minimum limits:
$1,000,000 each loss and annual aggregate
1-07.28_ Communication with Businesses and Property Owners
(April 12, 2018 CFW GSP)
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -22 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
Section 1-07.28 is added:
The Contractor will be responsible for communicating all work activities with the property
owners / tenants that are located adjacent to the project. The Contractor, along with the
City's inspector & project engineer, shall have one formal meeting (door-to-door project
walk-through) with the property owners/tenants prior to the start of construction. It will be
the Contractor's responsibility to initiate and set up the meeting.
Thereafter, the Contractor shall keep the property owners / tenants informed of their
general work locations and upcoming activities by distributing a monthly status/schedule
memo to the businesses. The memo shall be approved by the City's Project Engineer
prior to distribution.
PIE117-ju-• mm nagnema;6*1
Add the following new section:
1-08.0 Preliminary Matters
(May 25, 2006 APWA GSP)
1-08.0(1) Preconstruction Conference
(October 10, 2008 APWA GSP)
Prior to the Contractor beginning the work, a preconstruction conference will be
held between the Contractor, the Engineer, and such other interested parties as
may be invited. The purpose of the preconstruction conference will be:
1. To review the initial progress schedule;
2. To establish a working understanding among the various parties
associated or affected by the work;
3. To establish and review procedures for progress payment, notifications,
approvals, submittals, etc.;
4. To establish normal working hours for the work;
5. To review safety standards and traffic control; and
6. To discuss such other related items as may be pertinent to the work.
The Contractor shall prepare and submit at the preconstruction meeting the
following:
1. A breakdown of all lump sum items;
2. A preliminary schedule of working drawing submittals; and
3. A list of material sources for approval if applicable.
1-08.0(2) Hours of Work
(December 8, 2014 APWA GSP)
Add the following new section:
Except in the case of emergency or unless otherwise approved by the Engineer,
the normal working hours for the Contract shall be any consecutive 8 -hour period
between 7:00 a.m. and 6:00 p.m. Monday through Friday, exclusive of a lunch
break. If the Contractor desires different than the normal working hours stated
above, the request must be submitted in writing prior to the preconstruction
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -23 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
conference, subject to the provisions below. The working hours for the Contract
shall be established at or prior to the preconstruction conference.
All working hours and days are also subject to local permit and ordinance
conditions (such as noise ordinances).
If the Contractor wishes to deviate from the established working hours, the
Contractor shall submit a written request to the Engineer for consideration. This
request shall state what hours are being requested, and why. Requests shall be
submitted for review no later than noon two working days prior to the day(s) the
Contractor is requesting to change the hours.
If the Contracting Agency approves such a deviation, such approval may be
subject to certain other conditions, which will be detailed in writing. For example:
1. On non -Federal aid projects, requiring the Contractor to reimburse the
Contracting Agency for the costs in excess of straight -time costs for
Contracting Agency representatives who worked during such times. (The
Engineer may require designated representatives to be present during the
work. Representatives who may be deemed necessary by the Engineer
include, but are not limited to: survey crews; personnel from the
Contracting Agency's material testing lab; inspectors; and other
Contracting Agency employees or third party consultants when, in the
opinion of the Engineer, such work necessitates their presence.)
2. Considering the work performed on Saturdays, Sundays, and holidays as
working days with regard to the contract time.
3. Considering multiple work shifts as multiple working days with respect to
contract time even though the multiple shifts occur in a single 24-hour
period.
4. If a 4-10 work schedule is requested and approved the non -working day
for the week will be charged as a working day.
5. If Davis Bacon wage rates apply to this Contract, all requirements must
be met and recorded properly on certified payroll.
1-08.1 Subcontracting
(May 172018 APWA GSR OPTION B1
Delete the eighth paragraph.
Revise the ninth paragraph to read:
The Contractor shall comply with the requirements of RCW 39.04.250, 39.76.011,
39.76.020, and 39.76.040, in particular regarding prompt payment to Subcontractors.
Whenever the Contractor withholds payment to a Subcontractor for any reason including
disputed amounts, the Contractor shall provide notice within 10 calendar days to the
Subcontractor with a copy to the Contracting Agency identifying the reason for the
withholding and a clear description of what the Subcontractor must do to have the
withholding released. Retainage withheld by the Contractor prior to completion of the
Subcontractors work is exempt from reporting as a payment withheld and is not included
in the withheld amount. The Contracting Agency's copy of the notice to Subcontractor for
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -24 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
deferred payments shall be submitted to the Engineer concurrently with notification to
the Subcontractor.
1-08.3 Progress Schedule
1-08.3(2)A Type A Progress Schedule
(March 13, 2012 APWA GSP)
Revise this section to read:
The Contractor shall submit 3 copies of a Type A Progress Schedule no later
than at the creconstruction conference, or some other mutually agreed upon
submittal time. The schedule may be a critical path method (CPM) schedule, bar
chart, or other standard schedule format. Regardless of which format used, the
schedule shall identify the critical path. The Engineer will evaluate the Type A
Progress Schedule and approve or return the schedule for corrections within 15
calendar days of receiving the submittal.
1-08.4 Prosecution of Work
Delete this section and replace it with the following:
1-08.4 Notice to Proceed and Prosecution of Work
(July 23, 2015 APWA GSP)
Notice to Proceed will be given after the contract has been executed and the contract
bond and evidence of insurance have been approved and filed by the Contracting
Agency. The Contractor shall not commence with the work until the Notice to Proceed
has been given by the Engineer. The Contractor shall commence construction activities
on the project site within ten days of the Notice to Proceed Date, unless otherwise
approved in writing. The Contractor shall diligently pursue the work to the physical
completion date within the time specified in the contract. Voluntary shutdown or slowing
of operations by the Contractor shall not relieve the Contractor of the responsibility to
complete the work within the time(s) specified in the contract.
When shown in the Plans, the first order of work shall be the installation of high visibility
fencing to delineate all areas for protection or restoration, as described in the Contract.
Installation of high visibility fencing adjacent to the roadway shall occur after the
placement of all necessary signs and traffic control devices in accordance with 1-10.1(2).
Upon construction of the fencing, the Contractor shall request the Engineer to inspect
the fence. No other work shall be performed on the site until the Contracting Agency has
accepted the installation of high visibility fencing, as described in the Contract.
1-08.5 Time for Completion
(September 12, 2016 APWA GSP, OPTION A)
Revise the third and fourth paragraphs to read:
Contract time shall begin on the first working day following the Notice to Proceed Date.
Each working day shall be charged to the contract as it occurs, until the contract work is
physically complete. If substantial completion has been granted and all the authorized
working days have been used, charging of working days will cease. Each week the
Engineer will provide the Contractor a statement that shows the number of working days:
(1) charged to the contract the week before; (2) specified for the physical completion of
the contract; and (3) remaining for the physical completion of the contract. The
statement will also show the nonworking days and any partial or whole day the Engineer
declares as unworkable. Within 10 calendar days after the date of each statement, the
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -25 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
Contractor shall file a written protest of any alleged discrepancies in it. To be considered
by the Engineer, the protest shall be in sufficient detail to enable the Engineer to
ascertain the basis and amount of time disputed. By not filing such detailed protest in
that period, the Contractor shall be deemed as having accepted the statement as
correct. If the Contractor is approved to work 10 hours a day and 4 days_a weeka� 4-10
schedule) and the fifth day of the week in which a 4-10 shift is worked would ordinarily
be charged as a working day then the fifth day of that week will be charged as a working
day whether or not the Contractor works on that day.
Revise the sixth paragraph to read:
The Engineer will give the Contractor written notice of the completion date of the
contract after all the Contractor's obligations under the contract have been performed by
the Contractor. The following events must occur before the Completion Date can be
established:
1. The physical work on the project must be complete; and
2. The Contractor must furnish all documentation required by the contract and
required by law, to allow the Contracting Agency to process final acceptance of
the contract. The following documents must be received by the Project Engineer
prior to establishing a completion date:
a. Certified Payrolls (per Section 1-07.9(5)).
b. Material Acceptance Certification Documents
c. Monthly Reports of Amounts Credited as DBE Participation, as required
by the Contract Provisions.
d. Final Contract Voucher Certification
e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the
Contractor and all Subcontractors
f. Property owner releases per Section 1-07.24
(March 13, 1995 WSDOT GSP, OPTION 7)
Section 1-08.5 is supplemented with the following:
This project shall be physically complete within 30 working days.
1-08.6 Suspension of Work
(January 2, 2018 WSDOT GSP, OPTION 2)
Section 1-08.6 is supplemented with the following:
Contract time may be suspended for procurement of critical materials (Procurement
Suspension). In order to receive a Procurement Suspension, the Contractor shall within
21 calendar days after execution by the Contracting Agency, place purchase orders for
all materials deemed critical by the Contracting Agency for physical completion of the
contract. The Contractor shall provide copies of purchase orders for the critical
materials. Such purchase orders shall disclose the purchase order date and estimated
delivery dates for such critical material.
The Contractor shall show procurement of the materials listed below as activities in the
Progress Schedule. If the approved Progress Schedule indicates the materials
procurement are critical activities, and if the Contractor has provided documentation that
purchase orders are placed for the critical materials within the prescribed 21 calendar
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -26 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
days, then contract time shall be suspended upon physical completion of all critical work
except that work dependent upon the listed critical materials:
*** Pin Pile Foundations ***
Charging of contract time will resume upon delivery of the critical materials to the
Contractor or 120 calendar days after execution by the Contracting Agency, whichever
occurs first.
1-08.9 Liquidated Damages
(August 14, 2013 APWA GSP)
Revise the fourth paragraph to read:
When the Contract Work has progressed to Substantial Completion as defined in the
Contract, the Engineer may determine that the work is Substantially Complete. The
Engineer will notify the Contractor in writing of the Substantial Completion Date. For
overruns in Contract time occurring after the date so established, the formula for
liquidated damages shown above will not apply. For overruns in Contract time occurring
after the Substantial Completion Date, liquidated damages shall be assessed on the
basis of direct engineering and related costs assignable to the project until the actual
Physical Completion Date of all the Contract Work. The Contractor shall complete the
remaining Work as promptly as possible. Upon request by the Project Engineer, the
Contractor shall furnish a written schedule for completing the physical Work on the
Contract.
1-09 MEASUREMENT AND PAYMENT
1-09.9 Payments
(March 13, 2012 APWA GSP)
Delete the first four paragraphs and replace them with the following:
The basis of payment will be the actual quantities of Work performed according to the
Contract and as specified for payment.
The Contractor shall submit a breakdown of the cost of lump sum bid items at the
Preconstruction Conference, to enable the Project Engineer to determine the Work
performed on a monthly basis. A breakdown is not required for lump sum items that
include a basis for incremental payments as part of the respective Specification. Absent
a lump sum breakdown, the Project Engineer will make a determination based on
information available. The Project Engineer's determination of the cost of work shall be
final.
Progress payments for completed work and material on hand will be based upon
progress estimates prepared by the Engineer. A progress estimate cutoff date will be
established at the preconstruction conference.
The initial progress estimate will be made not later than 30 days after the Contractor
commences the work, and successive progress estimates will be made every month
thereafter until the Completion Date. Progress estimates made during progress of the
work are tentative, and made only for the purpose of determining progress payments.
