Loading...
6a- 2018 – 2023 Transportation Improvement PlanCIT Federal Wa 2018-2023 Transportation Improvement Plan Presentation to City Council Presented by Rick Perez, P.E. City Traffic Engineer 9/4/2018 CIT Federal Wa 2018-2023 Transportation Improvement Plan Policy Question: Should the Council authorize staff to proceed with the adoption of the 2018-2023 City of Federal Way Transportation Improvement Plan and Arterial Street Improvement Plan on June 20, 2017? 9/4/2018 2 CIT Federal Wa 2018-2023 Transportation Improvement Plan • Outlines 6-year plan for transportation - related capital projects • Updated annually • Requirement for grant eligibility • Must be "financially constrained" • Must conform to air quality requirements • Adopted after a public hearing 9/4/2018 -' CIT Federal Wa 2018-2023 Transportation Improvement Plan Prioritization Criteria -NEW! • Level of Service Improvement • Number of Collisions • Collision Rate Improvement • Collision Severity Rate Improvement • HOV Supportive • Non -Motorized Supportive • Community Support • Air Quality • Ease of Implementation • Benefit/Cost Ratio 9/4/2018 M CIT Federal Wa 2018-2023 Transportation Improvement Plan Impacts of Revised Prioritization Criteria • Removal of several concurrency-driven projects • Non -motorized projects ranking similarly to capacity proj ects • Highest-ranking projects typically address safety, capacity, and non -motorized needs • Rankings not necessarily consistent with criteria for grant - funding programs 9/4/2018 G CIT Federal Wa _ S 272nd St 99j ""dS Ar s;el Sound �509 S 3 4th i 5W 312th St 19! 1If, lal,� sW356t -- z u A r o� a i J lcomplanl ran ortaticnVVpla _mxd�- 9/4/2018 Lade Cieeet" i Tt�ttf 1"— L<,r i City of Federal Way 2018-2023 Transportation Improvement Plan (Draft) Legend • Intersection Improvement Non -Motorized Improvement Overlay Improvement Roadway Improvement Original Map Date: May, 2017 City of Federal Way, 33325 8th Ave S, Federal Way, WA 98003 (253)835-7000 a as N Miles CITY OF Federal Way This map is accompanied by no warranties, and is simply a graphic representation. [6- CIT Federal Wa 2018-2023 Transportation Improvement Plan Completed Projects (2016) • S 304t'' St & 28t' Ave S • 1StAveS&S328thSt • S 288th St Preservation: Military Rd S — I-5 • S 324th St Preservation: SR 99 — S 322nd St 9PVRWyS@S316thSt 9/4/2018 7 CIT Federal Wa 2018-2023 Transportation Improvement Plan Removed Projects • 1 Oth Ave SW at SW Campus Dr; SB RT lane • SW 344th St: 12th Ave SW — 21 St Ave SW; Extension • SR 99 @ S 312th St; 2nd NB LT lane • SR 161 @ S 3 5 6th St; 2nd NB LT lane • Weyerhaeuser Wy S @ S 344th Wy; roundabout • 8th Ave S: S 312th St — S 315th St; sidewalk • S 314th St: 20th Ave S — 23rd Ave S; sidewalk • S 3 3 6th St: SR 99 — 20th Ave S; sidewalk • 26th Ave SW: SW 327th St — SW 330th St; sidewalk 9/4/2018 8 CIT Federal Wa 2018-2023 Transportation Improvement Plan Modified Project #5 & 17: SW 340th S Project split into 3 phases to improve ability to fund Third phase not on T 9/4/2018 CIT Federal Wa 2018-2023 Transportation Improvement Plan New Projects #15: Military Rd S 9/4/2018 Star Lake Rd — I EB RT lane, side Public Works: -.�,,di Streets • Traffic • Development Services Solid Waste • Surface Water Management A CIT Federal Wa 2018-2023 Transportation Im rmramonf Plan New Projects #14:16thAve S: SR 99 - SR 18 - overlay (contingent on grant funding) 9/4/2018 Public Works: i Streets • Traffic • Development Services Solid Waste • Surface Water Management Public Works: -.�,,di Streets • Traffic • Development Services Solid Waste • Surface Water Management Ah 1 1� U I [: Public Works: O Streets • Traffic -aDevelopment Services Solid Waste • Surface Water Management i a U I [: ai vvayl 20 ;nortatic Public Works: Streets • Traffic • Development Services Solid Waste • Surface Water Management • .-0 0 1 CIT Federal Wa 2018-2023 Transportation Improvement Plan Additional Questions: 1. Project 1 a: City Center Access Phase 1 Environmental. 2. 47th Ave SW g SW 320th St. 9/4/2018 17 CIT Federal Wa 2018-2023 Transportation Improvement Plan Options Considered: 1. Recommend approval of the resolution adopting the 2018— 2023 Transportation Improvement Plan and Arterial Street Improvement Plan as presented at the June 20, 2017 Public Hearing. 2. Do not recommend approval of the draft document and provide direction to staff. 9/4/2018 M CIT Federal Wa 2018-2023 Transportation Improvement Plan Mayor's Recommendation Approve the resolution adopting the 2018— 2023 Transportation Improvement Plan and Arterial Street Improvement Plan as presented. 9/4/2018 19