The progress estimates are subject to change at any time prior to the calculation of the
final payment.
The value of the progress estimate will be the sum of the following:
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -27 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
1. Unit Price Items in the Bid Form — the approximate quantity of acceptable units
of work completed multiplied by the unit price.
2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump
sum breakdown for that item, or absent such a breakdown, based on the
Engineer's determination.
3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job
site or other storage area approved by the Engineer.
4. Change Orders — entitlement for approved extra cost or completed extra work
as determined by the Engineer.
Progress payments will be made in accordance with the progress estimate less:
1. Retainage per Section 1-09.9(1), on non FHWA-funded projects;
2. The amount of progress payments previously made; and
3. Funds withheld by the Contracting Agency for disbursement in accordance with
the Contract Documents.
Progress payments for work performed shall not be evidence of acceptable performance
or an admission by the Contracting Agency that any work has been satisfactorily
completed. The determination of payments under the contract will be final in accordance
with Section 1-05.1.
1-09.11 Disputes and Claims
1-09.11(3) Time Limitation and Jurisdiction
(July 23, 2015 APWA GSP)
Revise this section to read:
For the convenience of the parties to the Contract it is mutually agreed by the
parties that any claims or causes of action which the Contractor has against the
Contracting Agency arising from the Contract shall be brought within 180
calendar days from the date of final acceptance (Section 1-05.12) of the Contract
by the Contracting Agency; and it is further agreed that any such claims or
causes of action shall be brought only in the Superior Court of the county where
the Contracting Agency headquarters is located, provides) that where an action is
asserted against a county, RCVV 36.01.05 shall control venue and urisdiction.
The parties understand and agree that the Contractor's failure to bring suit within
the time period provided, shall be a complete bar to any such claims or causes of
action. It is further mutually agreed by the parties that when any claims or
causes of action which the Contractor asserts against the Contracting Agency_
arising from the Contract are filed with the Contracting Agency or initiated in
court, the Contractor shall permit the Contracting Agency to have timely access
to any records deemed necessary by the Contracting Agency to assist in
evaluating the claims or action.
1-09.13 Claim Resolution
1-09.13(3) Claims $250,000 or Less
(October 1, 2005 APWA GSP)
Delete this Section and replace it with the following:
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -28 PROJECT #284 I RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
The Contractor and the Contracting Agency mutually agree that those claims that
total $250,000 or less, submitted in accordance with Section 1-09.11 and not
resolved by nonbinding ADR processes, shall be resolved through litigation
unless the parties mutually agree in writing to resolve the claim through binding
arbitration.
1-05.13(3)A Administration of Arbitration
(July 23, 2015 APWA GSP)
Revise the third paragraph to read:
The Contracting Agency and the Contractor mutually agree to be bound by the
decision of the arbitrator, and judgment upon the award rendered by the
arbitrator may be entered in the Superior Court of the county in Which the
Contracting Agency's headquarters is located, provided_ that where claims subject
to arbitration are asserted against a county, RCW 36.01.05 shall control venue
and 'urisdiction of the Superior Court. The decision of the arbitrator and the
specific basis for the decision shall be in writing. The arbitrator shall use the
Contract as a basis for decisions.
1-10.1 General
1-10.1(2) Description
(April 12, 2018 CFW GSP)
Section 1-10.1(2) is supplemented with the following:
City of Federal Way Project Signs
City of Federal Way Project signs shall be considered incidental to the Contract.
The Contractor shall provide one (1) project sign (4' x 8') per the detail available
from the City.
END OF DIVISION 1
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -29 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
DIVISION 2
EARTHWORK
2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP
2-01.1 Description
(March 13, 1995 WSDOT GSP, OPTION 1)
Section 2-01.1 is supplemented with the following:
Clearing and grubbing on this project shall be performed within the following limits:
Limits for clearing & grubbing shall be as shown on the plans. Clearing shall
include removal of trees as noted on the plans or as directed by the Engineer to
accommodate the improvements. Tree removal shall include removal of stumps
and/or grinding of stumps to a depth at least two feet below finish grade.
2-01.3 Construction Requirements
2-01.3(3) Clearing Limit Fence
(April 12, 2018 CFW GSP)
Section 2-01.3(3) is a new section:
Clearing limit fence shall be 4 -feet high, orange, high density polyethylene
fencing with mesh openings 1%2 -inch by 3 -inches nominal and weigh at least 7
oz. per linear foot. Either wood or steel posts shall be used. Wood posts shall
have minimum dimensions of 1Y2 inches by 1% inches by the minimum length of
5 feet, and shall be free of knots, splits, or gouges. Steel posts shall consist of
either size No. 6 rebar or larger, ASTM A 120 steel pipe with a minimum diameter
of 1 inch, U, T, L or C shape steel posts with a minimum weight of 1.35 lbs./ft. or
other steel posts having equivalent strength and bending resistance to the post
sizes listed. The spacing of the support posts shall be a maximum of 6% feet.
2-01.4 Measurement
Section 2-01.4 is deleted
2-01.5 Payment
Section 2-01.5 is -deleted
2-02 REMOV L F S UCTURES ANLL OBSTRUCTION
2-02.3 Construction Requirements
(February 17, 1998 WSDOT GSP, OPTION 1)
Section 2-02.3 is supplemented with the following:
Removal of Obstructions
The Contractor shall remove and dispose of all items shown on the plans and other
minor items necessary to complete the work. The following partial list of items to be
removed and disposed of is provided for the convenience of the contractor. The
contractor shall review the plans, specifications, and project site to verify other items to
be removed.
Items to be removed include, but is not limited to, the following:
ITEMS TO BE REMOVED iNCUDE, BUT IS NOT LIMITED TO, THE
FOLLOWING:
STATION / ITEM DESCRIPTION QUANTITY
OFFSET I
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -30 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
15+00 to 16+50,
54' RT
Remove bull rail and
connecting items from
existing deck at match point
ITEMS TO BE SALVAGED TO THE CITY INCLUDE, BUT IS NOT LIMITED
TO, THE FOLLOWING:
Removal of pavements, curbs, sidewalks, concrete, and driveway approaches are
included in the "Roadway Excavation Incl. Haul" bid item.
2-02.3(6) Existing Utilities to Remain
(April 12, 2018 CFW GSP)
2-02.3(6) is a new section:
Utilities indicated in the Plans to remain shall be protected
such a manner that they remain functional and undamaged.
that are damaged as a result of Contractor's activity shall be
satisfaction of the Contracting Agency at no additional "cost.
2-02.4 Vacant
Section 2-02.4 is deleted
2-02.5 Payment
Section 2-02.5 is deleted
2-03 ROADWAY EXCAVAIION AND EMBANKMENT
and supported in place in
Utilities indicated to remain
repaired or replaced to the
Section 2-03.3(14)G Backfilling
(April 12, 2018 CFW GSP)
Section 2-03.3(14)G is supplemented with the following:
Remove all water and non -compatible materials from excavations prior to
backfilling or attempting to compact embankment soil. Place native soils or
provide import Gravel Borrow as required to complete the work. Backfill all
embankments in accordance with 2-03.3(14)C, Compacting Earth Embankments,
Method C.
Section 2-03.3(14)N Wet Weather Earthwork
(April 12, 2018 CFW GSP)
Section 2-03.3(14)N is a new section:
Earthwork completed in wet weather or
accomplished in small sections to minimize
section shall be sufficiently small so that the
backfill can be accomplished on the same
compacted and exposed to water. Soil that
under wet conditions shall be
exposure to wet weather. Each
removal of soil and placement of
day. No soil shall be left un -
s too wet for compaction shall be
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -31 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
removed and replaced with Gravel Borrow material. Grading and earthwork
should not be accomplished during periods of heavy continuous rainfall.
2-03.4 Measurement
Section 2-03.4 is deleted
2-03.5 Payment
Section 2-03.5 is deleted
A`ls9l:101VA671101`.IN
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -32 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
DIVISION 3
AGGREGATE PRODUCTION AND ACCEPTANCE
3-01 PRODUCTION FRO U RRY AND PIT SITES
3-01.4 Contractor Furnished Material Sources
3-01.4{1) Acquisition and Development
(April 12, 2018 CFW GSP)
Section 3-01.4(1) is supplemented with the following:
No source has been provided for any materials necessary for the construction of
these improvements.
If the source of material provided by the Contractor necessitates hauling over
roads other than City streets, the Contractor shall, at his own cost and expense,
make all arrangements for the use of haul routes.
END OF DIVISION 3
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -33 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
DIVISION 6
STRUCTURES
6-20 TIMBER/COMEPSIT BOARDWALKS
(...PROJECT -SPECIFIC SPECIAL PROVISION***)
Section 6-20 is a new section:
6-20.1 Description
The work to be performed shall consist of construction of a new boardwalk connecting the
existing boardwalk trail at the West Hylebos Wetland park to the Brook Lake Center, with field
assembled pieces with pin pile foundations, pre -assembled pieces with tire foundations,
approach ramp and ramp landing areas within the corridor as detailed in the project plans.
6-20.2 Materials
Materials required are shown in the plans and shall meet the requirements of the following
sections:
Bolts, Washers, Other Hardware 9-06.22
Timber and Lumber 9-09
Decking Plan Notes
Tire Foundations Plan Notes
Pin Pile Foundations Plan Notes
6-20.2(1) Warranties
A. Manufacturer shall warrant all products to be free from defects in materials and
workmanship for a minimum of 1 year from the date of installation. Manufacturer shall
inspect and repair or replace defective parts during warranty period at no additional cost to
Owner.
6-20.3 Construction Requirements
6-20.3(1) Submittals
A. Submittals for the boardwalk are to be per the Plan Notes and are to be submitted as Type
2 Working Drawings.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -34 PROJECT #2841 RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
6-20.4 Measurement
"Boardwalk Complete" shall
apply, but measurement will
be furnished.
6-20.5 Payment
be per Lump Sum and no specific unit of measurement will
be for the sum total of all items for a complete boardwalk to
Payment will be made in accordance with Section 1-09.1 for the following Bid Item:
"Boardwalk Complete", per lump sum.
The lump sum price for "Boardwalk Complete" shall be measured per lump sum for the
total of all items and material for a complete boardwalk. All items material and labor
necessary to supply and install all pre -assembled sections, field built sections, ramps and
associated landing area, delivery and storage of materials, erosion control, demolition of
existing boardwalk, and restoration of the landing area.
END OF DIVISION 6
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -35 'PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
DIVISION 8
MISCELLANEOUS CONSTRUCTION
8-01 EROSION CONTROL AND WATER POLLUTION CONTROL
8-01.3 Construction Recauirements
8.01.3(1) General
(April 12, 2018 CFW GSP)
The first paragraph of 8-01.3(1) is deleted and replaced with the following:
The Contractor shall install a high visibility fence along the right-of-way lines
shown in the Plans or as instructed by the Engineer.
8-01.3(2) Seedinra, Fertilizinta, and Mulchin
8-01.3(2)B Seeding and Fertilizing
(January 3, 2006 WSDOT GSP, OPTION 3)
Section 8-01.3(2)6 is supplemented with the following:
Grass seed shall be a commercially prepared mix, made up of low
growing species which will grow without irrigation at the project location,
and approved by the Engineer. The application rate shall be two pounds
per 1000 square feet.
(January 3, 2006 WSDOT GSP, OPTION 6)
Section 8-01.3(2)6 is supplemented with the following:
Fertilizer shall be a commercially prepared mix of 10-20-20 and shall be
applied at the rate of 10 pounds per 1000 square feet.
8-01.4 Measurement
Section 8-01.4 is deleted
8-01.5 Payment
Section 8-01.5 is deleted
8-12 CHAIN-LINK FENCE AND WIRE FENCE
8-12.2 Materials
(Special Provision)
Section 8-12.2 is supplemented with the following:
For temporary fencing, posts shall be installed in cement concrete blocks of sufficient
size to properly support and secure the temporary chain link fence. Tiebacks and lateral
bracing shall be installed where necessary to prevent overturning, particularly where the
fence is installed as a barrier between temporary sidewalk and the construction zone.
8-12.4 Measurement
Section 8-01.4 is deleted
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -36 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
8-12.5 Payment
Section 8-01.5 is deleted
END OF DIVISION 8
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -37 PROJECT #284 I RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
DIVISION 9
MATERIALS
9-03 AGGREGATES
9-03.12 Gravel Backfill
9-03.12(6) Pit Run Sand
(April 12, 2018 CFW GSP)
Section 9-03.12(6) is a new section:
Sieve Size Percent Passi
3/8" square 100
U.S. No. 4 90
Sand Equivalent 30 minimum
9-03.14(3) Common Borrow
(April 12, 2018 CFW GSP)
Section 9-03.14(3) is modified with the following requirements:
Material from on-site excavations meeting the requirements for Common Borrow
shall be used to the extent practicable. Material for common borrow shall consist
of granular soil and/or aggregate which is free of trash, wood, debris, and other
deleterious material.
Common Borrow material shall be at the proper moisture content for compaction.
This material is generally moisture sensitive. The natural moisture content shall
range from not more than 1 percent wet of optimum to not more than 3 percent
dry of optimum as determined in accordance with Section 2-03.3(14)D. The
material shall not pump or yield under the weight of compaction equipment and
construction traffic. The Contractor is responsible for protecting the material from
excess moisture wherever/whenever possible. To the extent practicable, this
material should be handled only during non -rainy periods and should be
removed, hauled, placed, and compacted into final embankments without
intermediate handling or stockpiling. Surfaces should be graded and sloped to
drain and should not be left uncompacted.
Common Borrow shall meet the following gradation limits:
Sieve Size Percent Passing (by weight)
6" square100
4" square 90-100
2" square 75-100
U.S. No. 4 50-80
U.S. No. 40 50 max.
U.S. No 200 25 max.
For geosynthetic reinforced walls or slopes, 100percent passing 1'/ -
inch square sieve and 90 to 100 percent passing the 1 -inch square sieve.
Common Borrow shall contain sufficient fines for compaction and to bind the
compacted soil mass together to form a stable surface when heavy construction
equipment is operated on its surface.
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -38 PROJECT #284 / RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
9-14 EROSION CONTROL AND ROADSIDE PLANTING
9-14.1 Topsoil
9-14.1(1) Topsoil Type
(April 12, 2018 CFW GSP)
Section 9-14.1(1) is supplemented with the following:
Topsoil Type A mix shall be 50% pure organic compost and 50% sand or sandy
loam. The soil shall be high in organic content and compromised of fully
composted and mature organic materials.
Refer to Section 9-14.4(8) of the Standard Specifications for compost
requirements. No fresh sawdust or other fresh wood by-products shall be added
to extend the volume after the composting process.
Chemical and physical characteristics of Topsoil Type A shall comply with the
following:
Screen Size 7/16" Maximum
Total Nitrogen 0.25% Minimum
Organic Matter 10% Minimum
pH Range 5.5 to 7.5
Conductivity 5 mmhos/cm Maximum
9-14.2 Seed
(April 12, 2018 CFW GSP)
Section 9-14.2 is supplemented with the following:
The grass seed dealer shall mix the grass seed only. The Contractor shall furnish the
Engineer with a dealer's guaranteed statement of the composition, mixture, and the
percentage of purity and germination of each variety. Seed shall be applied at
manufacturer's recommended rate. Hydroseed shall be composed of the following
varieties mixed in the proportions indicated, or approved equal:
SEEDED LAWN MIXTURE
BY % %
NAME WEIG PURI GERMINATI
HT TY ON
Tall Fescue / Festuca arundinacea
40%
98%
90%
Creeping Red Fescue / Festuca rubra
25%
98%
90%
Highland Colonial Bentgrass / Agrostis
5%
98%
90%
capillaris var. `Highland'
Perennial Rye / Lolimum perenne
30%
95%
90%
(blend of two: 'Fiesta II', `Prelude II',
'Commander'
END DIVISION 9
CITY OF FEDERAL WAY BROOK LAKE CENTER CONNECTOR
MARCH 2019 SP -39 PROJECT #284 I RFB #19-004
CFW SPECIAL PROVISIONS VER. 2019.02
APPENDIX A
STANDARD PLANS AND DETAILS
City of Federal Way RFB # 19-004
Brook Lake Center Connector 2019
RFB ver. 5-18
NOTES:
1. SIGN TO BE CONSTRUCTED OF 3/4" MARINE GRADE PLYWOOD
2. SIGN TO BE SEALED ON ALL SIDES WITH MARINE GRADE ENAMEL (WHITE).
3. PROVIDE 4"x 4" POSTS, PRESSURE TREATED. SITE CONDITIONS MAY REQUIRE
DIFFERENT POST LENGTHS TO KEEP SIGN A PROPER DISTANCE ABOVE PREVAILING
GRADE TO PERMIT PUBLIC VIEWING.
0'-0-
_g
0.5" BORDER
(FEDERAL WAY DARK BLUE)
LOGO PROVIDED0 75"
I I
BY THE CITY
1" BLACK
PUBLIC WORKS DEPARTMENT T
'(253) 835-2700
WHITE�-—
TEXT ON FEDERAL WAY DARN. BLUE
SOLID FEDERAL WAY
LIGHT BLUE BROOK LAKE CENTER
-\ CONNECTOR
z 5'
YOUR CITY AT WORK FOR YOU
1.25 I _ 5• ULACr—
'FUNDED BY: $230,000 SURFACE WATER MANAGEMENT CIP FUNDS PROJECT PARTNERS
OWNER: CITY OF FEDERAL WAY
EST. COMPLETION DATE: AUGUST 2019 CONTRACTOR: —
1 zs':vWWA lfedeWwayxom ENGINEER: PUBLIC WORKS DEPARTMENT
1`
1 25
-o"
—g
r Sarni.�mr�laraEC�sts�:+ai�Ks:�wdan.nr�:
APPENDIX B
PREVAILING WAGE AND BENEFIT CODE KEY
City of Federal Way
Brook Lake Center Connector
RFB ver. 5-18
RFB # 19-004
2019
3/8/2019 about:blank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe
benefits. On public works projects, worker's wage and benefit rates must add to not less than this
total. A brief description of overtime calculation requirements are provided on the Benefit Code
Key.
Journey Level Prevailing Wage Rates for the Effective Date: 03/22/2019
County
Trade
Job Classification
Wage
Holiday Overtime Note
King
Asbestos Abatement Workers
Journey Level
$46.57
5D
1 H
King
Boilermakers
Journey Level
$66.54
5N
1C
King
Brick Mason
Journey Level
$57.32
5A
1M
King
Brick Mason
Pointer -Caulker -Cleaner
$57.32
5A
1M
King
Building Service Employees
Janitor
$24.63
5S
2F
King
Building Service Employees
Traveling Waxer/Shampooer
$25.08
5S
2F
King
Building Service Employees
Window Cleaner (Non -Scaffold)
$28.13
5S
2F
King
Building Service Employees
Window Cleaner (Scaffold)
$29.03
5S
2F
King
Cabinet Makers (In Shop),
Journey Level
$22.74
1
King
Carpenters
Acoustical Worker
$60.04
5D
4C
King
Carpenters
Bridge, Dock And Wharf
$60.04
5D
4C
Carpenters
King
Carpenters
Carpenter
$60.04
5D
4C
King
Carpenters
Carpenters on Stationary Tools
$60.17
5D
4C
King
Carpenters
Creosoted Material
$60.14
5D
4C
King
Carpenters
Floor Finisher
$60.04
5D
4C
King
Carpenters
Floor Layer
$60.04
5D
4C
King
Carpenters
Scaffold Erector
$60.04
5D
4C
King
Cement Masons
Journey Level
$60.07
7A
4U
King
Divers Ft Tenders
Bell/Vehicle or Submersible
$113.60
5D
4C
Operator (Not Under Pressure)
King
Divers Et Tenders
Dive Supervisor/ Master
$76.33
5D
4C
King
Divers Et Tenders
Diver
$113.60
5D
4C 8V
King
Divers Et Tenders
Diver On Standby
$71.33
5D
4C
King
Divers Et Tenders
Diver Tender
$64.71
5D
4C
King
Divers a Tenders
Manifold Operator
$64.71
5D
4C
King
Divers Et Tenders
Manifold Operator Mixed Gas
$69.71
5D
4C
King
Divers Et Tenders
Remote Operated Vehicle
$64.71
5D
4C
Operator/Technician
King
Divers Et Tenders
Remote Operated Vehicle Tender
$60.29
5A
4C
King
Dredge Workers
Assistant Engineer
$56.44
5D
3F
King
Dredge Workers
Assistant Mate (Deckhand)
$56.00
5D
3F
about:blank 1/17
3/8/2019
aboutblank
King
Dredge Workers
Boatmen
$56.44
5D
3F
King
Dredge Workers
Engineer Welder
$57.51
5D
3F
King
Dredge Workers
Leverman, Hydraulic
$58.67
5D
3F
King
Dredge Workers
Mates
$56.44
5D
3F
King
Dredge Workers
Oiler
$56.00
5D
3F
King
Drywall Applicator
Journey Level
$58.48
5D
1H
King
Drywall Tapers
Journey Level
$59.32
5P
1 E
King
Etectrical Fixture Maintenance
Journey Level
$30.59
5L
1E
Workers
King
Electricians - Inside
Cable Splicer
$81.32
7C
4E
King
Electricians - Inside
Cable Splicer (tunnel)
$87.37
7C
4E
King
Electricians - Inside
Certified Welder
$78.55
7C
4E
King
Electricians - Inside
Certified Welder (tunnel)
$84.34
7C
4E
King
Electricians - Inside
Construction Stock Person
$41.49
7C
4E
King
Electricians - Inside
Journey Level
$75.80
7C
4E
King
Electricians - Inside
Journey Level (tunnel)
$81.32
7C
4E
King
Electricians - Motor Shop
Journey Level
$45.08
5A
1 B
King
Electricians - Powerline
Cable Splicer
$79.60
5A
4D
Construction
King
Electricians - Powerline
Certified Line Welder
$72.98
5A
4D
Construction
King
Etectricians - Powerline
Groundperson
$47.94
5A
4D
Construction
King
Electricians - Powerline
Heavy Line Equipment Operator
$72.98
5A
4D
Construction
King
Electricians - Powertine
Journey Level Lineperson
$72.98
5A
4D
Construction
King
Etectricians - Powerline
Line Equipment Operator
$62.06
5A
4D
Construction
King
Electricians - Powerline
Meter Installer
$47.94
5A
4D 8W
Construction
King
Electricians - Powerline
Pole Sprayer
$72.98
5A
4D
Construction
King
Electricians - Powerline
Powderperson
$54.55
5A
4D
Construction
King
Electronic Technicians
Journey Level
$50.57
7E
1E
King
Elevator Constructors
Mechanic
$94.22
7D
4A
King
Elevator Constructors
Mechanic In Charge
$101.73
7D
4A
King
Fabricated Precast Concrete
All Classifications - In-Factory
$18.25
5B
1 R
Products
Work Only
King
Fence Erectors
Fence Erector
$41.45
7A
31
King
Fence Erectors
Fence Laborer
$41.45
7A
31
King
Flaggers
Journey Level
$41.45
7A
31
King
Glaziers
Journey Level
$64.56
7L
1y
King
Heat Ft Frost Insulators And
Journeyman
$73.58
5.1
4H
Asbestos Workers
King
Heating Equipment Mechanics
Journey Level
$82.51
7F
1 E
King
Hod Carriers Mason Tenders
Journey Level
$50.42
7A
31
King
Industrial Power Vacuum Cleaner
Journey Level
$12.00
1
aboutblank
2/17
3/8/2019
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
Inland Boatmen
Inland Boatmen
Inland Boatmen
Inland Boatmen
Inland Boatmen
Inland Boatmen
Inspection/Gleaning/Sealing Of
Sewer Et Water Systems By
Remote Control
Inspection/Cteaning/Sealing Of
Sewer Et Water Systems By
Remote Control
Inspection/Cleaning/Sealing Of
Sewer Et Water Systems By
Remote Control
Inspection/Cleaning/Sealing Of
Sewer Et Water Systems By
Remote Control
Insp ctic3n_/Clealling/Sealing Of
Sewer Et Water Systems By
Remote Control
Insulation Applicators
Ironworkers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
Laborers
about:blank
5D
4C
$69.28
Boat Operator
$61.41
5B
1 K
Cook
$56.48
5B
1K
Deckhand
$57.48
5B
1K
Deckhand Engineer
$58.81
5B
1K
Launch Operator
$58.89
5B
1K
Mate
$57.31
5B
IK
Cleaner Operator, Foamer
$31.49
$50.42
1
Operator
$48.90
7A
31
Grout Truck Operator
$12.00
31
1
Head Operator
$24.91
$48.90
1
Technician
Tv Truck Operator
Journey Level
Journeyman
Air, Gas Or Electric Vibrating
Screed
Airtrac Drill Operator
Ballast Regular Machine
Batch Weighman
Brick Pavers
Brush Cutter
Brush Hog Feeder
Burner
Caisson Worker
Carpenter Tender
Caulker
Cement Dumper -paving
Cement Finisher Tender
Change House Or Dry Shack
Chipping Gun (under 30 Lbs.)
Chipping Gun(30 Lbs. And Over)
Choker Setter
Chuck Tender
Clary Power Spreader
Clean-up Laborer
Concrete Dumper/chute Operator
Concrete Form Stripper
Concrete Placement Crew
Concrete Saw Operator/core
Driller
$19.33 1
$20.45 1
$60.04
5D
4C
$69.28
7N
10
$48.90
7A
31
$50.42
7A
31
$48.90
7A
31
$41.45
7A
31
$48.90
7A
31
$48.90
7A
31
$48.90
7A
31
$48.90
7A
31
$50.42
7A
31
$48.90
7A
31
$48.90
7A
31
$49.81
7A
31
$48.90
7A
31
$48.90
7A
31
$48.90
7A
31
$49.81
7A
31
$48.90
7A
31
$48.90
7A
31
$49.81
7A
31
$48.90
7A
31
$49.81
7A
31
$48.90
7A
31
$49.81
7A
31
$49.81
7A
31
about:blank 3/17
3/8/2019
about:blank
King
Laborers
Crusher Feeder
$41.45
7A
31
King
Laborers
Curing Laborer
$48.90
7A
31
King
Laborers
Demolition: Wrecking Et Moving
$48.90
7A
31
(incl. Charred Material)
King
Laborers
Ditch Digger
$48.90
7A
31
King
Laborers
Diver
$50.42
7A
31
King
Laborers
Drill Operator
$49.81
7A
31
(hydraulic, diamond)
King
Laborers
Dry Stack Walls
$48.90
7A
31
King
Laborers
Dump Person
$48.90
7A
31
King
Laborers
Epoxy Technician
$48.90
7A
31
King
Laborers
Erosion Control Worker
$48.90
7A
31
King
Laborers
Faller Et Bucker Chain Saw
$49.81
7A
31
King
Laborers
Fine Graders
$48.90
7A
31
King
Laborers
Firewatch
$41.45
7A
31
King
Laborers
Form Setter
$48.90
7A
31
King
Laborers
Gabian Basket Builders
$48.90
7A
31
King
Laborers
General Laborer
$48.90
7A
31
King
Laborers
Grade Checker Et Transit Person
$50.42
7A
31
King
Laborers
Grinders
$48.90
7A
31
King
Laborers
Grout Machine Tender
$48.90
7A
31
King
Laborers
Groutmen (pressure)including
$49.81
7A
31
Post Tension Beams
King
Laborers
Guardrail Erector
$48.90
7A
31
King
Laborers
Hazardous Waste Worker (level A)
$50.42
7A
31
King
Laborers
Hazardous Waste Worker (level B)
$49.81
7A
31
King
Laborers
Hazardous Waste Worker (level C)
$48.90
7A
31
King
Laborers
High Scaler
$50.42
7A
31
King
Laborers
Jackhammer
$49.81
7A
31
King
Laborers
Laserbeam Operator
$49.81
7A
31
King
Laborers
Maintenance Person
$48.90
7A
31
King
Laborers
Manhole Builder-mudman
$49.81
7A
31
King
Laborers
Material Yard Person
$48.90
7A
31
King
Laborers
Motorman -dinky Locomotive
$49.81
7A
31
King
Laborers
Nozzleman (concrete Pump,
$49.81
7A
31
Green Cutter When Using
Combination Of High Pressure Air
Et Water On Concrete Et Rock,
Sandblast, Gunite, Shotcrete,
Water Bla
King
Laborers
Pavement Breaker
$49.81
7A
31
King
Laborers
Pilot Car
$41.45
7A
31
King
Laborers
Pipe Layer Lead
$50.42
7A
31
King
Laborers
Pipe Layer/tailor
$49.81
7A
31
King
Laborers
Pipe Pot Tender
$49.81
7A
31
King
Laborers
Pipe Reliner
$49.81
7A
31
King
Laborers
Pipe Wrapper
$49.81
7A
31
King
Laborers
Pot Tender
$48.90
7A
31
abouttlank 4/17
3/8/2019
aboutblank
King
Laborers
Powderman
$50.42
7A 31
King
Laborers
Powderman's Helper
$48.90
7A 31
King
Laborers
Power Jacks
$49.81
7A 31
King
Laborers
Railroad Spike Puller - Power
$49.81
7A 31
King
Laborers
Raker - Asphalt
$50.42
7A 31
King
Laborers
Re-timberman
$50.42
7A 31
King
Laborers
Remote Equipment Operator
$49.81
7A 31
King
Laborers
Rigger/signal Person
$49.81
7A 31
King
Laborers
Rip Rap Person
$48.90
7A 31
King
Laborers
Rivet Buster
$49.81
7A 31
King
Laborers
Rodder
$49.81
7A 31
King
Laborers
Scaffold Erector
$48.90
7A 31
King
Laborers
Scale Person
$48.90
7A 31
King
Laborers
Sloper (over 20")
$49.81
7A 31
King
Laborers
Sloper Sprayer
$48.90
7A 31
King
Laborers
Spreader (concrete)
$49.81
7A 31
King
Laborers
Stake Hopper
$48.90
7A 31
King
Laborers
Stock Piler
$48.90
7A 31
King
Laborers
Tamper Et Similar Electric, Air Et
$49.81
7A 31
Gas Operated Tools
King
Laborers
Tamper (multiple Et Self-
$49.81
7A 31
propelled)
King
Laborers
Timber Person - Sewer (tagger,
$49.81
7A 31
Shorer Et Cribber)
King
Laborers
Toolroom Person (at Jobsite)
$48.90
7A 31.
King
Laborers
Topper
$48.90
7A 31
King
Laborers
Track Laborer
$48.90
7A 31
King
Laborers
Track Liner (power)
$49.81
7A 31
King
Laborers
Traffic Control Laborer
$44.33
7A 31
King
Laborers
Traffic Control Supervisor
$44.33
7A 31
King
Laborers
Truck Spotter
$48.90
7A 31
King
Laborers
Tugger Operator
$49.81
7A 31
King
Laborers
Tunnel Work -Compressed Air
$107.60
7A 31
Worker 0-30 psi
King
Laborers
Tunnel Work -Compressed Air
$112.63
7A 31
Worker 30.01-44.00 psi
King
Laborers
Tunnel Work -Compressed Air
$116.31
7A 31
Worker 44.01-54.00 psi
King
Laborers
Tunnel Work -Compressed Air
$122.01
7A 31
Worker 54.01-60.00 psi
King
Laborers
Tunnel Work -Compressed Air
$124.13
7A 31
Worker 60.01-64.00 psi
King
Laborers
Tunnel Work -Compressed Air
$129.23
7A 31
Worker 64.01-68.00 psi
King
Laborers
Tunnel Work -Compressed Air
$131.13
7A 31
Worker 68.01-70.00 psi
King
Laborers
Tunnel Work -Compressed Air
$133.13
7A 31
Worker 70.01-72.00 psi
King
Laborers
Tunnel Work -Compressed Air
$135.13
7A 31
8R
8R
aboutblank 5/17
3/8/2019
7A
aboutblank
$50.52
7A
Worker 72.01-74.00 psi
King
Laborers
Tunnel Work-Guage and Lock
$48.90
7A
Tender
King
Laborers
Tunnel Work -Miner
King
Laborers
Vibrator
King
Laborers
Vinyl Seamer
King
Laborers
Watchman
King
Laborers
Welder
King
Laborers
Well Point Laborer
King
Laborers
Window Washer/cleaner
King
Laborers - Underground Sewer Et
General Laborer Et Topman
Modular Buitdings
Water
$12.00
King
Laborers - Underground Sewer Et
Pipe Layer
Modular Buildings
Water
$12.00
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
aboutblank
$50.52
7A
31 8Q
$50.52
7A
31 8Q
$49.81
7A
31
$48.90
7A
31
$37.67
7A
31
$49.81
7A
31
$49.81
7A
31
$37.67
7A
31
$48.90
7A
31.
$49.81 7A
Landscape Construction
Landscape Laborer
$37.67
Landscape Construction
Landscape Operator
$63.76
Lathers
Journey Level
$58.48
Marble Setters
Journey Level
$57.32
Metal Fabrication (In Shop),
Fitter
$15.86
Metal Fabrication (In Shop)
Laborer
$12.00
Metal Fabrication (In Shop)
Machine Operator
$13.04
Metal Fabrication (In Shop)
Painter
$12.00
Metal Fabrication (In Shop)
Welder
$15.48
Millwright
Journey Level
$61.54
Modular Buitdings
Cabinet Assembly
$12.00
Modular Buildings
Electrician
$12.00
Modular Buitdings
Equipment Maintenance
$12.00
Modular Buildings
Plumber
$12.00
Modular Buildings
Production Worker
$12.00
Modular Buildings
Tool Maintenance
$12.00
Modular Buildings
Utility Person
$12.00
Muduldl Buildings
Welder
$12.00
Painters
Journey Level
$42.50
Pile Driver
Crew Tender/Technician
$64.71
Pile Driver
Hyperbaric Worker - Compressed
$74.87
Air Worker 0-30.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$79.87
Air Worker 30.01 - 44.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$83.87
Air Worker 44.01 - 54.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$88.87
Air Worker 54.01 - 60.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$91.37
Air Worker 60.01 - 64.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$96.37
Air Worker 64.01 - 68.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$98.37
Air Worker 68.01 - 70.00 PSI
Pile Driver
Hyperbaric Worker - Compressed
$100.37
7A
7A
5D
5A
5D
6Z
5D
5D
5D
5D
5D
5D
5D
5D
5D
31
31
3K
1H
1M
1
1
1
1
1
4C
1
1
1
1
1
1
1
1
2B
4C
4C
8X
4C
4C
4C
4C
4C
4C
4C
6/17
3/8/2019
about:blank
Air Worker 70.01 - 72.00 PSI
King
Pile Driver
Hyperbaric Worker - Compressed
$102.37
5D
4C
Air Worker 72.01 - 74.00 PSI
King
Pile Driver
Journey Level
$60.29
5D
4C
King
Pile Driver
Manifold Operator (LST)
$69.71
5D
4C
King
Plasterers
Journey Level
$56.54
7Q
111
King
Playground Et Park Equipment
Journey Level
$12.00
1
Installers
King
Plumbers Et Pipefitters
Journey Level
$85.69
6Z
1G
King
Power Equipment Operators
Asphalt Plant Operators
$64.83
7A
3K
8X
King
Power Equipment Operators
Assistant Engineer
$60.98
7A
3K
8X
King
Power Equipment Operators
Barrier Machine (zipper)
$64.26
7A
3K
8X
King
Power Equipment Operators
Batch Plant Operator: concrete
$64.26
7A
3K
8X
King
Power Equipment Operators
Bobcat
$60.98
7A
3K
8X
King
Power Equipment Operators
Brokk - Remote Demolition
$60.98
7A
3K
8X
Equipment
King
Power Equipment Operators
Brooms
$60.98
7A
3K
8X
King
Power Equipment Operators
Bump Cutter
$64.26
7A
3K
8X
King
Power Equipment Operators
Cableways
$64.83
7A
3K
8X
King
Power Equipment Operators
Chipper
$64.26
7A
3K
8X
King
Power Equipment Operators
Compressor
$60.98
7A
3K
8X
King
Power Equipment Operators
Concrete Finish Machine - Laser
$60.98
7A
3K
8X
Screed
King
Power Equipment Operators
Concrete Pump - Mounted Or
$63.76
7A
3K
8X
Trailer High Pressure Line Pump,
Pump High Pressure
King
Power Equipment Operators
Concrete Pump: Truck Mount
$64.83
7A
3K
8X
With Boom Attachment Over 42 M
King
Power Equipment Operators
Concrete Pump: Truck Mount
$64.26
7A
3K
8X
With Boom Attachment Up To
42m
King
Power Equipment Operators
Conveyors
$63.76
7A
3K
8X
King
Power Equipment Operators
Cranes friction: 200 tons and over
$66.80
7A
3K
8X
King
Power Equipment Operators
Cranes: 100 tons through 199
$65.48
7A
3K
8X
tons, or 150' of boom (including
jib with attachments)
King
Power Equipment Operators
Cranes: 20 Tons Through 44 Tons
$64.26
7A
3K
8X
With Attachments
King
Power Equipment Operators
Cranes: 200 tons- 299 tons, or
$66.15
7A
3K
8X
250' of boom including jib with
attachments
King
Power Equipment Operators
Cranes: 300 tons and over or 300'
$66.80
7A
3K
8X
of boom including jib with
attachments
King
Power Equipment Operators
Cranes: 45 Tons Through 99 Tons,
$64.83
7A
3K
8X
Under 150' Of Boom (including Jib
With Attachments)
King
Power Equipment Operators
Cranes: A -frame - 10 Tons And
$60.98
7A
3K
8X
Under
King
Power Equipment Operators
Cranes: Friction cranes through
$66.15
7A
3K
8X
199 tons
about:blank 7/17
3/8/2019
about blank
King
Power Equipment Operators
Cranes: through 19 tons with
$63.76
7A
3K
8X
attachments, A-frame over 10
tons
King
Power Equipment Operators
Crusher
$64.26
7A
3K
8X
King
Power Equipment Operators
Deck Engineer/Deck Winches
$64.26
7A
3K
8X
(power)
King
Power Equipment Operators
Derricks, On Building Work
$64.83
7A
3K
8X
King
Power Equipment Operators
Dozers D-9 Et Under
$63.76
7A
3K
8X
King
Power Equipment Operators
Drill Oilers: Auger Type, Truck Or
$63.76
7A
3K
8x
Crane Mount
King
Power Equipment Operators
Drilling Machine
$65.48
7A
3K
8x
King
Power Equipment Operators
Elevator And Man-lift: Permanent
$60.98
7A
3K
8X
And Shaft Type
King
Power Equipment Operators
Finishing Machine, Bidwell And
$64.26
7A
3K
8X
Gamaco Et Similar Equipment
King
Power Equipment Operators
Forklift: 3000 Lbs And Over With
$63.76
7A
3K
8X
Attachments
King
Power Equipment Operators
Forklifts: Under 3000 Lbs. With
$60.98
7A
3K
8X
Attachments
King
Power Equipment Operators
Grade Engineer: Using Blue
$64.26
7A
3K
8X
Prints, Cut Sheets, Etc
King
Power Equipment Operators
Gradechecker/Stakeman
$60.98
7A
3K
8x
King
Power Equipment Operators
Guardrail Punch
$64.26
7A
3K
8X
King
Power Equipment Operators
Hard Tail End Dump Articulating
$64.83
7A
3K
8X
Off- Road Equipment 45 Yards. Et
Over
King
Power Equipment Operators
Hard Tail End Dump Articulating
$64.26
7A
3K
8X
Off-road Equipment Under 45
Yards
King
Power Equipment Operators
Horizontal/ Directional Drill
$63.76
7A
3K
8x
Locator
King
Power Equipment Operators
Horizontal/ Directional Drill
$64.26
7A
3K
8X
Operator
King
Power Equipment Operators
Hydralifts/Boom Trucks Over 10
$63.76
7A
3K
SX
Tons
King
Power Equipment Operators
Hydralifts/Boom Trucks, 10 Tons
$60.98
7A
3K
8X
And Under
King
Power Equipment Operators
Loader, Overhead 8 Yards. Et
$65.48
7A
3K
8x
Over
King
Power Equipment Operators
Loader, Overhead, 6 Yards. But
$64.83
7A
3K
8X
Not Including 8 Yards
King
Power Equipment Operators
Loaders, Overhead Under 6 Yards
$64.26
7A
3K
8x
King
Power Equipment Operators
Loaders, Plant Feed
$64.26
7A
3K
8X
King
Power Equipment Operators
Loaders: Elevating Type Belt
$63.76
7A
3K
8X
King
Power Equipment Operators
Locomotives, All
$64.26
7A
3K
8X
King
Power Equipment Operators
Material Transfer Device
$64.26
7A
3K
8x
King
Power Equipment Operators
Mechanics, All (leadmen - $0.50
$65.48
7A
3K
8X
Per Hour Over Mechanic)
King
Power Equipment Operators
Motor Patrol Graders
$64.83
7A
3K
8x
King
Power Equipment Operators.
Mucking Machine, Mole, Tunnel
$64.83
7A
3K
8x
Drill, Boring, Road Header And/or
Shield
about:blank
8/17
3/8/2019
abouttlank
King
Power Equipment Operators
Oil Distributors, Blower
$60.98
7A
3K
8X
Distribution Ft Mulch Seeding
Operator
King
Power Equipment Operators
Outside Hoists (Elevators And
$63.76
7A
3K
8X
Manlifts), Air Tuggers, Strato
King
Power Equipment Operators
Overhead, Bridge Type Crane: 20
$64.26
7A
3K
8X
Tons Through 44 Tons
King
Power Equipment Operators
Overhead, Bridge Type: 100 Tons
$65.48
7A
3K
SX
And Over
King
Power Equipment Operators
Overhead, Bridge Type: 45 Tons
$64.83
7A
3K
8X
Through 99 Tons
King
Power Equipment Operators
Pavement Breaker
$60.98
7A
3K
8X
King
Power Equipment Operators
Pile Driver (other Than Crane
$64.26
7A
3K
8x
Mount)
King
Power Equipment Operators
Plant Oiler - Asphalt, Crusher
$63.76
7A
3K
SX
King
Power Equipment Operators
Posthole Digger, Mechanical
$60.98
7A
3K
8X
King
Power Equipment Operators
Power Plant
$60.98
7A
3K
8X
King
Power Equipment Operators
Pumps - Water
$60.98
7A
3K
8X
King
Power Equipment Operators
Quad 9, Hd 41, D10 And Over
$64.83
7A
3K
8X
King
Power Equipment Operators
Quick Tower - No Cab, Under 100
$60.98
7A
3K
8X
Feet In Height Based To Boom
King
Power Equipment Operators
Remote Control Operator On
$64.83
7A
3K
SX
Rubber Tired Earth Moving
Equipment
King
Power Equipment Operators
Rigger and Bellman
$60.98
7A
3K
8X
King
Power Equipment Operators
Rigger/Signal Person, BeRman
$63.76
7A
3K
8X
(Certified)
King
Power Equipment Operators
Rollagon
$64.83
7A-
3K
8X
King
Power Equipment Operators
Roller, Other Than Plant Mix
$60.98
7A
3K
8X
King
Power Equipment Operators
Roller, Plant Mix Or Multi -lift
$63.76
7A
3K
8X
Materials
King
Power Equipment Operators
Roto -mill, Roto -grinder
$64.26
7A
3K
8X
King
Power Equipment Operators
Saws - Concrete
$63.76
7A
3K
8X
King
Power Equipment Operators
Scraper, Self Propelled Under 45
$64.26
7A
3K
8X
Yards
King
Power Equipment Operators
Scrapers - Concrete Ft Carry All
$63.76
7A
3K
8X
King
Power Equipment Operators
Scrapers, Self-propelled: 45 Yards
$64.83
7A
3K
8X
And Over
King
Power Equipment Operators
Service Engineers - Equipment
$63.76
7A
3K
8X
King
Power Equipment Operators
Shotcrete/Gunite Equipment
$60.98
7A
3K
8X
King
Power Equipment Operators
Shovel , Excavator, Backhoe,
$63.76
7A
3K
8X
Tractors Under 15 Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoe: Over
$64.83
7A
3K
8X
30 Metric Tons To 50 Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoes,
$64.26
7A
3K
8X
Tractors: 15 To 30 Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoes:
$65.48
7A
3K
8X
Over 50 Metric Tons To 90 Metric
Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoes:
$66.15
7A
3K
8X
Over 90 Metric Tons
about:blank 9/17
3/8/2019
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
about blank
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators
Power Equipment Operators -
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer €t Water
Power Equipment Operators -
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer a Water
Power Equipment Operators -
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer & Water
Powcr Equipment Operators -
Underground Sewer & Water
Power Equipment Operators -
Underground Sewer Et Water
Power E uil2ment rerators-
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer Et Water-
power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer & Water
Power Equipment Operators -
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer Ft Water
about blank
Slipform Pavers
$64.83
7A
Spreader, Topsider Et Screedman
$64.83
7A
Subgrader Trimmer
$64.26
7A
Tower Bucket Elevators
$63.76
7A
Tower Crane Up To 175' In Height
$65.48
7A
Base To Boom
Tower Crane: over 175' through
$66.15
7A
250' in height, base to boom
Tower Cranes: over 250' in height
$66.80
7A
from base to boom
Transporters, All Track Or Truck
$64.83
7A
Type
Trenching Machines
$63.76
7A
Truck Crane Oiler/driver - 100
$64.26
7A
Tons And Over
Truck Crane Oiler/Driver Under
$63.76
7A
100 Tons
Truck Mount Portable Conveyor
$64.26
7A
Welder
$64.83
7A
Wheel Tractors, Farmall Type
$60.98
7A
Yo Yo Pay Dozer
$64.26
7A
Asphalt Plant Operators
$64.83
7A
Assistant Engineer
$60.98
7A
Barrier Machine (zipper)
$64.26
7A
Batch Plant Operator, Concrete
$64.26
7A
Bobcat
$60.98
7A
Brokk - Remote Demolition
$60.98
7A
Equipment
Brooms
$60.98
7A
Bump Cutter
$64.26
7A
Cableways
$64.83
7A
Chipper
$64.26
7A
Compressor
$60.98
7A
Concrete Finish Machine - Laser
$60.98
7A
Screed
Concrete Pump - Mounted Or
$63.76
7A
Trailer High Pressure Line Pump,
Pump High Pressure
Concrete Pump: Truck Mount
$64.83
7A
With Boom Attachment Over 42 M
Concrete Pump: Truck Mount
$64.26
7A
With Boom Attachment Up To
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
8x
8x
8x
8x
8x
8x
8x
8x
8X
8x
8X
8X
8x
8x
8x
8x
8x
8x
8x
8x
8x
8X
8x
8x
8x
8x
8x
8x
8x
8x
10/17
3/8/2019
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
about:blank
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer Et Water
Power Equipment Operators -
Underground Sewer £t Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators-
Undergruurld Sewer Ft WaLer
Power Equipment Operators -
Underground Sewer & Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators-
Undergr-ound Sewer fit Water
Power Equipment Operators -
Underground Sewer Fx Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer €t Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer It Water
Power Equipment Operators -
Underground Sewer & Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer St Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer Ft Water
Power Equipment Operators -
Underground Sewer ft Water
Power Equipment Operators -
Underground Sewer & Water
Power Equipment Operators -
Underground Sewer Fr Water
Power Equipment Operators -
about blank
42m
Conveyors
$63.76
7A
Cranes friction: 200 tons and over
$66.80
7A
Cranes: 100 tons through 199
$65.48
7A
tons, or 150' of boom (including
jib with attachments)
Cranes: 20 Tons Through 44 Tons
$64.26
7A
With Attachments
Cranes: 200 tons- 299 tons, or
$66.15
7A
250' of bourn including jib with
attachments
Cranes: 300 tons and over or 300'
$66.80
7A
of boom including jib with
attachments
Cranes: 45 Tons Through 99 Tons,
$64.83
7A
Under 150' Of Boom (including Jib
With Attachments)
Cranes: A -frame - 10 Tons And
$60.98
7A
Under
Cranes: Friction cranes through
$66.15
7A
199 tons
Cranes: through 19 tons with
$63.76
7A
attachments, A -frame over 10
tons
Crusher
$64.26
7A.
Deck Engineer/Deck Winches
$64.26
7A
(power)
Derricks, On Building Work
$64.83
7A
Dozers D-9 8 Under
$63.76
7A.
Drill Oilers: Auger Type, Truck Or
$63.76
7A
Crane Mount
Drilling Machine
$65.48
7A
Elevator And Man -lift: Permanent
$60.98
7A
And Shaft Type
Finishing Machine, Bidwell And
$64.26
7A
Gamaco ft Similar Equipment
Forklift: 3000 Lbs And Over With
$63.76
7A
Attachments
Forklifts: Under 3000 Lbs. With
$60.98
7A
Attachments
Grade Engineer: Using Blue
$64.26
7A
Prints, Cut Sheets, Etc
Gradechecker/Stakeman
$60.98
7A
Guardrail Punch
$64.26
7A
Hard Tail End Dump Articulating
$64.83
7A
3K 8X
3K 8X
3K 8x
3K 8X
3K 8x
3K 8x
3K 8x
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
8x
8X
8x
8x
8x
8X
8x
8X
8x
8x
8x
8x
8x
8x
8x
8x
3/8/2019
about blank
Underground Sewer ft Water
Off- Road Equipment 45 Yards. Et
Over
King
Power Equipment Operators-
Hard Tail End Dump Articulating
$64.26
7A 3K 8X
Underground Sewer Et Water
Off-road Equipment Under 45
Yards
King
Power Equipment Operators-
Horizontal/ Directional Drill
$63.76
7A 3K 8X
Underground Sewer Et Water
Locator
King
Power Equipment Operators-
Horizontal/ Directional Drill
$64.26
7A 3K 8X
Underground Sewer Et Water
Operator
King
Power Equipment Operators-
Hydralifts/Boom Trucks Over 10
$63.76
7A 3K 8X
Underground Sewer Et Water
Tons
King
Power Equipment Operators-
Hydralifts/Boom Trucks, 10 Tons
$60.98
7A 3K 8X
Underground Sewer Et Water
And Under
King
Power Equipment Operators-
Loader, Overhead 8 Yards. Et
$65.48
7A 3K 8X
Underground Sewer Et Water
Over
King
Power Equipment Operators-
Loader, Overhead, 6 Yards. But
$64.83
7A 3K 8X
Underground Sewer Et Water
Not Including 8 Yards
King
Power Equipment Operators-
Loaders, Overhead Under 6 Yards
$64.26
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Loaders, Plant Feed
$64.26
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Loaders: Elevating Type Belt
$63.76
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Locomotives, All
$64.26
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Material Transfer Device
$64.26
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Mechanics, All (leadmen - $0.50
$65.48
7A 3K 8X
Underground Sewer Et Water
Per Hour Over Mechanic)
King
Power Equipment Operators-
Motor Patrol Graders
$64.83
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Mucking Machine, Mole, Tunnel
$64.83
7A 3K 8X
Underground Sewer & Water
Drill, Boring, Road Header And/or
Shield
King
Power Equipment Operators-
Oil Distributors, Blower
$60.98
7A 3K 8X
Underground Sewer Et Water
Distribution Et Mulch Seeding
Operator
King
Power Equipment Operators-
Outside Hoists (Elevators And
$63.76
7A 3K 8X
Underground Sewer Et Water
Manlifts), Air Tuggers, Strato
King
Power Equipment Operators-
Overhead, Bridge Type Crane: 20
$64.26
7A 3K 8X
Underground Sewer Et Water
Tons Through 44 Tons
King
Power Equipment Operators-
Overhead, Bridge Type: 100 Tons
$65.48
7A 3K 8X
Underground Sewer Et Water
And Over
King
Power Equipment Operators-
Overhead, Bridge Type: 45 Tons
$64.83
7A 3K 8X
Underground Sewer Et Water
Through 99 Tons
King
Power Equipment Operators-
Pavement Breaker
$60.98
7A 3K 8X
Underground Sewer & Water
King
Power Equipment Operators-
Pile Driver (other Than Crane
$64.26
7A 3K 8X
Underground Sewer Et Water
Mount)
King
Power Equipment Operators-
Plant Oiler - Asphalt, Crusher
$63.76
7A 3K 8X
Underground Sewer Et Water
King
Power Equipment Operators-
Posthole Digger, Mechanical
$60.98
7A 3K 8X
Underground Sewer Et Water
about:blank 12/17
3/8/2019
about:blank
King
Power Equipment Operators-
Power Plant
$60.98
7A
3K
8X
Underground Sewer Er Water
King
Power Equipment Operators-
Pumps - Water
$60.98
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Quad 9, Hd 41, D10 And Over
$64.83
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Quick Tower - No Cab, Under 100
$60.98
7A
3K
8X
Underground Sewer Et Water
Feet In Height Based To Boom
King
Power Equipment Operators-
Remote Control Operator On
$64.83
7A
3K
8X
Underground Sewer Et Water
Rubber Tired Earth Moving
Equipment
King
Power Equipment Operators-
Rigger and Bellman
$60.98
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Rigger/Signal Person, Bellman
$63.76
7A
3K
8X
Underground Sewer Et Water
(Certified)
King
Power Equipment Operators-
Rollagon
$64.83
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Roller, Other Than Plant Mix
$60.98
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Roller, Plant Mix Or Multi-lift
$63.76
7A
3K
8X
Underground Sewer Et Water
Materials
King
Power Equipment Operators-
Roto-mill, Roto-grinder
$64.26
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Saws - Concrete
$63.76
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Scraper, Self Propelled Under 45
$64.26
7A
3K
8X
Underground Sewer &t Water
Yards
King
Power Equipment Operators-
Scrapers - Concrete Et Carry All
$63.76
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Scrapers, Self-propelled: 45 Yards
$64.83
7A
3K
8X
Underground Sewer Et Water
And Over
King
Power Equipment Operators-
Service Engineers - Equipment
$63.76
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Shotcrete/Gunite Equipment
$60.98
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel , Excavator, Backhoe,
$63.76
7A
3K
8X
Underground Sewer Et Water
Tractors Under 15 Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoe: Over
$64.83
7A
3K
8X
Underground Sewer a Watei,
30 Metric Tons To 50 Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoes,
$64.26
7A
3K
8X
Underground Sewer Et Water
Tractors: 15 To 30 Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoes:
$65.48
7A
3K
8X
Underground Sewer & Water
Over 50 Metric Tons To 90 Metric
Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoes:
$66.15
7A
3K
8X
Underground Sewer Et Water
Over 90 Metric Tons
King
Power Equipment Operators-
Slipform Pavers
$64.83
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Spreader, Topsider Et Screedman
$64.83
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Subgrader Trimmer
$64.26
7A
3K
8X
Underground Sewer Et Water
King
Power Equipment Operators-
Tower Bucket Elevators
$63.76
7A
3K
8X
about blank
13/17
3/8/2019
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
about blank
about:blank
Underground Sewer Et Water
Power Equipment Operators-
Tower Crane Up To 175' In Height
$65.48
7A
Underground Sewer Et Water
Base To Boom
Power Equipment Operators-
Tower Crane: over 175' through
$66.15
7A
Underground Sewer Et Water
250' in height, base to boom
Power Equipment Operators-
Tower Cranes: over 250' in height
$66.80
7A
Underground Sewer >: Water
from base to boom
Power Equipment Operators-
Transporters, All Track Or Truck
$64.83
7A
Underground Sewer Et Water
Type
Power Equipment Operators-
Trenching Machines
$63.76
7A
Underground Sewer h Water
Power Equipment Operators-
Truck Crane Oiler/driver - 100
$64.26
7A
Underground Sewer Et Water
Tons And Over
Power Equipment Operators-
Truck Crane Oiler/Driver Under
$63.76
7A
Underground Sewer Et Water
100 Tons
Power Equipment Operators-
Truck Mount Portable Conveyor
$64.26
7A
Underground Sewer Et Water
Power Equipment Operators-
Welder
$64.83
7A
Underground Sewer Et Water
Power Equipment Operators-
Wheel Tractors, Farman Type
$60.98
7A
Underground Sewer Et Water
Power Equipment Operators-
Yo Yo Pay Dozer
$64.26
7A
Underground Sewer Et Water
Power Line Clearance Tree
Journey Level In Charge
$49.96
5A
Trimmers
Power Line Clearance Tree
Spray Person
$47.37
5A
Trimmers
Power Line Clearance Tree
Tree Equipment Operator
$49.96
5A
Trimmers
Power Line Clearance Tree
Tree Trimmer
$44.57
5A
Trimmers
Power Line Clearance Tree
Tree Trimmer Groundperson
$3__3.6.0
5A
Trimmers
Refrigeration Et Air Conditioning
Mechanics
Journey Level
$81.01
6Z
Residential Brick Mason
Journey Level
$57.32
5A
Residential Carpenters
Journey Level
$45.05
5D
Residential Cement Masons
Journey Level
$60.07
7A
Residential Drywall Applicators
Journey Level
$45.05
5D
Residential Drywall Tapers
Journey Level
$45.19
5P
Residential Electricians
Journey Level
$39.81
5Q
Residential Glaziers
Journey Level
$43.00
7L
Residential Insulation Applicators
Journey Level
$45.05
5D
Residential Laborers
Journey Level
$36.68
7A
Residential Marble Setters
Journey Level
$57.32
5A
Residential Painters
Journey Level
$42.50
6Z
Residential Plumbers 0 Fipefitters
Journey Level
$51.37
5A
Residential Refrigeration Et Air
Journey Level
$51.37
5A
Conditioning Mechanics
Residential Sheet Metal Workers
Journey Level (Field or Shop)
$50.01
7F
Residential Soft Floor Layers
Journey Level
$49.43
5A
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
3K
4A
4A
4A
4A
1G
1M
4_C
4U
4C
1E
2D
1H
4C
1H
1M
2B
1G
1G
1R
3J
8X
8X
8X
8X
8X
8X
8X
8X
8X
8X
8X
14/17
3/8/2019
Sheet Metal Workers
King
Residential Sprinkler Fitters (Fire
King
Protection),
King
Residential Stone Masons
King
Residential Terrazzo Workers
King
Residential Terrazzo/Tile
King
Finishers
King
Residential Tile Setters
King
Roofers
King
Roofers
King
Sheet Metal Workers
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship -Rep ir
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King
Shipbuilding Et Ship Repair
King Sign Makers Ft InsCalters
.(Electrical).
King Sign Makers a Installers (Non -
Electrical).
about:blank
about:blank
Journey Level
$48.18 5C 211
Journey Level $57.32 5A 1M
Journey Level $52.61 5A 1M
Journey Level $43.44 5A 1 B
Journey Level
Journey Level
Using Irritable Bituminous
Materials
Journey Level (Field or Shop)
New Construction Boilermaker
New Construction Carpenter
New Construction Crane Operator
New Construction Electrician
New Construction Heat Et Frost
Insulator
New Construction Laborer
New Construction Machinist
New Construction Operating
Engineer
New Construction Painter
New Construction Pipefitter
New Construction Rigger
New Construction Sheet Metal
New Construction Shipfitter
New Construction
Warehouse/ Teamster
New Construction Welder /
Burner
Ship Repair Boilermaker
Ship Repair Carpenter
Ship Repair Crane Operator
Ship Repair Electrician
Ship Repair Heat Et Frost Insulator
Ship Repair Laborer
Ship Repair Machinist
Ship Repair Operating Engineer
Ship Repair Painter
Ship Repair Pipefitter
Ship Repair Rigger
Ship Repair Sheet Metal
Ship Repair Shipwright
Ship Repair Warehouse /
Teamster
Journey Level
Journey Level
$52.61
5A
1 M
$51.52
5A
3H
$54.52
5A
3H
$82.51
7F
1E
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$73.58
5.1
4H
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36
7V
1
$36.36 7V 1
$44.95
7X
4J
$44.95
7X
4J
$44.06
7Y
4K
$44.95
7X
4.1
$73.58
5J
4H
$44.95
7X
4J
$44.95
7X
4J
$44.06
7Y
4K
$44.95
7X
4.1
$44.95
7X
4J
$44.95
7X
4.1
$44.95
7X
4J
$44.95
7X
4J
$44.06
7Y
4K
$49.70 0 1
$31.52 0 1
15/17
3/8/2019
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
8X
8X
8P
8X
8L
8L
L8L81-
8L
8L
about:blank 16/17
aboutblank
Soft Floor Layers
Journey Level
$49.43
5A
3.1
Solar Controls For Windows
Journey Level
$12.44
1
Sprinkler Fitters (Fire Protection)
Journey Level
$78.39
5C
1X
Stage Rigging Mechanics (Non
Journey Level
$13.23
1
Structural),
Stone Masons
Journey Level
$57.32
5A
1M
Street And Parking Lot Sweeper
Journey Level
$19.09
1
Workers
Surveyors
Assistant Construction Site
$62.71
7A
3K
Surveyor
Surveyors
Assistant Construction Site
$62.71
7A
3K
Surveyor
Surveyors
Chainman
$58.93
7A
3C
Surveyors
Construction Site Surveyor
$63.76
7A
3K
TetecommunicaLion Technicians
Journey Level
$50.57
7E
1E
Telephone Line Construction -
Cable Splicer
$41.22
5A
2B
Outside
Telephone Line Construction -
Hole Digger/Ground Person
$23.12
5A
2B
Outside
Telephone Line Construction -
Installer (Repairer)
$39.53
5A
2B
Outside
Telephone Line Construction -
Special Aparatus Installer 1
$41.22
5A
2B
Outside
Telephone Line Construction -
Special Apparatus Installer II
$40.41
5A
2B
Outside
Telephone Line Construction -
Telephone Equipment Operator
$41.22
5A
2B
Outside
(Heavy)
Telephone Line Construction _
Telephone Equipment Operator
$38.36
5A
2B
Outside
(Light)
Telephone Line Construction -
Telephone Lineperson
$38.36
5A
2B
Outside
Telephone Line Construction -
Television Groundperson
$21.92
5A
2B
Outside
Telephone Line Construction -
Television Lineperson/Installer
$29.13
�A
2B
Outside
Telephone Line Construction -
Television System Technician
$34.68
5A
2B
Outside
Telephone Line Construction -
Television Technician
$31.18
5A
2B
Outside
Telephone Line Construction -
Tree Trimmer
$38.36
5A
2B
Outside
Terrazzo Workers
Journey Level
$52.61
5A
1M
Tile Setters
Journey Level
$52.61
5A
1M
Tile, Marble Et Terrazzo Finishers
Finisher
$43.44
5A
1B
Traffic Control 5tripers
Journey Level
$46.23
7A
1K
Truck Drivers
Asphalt Mix Over 16 Yards
$54.30
5D
3A
Truck Drivers
Asphalt Mix To 16 Yards
$53.46
5D
3A
Truck Drivers
Dump Truck
$53.46
5D
3A
Truck Drivers
Dump Truck It Trailer
$54.30
5D
3A
Truck Drivers
Other Trucks
$54.30
5D
3A
8X
8X
8P
8X
8L
8L
L8L81-
8L
8L
about:blank 16/17
3/8/2019
King
King
King
King
King
Truck Drivers - Ready Mix
Truck Drivers - Ready Mix
Well Drillers ft Irrigation Pump
Installers
Well Dritters & Irrigation Pump
Installers
Well Drifters Et Irrigation Pump
Installers
about:blank
Booster 9 Yards and Over $52.78 5A 4T
Non -Booster Loads Under 9 Cubic $52.53 5A 4T
Yards
Irrigation Pump Installer $17.71 1
Oiler $12.97 1
Well Driller $18.00 1
about:blank 17/17
Benefit Co e e ffe ti e
************************************************************************************************************
Overtime Codes
Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate
must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for
the worker.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage.
C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage.
D. The first two (2) hours before or after a five -eight (8) hour workweek day or a four -ten (10) hour workweek day and
the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly
rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly
rate of wage.
E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day,
shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly
rate of wage.
G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four -
ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten
(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double
the hourly rate of wage.
H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment
breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through
Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate
of wage.
All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage.
The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid atone and one-half times the hourly rate of wage. All hours worked over ten (l 0) hours Monday through
Saturday, Sundays and holidays shall be paid at double the hourly rate of wage.
K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours
worked on holidays shall be paid at double the hourly rate of wage.
M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid
at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double
the hourly rate of wage.
N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage
All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Overtime Codes Continued
O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours
worked on Sundays, holidays and after twelve (12) hours, Monday through Friday and after ten (10) hours on Saturday
shall be paid at double the hourly rate of wage.
P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and
one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage.
Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall
be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times
the hourly rate of wage.
R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage.
S. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime
hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day
shall be paid at three times the hourly rate of wage.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on
Labor Day shall be paid at three times the hourly rate of wage.
V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and
one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at
double the hourly rate of wage.
W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the
employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid
at double the hourly rate of wage.
X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday
through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on
Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the
holiday and all work performed shall be paid at double the hourly rate of wage.
Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any
employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10
workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate
of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the
workweek shall be paid at the straight -time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or
40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours
worked on Sundays and Labor Day shall be paid at double the hourly rate of wage.
Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay.
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Overtime Codes Continued
2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage.
C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
holidays shall be paid at two times the hourly rate of wage.
F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday
pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage.
G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays
shall be paid at two and one-half times the hourly rate of wage including holiday pay.
H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall
be paid at one and one-half times the hourly rate of wage.
O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage.
R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double
the hourly rate of wage.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage.
W. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-
hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall
be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one and
one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays
shall be paid at double the hourly rate of wage.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours
worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday
and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and
midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall
have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given
to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked
eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such
time as the employee has had a break of eight (8) hours or more.
C. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage.
All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate
of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at
the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more.
3
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Overtime Codes Continued
E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of
straight time work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate.
F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and
one-half times the hourly rate of wage including holiday pay.
H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at
two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be
compensated at one and one half (1-1/2) times the regular rate of pay.
I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is
down due to weather conditions during a five day work week (Monday through Friday,) or a four day -ten hour work
week (Tuesday through Friday,) then Saturday may be worked as a voluntary make-up day at the straight time rate.
However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday
through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the
hourly rate of wage.
All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on
Saturdays shall be paid at a one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays
shall be paid at double the hourly rate of wage.
K. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal 5 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly
rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in
excess of twelve (12) hours in a single shift shall be paid at double the hourly rate of wage.
After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the
applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. When an employee
returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation
of shift and paid at the applicable overtime rate until he/she shall have the eight (8) hours rest period.
4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly
rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage.
B. All hours worked over twelve (12) hours per day and all hours worked on holidays shall be paid at double the hourly
rate of wage.
C. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be
paid at one and one half (i-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has
been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday
through Friday, the first two (2) hours of overtime after ten (l 0) hours of straight time work shall be paid at one and
one half (1-1/2) times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at
one and one half (1-1/2) times the straight time rate of pay, except that if the job is down on Monday through Friday
due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday
may be worked at the straight time rate of pay. All hours worked over twelve (12) hours in a day and all hours worked
on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay.
4
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Overtime Codes Continued
4. D. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly
rate of wage. All hours worked on Saturday, Sundays and holidays shall be paid at double the hourly rate of pay. Rates
include all members of the assigned crew.
EXCEPTION:
On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations, generating
plants, industrial plants, associated installations and substations, except those substations whose primary function is
to feed a distribution system, will be paid overtime under the following rates:
The first two (2) hours after eight (8) regular hours Monday through Friday of overtime on a regular workday, shall
be paid at one and one-half times the hourly rate of wage. All hours in excess of ten (10) hours will be at two (2) times
the hourly rate of wage. The first eight (8) hours worked on Saturday will be paid at one and one-half (1-1/2) times
the hourly rate of wage. All hours worked in excess of eight (8) hours on Saturday, and all hours worked on Sundays
and holidays will be at the double the hourly rate of wage.
All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the
hourly rate of wage.
E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours
worked after ten shall be paid at double the hourly rate of wage. The Monday or Friday not utilized in the normal four-
day, ten hour work week, and Saturday shall be paid at one and one half (1 %) times the regular shift rate for the first
eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays
shall be paid at double the hourly rate of wage.
F. All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium
rate of 20% over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the
hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage.
G All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
H. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day,
and all hours on Sunday shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid
at three times the hourly rate of wage.
The First eight (8) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All
hours worked in excess of eight (8) per day on Saturdays shall be paid at double the hourly rate of wage. All hours
worked on Sundays and holidays shall be paid at double the hourly rate of wage.
The first eight (8) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All
hours worked in excess of eight (8) hours on a Saturday shall be paid at double the hourly rate of wage. All hours
worked over twelve (12) in a day, and all hours worked on Sundays and Holidays shall be paid at double the hourly
rate of wage.
K. All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage, so long as Saturday
is the sixth consecutive day worked. All hours worked over twelve (12) in a day Monday through Saturday, and all
hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage.
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
L. The first twelve (12) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All
hours worked on a Saturday in excess of twelve (12) hours shall be paid at double the hourly rate of pay. All hours
worked over twelve (12) in a day Monday through Friday, and all hours worked on Sundays shall be paid at double
the hourly rate of wage. All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage,
except that all hours worked on Labor Day shall be paid at double the hourly rate of pay.
M. All hours worked on Sunday and Holidays shall be paid at double the hourly rate. Any employee reporting to work
less than nine (9) hours from their previous quitting time shall be paid for such time at time and one-half times the
hourly rate.
N. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays, and all work performed between the hours of midnight (12:00 AM) and eight AM (8:00 AM)
every day shall be paid at double the hourly rate of wage.
O. All hours worked between midnight Friday to midnight Sunday shall be paid at one and one-half the hourly rate of
wage. After an employee has worked in excess of eight (8) continuous hours in any one or more calendar days, all
additional hours shall be at the applicable overtime rate until such time as the employee has had a break of six (6)
hours or more. All hours worked on Holidays shall be paid at double the hourly rate of wage.
P. All hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage.
Q. The first four (4) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday
through Saturday shall be paid at double the hourly rate. All hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
R. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is
the sixth consecutive day worked. All hours worked on Sundays and holidays shall be paid at double the hourly rate
of wage.
All hours worked on Saturdays and Holidays shall be paid at one and one-half times the hourly rate of wage. All hours
worked on Sundays shall be paid at double the hourly rate of wage.
T. The first two (2) hours of overtime for hours worked Monday -Friday shall be paid at one and one-half times the hourly
rate of wage. All hours worked in excess of ten (10) hours per day shall be paid at double the hourly rate of wage. All
hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. For work on Saturday which
is scheduled prior to the end of shift on Friday, the first six (6) hours work shall be paid at one and one-half times the
hourly rate of wage, and all hours over (6) shall be paid double the hourly rate of wage. For work on Saturday which
was assigned following the close of shift on Friday, all work shall be paid at double the hourly rate of wage.
U. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. (Except on makeup days if work is lost due to inclement
weather, then the first eight (8) hours on Saturday may be paid the regular rate.) All hours worked over twelve (12)
hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly
rate of wage.
Holidav Codes
A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, and Christmas Day (7).
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, the day before Christmas, and Christmas Day (8).
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Holidav Codes Continued
C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the
Friday after Thanksgiving Day, And Christmas Day (8).
D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8).
H. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanksgiving Day,
And Christmas (6).
I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6).
Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day,
Christmas Eve Day, And Christmas Day (7).
K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9).
L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, Friday after Thanksgiving Day, And Christmas Day (8).
N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (9).
P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday
After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The
Following Monday Shall Be Considered As A Holiday.
Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas
Day (6).
R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgiving Day, One -Half Day Before Christmas Day, And Christmas Day. (7 1/2).
S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
And Christmas Day (7).
T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9).
Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the
Friday after Thanksgiving Day, And Christmas Day (8).
A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
the Friday after Thanksgiving Day, And Christmas Day (8).
E Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half -
7
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Day On Christmas Eve Day. (9 1/2).
Holiday oliday Codes Continued
6. G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day,
Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Christmas Eve
Day (11).
H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10).
1. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday
After Thanksgiving Day, And Christmas Day (7).
6. T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And
Christmas Day (9).
Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the
holiday.
7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed
As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall
be a regular work day.
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as
a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be
observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday
on the preceding Friday.
D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day,
the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday
which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a
Saturday shall be observed as a holiday on the preceding Friday.
E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.
8
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Holidav Odes Continued
H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving
Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any
holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on
a Saturday shall be observed as a holiday on the preceding Friday.
Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The
Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6).
Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which
falls on a Saturday shall be observed as a holiday on the preceding Friday.
K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after
Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day
before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday
on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday.
M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, And the Day
after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the
following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday.
P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday.
Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (8). Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the
preceding Friday shall be a regular work day.
R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day
after or before Christmas Day (10). If any of the listed holidays fall on Saturday, the preceding Friday shall be observed
as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a
holiday and compensated accordingly.
S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, Christmas Day, the Day after Christmas, and A Floating Holiday (9). If any of the listed holidays
falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly.
0
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Holiday Codes Continued
T. Paid Holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and The Day
after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the Nation
shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed
as a holiday on the preceding Friday.
V. Holidays: New Year's Day, President's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
the Friday after Thanksgiving Day, Christmas Day, the day before or after Christmas, and the day before or after New
Year's Day. If any of the above listed holidays falls on a Sunday, the day observed by the Nation shall be considered
a holiday and compensated accordingly.
W. Holidays: New Year's Day, Day After New Year's, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, the Friday after Thanksgiving Day, Christmas Eve Day, Christmas Day, the day after Christmas, the day before
New Year's Day, and a Floating Holiday.
X. Holidays: New Year's Day, Day before or after New Year's Day, Presidents' Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after
Christmas day. If a holiday falls on a Saturday or on a Friday that is the normal day off, then the holiday will be taken
on the last normal workday. If the holiday falls on a Monday that is the normal day off or on a Sunday, then the holiday
will be taken on the next normal workday.
Y. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the
Friday after Thanksgiving Day, and Christmas Day. (8) If the holiday falls on a Sunday, then the day observed by the
federal government shall be considered a holiday and compensated accordingly.
Z. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The
Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a
holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
15. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the day before Christmas Day and Christmas Day. (8) Any holiday which falls on a Sunday shall
be observed as a holiday on the following Monday.
B. Holidays: New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Independence Day, Labor
Day, Veteran's Day, Thanksgiving Day, and Christmas Day. (9)
C. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the day before Christmas Day and Christmas Day. (8)
D Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday
after Thanksgiving Day, Christmas Day, and the day after Christmas.
10
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Note Codes
D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour.
L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And
Level C: $0.25.
M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D:
$0.50.
N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level
C: $0.50, And Level D: $0.25.
P. Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: $2.00, Class B Suit: $1.50,
Class C Suit: $1.00, And Class D Suit $0.50.
Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the
shift shall be used in determining the scale paid.
R. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting
or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal
of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian
traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control
Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the
State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012.
S. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting
or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic
Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued
by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31,
2012.
T. Effective August 31, 2012 — A Tiaffic Cuutiul Labuiei pei futuis the setup, maintenance and ieuiuval of all temporary
traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during
construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or
where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of
Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012.
U. Workers on hazmat projects receive additional hourly premiums as follows — Class A Suit: $2.00, Class B Suit: $1.50,
And Class C Suit: $1.00. Workers performing underground work receive an additional $0.40 per hour for any and all
work performed underground, including operating, servicing and repairing of equipment. The premium for
underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive
an additional $0.50 per hour. The premium for work suspended shall be paid for the entire shift worked. Workers who
do "pioneer" work (break open a cut, build road, etc.) more than one hundred fifty (150) feet above grade elevation
receive an additional $0.50 per hour.
11
Benefit Code Key — Effective 3/3/2019 thru 8/30/2019
Note Codes Continued
V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The
premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day.
The premiums are to be paid one time for the day and are not used in calculating overtime pay.
Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. Over
101' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220'- $4.00 per foot for each foot over 220 feet.
Over 221' - $5.00 per foot for each foot over 221 feet.
Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent
and is measured by the distance travelled from the entrance. 25' to 300' - $1.00 per foot from entrance. 300' to 600'
- $1.50 per foot beginning at 300'. Over 600' - $2.00 per foot beginning at 600'.
W. Meter Installers work on single phase 120/240V self-contained residential meters. The Lineman/Groundmen rates
would apply to meters not fitting this description.
X. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit:
$1.50, Class C Suit: $1.00, and Class D Suit: $0.50. Special Shift Premium: Basic hourly rate plus $2.00 per hour.
When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a
government agency or the contract specifications requires that work can only be performed outside the normal 5 am
to 6pm shift, then the special shift premium will be applied to the basic hourly rate. When an employee works on a
special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time
status. (For example, the special shift premium does not waive the overtime requirements for work performed on
Saturday or Sunday.)
12